0% found this document useful (0 votes)
103 views

Fusion Solar

FusionSolar App Quick Guide

Uploaded by

Nikita Zubov
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views

Fusion Solar

FusionSolar App Quick Guide

Uploaded by

Nikita Zubov
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

FusionSolar App Quick Guide

Issue: 08
Date: 2023-05-05
Copyright © Huawei Digital Power Technologies Co., Ltd. 2023. All rights reserved.
FusionSolar App Quick Settings
Operation Procedure
• The figures are for reference only.
Download and install the FusionSolar app • The initial password for connecting the inverter WLAN is Changeme.
• The initial password for connecting to the Smart USB-WLAN adapter is Changeme.
Register an installer account • The initial password for the installer account is 00000a. If the system prompts you
(optional, for installers without an account) to change password, set a new password and then log in to the system.
• Some device do not support the initial password. You need to set the initial
password upon the first connection. Set the password before log in to the system.
Log in and start Setup wizard • To ensure account security, change the password periodically and keep the new
password in mind. Not changing the initial password may cause password
Create an owner account disclosure. A password left unchanged for a long period of time may be stolen or
cracked. If a password is lost, devices cannot be accessed. In these cases, the user is
liable for any loss caused to the PV plant.
Check the device status

This document applies to the following scenarios:


• Inverter with built-in WLAN for local commissioning
• Inverter with a Smart USB-WLAN Adapter for local commissioning
• In RS485 cascading networking.
• SDongleB-06+Commercial inverter (without WLAN module)
• Inverter with a SmartLogger for local commissioning

1
1. Downloading and Installing the FusionSolar App

Method 1: Download and install the app from the app store. Users who select method 2 can select the download method based on the mobile phone
• Huawei phone users: Search for FusionSolar in Huawei AppGallery. type.
• iPhone users: Search for FusionSolar in the App Store. • Huawei mobile phone users: Download from Huawei AppGallery.
• Other mobile phone users: Select method 2. • Non-Huawei phone users: Download on a browser.

Note:
Method 2: Scan the QR code to download and install the app.
When you select Download via the
Browser, if a security warning message is
displayed indicating that the app is from an
external source, tap ALLOW.

2
2. Register an Installer Account (Optional, for Installers Without an Account)
Add user
Register the first installer account and create a company account.

To create multiple
installer accounts for
the same company, log
in to the FusionSolar
app to Add User or
Invite User.

Both the email address


and username can be
used to log in to
FusionSolar app.

Invite a user

Note:
In some regions, the
function of inviting users is
not supported. The actual
page prevails.

3
3. Log in and Start Setup Wizard
• WLAN/FE SDongle+Built-in WLAN of the Inverter

Log in to the app as an


Scan the QR code of installer. The initial
the inverter password of the
connected to the installer is 00000a. If
Smart Dongle. the system prompts you
to set a password, set
the password and login
first power-on and
change it immediately
after login.
At the first login, the
Quick settings screen
is displayed by default.

In a non-cascading scenario, the step of Searching for cascaded inverters is not involved.

The grid code is set to N/A


by default (automatic
startup is not supported).
Set the grid code based on
the area where the PV plant
is located.

If Sync phone time


is enabled, the time
and time zone of the
inverter are
synchronized with
those of the mobile
phone.

4
In a non-Battery scenario, the step of Energy storage control is not involved.

You can tap to


obtain the detailed
working mode
information.

Set network parameters and domain name.

WLAN communication FE communication

Enabled Monitor the


Enabled Monitor the
PV plant through the
PV plant through the
management system.
management system.
Set the Domain name
Set the Domain name
to
to
intl.fusionsolar.huawe
intl.fusionsolar.huawe
i.com and Port number
i.com and Port number
to 27250.
to 27250.
If Ethernet is disabled,
Select a router that can the network cable is
connect to the Internet not connected. Ensure that the devices
and enter the router Reconnect the network are consistent with the
password. cable. actual connected devices.

5
Add a plant.

Note:
In scenarios without
energy storage, no ESS
photos are required.

6
• SDongleA-03+Distributed inverter/SDongleB-06+Commercial inverter (without WLAN module)

SDongleB-06

In the MBUS cascading


scenario, use the USB-
WLAN module to
connect to the inverter,
and then log in to the
commissioning page of
inverter to set the
parallel parameter. Remove the USB-WLAN module,
install the SDongleB-06.

Log in to the app as an


installer. If the system
prompts you to set a
password, set the
Scan the QR code of password and login first
the Smart Dongle. power-on and change it
immediately after login.

At the first login, the


Quick settings screen
is displayed by default.

7
In cascading scenarios, you need to manually search for cascaded inverters.

Upload the SN file


to search for
cascaded inverters. The grid code is set to
(On the app You can tap to
N/A by default
connection page, obtain the detailed
(automatic startup is
click MBUS whitelist working mode
not supported). Set the
to generate an SN information.
grid code based on the
file.) area where the PV
Note:
plant is located.
In a non-Battery
scenario, the step of
Energy storage control
is not involved.
RS485 scenarios
MBUS scenarios

Set communication parameters based on the actual networking scenario.

Networking Parameters

FE DHCP is enabled by default. If the router does not


communication support DHCP, disable DHCP and manually assign
an IP address.
WLAN Select the router you want to connect to, enter the
communication password, and tap Connect Router.

4G By default, APN mode is set to Automatic. When


communication this mode cannot be used to access the Internet,
set the parameter to Manual. In this case, set the
parameters related to the SIM card based on the
information obtained from the carrier.

Set the Domain name to intl.fusionsolar.huawei.com and Port


number to 27250.

8
Add a plant.

9
• Local Commissioning Using a Smart USB-WLAN Adapter

Note: Check the indicator status. When the


Before commissioning a commercial inverter, connect the 4G Smart Dongle to identify parameters. If the indicator indicator blinks green at an interval of
status is normal, remove the Smart Dongle, and then connect the USB-WLAN adapter to start commissioning. 2s (on for 0.1s and then off for 1.9s),
remove the 4G Smart Dongle.

WLAN module

The grid code is set to N/A


by default (automatic
startup is not supported).
Set the grid code based on
Scan the QR code the area where the PV plant
of the WLAN is located.
module (USB-
Adapter2000-C).
Advanced user
At the first login, the
Quick settings screen If Sync phone time is enabled,
is displayed by default. the time and time zone of the
The initial password is inverter are synchronized with
00000a. those of the mobile phone.

10
Set network parameters and domain name.
In a non-cascading scenario, the step of searching for cascaded inverters is not involved.

4G communication
Enabled Monitor the PV plant
through the management
system.

Set the Domain name to


intl.fusionsolar.huawei.com
and Port number to 27250.

By default, APN mode is set to


Automatic. When this mode
cannot be used to access the
Internet, set the parameter to
Manual. In this case, set the
parameters related to the SIM
card based on the information
obtained from the carrier.

Connect to the management system.

LED

Scan the QR code of


the Smart Dongle or
the inverter
connected to the
Smart Dongle.
After the commissioning is
complete, remove the USB-
WLAN module, install the 4G
module. Check the indicator
Ensure that the devices
status. After the indicator is
are consistent with the
steady green or blinks at short
actual connected devices.
intervals (on for 0.2s and then
off for 0.2s) add a PV plant.

11
Add a plant.

12
• Local Commissioning Using the SmartLogger of the Inverter

Scan the QR code of


the inverter
connected to the
SmartLogger. If Sync phone time is
enabled, the time and
time zone of the
inverter are
synchronized with
those of the mobile
Log in to the app as
an installer. The initial
password is 00000a.

In a non-Battery scenario, the step of Energy storage control is not involved.

Ensure that the devices The grid code is set to


are consistent with the N/A by default
actual connected d (automatic startup is
You can tap to
not supported). Set the
obtain the detailed
grid code based on the
working mode
area where the PV Note:
information. In scenarios without
plant is located.
household energy storage,
no ESS photos are required.

13
When the SmartLogger
connects to the
SmartPVMS over a
When the SmartLogger wired network, set
connects to the Wired network
SmartPVMS over the parameters.
wireless network, set
Mobile network
parameters and
Enabled Monitor the Network mode.
PV plant through the
management system.
Set the Domain name
to
intl.fusionsolar.huawe
i.com and Port number
to 27250.

Add a plant.

Note:
In scenarios without
energy storage, no ESS
photos are required.

14
4. Create an owner account

Add user Invite a user Register an account

Note: After receiving the


In some regions, the invitation, the user
function of inviting users accesses the
is not supported. The registration page to
actual page prevails. register an account.

15
5. Checking the Device Status
• Checking the Device Status Using Device Commissioning

16
FAQ. Physical Layout Design (With Optimizers)
Step 1 After determining the installation position of an optimizer, remove the SN label from the
1. The physical layout must be configured for optimizers. When an optimizer is faulty, it can be
optimizer and attach it to the physical layout template.
quickly located and replaced based on the physical layout.
2. The optimizer disconnection detection is available only after the physical layout is complete.
Perform optimizer disconnection detection and view the result on the Optimizer layout screen.

Rooftop PV

Physical location layout Step 2 Take a photo of the template with the QR code attached.

Positioning point for photographing

Positioning point

Fault indication Disconnection indication

Note: Ensure that the four positioning points on the template are within the frame.

17
FAQ . Physical Layout Design

Take a photo of the


template with the
Set optimizer QR code attached,
parameters. or select the photo
Tap Physical from your phone
layout. album.

Tap to upload the


Tap a plant that is physical layout
equipped with template. Tap to add a
optimizers. physical layout
template.

Note:
After all templates For some unidentified QR
are uploaded, tap codes, manually bind them.
Layout Generation
to generate the
physical layout.

18
Indicators on the Smart Dongle
LED Remarks Description
Color Status
N/A Off Normal The Dongle is not secured or is not powered on.
Yellow (blinking green and The Dongle is secured and powered on.
red simultaneously) Steady on

Green Blinking in a 2-second cycle (on for 0.1s and Normal Dialing (duration < 1 min)
then off for 1.9s)
Abnormal If the duration is longer than 1 min, the 4G parameter settings are incorrect. Reset the parameters.
Blinking at long intervals (on for 1s and then Normal The dial-up connection is set up successfully (duration < 30s).
off for 1s)
Abnormal If the duration is longer than 30s, the settings of the management system parameters are incorrect. Reset the parameters.

Steady on Normal Successfully connected to the management system.


The inverter is communicating with the management system through the Dongle.
Blinking at short intervals (on for 0.2s and
then off for 0.2s)

Red Abnormal The Dongle is faulty. Replace Dongle.


Steady on

The Dongle has no SIM card or the SIM card is in poor contact. Check whether the SIM card has been installed or is in good
Blinking at short intervals (on for 0.2s and contact. If not, install the SIM card or remove and insert the SIM card.
then off for 0.2s)

The Dongle fails to connect to the management system because it has no signals, weak signal, or no traffic. If the Dongle is
Blinking at long intervals (on for 1s and then reliably connected, check the SIM card signal through the APP. If no signal is received or the signal strength is weak, contact
off for 1s) the carrier. Check whether the tariff and traffic of the SIM card are normal. If not, recharge the SIM card or buy traffic.

Blinking red and green No communication with the inverter


alternatively • Remove and insert the Dongle.
Blinking at long intervals (red for 1s and green • Check whether inverters match the Dongle.
for 1s) • Connect the Dongle to other inverters. Check whether the Dongle or the USB port of the inverter is faulty.

Normal The Dongle is being upgraded locally.


Blinking at short intervals (red for 0.2s
and green for 0.2s)