0% found this document useful (0 votes)
30 views15 pages

30000A

This document provides a summary of architectural works for the expansion of Hazrat Shahjalal International Airport. It includes item numbers, descriptions, units, quantities, and costs for various construction components grouped under divisions such as earthworks, foundations, concrete structure, masonry works, roofing works, and more. Foundations will involve prestressed high strength pile driving, testing, and cutting pile tops. The total cost for all architectural works under section 30000A Aeronautical Ground Lighting Substation is presented.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views15 pages

30000A

This document provides a summary of architectural works for the expansion of Hazrat Shahjalal International Airport. It includes item numbers, descriptions, units, quantities, and costs for various construction components grouped under divisions such as earthworks, foundations, concrete structure, masonry works, roofing works, and more. Foundations will involve prestressed high strength pile driving, testing, and cutting pile tops. The total cost for all architectural works under section 30000A Aeronautical Ground Lighting Substation is presented.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

Hazrat Shahjalal International Airport Expansion Project.

- Bills of Quantities Section 30000A Summary-Architectural Works

Item Amount
Description Unit Qty
No
Yen BDT

30000A: Aeronautical Ground Lighting Substation

Section Summary

30200A Earthworks (Site Clearance is Civil Works, Tree


cutting and disposal)
30201A: Basement excavation sum 1

Sub-total to Division Summary

30300A Foundations (Prestressed High Strength pile- PHC,


Excavations & Shoring)

30301A: Prestressed High Strength pile- PHC sum 1

30304A: Cutting off tops of piles sum 1

30305A: Pile Tests sum 1

30306A: Static Working Load Test sum 1

30307A: Dynamic Load Test sum 1

30308A: Integrity Test sum 1

30309A: Others sum 1

Sub-total to Division Summary

30400A Concrete Structure (Cement Material, Aggregate


,Steel Reinforcement, Formwork, Placement, Curing &
Quality Control)

30401A: Reinforced in-situ concrete sum 1

30402A: Formwork to in-situ concrete framed structures sum 1

30403A: Reinforcement for RC structure sum 1

30404A: Waterproofing sum 1

30405A: Sundries sum 1

Sub-total to Division Summary

30600A Masonry Works

30601A: Brick wall sum 1

Sub-total to Division Summary

30800A Roofing works

30809A: Asphalt Built Up Roofing sum 1

Sub-total to Division Summary

Page No.30000A Summary- 1


Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Section 30000A Summary-Architectural Works

Item Amount
Description Unit Qty
No
Yen BDT

30000A: Aeronautical Ground Lighting Substation

30900A External glazing/Internal glazing/Partition/

30904A: Toilet compartment sum 1

Sub-total to Division Summary

31000A Doors / Windows / Grilles / Shutter

31002A: Metal doors/Windows/Grilles sum 1

Sub-total to Division Summary

31100A Metalworks
31101A: Steel catladders sum 1
31104A: Mild Steel Works sum 1
31106A: Stainless Steel Works sum 1

Sub-total to Division Summary

31200A Finishing Works

31201A: Wall finishes sum 1

31202A: Ceiling finishes sum 1

31203A: Floor finishes sum 1

31204A: Waterproofing sum 1


31206A: Suspended Ceiling ( Exposed RCP-Acoustic Rock wool
sum 1
Ceiling Board)
31207A: Painting / Clear Finishing sum 1

31208A: Tile works sum 1

Sub-total to Division Summary

31300A Interior fittings

31301A: Toilet accessories sum 1

31302A: Signages sum 1

31305A: Fixtures & fittings sum 1

Sub-total to Division Summary

Total to Sub Final Summary

for Section 30000A : Aeronautical Ground Lighting


Substation

Page No.30000A Summary- 2


Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30200A-Architectural Works

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30200A Earthworks (Site Clearance is Civil Works,


Tree cutting and disposal)

Division Summary

30201A: Basement excavation sum 1

Sub-total to Division Summary

30201A: Basement excavation

Basement excavation- Site Clearance is Civil Works, Tree


cutting and disposal

1 Survey / Layout sum 1

2 Marking works

a) Land layout sum 1

b) PHS piles layout sum 1

c) Floors layout sum 1

3 Filling and Leveling works m3 42

4 Excavation m3 184

5 Soil moving m3 134


3
7 Service line trench & pits m 32

Disposal_

8 Disposal of excavated material off the site m3 134

Filling_
Filling using imported material around pile caps and ground
9 m3 82
beams
10 Gravel / Crushed Stone as per specification m3 126

11 Compacted ABC filling - Ground slab,etc. m3 841

Sub-total to Division Summary

Page No.30200A- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30300A-Architectural Works

Item Unit Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30300A Foundations (Prestressed High Strength


pile- PHC, Excavations & Shoring)

Division Summary
30301A: Prestressed High Strength pile- PHC sum 1
30304A: Cutting off tops of piles sum 1
30305A: Pile Tests sum 1
30306A: Static Working Load Test sum 1
30307A: Dynamic Load Test sum 1
30308A: Integrity Test sum 1
30309A: Others sum 1

Sub-total to Division Summary

30301A: Prestressed High Strength pile- PHC


Pile capacity- 530KN for 15 meters pile embedment length above
values are for net length. Net embedment length- pile length- pile
cut-off length. Test piles shall be driven at the location specified
by the embedment to determine the recurred length of piles. Test
pile shall driven with the same hammer that is used for driving
foundation piles; all in accordance with Drawings and
Specifications

1 500 mm dia. PHC piles m 756

Sub-total to Division Summary

30304A: Cutting off tops of piles

1 500 mm dia. PHC piles m 50

Sub-total to Division Summary

30305A: Pile Tests


Preliminary load test
1 500 mm dia. PHC piles no. 2

Sub-total to Division Summary

30306A: Static Working Load Test

1 500 mm dia. PHC piles no. 2

Sub-total to Division Summary

30307A: Dynamic Load Test

1 500 mm dia. PHC piles no. 2


Sub-total to Division Summary

30308A: Integrity Test


1 500 mm dia. PHC piles no. 2

Sub-total to Division Summary

30309A: Others

1 Rebar for Pile cap connections kg 430

2 Concrete for Pile cap connections m3 5

3 Steel plate for Pile cap connections kg 90

Sub-total to Division Summary

Page No.30300A- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30400A-Architectural Works

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30400A Concrete Structure (Cement Material,


Aggregate ,Steel Reinforcement, Formwork,
Placement, Curing & Quality Control)
Division Summary

30401A: Reinforced in-situ concrete sum 1


30402A: Formwork to in-situ concrete framed structures sum 1
30403A: Reinforcement for RC structure sum 1
30404A: Waterproofing sum 1
30405A: Sundries sum 1
Sub-total to Division Summary

30401A: Reinforced in-situ concrete


Plain Concrete C25,30._
1 Lean concrete 100mm thick - Pile cap m3 10
2 Lean concrete 100mm thick - Ground beam m3 19
3 Lean concrete 100mm thick - Ground Slab m3 64
Lean concrete 100mm thick - Stairway walls, Lift pits, Escalator pits 3
4 m 2
& Pump pits
3
5 Lean concrete 100mm thick - service line trench & pits m 7
3
6 Lean concrete 100mm thick - service pits m 1
Reinforced Concrete C35_
Grade 35 for reinforced concrete as shown in the Drawings and
Specifications.

7 Pile cap m3 80

8 Ground beam m3 139

9 Stairway walls, Lift pits, Escalator pits & Pump pits m3 3


10 Ground floor slab m3 123

11 Suspended slabs m3 68

12 Columns m3 32
3
13 Beams m 85
3
14 Walls m 28
15 Service line trench & pits m3 19

16 Service pits - base m3 2

17 Service pits - wall m3 5


3
18 Service pits - slab m 2

19 Damp Proof Membrane. Gauge 1000 polythene m2 580


Sub-total to Division Summary

30402A: Formwork to in-situ concrete framed structures

Formwork as shown in the Drawings and Specifications._

1 Plain Smooth Finish m2 564


2
2 Sides of Pile cap m 167
2
3 Sides of Ground slab m 79

4 Sides of Ground beams m2 594


2
5 Sides of Stairway walls, Lift pits, Escalator pits & Pump pits m 8
2
6 Base of service line trench & pit m 69

7 Side of service line trench & pit m2 138


8 Service pits - base m2 4
9 Service pits - wall m2 64

10 Service pits - slab m2 11


2
11 Sides and soffit of beams m 451

Page No.30400A- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30400A-Architectural Works

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30400A Concrete Structure (Cement Material,


Aggregate ,Steel Reinforcement, Formwork,
Placement, Curing & Quality Control)
12 Sides of columns m2 206
13 Side of wall m2 258

14 Side of suspended slab m2 516

15 Fine Smooth Finish m2 600

Sub-total to Division Summary


30403A: Reinforcement for RC structure

Deformed bar reinforcement Grade 460, dia. 10mm to 32mm_

Pile cap

1 20mm dia. kg 4,787


2 16mm dia. kg 3,325

3 12mm dia. kg 346


Columns
4 32mm dia. kg 15,233

5 10mm dia. kg 2,699


Staircase
Beams
6 32mm dia. kg 20,012
7 25mm dia. kg 8,616
8 16mm dia. kg 1,875
9 10mm dia. kg 7,688
Ground floor slab
10 12mm dia. kg 12,690

Slabs

11 10mm dia. kg 5,817

Walls
12 10mm dia. kg 998

Utility Tunnel N/A

M&E Foundation

Service line trench and pits


13 10mm dia. kg 1,619

Service pits
14 10mm dia. kg 792

Sub-total to Division Summary


30404A: Waterproofing

1 Waterproofing/ polyethylene sheet to toilet m2 23

Sub-total to Division Summary

30405A: Sundries
Ground floor slab
1 10mm dia. kg 1,336

Sides of Stairway walls, Lift pits, Escalator pits & Pump pits
2 10mm dia. kg 622
Lintel and soffit
3 16mm dia. kg 158

4 8mm dia. kg 87

Page No.30400A- 2
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30400A-Architectural Works

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30400A Concrete Structure (Cement Material,


Aggregate ,Steel Reinforcement, Formwork,
Placement, Curing & Quality Control)
5 Concrete for slab, lintel ans soffit m3 18

6 Formwork for slab, lintel and soffit m2 59

Sub-total to Division Summary

Page No.30400A- 3
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30600A-Architectural Works

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT
30600A Masonry Works
Division Summary

30601A: Brick wall sum 1

Sub-total to Division Summary

30601A: Brick wall


Brickwall
2
1 115 mm thick brick wall m 59

2 240 mm thick brick wall m2 751

Sub-total to Division Summary

Page No.30600A- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30800A-Architectural Works

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT
30800A Roofing works

Division Summary

30809A: Asphalt Built Up Roofing sum 1

Sub-total to Division Summary

30809A: Asphalt Built Up Roofing

1 Asphalt build up roofing (ROY, WP-1 SYS. included) m2 538

Sub-total to Division Summary

Page No.30800A- 1
Hazrat Shahjalal International Airport Expansion Project. Phase III- Bills of Quantities Division 30900A-Architectural Works

Item Rate Amount


No Description Unit Qty
Yen BDT Yen BDT
30900A External glazing/Internal
glazing/Partition/

Division Summary

30904A: Toilet compartment sum 1

Sub-total to Division Summary

30904A: Toilet compartment

1 Partion for toilet H=2100, 18mm thk m2 2

Sub-total to Division Summary

Page No.30900A- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31000A-Architectural Works

Rate Amount
Item No Description Unit Qty
Yen BDT Yen BDT

31000A Doors / Windows / Grilles / Shutter


Final finish paint shall not be paid separately. All related cost
but exempt tariff (Hardwear/parts, stainless sill, fillings,
embedments etc.,) to be included to unit rate.
Division Summary
31002A: Metal doors/Windows/Grilles sum 1

Sub-total to Division Summary

31002A: Metal doors/Windows/Grilles

Steel Doors(SD)

1 SD-1 900*2100 no. 2

2 SD-1B(SAT) 900*2100 no. 3

3 SD-6B(SAT) 1800*2100 no. 1

4 SD-6Bi(SAT) 1800*2100 no. 3

5 SD-7B 2500*2500 no. 3

6 SD-P 600*600 no. 1

7 LSD-1L 900*2100 no. 1

8 LSD-11L 800*2100 no. 1

Sub-total to Division Summary

Page No.31000A- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31100A-Architectural Works

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

31100A Metalworks
Division Summary

31101A: Steel catladders sum 1

31104A: Mild Steel Works sum 1

31106A: Stainless Steel Works sum 1

Sub-total to Division Summary

31101A: Steel catladders

1 Stainless Steel catladders LSD1 m 11

Sub-total to Division Summary

31104A: Mild Steel Works

1 MD22 trench cover sum 1

Sub-total to Division Summary


31106A: Stainless Steel Works
1 RD104 roof outlets sum 1

Sub-total to Division Summary

Page No.31100A- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31200A-Architectural Works

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

31200A Finishing Works

Division Summary

31201A: Wall finishes sum 1


31202A: Ceiling finishes sum 1
31203A: Floor finishes sum 1
31204A: Waterproofing sum 1
31206A: Suspended Ceiling ( Exposed RCP-Acoustic Rock
sum 1
wool Ceiling Board)

31207A: Painting / Clear Finishing sum 1


31208A: Tile works sum 1

Sub-total to Division Summary

31201A: Wall finishes


(Cement render to lintel & stiffer included)
1 Cement render to skirting, H=150mm m 206
2
2 Cement render to walls (Ext.) m 553
2
3 Cement render to walls (Int.) m 1,067
4 Cement render to walls (Concrete) m2 1,070
2
5 Cement render to walls (trench and pit) m 103

Sub-total to Division Summary

31202A: Ceiling finishes


1 Cement render to ceiling (Ext) m2 38

2 Cement render to ceiling (Int) m2 421

Sub-total to Division Summary

31203A: Floor finishes

INTERNAL WORK_
1 Cement render to internal ground flooring m2 421
2 Cement render to external ground flooring m2 247
2
3 Cement render to roof flooring (ROY, EVW) m 579

4 Cement render to toilet floors m2 14

5 Cement render to floor (trench and pit) m2 65

Sub-total to Division Summary

31204A: Waterproofing

1 Toilet flooring m2 23

Sub-total to Division Summary

31206A: Suspended Ceiling ( Exposed RCP-Acoustic Rock


wool Ceiling Board)

1 To celling for toilet (C31) m2 14

Sub-total to Division Summary

31207A: Painting / Clear Finishing

Synthetic Resin Emulsion Paint (P1)


1 To wall m2 997

Page No.31200A- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31200A-Architectural Works

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

31200A Finishing Works

2 To ceiling m2 390

3 To celling ( C41) m2 421


Rockwool Board w/glasswool cloth (above 1,5m heigh
4 m2 222
fromFFL for wall, column, beam
Rockwool Board w/glasswool cloth (above 1,5m heigh
5 m2 99
fromFFL for ceiling

Epoxy Resin Floor Paint (P6)

6 To cement render floorings m2 410

7 To concrete floorings m2 99

8 To skirting (h:150mm) m2 45

Acrylic resin Emnlsion paint (P7)

9 To soffit and eaves m2 60


2
10 To beam/column/wall parapet in formed face concrest m 1,233

Sub-total to Division Summary

31208A: Tile works


INTERNAL WORK_
1 Ceramic Tiles to Flooring (Toilet ) m2 14

2 Ceramic Tiles to Walls (Toilet ) m2 71

Sub-total to Division Summary

Page No.31200A- 2
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31300A-Architectural Works

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

31300A Interior fittings

Division Summary

31301A: Toilet accessories sum 1

31302A: Signages sum 1

31305A: Fixtures & fittings sum 1

Sub-total to Division Summary

31301A: Toilet accessories


1 Mirrors for toilet sum 1
Sub-total to Division Summary
31302A: Signages

1 SGD2 toilet signage sum 1

Sub-total to Division Summary

31305A: Fixtures & fittings

1 Toilet lining counter, wash bowl counter sum 1

Sub-total to Division Summary

Page No.31300A- 1

You might also like