CHECKLIST FOR
Doc No: LEL-OPD-CCP-001
CONCRETE PLACEMENT
PROCESS: OPERATIONS Rev No: 00
Originator: Doc Type:
Date: Page 1 of 2
OYN CHK
PROJECT…………………………………………………………………………
……………………….
LOCATION
……………………………………………………………………………………
…………….
PROJECT…………………………………………………………………………
……………………….
NO STANDARD CHECK REMARK
A PRE-CONCRETE PREPARATION
1 Mix proportion is checked by the engineer: Y☐ N ☐ NA ☐
2 Volume of concrete is estimated and the target Y☐ N ☐ NA ☐
time is set
3 Manpower for mixing is enough with respect to Y☐ N ☐ NA ☐
volume of work
4 During casting sufficient shuttering men are kept Y☐ N ☐ NA ☐
for constant watch on prop
5 Chutes, concrete buckets are cleaned and ready Y☐ N ☐ NA ☐
for use.
6 Adequate Vibrator nozles are checked and ready Y☐ N ☐ NA ☐
for use.
X CONCRETE PREPARATION
1 Mixing portion of cement, aggregates and sand are Y☐ N ☐ NA ☐
investigated as per design specification
2 Adequate Material such as cement, aggregates Y☐ N ☐ NA ☐
and sand are presented with respect to volume of
work
3 Aggregates are well graded Y☐ N ☐ NA ☐
4 For bonding with old concrete, the edges of old Y☐ N ☐ NA ☐
concrete are to be broken to give a firm bonding
B CONCRETEING WORK (During Construction)
1 Workability of concrete is adequate (slump is Y☐ N ☐ NA ☐
proper
2 Cubes/ Cylinders are taken from the mixing for Y☐ N ☐ NA ☐
testing
3 Slump test is conducted and found OK Y☐ N ☐ NA ☐
4 Water is sprayed on surface of shutter/ steel Y☐ N ☐ NA ☐
shutter
CHECKLIST FOR
Doc No: LEL-OPD-CCP-001
CONCRETE PLACEMENT
PROCESS: OPERATIONS Rev No: 00
Originator: Doc Type:
Date: Page 2 of 2
OYN CHK
5 Concrete is placed within 30 minutes after mixing Y☐ N ☐ NA ☐
the water
6 Height of free fall concrete is within 3 feet Y☐ N ☐ NA ☐
7 Concrete is layed from one end, then continuously Y☐ N ☐ NA ☐
proceeded to the other end
8 Fresh concrete is deposited against concrete which Y☐ N ☐ NA ☐
is in position within 45 minutes
9 Thickness is checked @ 3’-0’’ interval over the Y☐ N ☐ NA ☐
concrete slab
10 Frequent movement of labours/others over Y☐ N ☐ NA ☐
reinforcement is avoided during casting. Use of
plain sheet as walk way for carrying concrete at
place.
11 During casting, immediate remedial measure are Y☐ N ☐ NA ☐
taken in case props get loosened
12 For beam and column, concrete compaction is Y☐ N ☐ NA ☐
done properly by vibrator
13 Compaction is done within the 15 minutes after the Y☐ N ☐ NA ☐
fresh concrete is placed in position
14 Vibrating is stopped as soon as laitance of mortar Y☐ N ☐ NA ☐
appears on the surface. (Excessive vibration
segregates the mix.)
15 Vibrating is executed properly in vertical placement Y☐ N ☐ NA ☐
of vibrator)
16 Vibrating is executed without touching the re-bar Y☐ N ☐ NA ☐
17 Proper surface vibration of slab surface with thick Y☐ N ☐ NA ☐
& plain wooden plank
D CONCRETEING WORK (After concreting
1 Movement over concrete surface is avoided within Y☐ N ☐ NA ☐
24 hours.
2 Concrete surface is kept wet with water till the Y☐ N ☐ NA ☐
removal of form work
3 Keys in the column-lift are provided for subsequent Y☐ N ☐ NA ☐
concreting in the proceeding days
4 Curing be done for at least 7 days Y☐ N ☐ NA ☐
COMPANY REP CLIENT REP
Checked & signed Checked &
signed