Daily Mechanical Activities Log

The mechanical activities log documents the work done by various mechanical department staff on different dates. It includes activities like replacing bearings, working on RO system pumps, load cells, tensile testing, induction heaters, rolling machine rings, gear motor seals, quench oil reservoirs, flame torches, pumps, load cell platforms, and repairs to various machines. The key people mentioned are Agha, Waleed, Hammad, Khalid and their work on machines like CM1-9, Rolling 1-2, and other equipment is summarized.

Uploaded by

Nazar Fareed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views18 pages

Daily Mechanical Activities Log

The mechanical activities log documents the work done by various mechanical department staff on different dates. It includes activities like replacing bearings, working on RO system pumps, load cells, tensile testing, induction heaters, rolling machine rings, gear motor seals, quench oil reservoirs, flame torches, pumps, load cell platforms, and repairs to various machines. The key people mentioned are Agha, Waleed, Hammad, Khalid and their work on machines like CM1-9, Rolling 1-2, and other equipment is summarized.

Uploaded by

Nazar Fareed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Mechanical Activities log

Date:-05-04-23

 Agha shb has replaced the Bearing numbers (6204 And 6205) Of coiler in CM 1 machine.
Mechanical Activities Log

Date: -06-04-23

 Waleed is working on RO system pump flange leakage.


Timeframe:- 2 hours.
 Waleed is deputed on load cells activity of CM6 to CM9 after leakage activity
Cleared.
 Agha shb is working on rings (spare) includes boring, dia, thickness and heat
processing (Time 11:30 AM)
 Khalid shb is working on development work regarding tensile testing (Time 11:00
AM).
Mechanical Department Activities

Date:-08-04-23

 Khalid shb starts working on stands of induction heaters by 10:30 AM.


 Agha shb starts work on rings of rolling machines by 11:00.
 Waleed starts work preparation for load cells of CM6 TO CM9.
 Hammad is working on CM 2 for manage gear oil leakge work.
Mechanical Department Activities

Date:- 09-04-23

 Waleed starts working on the load cells activity. He starts the activity of platform
preparation for load cells.
 Hammad is working on CM3 gear motor seal replacement.
 Agha is working on CM3 gear motor seal replacement and working on Rolling 1 bearing
replacement.
Mechanical Department Activities

Date :- 10-04-23

 Agha is working on air pressure valve in CM5.


 Agha is working on Quench oil reservoir tenkey in CM2.
 Agh is working on feed roll grinding cutter for making handle system for it.
 Seal Replacement work at CM3 has done.
Mechanical Department activities

Date:- 12-04-23

 Hammad is working on gear motor seal replacement at CM5.


 Waleed is working on load cells activity of CM9.
 Agha shb working activities includes inspection and fitting of quench oil reservoir
tankey.
 Agha is also working on development project spindle rings facing, thickness and
boring.
Mechanical Maintenance Activities

Date:- 13-04-23

 Waleed starts working on fabrication platform for load cells of CM 8.


 Hammad is working on PW13 torch flame work for install one flame torch.
 Agha is working on pipe roll feed cutter for unbalance issue.
Mechanical Department Activities

Date: - 15-04-23

 Agha is working on rings of spindle machines and cutter machine.


 Hammad is working on flame torches and pump assembly.
Mechanical Department Activities

Date:-17-04-23

 Hammad is working on punch of cutting machine 3 due to breakup.


 Hammad changes the flame torch of CM1
 Agha replaces the seals of CM1.
 Hammad is fitting the pumps of water circulation system.
 Waleed is testing and inspecting the loadcell platform.
Mechanical Department Activities

Date:-18-04-23

 Hammad is working on CM4 flame torch replacement.


 Agha is working on CM3 machine gear motor and waleed is working on
Load cells related to tensile testing machine.
Mechanical Activities log

Date:-08-05-23

 Agha shb is working on rolling 2


 Waleed and Hamaad are working on cm 8-9.
 Khalid shb is working on roll set.
 Nazar Fareed is working on Qc questionare and demand draftings.
 Nazar fareed is working on gears cm 8-9
Mechanical Activities log

Date:-09-05-23
Feeder fitting done by Hammad shb and Waleed shb
Gears done by Nazar Fareed
Die stands are in progress under Waleed shb
Haji shb is working on rolls set
Manual batch track started
Demand log started
Carbide tips are in progress by Hammad shb
Mechanical Activities log

Date:-10-05-23
Hammad shb is working In workshop cleanings
Machine 2 torch replaced by hammad
Waleed shb is working on pw 1 for repairing of roll set
Pw 3 is repaired by Nazar fareed
Hammad leaves due to accident
Cmpw 1 is fitted coiler speed changed and induction machine is replaced frommachine no 5
to 1
Pw3 again repaired by nazar
Mechanical Activities log

Date:-11-05-23
Hammad shb is working on torch set.
Pw11 and pw13 water pipe brusted repaired by habib
Electric team is working on cm 8-9 electrical commissioning.
Hammad shb started working on tips and wire supports
Waleed shb is working on cutting machines of cm8-9
Waleed shb shifted to cutting 1 reapirence.
Mechanical Activities log

Date:-13-05-23
Aftab agha fixed the coiler issue for PW11
Hammad is working on tips and supports
Hammad shifted to die punch repairence
Waleed shb working on cm cutting machine fitting
Waleed shb shifted to conversion of cm machines.
Mechanical Activities log

Date:-13-05-23
Hammad is working on tips and supports
Hammad shifted to die punch repairence
Waleed shb is working on cm alignments.
Mechanical Activities log
Dated : 15-05-23

Hammad and waleed both absent


Aftab agha fixed the cutting 3 gear problem then shifted to routine work
Mechanical Activities log

Date:-16-05-23
Hammad shb replaced torches of pw11-12
Hammad and waleed is working on cm8-9
Agha shb is working on rolls
Waleed shb shifted to rolling 2 payoff work
Hammad shifted to cutting machines