Checklist For Concrete Placement

This document is a checklist for concrete placement processes during construction projects. It contains guidelines for pre-concrete preparation, concrete preparation, concrete placement procedures, and post-placement curing. The checklist ensures mix proportions, materials, workability, compaction methods, and curing processes meet specifications. Adherence is checked and remarks note compliance or issues in 17 steps for proper concrete pouring, finishing, and curing.

Uploaded by

ogbo deinmone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
55 views2 pages

Checklist For Concrete Placement

This document is a checklist for concrete placement processes during construction projects. It contains guidelines for pre-concrete preparation, concrete preparation, concrete placement procedures, and post-placement curing. The checklist ensures mix proportions, materials, workability, compaction methods, and curing processes meet specifications. Adherence is checked and remarks note compliance or issues in 17 steps for proper concrete pouring, finishing, and curing.

Uploaded by

ogbo deinmone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CHECKLIST FOR

Doc No: LEL-OPD-CCP-001


CONCRETE PLACEMENT
PROCESS: OPERATIONS Rev No: 00
Originator: Doc Type:
Date: Page 1 of 2
OYN CHK

PROJECT…………………………………………………………………………
……………………….
LOCATION
……………………………………………………………………………………
…………….
PROJECT…………………………………………………………………………
……………………….

NO STANDARD CHECK REMARK

A PRE-CONCRETE PREPARATION
1 Mix proportion is checked by the engineer: Y☐ N ☐ NA ☐

2 Volume of concrete is estimated and the target Y☐ N ☐ NA ☐


time is set
3 Manpower for mixing is enough with respect to Y☐ N ☐ NA ☐
volume of work
4 During casting sufficient shuttering men are kept Y☐ N ☐ NA ☐
for constant watch on prop
5 Chutes, concrete buckets are cleaned and ready Y☐ N ☐ NA ☐
for use.
6 Adequate Vibrator nozles are checked and ready Y☐ N ☐ NA ☐
for use.
X CONCRETE PREPARATION
1 Mixing portion of cement, aggregates and sand are Y☐ N ☐ NA ☐
investigated as per design specification
2 Adequate Material such as cement, aggregates Y☐ N ☐ NA ☐
and sand are presented with respect to volume of
work
3 Aggregates are well graded Y☐ N ☐ NA ☐
4 For bonding with old concrete, the edges of old Y☐ N ☐ NA ☐
concrete are to be broken to give a firm bonding
B CONCRETEING WORK (During Construction)

1 Workability of concrete is adequate (slump is Y☐ N ☐ NA ☐


proper
2 Cubes/ Cylinders are taken from the mixing for Y☐ N ☐ NA ☐
testing
3 Slump test is conducted and found OK Y☐ N ☐ NA ☐
4 Water is sprayed on surface of shutter/ steel Y☐ N ☐ NA ☐
shutter
CHECKLIST FOR
Doc No: LEL-OPD-CCP-001
CONCRETE PLACEMENT
PROCESS: OPERATIONS Rev No: 00
Originator: Doc Type:
Date: Page 2 of 2
OYN CHK

5 Concrete is placed within 30 minutes after mixing Y☐ N ☐ NA ☐


the water
6 Height of free fall concrete is within 3 feet Y☐ N ☐ NA ☐
7 Concrete is layed from one end, then continuously Y☐ N ☐ NA ☐
proceeded to the other end
8 Fresh concrete is deposited against concrete which Y☐ N ☐ NA ☐
is in position within 45 minutes
9 Thickness is checked @ 3’-0’’ interval over the Y☐ N ☐ NA ☐
concrete slab
10 Frequent movement of labours/others over Y☐ N ☐ NA ☐
reinforcement is avoided during casting. Use of
plain sheet as walk way for carrying concrete at
place.
11 During casting, immediate remedial measure are Y☐ N ☐ NA ☐
taken in case props get loosened
12 For beam and column, concrete compaction is Y☐ N ☐ NA ☐
done properly by vibrator
13 Compaction is done within the 15 minutes after the Y☐ N ☐ NA ☐
fresh concrete is placed in position
14 Vibrating is stopped as soon as laitance of mortar Y☐ N ☐ NA ☐
appears on the surface. (Excessive vibration
segregates the mix.)
15 Vibrating is executed properly in vertical placement Y☐ N ☐ NA ☐
of vibrator)
16 Vibrating is executed without touching the re-bar Y☐ N ☐ NA ☐
17 Proper surface vibration of slab surface with thick Y☐ N ☐ NA ☐
& plain wooden plank
D CONCRETEING WORK (After concreting
1 Movement over concrete surface is avoided within Y☐ N ☐ NA ☐
24 hours.
2 Concrete surface is kept wet with water till the Y☐ N ☐ NA ☐
removal of form work
3 Keys in the column-lift are provided for subsequent Y☐ N ☐ NA ☐
concreting in the proceeding days
4 Curing be done for at least 7 days Y☐ N ☐ NA ☐
COMPANY REP CLIENT REP
Checked & signed Checked &
signed