0% found this document useful (0 votes)
303 views7 pages

Retaining Wall L4 Design Drawings Details

1. The Resident Engineer requested that the Site Agent proceed with setting out works for Retaining Wall L4 according to the enclosed preliminary design drawings and reinforcement details. 2. The works include excavation between Km 2+077 and Km 2+180 on the left hand side, and placing concrete and reinforcement for the foundation and stem of Retaining Wall L4. 3. The Site Agent was instructed not to exceed the estimated quantities provided for each work item without approval from the Resident Engineer.

Uploaded by

Abdullahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
303 views7 pages

Retaining Wall L4 Design Drawings Details

1. The Resident Engineer requested that the Site Agent proceed with setting out works for Retaining Wall L4 according to the enclosed preliminary design drawings and reinforcement details. 2. The works include excavation between Km 2+077 and Km 2+180 on the left hand side, and placing concrete and reinforcement for the foundation and stem of Retaining Wall L4. 3. The Site Agent was instructed not to exceed the estimated quantities provided for each work item without approval from the Resident Engineer.

Uploaded by

Abdullahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

RORDE KENYAURBAN ROADSAUTHORITY

Enhancing Urban Mobility


DUALLING OF LIMURUROAD PHASE I
CONTRACT NO: KURA/RMLF/HÌ/304/2022-2023
OFTICE OF THE RESIDENT ENGINEER
P.O. Box 41727-00100 NAIROBI
AR

Ref: KURA/RMLE/HQ/304/2022-2023/RE/GEN/34 Date: 29h June, 2023

The Site Agent


Derow ConstructionCompany Limited
P.O. Box 106 - 70300
Mandera.

Dear Sir/Madam,

RE: RETAINING WALL LA DETAILS

The above subject refers.


Flease find enclosed herewith the Retaining Wall L4 Preliminary Design Drawings, Bar
Bending Schedules and Setting Out Data for your reference and action.
You are therefore required to proceed with the setting out of the above-mentioned works
for our approval.
Yours faithfully,

Eng. Benjamin Asin


RESIDENT ENGINEER

KenyaRESIDENT
Urban Roads Authority
ENGINEER
DUALLING OF LIMURU RO DPHASEI
CONTRACT No: KRA/RMLEHQ/304/2022-2023
P.0. Box 41727 - 00L00, N\TROBI
SITE INSTRUCTION FORM
KURA/MS/FM/034
SHEET No.I
KENYA URBAN SITE INSTRUCTION
ROADS AUTHORITY No: 53
Enhancing Urban Mobility Date:29/06/2023
PROJECT NAME: DUALLINGOF LMURUROAD PHASE I(FOREST ROAD JUNCTION
- MUTHAIGA ROAD JUNCTION)
ROAD NAME: LIMURU ROAD
CONTRACT NO: KURA/RMLF/HQ/304/2022-2023
CONTRACTOR: DEROW CONSTRUCTION COMPANY LIMITED
FROM: RESIDENT ENGINEER TO: SITE AGENT
MAIN ACTIVITIES:EXCAVATION FOR STRUCTURES
& CONCRETE WORKS ROAD: LIMURU ROAD
Bill No. Activity Description Section Estimated quantity
(As per BOQ |(Activities to be described exhaustively and in (Indicate the exact section for execution NOT to be exceeded
Contract items) the manner of Contract items) of works) without approval by RE)
7.01 Excavate in soft material for Retaining Km 2+077-Km 2+180 LHS
Wallto a maximum depth of 3m (Retaining Wall L4)
7.02
Ditto Item 7.01 but to a depth of more Km 2+077-Km 2+180LHS
than 3n. (Retaining Wall L4)
7.03
Excavate in hard material for Retaining Km 2+077-Km 2+180 LHS
Wall toa depth of 3m. (Retaining Wall L4)
Provide, place and compact blinding Km 2+077-Km 2+180 LHS
17.01 concrete class (15/20) 75mm thick to
foundation of retaining wall. (Retaining Wall L4)

Provide, place and compact concrete Km 2+077-Km 2+180 LHS


17.02 class 3O(20) to foundation and stem of
|retaining walls (Retaining Wall L4)
Provide, erect and dismantle formwork
Km 2+077-Km 2+180 LHS
17.05 to provide class FI finish to foundation
land stem of retaining wall. (Retaining Wall L4)
Provide, cut, bend and fix High tensile
Km 2+077-Km 2+180 LHS
17.08 bar reinforcement to BS 4461 or any
diameter less than 16mm (Retaining Wall L4)

Provide, cut, bend and fix High tensile Km 2+077-Km 2+180 LHS
17.09 Jbar reinforcement to BS 4461 of
diameter 16mm to 40mm (Retaining Wall L4)

Approved by:
Prepared by:

Eng B. Asin 29/06/23.


(Resident Engineer) (Date Instruction Issued)
(Assistant ResidentEngineer)
Sheet KURA/MSFM/O34
ISO 9O01:2015 Site Instruction
Kenya Urban Roads Authority
RESIDENT ENGINEER
DUALLING OF LIMURU ROAD PHASE 1
CONTRACT No: KURA/RMLF/HQ/304/2022-2023
P.O. Bo 41727 - 00100, N.IROBI
GDATE

REVISIONS

mm
DIMENSIONS
AREINALL
CONCRETE
BLINDING
C1520
COVER
50mm NOTE

BARRIER
CRASH
C3020
KEYA
PO
DETAILS
URBAM
MAROB
412-
00100
BOK
RGADS

AUTiHORTY DETAILS
BASE L4
ajniWagl L4
DO-URPD
DECTOR-URPO
APPROVALS
REINFORCEMENT
DETAILS
RETAINING
WALL L4 -12S-10
eo0-t3a63
2

CAAGEWAY LM

20200-
G2s03
T2.200c

SIGN

DATE

DUALLING
ROAD 100mm
HOLS EP

VGROUNDLVL
JUNCTION- PROJECT
OFTITLE
OUNDABOUT) LMURU

MUTHAIGAROAD
SECTIONA-L4
A
(
FOREST -301
ROAD BRAYER

sCALE.
AS)
RALLAR
ECD DRAUAGEACK
DAANNGN DRAWING
TITLE

ELEVATION
RETAINING
DETAILSWALL L4
HOR10001:
2023/KURA
RWL4-4001

ndng
7Smm

RETAINING ¼ 1S0AE

Retaining
DATE
KURA/RMLFHQB04/2022-2023
CONTRACT
DUALLING
No: Kenya
WALL wall
JNE,
2023
Base P.O.
L4 Top Box
RESIDENT
ENGINEER
DRAWING
STAGE
HEETNC
M
41727 Urban
OF
DETALEDDETAILS
LIMURU
-
00100,
Roads
DESIGN
NAIROBI ROAD
DESIGNS
Authority
PHASE

I
Authority
1 CONTRACT
KIRA/RMLFAIQI384/2022-2023
No:
PHASE
N.AIROBI
RESIDENT
ENGINEER
ROAD
Roads
LIMURU
00100,
Urban -
41727
OF
DUALLING
Box
Kenya
P.O.
LHS
E0GE
ROAD
WERICR
-200
ASSISTANT
DIRECTOR
(URPD-Stn
CRASH
BARRIER
PROFILE
-230
L4
WALL
RETAINING
Retaining
Wall
L4
AUTHORTY
ROADS
URBAN
KENYA
1b0mm
WLEP
HQLES REMAJS
DESCRIPTON
Box
Culvert
DATE
Elevotion
Elevotion

Elevatlon
Elevotion

Authority
I CONTRACT
No:
KURA/RMLFIQB04/2022-2023
PHASE
STA210
NATROBI
RESIDENT
ENGINEER
ROAD
Roads
LIMURU
00100,
Urban -
OF 41727 Elevatlon

Elevotion DUALLING
Box
Kenya
P.O.

PROJECT TITLE DESIGNS


APPROVALS SIGN DATE oRAWN Tme ROAD CROSS SECTION KM 2+080 - 2+18o
DUALLING OF LIMURU ROAD(FOREST
ROAD JUNCRONDOTHAIGA ROAD 2023KURAV RCS-DOT STAG DETALED DeSIGN
DD-URE
sCALE (A HOR t:1000 DATENE, 2023
BAR BENDING SCHEDULE
PROJECT NAME : DUALLING OF LIMURU ROAD PHASE 1 (FOREST ROAD - MUTHAIGA ROUNDABOUT) DRAFT- 30-06-23
CONTRACT NUMBER: KURA/RMLE/HQ/304/2022-2023
RETAINING WALL L4 (KM 2+077-2+180 LHS)
Description Bar Details Length (mm) Toal Weight
Bar Shape Code total (m) Number Weight (tonnes)
S/NO. Bar mark Bar type size Spacing A C d
Base Slab 01 T 16 200 2 250 4400 250 4.900 1.580 O.039
2 Base Slab 02 T 12 200 00 1000 1.000 22 0.888 0.020
Base Slab 03 T 12 200 1000 1.000 22 0.888 0.020
4 Base Slab 04 T 20 150 2 250 4400 250 4.900 7 2.470 0.085
5 Rey 05 T 16 200 21 200 800 200 1.200 5 1.580 0.009
1 1.580 O.002
Key 06 16 200 1000 1.000
7 Key 07 T 16 200 O 1000 1.000 1.580 0.002
Kex T 16 200 21 200 800 200 1.200 1.580 O.009
09 1.000 2 1.580 0.003
Key 16 200 1000
10 Slem 10 T 20 125 500 7200 7.700 2.470 0.152
11 Siem 12 200 00 1000 1.000 33 0.888 0.029
12 Stom 12 T 12 200 1000 1.000 33 0.888 0.029
13 Stem T 16 200 11 500 7200 7.700 1.580 0.061
14 Orash Barrier 14 12 200 1000.00 0.00 0.00 0.00 1.000 5 0.888 0.004
15 Crash Barrier 15 T 12 200 34 800.00 550.00 200.00 50.00 1.600 6 0.888 0.009
16 Crash Barier 16 T 12 200 360.00 0.00 0.00 0.00 O.360 0.888 O.002
17 Crash Earrier 17 12 200 11 50.00 1550.00 0.00 0.00 1.600 0.888 0.009
Crash Barrier 18 12 200 1000.00 0.00 0.00 O.00 1.000 0.888 0.005
|Total (kg/m) 488.11

Steel Quantity
TOTAL
TOTAL TOTAL QUANTTY
REINFORCEMENT BAR UNTT FACTOR QUANTITY No. of 12m Pieces
WEIGHT LENGTH (M) TONNAGE
TONNAGE

T20 TONNES O.237 104 24.63 102 25.13 T20 847.76 848
T1e TONNES 0.125 104 12.98 1.] 14.28 T16 753.13 754
T12 TONNES 0.126 104 13.15 11 14.46 T12 1357.17 1358
Total 53.87

Concrete Ouantity

LENGTH() WIDTH ( )
PLAN AREA AV. HEIGHT/
VOLUME (m3) FACTOR
FACTORED
VOLUME
Kenya Urban Roads Authority
(m2) DEPTH (m)
(m3) RESIDENT ENGINEER
BLINDDNG(Ciass 15/20) 104 488.8 O.05 24.44 29.328
DUALLING OF LIMURU RO0.\D PHASE 1
BASE FOOoTING (Cass S0/20) 104 45 468 O6 280.8 1.2 336.96 CONTRACT No: KURA/RMLF/HQ/304/2022-2023
KEY (Ciass 90/20) 52 13.6
104
07-Bottoer
18.72
P.O. Box 41727 -00100, N.AIROBI
104 343.2 L2 411.84
STEM (Cass 30/20) 03-Top
03-Rotoem 23 12
104 27.6
CRASH BAKRIER (Class 25/20) O.15-Top
Total 687.04 824.448
RETAINING WALL L4 SETTING OUT DATA
Start
Chainage LHS Edge Centre Line RHS Edge
2+077 X=257527.561 Y=9861637.028 X=257528.226 Y=9861637.548 X=257531.101 Y=9861639.806
2+080 X=257525.483 Y=9861639.677 X=257526.089 Y=9861640.282 X=257528.6 14 Y=9861642.976
2+100 X=257508.875 Y=9861650.573 X=257509.335 Y=986 1651.227 X=257511.440 Y=9861654.220
2+120 X=257492.644 Y=9861659.722 X=257493.064 Y=9861660.461 X=257494.866 Y=9861663.635
2+140 X=257475.847 Y=9861668.960 X=257476.225 Y=9861669.723 X=257477.848 Y=9861672.997
2+160 X=257458.151 Y=9861678.802 X=257458.533 Y=9861679.562 X=257460.174 Y=9861682.826
End 2+180 X=257440.355 Y=9861688.637 X=257440.738 Y=9861689.334 X=257442.540 Y=9861692.59 1

Kenya Urban Roads Authority


RESIDENT ENGINEER
DUALLINGOF LIMURU ROAD PHASE 1
CONTRACT No: KURA/RMLFIHQB04/2022-2023
P.0. Box 41727 - 00100, NAIROBI

You might also like