Fusion Solar
Fusion Solar
Issue: 08
Date: 2023-05-05
Copyright © Huawei Digital Power Technologies Co., Ltd. 2023. All rights reserved.
FusionSolar App Quick Settings
Operation Procedure
• The figures are for reference only.
Download and install the FusionSolar app • The initial password for connecting the inverter WLAN is Changeme.
• The initial password for connecting to the Smart USB-WLAN adapter is Changeme.
Register an installer account • The initial password for the installer account is 00000a. If the system prompts you
(optional, for installers without an account) to change password, set a new password and then log in to the system.
• Some device do not support the initial password. You need to set the initial
password upon the first connection. Set the password before log in to the system.
Log in and start Setup wizard • To ensure account security, change the password periodically and keep the new
password in mind. Not changing the initial password may cause password
Create an owner account disclosure. A password left unchanged for a long period of time may be stolen or
cracked. If a password is lost, devices cannot be accessed. In these cases, the user is
liable for any loss caused to the PV plant.
Check the device status
1
1. Downloading and Installing the FusionSolar App
Method 1: Download and install the app from the app store. Users who select method 2 can select the download method based on the mobile phone
• Huawei phone users: Search for FusionSolar in Huawei AppGallery. type.
• iPhone users: Search for FusionSolar in the App Store. • Huawei mobile phone users: Download from Huawei AppGallery.
• Other mobile phone users: Select method 2. • Non-Huawei phone users: Download on a browser.
Note:
Method 2: Scan the QR code to download and install the app.
When you select Download via the
Browser, if a security warning message is
displayed indicating that the app is from an
external source, tap ALLOW.
2
2. Register an Installer Account (Optional, for Installers Without an Account)
Add user
Register the first installer account and create a company account.
To create multiple
installer accounts for
the same company, log
in to the FusionSolar
app to Add User or
Invite User.
Invite a user
Note:
In some regions, the
function of inviting users is
not supported. The actual
page prevails.
3
3. Log in and Start Setup Wizard
• WLAN/FE SDongle+Built-in WLAN of the Inverter
In a non-cascading scenario, the step of Searching for cascaded inverters is not involved.
4
In a non-Battery scenario, the step of Energy storage control is not involved.
5
Add a plant.
Note:
In scenarios without
energy storage, no ESS
photos are required.
6
• SDongleA-03+Distributed inverter/SDongleB-06+Commercial inverter (without WLAN module)
SDongleB-06
7
In cascading scenarios, you need to manually search for cascaded inverters.
Networking Parameters
8
Add a plant.
9
• Local Commissioning Using a Smart USB-WLAN Adapter
WLAN module
10
Set network parameters and domain name.
In a non-cascading scenario, the step of searching for cascaded inverters is not involved.
4G communication
Enabled Monitor the PV plant
through the management
system.
LED
11
Add a plant.
12
• Local Commissioning Using the SmartLogger of the Inverter
13
When the SmartLogger
connects to the
SmartPVMS over a
When the SmartLogger wired network, set
connects to the Wired network
SmartPVMS over the parameters.
wireless network, set
Mobile network
parameters and
Enabled Monitor the Network mode.
PV plant through the
management system.
Set the Domain name
to
intl.fusionsolar.huawe
i.com and Port number
to 27250.
Add a plant.
Note:
In scenarios without
energy storage, no ESS
photos are required.
14
4. Create an owner account
15
5. Checking the Device Status
• Checking the Device Status Using Device Commissioning
16
FAQ. Physical Layout Design (With Optimizers)
Step 1 After determining the installation position of an optimizer, remove the SN label from the
1. The physical layout must be configured for optimizers. When an optimizer is faulty, it can be
optimizer and attach it to the physical layout template.
quickly located and replaced based on the physical layout.
2. The optimizer disconnection detection is available only after the physical layout is complete.
Perform optimizer disconnection detection and view the result on the Optimizer layout screen.
Rooftop PV
Physical location layout Step 2 Take a photo of the template with the QR code attached.
Positioning point
Note: Ensure that the four positioning points on the template are within the frame.
17
FAQ . Physical Layout Design
Note:
After all templates For some unidentified QR
are uploaded, tap codes, manually bind them.
Layout Generation
to generate the
physical layout.
18
Indicators on the Smart Dongle
LED Remarks Description
Color Status
N/A Off Normal The Dongle is not secured or is not powered on.
Yellow (blinking green and The Dongle is secured and powered on.
red simultaneously) Steady on
Green Blinking in a 2-second cycle (on for 0.1s and Normal Dialing (duration < 1 min)
then off for 1.9s)
Abnormal If the duration is longer than 1 min, the 4G parameter settings are incorrect. Reset the parameters.
Blinking at long intervals (on for 1s and then Normal The dial-up connection is set up successfully (duration < 30s).
off for 1s)
Abnormal If the duration is longer than 30s, the settings of the management system parameters are incorrect. Reset the parameters.
The Dongle has no SIM card or the SIM card is in poor contact. Check whether the SIM card has been installed or is in good
Blinking at short intervals (on for 0.2s and contact. If not, install the SIM card or remove and insert the SIM card.
then off for 0.2s)
The Dongle fails to connect to the management system because it has no signals, weak signal, or no traffic. If the Dongle is
Blinking at long intervals (on for 1s and then reliably connected, check the SIM card signal through the APP. If no signal is received or the signal strength is weak, contact
off for 1s) the carrier. Check whether the tariff and traffic of the SIM card are normal. If not, recharge the SIM card or buy traffic.
19