0% found this document useful (0 votes)
203 views6 pages

JTB Rjjif1 Ve Lay 900 00001

This document provides the layout for the temporary cathodic protection of the Gas Development Project for the Unitization of the Jambaran-Tiung Biru Field in Indonesia. It includes a revision history, table of contents, scope, definitions, and the enclosed layout drawing. The layout drawing shows the location of the various components of the temporary cathodic protection system, including test stations, cables, and pipeline markers. It has undergone four revisions to add more detail to the drawing and move some portions to other documents.

Uploaded by

SaBilScond
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
203 views6 pages

JTB Rjjif1 Ve Lay 900 00001

This document provides the layout for the temporary cathodic protection of the Gas Development Project for the Unitization of the Jambaran-Tiung Biru Field in Indonesia. It includes a revision history, table of contents, scope, definitions, and the enclosed layout drawing. The layout drawing shows the location of the various components of the temporary cathodic protection system, including test stations, cables, and pipeline markers. It has undergone four revisions to add more detail to the drawing and move some portions to other documents.

Uploaded by

SaBilScond
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

GAS DEVELOPMENT PROJECT

FOR THE UNITIZATION OF


THE JAMBARAN-TIUNG BIRU FIELD

Document Title : Layout for Temporary Cathodic Protection


Document No : JTB-RJJIF1-VE-LAY-900-00001

Vendor Name : PT Indocast Fransasia Sejahtera


Package Description : Cathodic Protection System
Tag No : 900-CPRE-0001
Purchase Order Number : JTB-RJJ000-EO-XEP-900-00061
Vendor Code : IF1
Vendor Rev. No. : 4

16/12/20
16/12/20

VENDOR/SUBCONTRACT
CONTRACTOR COMPANY
OR
REV. DESCRIPTION DATE
PREPARED CHECK APPD CHECK APPD CHECK APPD

4 Re-Issued For Construction 25 Sep 20 SKN SSU AAH


3 Re-Issued For Construction 14 Jan 20 SA SSU AAH
2 Re-Issued For Construction 09 Aug 19 UMM SSU AAH
1 Issued For Construction 24 Jun 19 UMM SSU AAH
0 Issued For Construction 25 Apr 19 UMM SSU AAH
C Issued For Approval 18 Mar 19 UMM SSU AAH

CONTRACTOR/VENDOR Document No :
Contract No :4650000076 PAGE 1 OF 6
JTB-RJJIF1-VE-LAY-900-00001
PERTAMINA EP CEPU
REVISION HISTORICAL SHEET

Rev. Date Section Description

C 18 March 2019 IFA Issued for Approval


0 25 April 2019 IFC Issued for Construction
1 24 June 2019 IFC Issued for Construction
2 09 August 2019 IFC Re-Issued for Construction
3 14 January 2020 IFC Re-Issued for Construction
4 25 September 2020 IFC Re-Issued for Construction

Document No : JTB-RJJIF1-VE-LAY-900-00001
Revision :4
Vendor Doc. No. : A-2018-0196-0040-LAY Page 2 of 6
TABLE OF CONTENTS

1. SCOPE

2. DEFINITION AND ABBREVIATIONS

3. LAYOUT FOR TEMPORARY CATHODIC PROTECTION

Document No : JTB-RJJIF1-VE-LAY-900-00001
Revision :4
Vendor Doc. No. : A-2018-0196-0040-LAY Page 3 of 6
Description of Change

Section
Description of Change Consortium Response Rev
Affected

Page 6 of 6 Drawing Layout – to add tag big fink and tag no


1
cable: added
Page 6 of 8 a) Drawing Layout – to Add hazardous test station:
3
added
b) CPTP9061-01: revised
c) 610-CPTP9061-01- non hazardous: revised
d) Kp 0+143: revised
e) 620-CPTP9061: revised
f) -hazardous: revised
g) kp 0+049: revised

Drawing Layout – to add drawing condensate


Page 7 of 8 3
pipeline for pipe: added
Drawing Layout – to add drawing Gas Processing
Page 8 of 8 3
Fasilities for casing: added
Harzadous Type : added
Page 6 of 6 4
Non-Harzadous Type : added
KP 4+450, KP 5+298 & KP 11+290 : added

Page 7 of 8 The drawing moves to the document no. JTB- 4


RJJIF2-VE-LAY-630-00002 Rev. 0

Page 8 of 8 The drawing moves to the document no. JTB- 4


RJJIF2-VE-LAY-630-00003 Rev. 0

Document No : JTB-RJJIF1-VE-LAY-900-00001
Revision :4
Vendor Doc. No. : A-2018-0196-0040-LAY Page 4 of 6
1. SCOPE
This document covers Layout for Temporary Cathodic Protection of GAS DEVELOPMENT PROJECT FOR
UNITIZATION OF THE JAMBARAN – TIUNG BIRU FIELD, owned and operated by PT PERTAMINA EP CEPU
(Persero) Indonesia.

2. DEFINITION AND ABBREVIATIONS


COMPANY Pertamina EPC Cepu
CONTRACTOR Consortium Rekayasa Industri, JGC Corp & JGC Indonesia
DFO Documentation for Operation
FD Final Delivery Documentation
ED Early Delivery Documentation
VMC Vendor Mechanical Catalog
MRB Manufacturing Record Book
PO Purchase Order

3. LAYOUT FOR TEMPORARY CATHODIC PROTECTION

(SEE ENCLOSED)

Document No : JTB-RJJIF1-VE-LAY-900-00001
Revision :4
Vendor Doc. No. : A-2018-0196-0040-LAY Page 5 of 6
1 2 3 4 5 6 7 8 9 10 11 12
NOTES

E. 575 000

E. 580 000
E. 570 000
Bojonegoro

Cepu pos

1906 Mtr End


Ramp
of
SECURITY
End
End
of
Start
of
Ramp

of
Ramp of
Ramp Ramp
End
FUTURE
of
BOJONEGOR
Start
EXISTING
Ramp ROAD
ROAD
O
BH-17
S-20

water
Pipeline

KA
FUTURE TRACK
ROAD MCL
BOUNDARY
EXISTING
FUTURE LINE
StartROADROAD
CEPU
FUTURE

of
ROAD
Ramp
BOUNDARY Start
Ramp

of
LINE

PEPC39

N. 9 207 500
water
Pipeline
±

9 210 000
BM
N
E 575519.494
OF-3
9207645.169
TUNNEL
SECURITY
ACROSS
SITEINSPECTION NEW
ACCESS UNDER
KAMPUNG
BOUNDARY ACCESS
EMBANKMENT
WITH
BOUNDARY
STONE TRACK
ROAD
ACCESSACCESS
PEMBANGUNA
FLY
VILLAGE LINE EXISTING
OVER MASONRY
TO
LINE
(ACCESSWAYTRACK BE
PROTECTED
POWER
BOUNDARY ROAD
DRILLING(SHOULDER)CABLEN
(SHOULDER)
(BYKAMPUNG
ANDROAD) PLN)
DESA ROUTE
WATER
LINE SERVICE NGAYAMACCESS
LINE
PRIMARY
REDUNDANCY
FIRE
(BYCABLES
WATER
WAY
OTHER)
KEBUN
INSTRUMENT
LINE
INSTRUMENT
TEBU
& POTABLE
DESA CABLE
DESA CABLE
WATER
BONOREJO KOLAMSENDANG
NGAYAM
LINE
OKO

KEBUN

H H
JTB-24
34.64 JATI

JTB-23
35.79 SECURITY
CHECK
1.4857 KEBUN

METERING LOCATION
TEBU

DETAIL 2 (Harzadous Type) DETAIL 3 (Non-Harzadous Type)


DCF
(DRILLING
CAMP
FACILITY)

WARE
HOUSE

MAIN
E.
GATE 5.420.906
(6
TELECOMUNIC
TF
TRIPATRA X 16
M)
PEPC38 ATION
PEPC38
PEPC-38 TOWER

FENCE
PEPC37 LINE
PEPC-37

9 209 500 KOLAM


FENCE
LINE

PI
E
P E 01
#

SL
EE
SLOPE
CULVERT
TRUCK
UNLOADING
AREA
FENCE
LINE

FLOWLINE

#
0.5% PE FROM
R WELLPAD

02
R "AC"
JTB-22
31.50 L
B ACCES

BANYU URIP CPF

C
WALKWAY FLOW
FLOW ACCES
JTB-21
31.44 MANIFOLD
FLOWLINE LINE
LINETO WALKWAY TO
EL.(+) CPF U LP. FGL FSPA-070
PARKING "B" FLARE FSPA-068
FSPA-069
+38.906
33.906 DRAINAGE TO FSPA-067
FSPA-066
AREA MSL N. HP. FSPA-064
FSPA-065
5.906.906 FSPA-062
FSPA-063

LC LC E.
Tag number
DITCH FLARE FSPA-060
FSPA-061 LOCAL
FSPA-059
FSPA-058 PIT
5.906.906 FSPA-057 CHEMICAL
PLAN T FSPA-055
FSPA-056
FSPA-054 LOADING FLARE
FSPA-052
FSPA-053
DATUM FSPA-051
FSPA-050 12
3467
5 111315
89
FSPA-049
FSPA-048 H PIT

1
120
14
16
N. FSPA-047 SLOPE

H
205 9 FSPA-045
FSPA-046
FSPA-043
FSPA-044 0.5%
802.500 FSPA-042
FSPA-041
FSPA-040
FSPA-039
FSPA-036
FSPA-038
FSPA-037
FSPA-035 RAMP
E. U FSPA-034
FSPA-033
FSPA-031
FSPA-032FSPA-015
FSPA-014 DOWN
FSPA-012
FSPA-013 F.G.L.EL.+34.2
576 FSPA-010
FSPA-011
194.787 #A3
#A5
FSPA-009 FLOW
#A4
#A2
#A1
FSPA-007
FSPA-008
BU#03
BU#01
# FSPA-006
FSPA-005 LINE 00
FSPA-003
FSPA-004 CROSSING
FSPA-001
01 FSPA-002
SHARE SSPA-011
SSPA-012
F
SSPA-009
SSPA-010
LINE SSPA-007
SSPA-008
SSPA-005
SSPA-006
V553100
SSPA-003
SSPA-004
2 SSPA-001
SSPA-002

#0
F.G.L+40.906
BOX
CULVERT

FLOWLINE

WP27 "C"
WP28
Power
Line

WP26
Power
GARIS Line
BATAS
RENCANA

9 209 000
P25

W
PEPC-36

Steel angle

W
POND
Power PEPC-35
Line

SALES GAS METERING


(F.FL)
30.8
30.6
30.6
PUMP
(F.FL)
30.8(F.FL)
(F.FL)
HOUSE 1:4
EL.+50.00 U/G
A45C
STA.
EL.+48.00
IP 3 EL.+50.00
A/G
A9J
EL.+49.00
02+450
1:4 EL.+50.00
EL.+50.00
EL.+49.00
EL.+48.00
R
R EL.+46.00
EL.+47.00
1:5.0R

R
CATHODIC PROTECTION EL.+44.00
1:3.0
1:3.0
1:5.0
1:5.0

R
TEST POINT EL.+39.00
1:5.0
1:5.0
EL.+39.00

R EL.+39.00

XXX-CPTPXXXX EL.+47.00
EL.+44.00
EL.+44.00
EL.+49.00
BARRIER

R
XXXX XXXX XXXX R
R
PCF-09

IN-PLANT PIPING SENDANG


KERAMAT

IP
4

R
WP21 JTB-19
JTB20

W
W

STATION
JTB-20 EL.+43.00
P20

W
IP 6
1:4 EL.+50.00
AVIATION
1:4
P19
IP BUILDING

I
5
AVTUR
W18
P SHELTER

S
MOJO
DELIK

W17
P

9 208 500
PEPC-34PEPC-33

WP14

P13
W

P12

Nickel brass cable gland


P11

P10

P9

P8
CATHODIC PROTECTION
TEST STATION BOX
KE
BOJONEGOR

CPTP-XXX JTB-18
perhutani
O
perhutani
JTB-17
47 26
P5
KE
BANDUNG

TP
REJO perhutani

perhutani

pht1
perhutani

Tag number
perhutani

Neo gum sealer 01


perhutani
PEPC-31

PEPC-32
AD2

perhutani

AD1

N. 9 202 500
AD0

9 208 000
perhutani

perhutani
wajib
BR14.1
mojodelik
perhutani
(1)
perhutani
perhutani
BR13.1
perhutani

perhutani
BR12
PEPC30
PEPC-29
PEPC-30
PEPC29

U'clamp with bolt and nut SS316 53.99 PEPC-27


55.48
PEPC-28

PVC pipe dia 3", L = 1.5 mtr TP


51.89
JTB-16
52.78
JTB-15

S-14

02 JTB EAST
9 207 500 PEPC-26
PEPC-25

PEPC-24
PEPC-23

Hot dipped galvanized u'channel PEPC-22


PEPC-21

1" conduit 9 207 000 TP BM02


70.97 GPF
JTB-14
JTB-13
70.92

S-26

JTB CENTRAL
Ke

03
Gayam
Jalan
Ke 69.78
TB05 Perhutani
71.69
Wellpad Ke TB06
PEPC-19
PEPC-20 Bandung
01 Sawit

S-11
BH-5
S-13 PEPC-17
PEPC-18
GPS-JTB005
S-12
BH-4
57.86
PIT#3

Hot dipped galvanized steel


PIT#2
MUD
MUD
CUTTING
CUTTING
PIT#4
PIT#5
PIT#PIT#
GPS-JTB006
MUDMUD
Flare
CUTTING
56.09 CUTTING
PIT#PIT#

Pit
#
PEPC-16

PEPC-15

BH-6
S-15

49.50
BH-16
S-8
S-7
JTB-11
50.20 BH-15

kali gandong
G
S-19
BH-14 Rumah
Pos

GAS PRODUCTION
JagaGenset
JTB-12
50.30

9 206 500
Hutan jati PEPC-13
PEPC-14
kali
gandong

Hutan jati

gandong
kali
FACILITIES (GPF)
Hex dyna bolt SS316 TP
PEPC-12

PEPC-11

04
BH-18
BH-9
S-16
BH-10
S-17

PEPC-09
S-18

N. 9 197 500
GPS-JTB003
75.07

GPS-JTB004
74.96

100 100 9 206 000


TP
9 205 500 05

Concrete Concrete
400 500 400 500
9 205 000 NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
9 204 500 TP
06
Cable to pipe UNLESS OTHERWISE STATED
HMWPE 1x10 sqmm 2. SYMBOL
500 500 9 204 000 TP
Cable to pipe Cable mg anode Cable mg anode 07 xxx-CPTP9xx
HMWPE 1x10 sqmm XLPE/PVC 1x10 sqmm XLPE/PVC 1x10 sqmm TP
9 203 500 08
SQUENCE NUMBER
DETAIL 1 TEST POINT
F DETAIL 1 CODE AREA F
9 203 000
A -
-
CENTRAL WELLPAD AREA
EAST WELLPAD AREA
= 211
= 212
TP
- SALES GAS METERING = 710
9 202 500 09
- GAS PROCESSING FACILITIES =232
3. TEST POINT (TP) WILL BE USED FOR BOTH SACRIFICIAL ANODE
9 202 000 AND IMPRESSED CURRENT (PERMANENT SYSTEM)
TP
10
1 (one) or 2 (two) or more anodes A 1 (one) or 2 (two) or more anodes VIEW A-A 9 201 500
LEGEND
TP

Stahl EExe II T6 IP66 SS316L 9 201 000 11 TP


12
Box test station Big fink (Polycarbonate) test station
Bolt and nut Cable shoe 9 200 500 TP
13
SS316 Busbar Copper Link EAST TP
14
E Thermitwelding
1 3
Terminal of test point 9 200 000 WELLPAD E
Royston handycap Weidmuller EExe II Cable tag 2

Terminal WFF 35 number 4 5 Heat shrink sleeve 20cm (blue color)


Wrapping tape 9 199 500
6 7
Surface coating Slotted din rail
9 199 000 GAS PROCESSING
Stainless steel FACILITIES
Cable mg anode CENTRAL
Pipeline wall Base plate 9 198 500
Cable to pipe XLPE/PVC 1x10 sqmm WELLPAD
Heat shrink sleeve HMWPE 1x10 sqmm
(Blue color) Ground connection 9 198 000
DETAIL 1 CATHODIC PROTECTION
TEST STATION BOX
JTB-SF-E-SPE-900-90622 SPECIFICATION FOR CATHODIC PROTECTION SYSTEM
PVC pipe 3" JTB-SF-E-DBS-900-90601 ELECTRICAL DESIGN BASIS
9 197 500 JTB-RJJIF1-VE-CAL-620-90601 DESIGN CALCULATION FOR TEMPORARY SACP FOR PIPELINE SALES GAS M

DETAIL 2 DETAIL 3

578 500
574 500

575 000

575 500

576 000

576 500

577 000

577 500

578 000

579 000

579 500

580 000

580 500

581 000

581 500
TAG number JTB-RJJIF1-VE-CAL-610-90601 DESIGN CALCULATION FOR TEMPORARY SACP FOR PIPELINE EAST WELLPAD
JTB-RJJIF1-VE-CAL-610-90601 DESIGN CALCULATION FOR TEMPORARY SACP FOR PIPELINE CENTRAL WELLPAD
JTB-RJJ906-E0-MTO-900-90601 ELCTRICAL MATRIAL TAKEOFF (MTO)-CATHODIC PROTECTION SYSTEM ALL AREA
D JTB-RJJIF1-VE-DWG-900-90603 CATHODIC PROTECTION SYSTEM TYPICAL INSTALLATION D
JTB-RJJIF1-VE-PHI-900-90605 CATHODIC PROTECTION DESIGN PHILOSOPHY
SKETCH OVERALL PLOTPLAN DRAWING NO. DRAWING TITLE
TYPICAL INSTALLATION OF MAGNESIUM ANODE WITH TEST STATION POINT JAMBARAN TIUNG BIRU
REFERENCE DRAWING

4 25/09/2020 RE-ISSUED FOR CONSTRUCTION SKN SSU FH - -


3 14/01/2020 RE-ISSUED FOR CONSTRUCTION SA SSU FH - -
2 09/08/2019 RE-ISSUED FOR CONSTRUCTION UMM SSU FH - -
1 24/06/2019 RE-ISSUED FOR CONSTRUCTION UMM SSU FH - -
25/04/2019
Hazardous Area Hazardous Area 0 ISSUED FOR CONSTRUCTION UMM SSU FH - -
C 18/03/2019 ISSUED FOR APPROVAL UMM SSU FH - -
KP 0+282

KP 0+675

KP 1+500

KP 2+445

KP 2+478

KP 2+710

KP 3+250

KP 3+318

KP 4+002

KP 4+050

KP 4+225

KP 4+450

KP 4+481

KP 5+074

KP 0+143

KP 0+325

KP 0+650

KP 0+850

KP 1+100
BY CK'D APP CK'D APP'D
REV. DATE STATUS
C PIPELINE 18" PIPELINE 20" CONTRACTOR COMPANY C

A REVISION
610-CPTP9061-01

610-CPTP9061-02

610-CPTP9061-03

610-CPTP9061-04

610-CPTP9061-05

610-CPTP9061-06

610-CPTP9061-07

610-CPTP9061-08

610-CPTP9061-09

610-CPTP9061-10

610-CPTP9061-11

610-CPTP9061-12

610-CPTP9061-13

610-CPTP9061-14

610-CPTP9062-01

610-CPTP9062-02

610-CPTP9062-03

610-CPTP9062-04

610-CPTP9062-05
COMPANY :
CENTRAL WELLPAD TP TP TP TP TP TP TP TP TP TP TP TP TP TP EAST WELLPAD TP TP TP TP TP
01 02 03 04 05 06 07 08 09 10 11 12 13 14 AREA 01 02 03 04 05
AREA PERTAMINA
PT PERTAMINA EP
EP CEPU

MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE skkmıgas
610-CPMA9061-01 610-CPMA9061-02 610-CPMA9061-03 610-CPMA9061-04 610-CPMA9061-05 610-CPMA9061-06 610-CPMA9061-07 610-CPMA9061-08 610-CPMA9061-09 610-CPMA9061-10 610-CPMA9062-01 610-CPMA9062-02 610-CPMA9062-03
CONTRACTOR :

B KP 0+100 CONSORTIUM
B
KP 8+225
PROJECT NAME :
Hazardous Area Hazardous Area
GAS DEVELOPMENT PROJECT

KP 10+425

KP 11+290
KP 0+049

KP 0+425

KP 1+425

KP 2+425

KP 3+425

KP 4+450

KP 5+298

KP 6+425

KP 7+425

KP 8+425

KP 9+425
FOR THE UNITIZATION OF
PIPELINE 20" THE JAMBARAN - TIUNG BIRU FIELD
GAS PROCESSING
620-CPTP9061-01

620-CPTP9061-02

620-CPTP9061-03

620-CPTP9061-04

620-CPTP9061-05

620-CPTP9061-06

620-CPTP9061-07

620-CPTP9061-08

620-CPTP9061-09

620-CPTP9061-10

620-CPTP9061-11

620-CPTP9061-12

620-CPTP9061-13
DOCUMENT TITLE :
FACILITIES
TP TP TP TP TP TP TP TP TP TP TP TP TP
01 02 03 04 05 06 07 08 09 10 11 12 13 SALES GAS METERING
STATION LAYOUT FOR TEMPORARY CATHODIC PROTECTION
A A
MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE MG ANODE
620-CPMA9061-02A 620-CPMA9061-03A 620-CPMA9061-04A 620-CPMA9061-05A 620-CPMA9061-06A 620-CPMA9061-07A 620-CPMA9061-08A 620-CPMA9061-09A 620-CPMA9061-10A 620-CPMA9061-11A 620-CPMA9061-12A 620-CPMA9061-13A
620-CPMA9061-02B 620-CPMA9061-04B 620-CPMA9061-05B 620-CPMA9061-06B 620-CPMA9061-07B 620-CPMA9061-08B 620-CPMA9061-09B 620-CPMA9061-10B 620-CPMA9061-11B 620-CPMA9061-12B 620-CPMA9061-13B
FGFGFG GF GFGDFFDF

620-CPMA9061-03B
SCALE DWG NO : SHEET REV

NTS JTB-RJJIF1-VE-LAY-900-00001 1 OF 1 4
CONTRACTOR DWG NO : A-2018-0196-0040-LAY
1 2 3 4 5 6 7 8 9 10 11 12