Auroville Production and Use of Compressed Stabilised Earth ..N Code) Satprem Maini 2010
Auroville Production and Use of Compressed Stabilised Earth ..N Code) Satprem Maini 2010
CODE OF PRACTICE
Auroshilpam, Auroville 605 101, INDIA http://www.earth-auroville.com Tel: +91 (0) 413 – 262 3064 / 262 3330
Email: [email protected] Fax: +91 (0) 413 – 262 2886
PRODUCTION AND USE OF COMPRESSED STABILISED EARTH BLOCKS
CODE OF PRACTICE
136 pages
Ref. TM 06
Humanity as a whole
No rights reserved!
TABLE OF CONTENTS
6. BASIC DESIGN GUIDELINES FOR MASONRY WITH CSEB ______________________________ 67
6.1 Design guidelines AND Principles _____________________________________________________ 67
6.1.1 Basic principles _____________________________________________________________ 67
6.1.2 Shear strength ______________________________________________________________ 67
6.1.3 Shrinkage stress ____________________________________________________________ 67
6.1.4 Water absorption ____________________________________________________________ 67
6.2 Compressive strength and safety factors for load bearing walls_______________________________ 68
6.3 Dimensioning buildings ____________________________________________________________ 68
6.4 Example of plan __________________________________________________________________ 69
6.5 Mortar quality and block laying principles _______________________________________________ 70
6.5.1 Mortar quality ______________________________________________________________ 70
6.5.2 Block laying principles for walls _________________________________________________ 70
6.6 Bonds principles for masonry________________________________________________________ 71
6.7 Examples of bond patterns __________________________________________________________ 73
6.8 Composite techniques with CSEB and stabilised earth techniques ____________________________ 100
6.8.1 Stabilised rammed earth foundation _____________________________________________ 100
6.8.2 Composite basement and plinth beam ___________________________________________ 104
6.8.3 Composite columns_________________________________________________________ 105
6.8.4 Composite beams and lintels __________________________________________________ 107
6.8.5 Arches, Vaults and Domes (AVD)_______________________________________________ 108
6.8.6 Disaster resistant buildings ___________________________________________________ 113
1. INTRODUCTION
1.1 FOREWORD
The tradition of building with earth is nearly as old as mankind, and earth as a building material has been used all
over the world. In the 20th century, a new earth technique has been developed: Compressed Earth Block, globally
known as CEB.
In India the initial research on CEB was conducted by CBRI Roorkee. The Indian Institute of Science, Bangalore, has
also done commendable work in this field.
CEB have gained popularity not only in India but also in many other countries worldwide. To ensure proper quality
of products and buildings, this Code of Practice has been elaborated to present the “State of the Art” in the field.
Most frequently, compressed earth blocks are stabilised with cement or lime. Therefore, today, we prefer to call
them Compressed Stabilised Earth Blocks (CSEB), to emphasize that they are both compressed and stabilised. The
addition of soil stabilisation allows people to build higher buildings with thinner walls, which have a much better
compressive strength and water resistance.
This Code of Practice is the result of research and development done by the Auroville Earth Institute since 1989.
Over the years, the Auroville Earth Institute has become one of the world leaders in the field of CSEB technology
and stabilised earth techniques. AVEI is the representative for Asia as the UNESCO Chair “Earthen Architecture,
Constructive Cultures and Sustainable Development”.
Moreover, the Auroville Earth Institute is part of a world network with CRATerre (The International Centre for Earth
Construction), ABC Terra in Brazil and a number of Indian NGO’s. A training agreement has been passed with the
School of Architecture of Grenoble, France, to provide long-term training courses to their students.
1.2 SCOPE
This Code of Practice details the state of the art for the production of Compressed Stabilised Earth Blocks, and the
basic design and construction with CSEB. The manual has been conceived for the purpose of being easily
understandable for laymen, with the aim that the technology can be widely spread with standardised quality and
strength.
This Code of Practice is organised in various parts:
After the Introduction, Chapter Two covers specifications for the raw material, which includes the soil identification
with sensitive tests. It describes soil suitability and strategies for the improvement of a soil for specified
requirements. It also presents examples on how to manage soil resources in a suitable and sustainable way.
Chapter Three covers soil stabilisation, including main stabiliser types and suitability, stabilisation principles and
calculations.
Chapter Four covers the product and equipment specifications with the various block types (solid, hollow and
interlocking CSEB), their use and selection criteria. It defines CSEB specifications and characteristics, and the
minimum performance for CSEB. Press types and selection criteria are also described in this section.
Chapter Five covers all steps of the block making process, including blockyard organisation, monitoring the
production and quality control during and after production.
Chapter Six covers basic design guidelines principles, including dimensioning of buildings and recommendations
for the structural design of load bearing unreinforced CSEB masonry for houses and buildings up to three floors
high. It introduces various building techniques, including composite earth technologies, arches, vault and domes,
and disaster resistant building techniques.
Chapter Seven shows examples of buildings, mostly in Auroville, to demonstrate a diversity of architectural style.
Chapter Eight, includes Annexes, which provide various references along with an alphabetic glossary related to the
various chapters: see this part if words are new to the reader.
-1-
1.3 HISTORICAL BACKGROUND, EVOLUTION AND BASICS
Earth as a building material has been used worldwide since the
dawn of mankind.
UNCHS Habitat has evaluated that about 1.7 billion people of the
world’s population live in earthen houses:
About 50 % of the population in developing countries
At least 20% of urban and suburban populations.
Compressed earth block is a modern technological development, which combines the ancestral techniques of sun
dried brick and rammed earth.
The first attempts at compressed earth blocks were made in the early days of the 19th century in France. The
architect François Cointeraux precast small blocks of rammed earth and he used hand rammers to compress the
humid soil into a small wooden mould held with the feet.
The first steel manual press was the “Cinvaram”, which was the
result of a research programme conducted in 1956 by Raul
Ramirez from the Colombian Inter-American Housing Center
(CINVA). This press could produce regular blocks in shape and
size, denser, stronger and more water resistant than the adobe.
The widest development and implementation of CSEB since the 1960’s has been seen in Africa. Nearly every
African country has examples of CSEB building, from social housing to luxurious apartments and government
buildings.
In India, one of the first institutions to research and develop this technology was the Central Building Research
Institute (CBRI) at Roorkee, which has been conducting research since the 1970’s. The Indian Institute of Science
of Bangalore (IISc) has also done a lot of research on this subject. The Auroville Earth Institute (AVEI) has done
extensive applied research and development on CSEB and various stabilised earth techniques which are being
disseminated and used worldwide.
-2-
South Asia has also demonstrated a lot of development and use of CSEB. In Thailand, the initial research was
undertaken by the Thailand Institute of Scientific and Technological Research (TISTR) in Bangkok in the 1960’s.
They used the Cinvaram press and developed a system for interlocking blocks.
Sri Lanka has also used this technology more and more, and the Sri Lankan Standard Institution has published a
standard on the production and use of CSEB.
New Zealand and Australia also have standards related to earth techniques which include compressed stabilised
earth blocks.
In the USA, the State of New Mexico has published standards including CSEB and other earth techniques. Several
other states are also using CSEB and other stabilised earth techniques. Contractors are building with CSEB in
Colorado, Texas and New Mexico and the demand is increasing in other US states.
Europe has also seen more and more development with earth techniques. There are networks in Germany, France
and Switzerland. In France, CRATerre-ENSAG promotes CSEB as well as other earth techniques, and is the centre
of excellence of the UNESCO Chair “Earthen Architecture, Constructive Cultures and Sustainable development”.
CRATerre-ENSAG had been actively involved in the preparation of norms and standards on CSEB for African
countries under a programme with the Industrial Centre for Development.
Globally, this material has often been called Compressed Earth Blocks (CEB); however, most frequently, the blocks
are both compressed and stabilised. Therefore, we have chosen rather to adopt the term Compressed Stabilised
Earth Blocks (CSEB).
CSEB can be compressed in many different shapes and sizes. Stabilised soil is slightly moistened, poured into a
mould and then compressed either with a manual or motorized press. Machinery for compressed earth blocks has
evolved significantly and it is now possible to find manual presses as well as motorised presses, mobile units and
completely integrated plants. The addition of soil stabilisation allows blocks to have a higher compressive strength
and water resistance, therefore affording the possibility to build higher buildings using thinner walls.
-3-
1.4 ADVANTAGES AND LIMITATIONS OF CSEB
-4-
Dimensional uniformity and flexibility
CSEB have consistent dimensions. Their accuracy and regular dimension saves mortar for laying the blocks and
for pointing. Blocks can be made in many different types and sizes.
Strength of load bearing structures
CSEB can be used for load bearing structure, as they are strong enough and can withstand the load of 4 floors
without concrete columns. Arches, vaults and domes can replace concrete beams and slabs, thus bringing the
overall cost lower than conventional structures. Furthermore, CSEB don’t necessarily need to be plastered.
Social acceptance
CSEB has a demonstrated ability to adapt itself to various needs: from low income to wealthy individuals or
governments. Its quality, regularity and finish allow a wide range of final products.
To facilitate social acceptance, the name “stabilised mud blocks” should never be used, when speaking of
CSEB. CSEB has benefited from more than half a century of research and development. Mud blocks give an
impression of a poor building material to most people. Further the name “mud” refers to a state of the earth
which has a lot of water: a mixture of soil and water in a fluid or weak solid-state. CSEB need only to be humid
and the mix contains a small quantity of water.
-5-
-6-
2. EARTH AS A BUILDING MATERIAL
2.1 SOILS
A soil can be considered as an “Earth Concrete”: Cement is the binder for cement concrete; in a soil, the silt and
clay are the binders. Thus, it is like a concrete, but silt and clay are not stable with water. Therefore a wet soil
will lose its strength and mechanical properties. In order to make silt and clay stable with water, they can be
stabilised to maintain some strength when the blocks get wet.
Solid components
Solid components include pebbles, gravel, sand, silt and clay. They can be classified according to these
grain sizes (based on the ISO 14688):
Pebbles Gravel Sand Silt Clay
200 to 20 mm 20 to 2 mm 2 to 0.06 mm 0.06 to 0.002 mm 0.002 to 0 mm
For compressed stabilised earth bocks, pebbles shall be removed.
Clay particles
Clays are the binders of the earth grains and they are the smallest particles (below 0.002 mm). Clays are
distinguished from other fine-grained particles not only by their difference in size but also by their
mineralogy. They are phyllosilicate minerals formed from thin plate-shaped particles, and their cohesion is
insured by electrostatic forces. They show plasticity through a variable range of water content. When drying,
the clay particles will harden and will become difficult to crush between the fingers.
There are three main groups of clays: kaolinite, smectite and illite:
Kaolinite group which is constituted of alumino silicates.
It includes clays such as kaolinite, dickite, halloysite and nacrite.
Smectite group which includes dioctahedral smectites such as montmorillonite.
Illite group which includes the clay-micas. Illite is a phyllosilicate or layered alumino-silicate.
-7-
For a compressed stabilised earth block, the clay in the soil acts first as a lubricant. When compressing the
soil, clay allows the other inert grains of gravel, sand and the silt to be reorganised differently, and it allows
to them to form a different dense matrix. Finally, once compressed, clay will bind the grains with
electrostatic forces which are conducted by water.
Silt particles
Silts are fine grains (0.06 to 0.002 mm) between sand and clay. Silts are created by a variety of physical
processes capable of splitting the generally sand-sized quartz crystals. The main process is abrasion
through transport, including fluvial, aeolian and glacial grinding. Silts are not very active particles, however,
according to their grain size and mineralogy, they can bind other inert grains (sand and gravel) to a certain
extent through capillary forces.
The Unified Soil Classification System (USCS) defines three major classification groups: (1) coarse-grained soils
(e.g. sands and gravels); (2) fine-grained soils (e.g. silts and clays); and (3) highly organic soils (referred to as
"peat"). The Indian standard IS: 1498- 1970, “Classification and Identification of Soils for General Engineering
Purposes” retains only two groups: “coarse-grained soils” and “fine-grained soils”. Highly organic soils and other
miscellaneous soils are placed in another group and not considered for engineering purposes.
Standard classification related to the texture is done using symbols such as GW-GP, GW-GM, SW-SP, SW-SM, CL-
Cl, OL-01, Cl-CH, 01-OH, Ml-01, MH-CH, etc. However, these references are not easily understandable for laymen.
Gravel, sand, silt and clay are the four components of a soil used for CSEB, and texture is the first criteria to look at
for the suitability of a soil for producing CSEB. Therefore it is preferred to reference the soil classification for CSEB
on the basis of the texture of the soil. The names of this classification are given by the component which most
influences the behaviour of the soil: i.e. gravely when the gravel influences the most, sandy when sand is more
influencing silty or clayey soils. Gravely, sandy, silty and clayey soils are defined as typical soils.
Note that the soil has to be evaluated as a whole and not as separate components. Therefore it is necessary to
examine how these various components combine with each other. For example, a soil might have more gravel than
normal, but if the clay is very plastic and with the proper proportion, the soil might not be called gravely, but it will
probably be a good soil because both components work well together.
In fact soils have a very large range of textures and it is necessary to define more categories of soil classification
for CSEB. Often two of the components of the soils are influencing its behaviour. Therefore more precise categories
will use the name of these two components, such as “gravely clay” or “silty sand”. These types of soils are defined
as combined soils.
The last name is the primary component of the soil which influences it the most. The first name is the secondary
component of the soil which influences it to a lesser extent. Examples of names for combined soils:
Silty sand = Soil mainly sandy with an influential proportion of silt.
Sandy silt = Soil mainly silty with an influential proportion of sand.
-8-
2.1.3 Soil suitability and improvement of soils for CSEB
2.1.3.1 Good soil for compressed stabilised earth blocks
Note that topsoil, which normally contains humus, shall never be used. It shall be scraped aside and reused
later on for agriculture or landscaping.
Two parameters shall be taken into account to define a good soil for compressed stabilised earth block:
Compressibility and type of stabiliser.
In general, it is not advisable to use soils with less than 10% of clay or less than 25% of silt and clay. The
reason is that there are not enough binders to lubricate the inert grains and to allow them to be reorganised
in a dense and cohesive structure.
Soils with less percentage of silt and clay will not be easily compressible and the blocks will not be cohesive
just after production. Therefore, it will be necessary to stabilise the soil more and to handle the blocks in a
very careful way after production.
Portland cement will bind the grains of gravel and sand together to create an inert matrix which restricts
movement. It will work less efficiently with silt and especially with clay. Therefore a good soil for
cement stabilisation will be a sandier soil.
Lime will also bind the grains of gravel, sand and silt, but to a lesser extent compared to cement. Lime
will especially have a pozzolanic reaction with clay. It will create stable chemical bonds between clay
and sand. Therefore a good soil for lime stabilisation is rather clayey.
Ideally the gradation obtained after modifying the soil shall be as close as possible to the values given above.
-9-
2.1.3.2 Improvement and stabilisation of soils according to their classification
Finding a good soil as described above is quite difficult. But it is possible to use many soils and to
modify/improve them. According to the original soil quality, adding materials like gravel or sand can be an easy
improvement. Note that it is not advisable to mix clay as the process would be long for an uncertain result. The
reason is that dry clay is a hard material to crush by hand and it should rather be pulverised with a machine.
Improvement can also be done by sieving the soil or by mixing different qualities of soil. Stabilising a soil will
also improve it. For more details, see chapter three “Stabilisers and soil stabilisation”, page 27. The main aim
for the modifications of a soil is to seek a good compressibility by having enough aggregates (gravel and sand)
and to adapt the choice of the stabiliser according to the plasticity and behaviour of the soil.
Note that the following recommendations have to be considered as general guidelines and not as fixed
rules. The infinite variation of soil qualities makes it impossible to define strict rules for soil suitability, for
their improvement and how to use them. The guidelines below are mostly based on soil texture, but the
activity / plasticity of clay also has to be considered.
Therefore always consider the following guidelines as a starting point to define specifications, soil
improvement and stabilisation. Note that in the following recommendations, the percentage of cement is
always by weight of dry materials.
- 10 -
Improvement and stabilisation of combined soils
Its suitability will depend on the silt-clay content: It shall not be less than 25%.
If the soil does not have enough clay, it can be mixed with another more clayey soil.
Gravely sand Sieving with a 8 to 10 mm mesh to remove the coarse gravel.
Stabilisation can be 6% of cement, especially for handling fresh blocks as this will
increase the cohesion after ejection.
Sieving with a 8 to 10 mm mesh to remove coarse gravel.
Gravely silt
Stabilisation can be 5 or 6% of cement, to give more cohesion after ejection.
Sieving with a 8 to 10 mm mesh to remove the coarse gravel.
Gravely clay Adding fine sand (10 to 20%) might be required if the gradation is too granular.
Stabilisation can be with lime or cement: 6% by weight.
Its suitability will depend on the silt-clay content.
The percentage of silt and clay shall not be less than 25%.
If the soil does not enough clay, it shall be mixed with another soil which is more clayey.
Sandy gravel
Sieving with a 8 to 10 mm mesh to remove the coarse gravel.
A maximum of 15% to 20% of gravel passing through the screen shall be allowed.
Stabilisation can be 6% by weight of cement, to give more cohesion after ejection.
Sieving with a 10 to 12 mm mesh is only required to loosen and aerate the soil.
Stabilisation can be 5% by weight of cement, if the soil is not too sandy.
Sandy silt
If the soil is not cohesive enough, 6% of cement might be preferable, especially for
handling fresh blocks as this will increase the cohesion after ejecting the block.
Sieving with a 10 to 12 mm mesh to aerate the soil and remove lumps of clay.
Sandy clay Depending on the clay content, adding some sand (10 to 20%) might be required.
Stabilisation can be with lime or cement: 6% by weight.
Sieving with a 8 to 10 mm mesh to remove coarse gravel.
A maximum of 15% to 20% of gravel passing through the screen shall be allowed.
Silty gravel Stabilisation can be 5% by weight of cement if the soil is cohesive enough.
If the soil is not cohesive enough, stabilisation would be 6% by weight of cement,
especially for handling fresh blocks as this will increase the cohesion after ejection.
Sieving with a 10 to 12 mm mesh is only required to loosen and aerate the soil.
Do not sieve in a very windy area, especially if the soil is dry (not to lose the fine clay).
Silty sand Stabilisation can be 5% by weight of cement, if the soil is not too sandy.
If the soil is too sandy, 6% by weight of cement might be preferable, especially for
handling fresh blocks as this will increase the cohesion after ejecting the block.
Crushing needed. Sieving with a 5-8 mm mesh if the soil is dry. Wet soil can’t be sieved.
Adding 15 to 25% of coarse sand is needed to reduce plasticity and give some skeleton.
Silty clay Stabilisation can be: 5 to 6% minimum of cement, if clay is not too plastic.
6 to 7% by weight of lime, if clay is very plastic.
2% cement + 5% lime could also give good results.
Sieving with a 8 to 10 mm mesh is indispensable to remove coarse gravel.
A maximum of 15% to 20% of gravel passing through the screen shall be allowed.
Clayey gravel The maximum size for the gravel passing through the sieve shall be 10 mm.
Adding sand might be required if the gradation is too fragmented.
Stabilisation can be 5% by weight of cement.
Sieving with a 10 to 12 mm mesh is only required to loosen and aerate the soil.
Clayey sand
Stabilisation can be 5% by weight of cement.
Crushing needed. Sieving with a 5-8 mm mesh if the soil is dry. Wet soil can’t be sieved.
Adding 15 to 25% of coarse sand is needed to reduce plasticity and give some skeleton.
Clayey silt Stabilisation can be: 5 to 6% minimum of cement, if clay is not too plastic.
6 to 7% by weight of lime, if clay is very plastic.
2% cement + 5% lime could also give good results.
- 11 -
2.1.4 Soil identification
Soils can be identified in two ways: laboratory analysis and field tests, also known as sensitive analysis. Laboratory
analysis need specialised equipment and chemicals. They cannot be performed by laymen.
Sensitive analysis can be performed by anybody after a short training. Of course sensitive analysis cannot be as
accurate as laboratory analysis for determining the grain size distribution or the plasticity. But most of the time they
are sufficient to determine the behaviour of a soil and its suitability for an earth technique and CSEB in particular.
The tests for the soil identification, either done with laboratory analysis or sensitive analysis, have to check mostly
the four fundamental properties (Texture, Compressibility, Plasticity and Cohesion).
Note that the soil identification shall be undertaken twice: first on the raw soil, before doing any modification,
and also after correcting and improving the soil (i.e. after sieving). The reason for this is that, since some
materials have been removed (gravel and lumps), the proportions of the other components have changed.
The following tests which are described hereafter can be practiced in the field by anybody and only some water
is needed. The interpretations of the following tests are given only for the 4 typical soils, owing to their
characteristic behaviour.
If the soil smells rotten, there is a lot of humus……………... Not suitable for earth construction
If the soil smells musty, like in a forest, there is humus…….. Not suitable for earth construction
If the soil smells agreeable, there is no humus……………... Suitable for earth construction
Big and hard pieces: The soil is very coarse and granular………………………… Gravely soil
Coarse to small pieces: The soil is rough…………………………………………... Sandy soil
Fine powder: The soil is soft and lumps are easy to crush………………………….. Silty soil
Very fine powder if the soil is crushed: The soil is very soft or there are lumps which
are hard to crush between the fingers……………………………………………… Clayey soil
- 12 -
2.1.4.1.3 Tests for compressibility
1. Add a little water and press by hand
Add a little water slowly until the soil is moist, and compress it by hand to make a
cohesive ball. The ball will be fully compressed when one additional hand
compression does not change its volume. Try to evaluate how much force is
required and count how many times the ball needs to be pressed for it to be fully compressed. Note that the
number of compressions described as follows depends on the strength of the operator. But in general the
more clay the soil has, the greater number of compressions are required to compress the ball.
Pressing requires a lot of strength and the ball is compressed after pressing 1 to 2
times. The compressed ball is not cohesive………………………………………... Gravely soil
Pressing requires some strength and the ball is compressed after pressing 2 to 3
times. The compressed ball is not very cohesive…………………………………… Sandy soil
Pressing requires a little strength and the ball is compressed after pressing several
times. The compressed ball is normally cohesive. Its cohesiveness depends on the
size of silts (coarse silts will not be too cohesive but fine silt will be)…………….. Silty soil
Pressing requires very little strength and the ball can be compressed after pressing
many times. The compressed ball is very cohesive………………………………… Clayey soil
2. Jar test
This test requires a bottle or a jar, which can be closed either by a lid or by hand. Some soil and
water are poured into the jar and shaken. The various grains will sediment (fall). The sedimentation
speed and the thickness of deposited layers are measured. A plastic bottle can do, but it shall be
smooth and without any grooves, which may disturb the observation of sedimentation and the
measurement of the height of the various layers.
1. About 5 cm of dry soil is poured into the bottle. It is advisable to make a mark on the side of the bottle
with a pen to reference the height of the dry soil.
2. The bottle is filled up to 3/4 of the height with water.
3. Shake the bottle after closing it, either with a lid or by hand.
4. Grains will sediment at various speeds: The largest and heaviest grains will fall first and faster.
5. The sedimentation speed of the various grains has to be examined carefully, as the heaviest grains
sediment very fast. The coarse grains (gravel, coarse and fine sand) sediment within seconds.
6. Measure the thickness of these layers. Compare them also with the total height of the initial dry soil.
7. Silt and clay will sediment slowly and their deposit could be seen the only next day.
Note that silt may expand slightly and clay will expand a lot more, according to its activity. Therefore
measuring the height of the various layers deposited and comparing them will not give accurate information.
What can be compared is the total height of the coarse grains (gravel, coarse and fine sand) which can be
measured, to the initial height of dry soil.
Very coarse particles fall very fast and the thickness of this layer is large:
More than 20 % of the height of the initial dry sample poured in the bottle……………. Gravely soil
Coarse particles fall fast and the various grain sizes falling will differentiate coarse
sand to fine sand. The layer is more than 50 % of the height of the initial dry sample..... Sandy soil
Particles fall slowly and the water soil mix in the bottle is cloudy for quite some time.
The largest layer appears like slurry but it is difficult to distinguish any grain size……... Silty soil
Particles fall very slowly and the water soil mix in the bottle is cloudy for a long time.
The top layer is large and appears like a slurry but it is impossible to distinguish grains. Clayey soil
- 13 -
2.1.4.1.4 Tests for plasticity
There are several tests to check soil plasticity. It is advisable to proceed by order, according to the following
tests and procedures described as follows.
The ball is very difficult to shape. It has no cohesion even with a lot of water.
Pressing the ball with the fingers breaks it easily and reshaping it is not easy……... Gravely soil
The ball is difficult to shape. It has little cohesion. The ball breaks quite easily when
pressed with the fingers but it can be reshaped…………………………………… Sandy soil
The ball is quite easy to shape. It has some cohesion and its cohesiveness depends
on the size of silts (coarse silt will not be too cohesive when fine silt will be).
Pressing the ball with the fingers can break it but it can be reshaped……………… Silty soil
The ball is easy to shape. It has a lot of cohesion. Pressing the ball with the fingers
changes the shape of the ball, which remains plastic……………………………... Clayey soil
The ball breaks apart very easily after a short pull: The soil is not plastic at all……… Gravely soil
The ball breaks apart easily: The soil is a little plastic only………………………… Sandy soil
The ball breaks after some length: The soil is plastic………………………………. Silty soil
The ball breaks after a long pull: The soil is very plastic…………………………….. Clayey soil
The knife penetrates easily, breaks the ball and remains very clean after pulling it out. Gravely soil
The knife penetrates into the ball easily and remains almost clean after pulling it out. Sandy soil
The knife penetrates with more difficulty into the ball and is very dirty after pulling it Silty soil
out.
The knife penetrates with difficulty into the ball and is a little dirty after pulling it out. Clayey soil
The ball can break apart and the cuts have a very rough aspect…………………… Gravely soil
The ball is easy to cut and the cuts have a rough aspect…………………………… Sandy soil
The ball is slightly difficult to cut and the cuts have a smooth but not shiny aspect…. Silty soil
The ball is more difficult to cut and the cuts have smooth and shiny aspects……….. Clayey soil
- 14 -
5. Make a thumbprint onto the plastic ball and fill it with water
Make a print with the thumb onto the cohesive ball, fill it with water and evaluate the speed of
absorption. This absorption test can also determine the cohesion and quality of the binders:
some binders are not very active and they will swell a little bit, but the very active ones will
swell a lot and their activity may split and break the ball apart.
Water penetrates very quickly……………………………………………………… Gravely soil
Water penetrates quickly…..………………………………………………………. Sandy soil
Water penetrates slowly…………………………………………………………… Silty soil
Water penetrates very slowly………………………………………………………. Clayey soil
Cohesion is lost very easily and the soil is very easy to wash. There are not much
fine particles and the soil does not stick to the hand……………………………….. Gravely soil
Cohesion is lost easily and the soil is easy to wash. There are a lot of medium and
fine grain sizes. The soil sticks a little to the hand…………………………………... Sandy soil
Cohesion is lost easily but the soil is difficult to wash. Dissolving the ball requires a
lot of water and it takes a long time to dissolve it. The soil sticks a lot to the hand…... Silty soil
Cohesion is lost slowly and a lot of water is required to dissolve the ball. A thin film,
like oil, sticks to the hands and the ball remains cohesive for a long time…………… Clayey soil
- 15 -
Sandy soil
The texture of the soil is coarse.
The compressibility requires some strength, and the ball is compressed after pressing for a short
time. The compressed ball is not very cohesive.
The sedimentation in the jar shows coarse to fine grains. It is important to note the fine sand falling
on the top of the sand layer. This helps to differentiate the fine sands from the silt.
The plastic ball is relatively difficult to shape and it has little cohesion. The ball breaks quite easily
when pressed with the fingers, but it can be reshaped.
The ball breaks apart easily when pulled like a rubber elastic, as the soil is a little plastic.
The knife penetrates easily into the plastic ball, and it remains almost clean after pulling it out. Note
that the cleanliness of the knife depends mostly on the quality of the fine particles of silt and clay
which are in the soil.
The ball is easy to cut and the cuts have a rough aspect.
Water penetrates quickly into the thumbprint made on the plastic ball.
The cohesion is lost easily and the soil is easy to wash. There are a lot of medium and fine grain
sizes. The soil sticks a little to the hand. It is important to see that no fine sand escapes from the
hand: this will help to differentiate if a soil has very fine sand or if it is silty.
Silty soil
The texture of the soil is fine. It can be like a powder, but it can have some lumps which are easy
to crush.
The compressibility requires a little strength, but the ball is compressed after pressing several
times. The compressed ball is normally cohesive. Its cohesiveness depends on the size of silts
(coarse silt will not be too cohesive when fine silt will be more).
The sedimentation in the jar shows particles falling slowly and the water-soil mix in the bottle is
cloudy for quite some time. The layer of silt appears like a slurry, but it is difficult to distinguish any
grain size.
The plastic ball is quite easy to shape. It has some cohesion, but its cohesiveness depends on the
size of silts (coarse silt will not be too cohesive when fine silt will be). If shaken in the palm of the
hand, a part of saturated silt releases enough water to make its surface appear glossy. If the ball is
pressed or squeezed between the fingers, its surface again becomes dull.
The ball breaks after some length when pulled like a rubber elastic, as the soil has a little plasticity.
The plastic ball shows some resistance to the penetration of the knife, and it is very dirty after
pulling it out.
The ball is slightly difficult to cut and the cuts have a smooth but not shiny aspect. It has a dull
aspect.
Water penetrates slowly into the thumbprint made on the plastic ball.
Cohesion is lost easily but the soil is difficult to wash. Dissolving the ball requires a lot of water
and it takes a long time to dissolve it. The soil sticks a lot to the hand. This is the typical difference
between silty and clayey soil: silty soils stick more to the hand, because they don’t have enough
cohesion.
- 16 -
Clayey soil
The texture of the soil is fine, but most of the time it has lumps which are hard to crush between
the fingers. Though these lumps can be hard to crush, they should not be confused with gravel.
The compressibility requires very little strength, but the soil needs to be pressed many times to
compress it. The compressed ball is very cohesive.
The sedimentation in the jar shows particles falling very slowly, and the water-soil mix in the bottle
is cloudy for a very long time. Once clay has totally sedimented, the top layer is large, as it has
swollen, and it appears like a slurry. But it is impossible to distinguish grains in this layer.
The plastic ball is easy to shape. It has a lot of cohesion and it is possible to change its shape
easily without breaking it.
The ball breaks after a long pull when pulled like a rubber elastic, as the soil is very plastic.
The knife penetrates with some difficulty into the ball as it is cohesive, and the knife is only a little
dirty after pulling it out.
The ball presents more resistance to be cut and the cuts have smooth and shiny aspects.
Water penetrates very slowly into the thumbprint on the plastic ball.
Cohesion is lost very slowly and a lot of water is required to dissolve the ball. When trying to
dissolve the ball, a thin film like oil sticks to the hands, but the ball remains cohesive for a long
time. This is the main difference in behaviour between silt and clay: silt sticks a lot to the hand,
whereas clay leaves this oily feeling.
The test consists of separating the soil’s components with a series of sieves. The masses of the various
grains retained within the sieves or those of the various grains passing the sieve are compared to the total
mass of the material. The percentages obtained are then given either in their numerical form, or in the form
of a graph (Grain size distribution chart). This chart can be drawn only for the coarse grains such as gravel
and sand. The part of the chart with the fine particles can be drawn only after doing the sedimentation test.
The principle of the test is that grains of soil of differing diameters, placed in homogeneous suspension in a
standing liquid, sediment, or "fall", at differing speeds according to their diameters. In the course of this
sedimentation, the density of the initially homogenous mixture will increase from the top to the bottom as
time passes. These variations of densities are measured with a hydrometer. By measuring times and
densities and by using Stokes' law, the diameters of the grains of soil can be defined.
- 17 -
Good soil for cement stabilised CSEB
The soil indicated in the chart below is a good soil, as it contains 15% gravel, 50% sand, 15% silt and
20% clay. It is the ideal soil for cement stabilised CSEB.
Gravely soil
The soil indicated in the chart below contains 25% pebbles, 48% gravel, 13% sand, 4% silt and 10%
clay. It is not suitable as such for CSEB. It could be modified by sieving with a 6 mm mesh. But the
amount of waste will be tremendous, as 65% of the grains are above 6 mm. Thus this soil is not
appropriate for CSEB.
- 18 -
Limits for the gradation of a soil for cement stabilised CSEB
The upper limit has no gravel, 40% sand, 30% silt and 30% clay. The bottom limit has 46% gravel, 32%
sand, 12% silt and 10% clay. Any soil between these curves would be appropriate for making cement
stabilised CSEB.
- 19 -
2.1.4.2.4 Plasticity characteristics
Plasticity characteristics are defined by the “Atterberg limits”. This a measurement of the behaviour of the
fine particles of a soil, which marks the passage of a soil from a solid state to a plastic state (plastic limit,
WP) and from a plastic state to a liquid state (liquid limit, WL).
These limits indicate the water content of a soil at the state of transition in question, expressed as a
percentage of the mass of the dry material. The Atterberg limits are carried out on the fine particles passing
through a 0.40 mm sieve.
The main Atterberg’s limits are the liquid limit, plastic limit and plasticity index. There are also other limits,
such as shrinkage limit, liquidity limit and activity. But they are not often referred to.
Liquid limit, WL
The liquid limit is the % of water content in which a soil changes from a plastic state to a liquid state.
The test uses a device called a Casagrande apparatus.
Plastic limit, WP
The plastic limit is the water content, in which a soil starts to exhibit plastic behaviour. A thread of soil
is at its plastic limit when it is rolled to a diameter of 3 mm or begins to crumble.
Plasticity index, IP
The plasticity index is a measurement of the plasticity of a soil. It defines the range of water content
within which the soil exhibits plastic properties. The plasticity index is the difference between the liquid
limit and the plastic limit: IP = WL – WP. Soils with a high IP tend to be clay, those with a lower IP tend to
be silt, and those with an IP of zero tend to have little or no silt or clay.
Even if the soil is not intended to be stabilised, it is not advisable to use these kinds of soils, as they cannot
be compressed properly and they may continue decomposing in the wall.
The procedure consists of heating the soil sample to a high temperature (400°C) in order to burn out the
organic matter, and thus to obtain its mass and therefore its percentage in dry mass.
- 20 -
2.1.4.2.7 Optimum moisture content, WOMC (Optimum water content)
This test enables one to determine the moisture content with which a soil can be compacted to a maximum.
The optimum moisture content is obtained with the Proctor compaction test.
A soil sample is subjected to static compaction at various moisture contents and with a standardized energy
of compaction. The dry density of every sample with different moisture content is measured. The sample
with the maximum dry density will give the optimum moisture content.
However in contemporary times, this balance between human development and nature has been lost, resulting in
careless exploitation of resources beyond measure. When building with earth, it is our responsibility to manage
resources appropriately from the very outset.
First of all, topsoil has to be scraped away and it can be re-used later for agriculture or gardens. Two types of
quarries may be developed:
A deep quarry, which can be used later for rainwater harvesting, wastewater treatment, basement floors,
pools, etc.
A shallow quarry, which can be used for landscape design, work or play areas, gardens, etc.
A proper plan should be drawn up beforehand to prevent discrepancies later on. If co-ordinated well, a
decentralised approach could be the most efficient and effective. The use of rainwater harvesting, medium scale
wastewater treatment, etc. can be integrated harmoniously into the urban environment.
At this point, coordination between the city/village authorities and block manufacturers will profit all sides: urban
development always needs earth to be excavated somewhere for some reason or another. These excavations
can be made in a judicious manner by producing building materials such as CSEB for the local developments.
Therefore it is indispensable to seek authorization from the mining department and local authorities.
Soil for building is a precious material. Don’t waste it. It is possible to take advantage of quarries to create a
harmonious development, as exemplified in the following section.
- 21 -
2.1.5.2 Examples of proper resource management
There are many ways to use / rehabilitate a quarry from which soil was extracted to make blocks:
The following examples from Auroville show that it is possible to use earth resources in a respectful way and to
take advantage of a quarry for the harmonious development of a place.
The wastewater system was combined with a rainwater harvesting system by percolation: the site had a steep
slope and it was needed to stop rainwater from running off. Both systems were studied in such a way that the
rainwater harvested in the percolation system was lower than the treated wastewater, as it is not advisable to
mix harvested rainwater and treated wastewater.
Excavation around the trees according to the design Laying back the top soil and planting grass
System designed and built around the trees. Totally integrated system for 4 houses
- 22 -
Basement floor and rainwater harvesting
The following example shows the management of soil resources for the construction of 13 apartments on 4 floors
in Vikas Community, Auroville. The building was planned with a basement floor, 1.20 m below the original ground
level. The volume of this basement floor was calculated to satisfy the need of soil to produce the blocks and build 4
floors. Thus, the amount of soil generated by the basement excavation was enough to build 819 m2 of carpet area,
on 4 floors. A rainwater harvesting system by percolation drains the site in case of excessive rainfall. This system
has worked perfectly as it harvested 450 m3 of water during a rainfall of 402 mm in 5 days.
Excavation of the basement, 1.2 m below ground level Section of the building with basement floor
Sections of the building with basement floor and rainwater harvesting system
- 23 -
Wastewater system integrated with the surroundings: Rainwater harvesting by percolation:
The system provided enough soil to build 4 apartments This playground’s landscape generated 80 m3 of soil
Rainwater catchment
The two following photos show how an excavation was managed to enlarge a rainwater catchment channel in the
bioregion of Auroville.
Excavation to develop a water catchment channel Water body harvesting thousands of m3 of rainwater
- 24 -
2.1.5.3 Do’s and Don’ts for an excavation
1. What shall never be done
Excavating earth without a proper rehabilitation plan for the future hole.
Tree cutting and breaking of natural dams, which will cause rainwater runoff and land erosion.
Un-designed quarries, which will become garbage dumps and pollute the environment and water table.
Disposing topsoil or uncontrolled excavations, which will waste agricultural land.
Note that every soil requires a different compression ratio. Clayey soils will require a higher compression ratio
than sandy or gravely soils. Therefore clayey soils will require more bulk volume than sandy soils. It is difficult
to determine coefficients for this, as the soil qualities vary too much.
For soil being compressed, the volume of bulk soil needed will be more than the volume of blocks. This volumic
ratio will depend whether the soil is dug on site or if it is dug somewhere else and transported by trucks: the soil
dug on site is already compacted in the ground while the soil transported by truck will have been loosened.
- 25 -
- 26 -
3. STABILISERS AND SOIL STABILISATION
3.1.1 Cement
When mixed with water, the calcium silicates in the cement undergo a chemical reaction. They crystallize and
establish a matrix with the grains of sand and gravel in the soil, which limit movement, especially of clay.
The main reaction of cement is with the inert particles of sand and gravel. It also has some chemical reaction
with clay. Therefore cement is better suited for sandy and gravely soils.
For instance, a reinforced concrete “1cement: 2 sand: 4 gravel” contains about 13% of cement by weight. A
soil stabilised with 13 % cement will never have the strength of a concrete, but its cost will be prohibitive.
- 27 -
Retention and setting time of cement
After adding water, cement starts to crystallize (to set). The initial setting occurs when cement paste loses its
plasticity and starts to stiffen. Final setting occurs when the paste hardens and can sustain minor load. Both
times are arbitrary and depend upon the quality of the cement.
The initial setting time also varies with the moisture content and the temperature. It can be considered as
beginning 30 to 40 minutes after hydration. Therefore the retention time for cement shall not be more than 40
minutes. CSEB must be compressed before that time after hydration.
3.1.2 Lime
Lime has a pozzolanic reaction with clay. This reaction changes the plasticity of clay. Therefore lime is better suited
for clayey soils than sandy soils.
Lime will have more effect on clays which have high plasticity, such as clays from the smectite group, which
includes montmorillonite and bentonite. The plasticity of kaolinite will not be so much influenced by lime because
its plasticity is rather low. Montmorillonite on the contrary will see its plasticity reduced significantly because of its
high plasticity, which is synonymous with a high capacity of cation exchange. Illite will react moderately with lime
and its plasticity will change a little.
Note that quick lime [Calcium oxide (CaO)] cannot be used for CSEB, since the exothermic reaction when it
hydrates can be dangerous for workers. It is said that adding quick lime as a powder to a humid clayey soil dries it
due to this exothermic reaction. But this is not advisable as quick lime is very caustic and can cause burns.
This reaction produces stable calcium silicate hydrates and calcium aluminate hydrates, as the calcium from
lime reacts with the alumino-silicates from clay. Lime will establish stable chemical bonds between the particles
of clay and between the grains of sand and clay through cation exchange.
The pozzolanic reaction occurs only when the blocks are kept humid and when the temperature is high enough.
Below a temperature of 4-5C, the pozzolanic reaction will be very much slowed down, but it will begin again
later on when the temperature rises.
In most cases, the effect of lime on the plasticity of clay in the soil is almost instantaneous. The calcium ions
from lime cause reduction in plasticity. The speed and intensity of the change of plasticity of clay is dependent
upon the quality of the calcium ions.
Kaolinite will undergo a very brief and minor reaction as it is not plastic enough, but montmorillonite or other
active clays of the smectite group will have a major change in plasticity. Although they will react
instantaneously, they will need a longer time to react fully; it is not really possible to give an accurate time for
this on account of the infinite variations in soil quality.
- 28 -
Stabilisation percentage of a good soil with lime
Minimum: 2 % Average: 6 % Maximum: 10 %
Fixation point
With 1 to 3 % of lime added to the soil, the pozzolanic reaction begins and modifies the plasticity of clay. This
percentage of lime is the fixation point. Beyond this percentage, any amount of lime added will not change the
plasticity, but will increase the strength of the soil through a process called carbonation.
The initial curing is similar to cement, but it can be slightly shorter: lime stabilised soils shall not dry for at least
1 to 2 weeks after production. After that they can dry freely. The setting process will start with the carbonation.
For more details regarding curing procedures, see paragraphs 5.2.4 & 5.2.5, pages 57 & 58.
Note that the humid curing time necessary for lime stabilised soils can vary considerably. Some soils may
require only 1 week of humid curing, some 2 weeks and others up to 4 weeks. After that time, the blocks are
left to dry. The full hardening process will continue for several months, though at a lower speed.
- 29 -
3.2 STABILISATION PRINCIPLES
Stabilising a soil is not only adding chemicals and/or processed products. The first action to stabilise the blocks is
to compress the soil, which is in fact the basis of the technology of compressed earth blocks.
There are three procedures and six methods to stabilise soil.
Physical
The texture of the soil is corrected by adding or removing aggregates, which are inert materials.
The actions and effect on the soil are:
The soil is sieved to remove the coarse particles.
Different soils are mixed to improve the texture.
Gravel or sand is added to reinforce the skeleton.
Clay is added to bind the grains better.
Chemical
Processed products, which are active materials, are added to the soil. There will be either a physico-chemical
reaction with the grains or the creation of a matrix which binds the coarse grains.
The actions and effect on the soil are:
The reaction helps to bind the grains of the soil.
The water resistance is increased.
The permeability and porosity are decreased.
- 30 -
3.2.3 Six methods
Six methods are considered for stabilising a soil. But not all of them are suitable for CSEB. These six methods are:
METHODS DEFINITION EXAMPLES
Compaction
Densification Establishes a dense medium, blocking pores & capillary Adding inert components
Mixing different soils
Establishes an anisotropic network limiting movement by the
Reinforcement Not suitable for CSEB
addition of fibres
Cement
Cementation Establishes an inert matrix which resists movement
Fly ash
Establishes stable chemical bonds between clay and sand
Linkage Lime
through ionic exchange
Bitumen
Imperviousness Surrounds every earth grain with a waterproof film Resins
Various chemicals
Waterproofing Prevents water absorption and adsorption by the surface Paints, plaster *
Note:
* Avoid bitumen and synthetic paints or plasters for earth walls: any paint or plaster shall allow the wall to breathe.
Principle
The calculations are always done by weight of dry material. As it is impossible to measure weights on site, they
have to be transformed into volumes. For that, it is required to know the dry density, .
Formulas
These formulas are used for all kinds of stabilisers. The aggregates are considered as the soil or (soil + sand)
or (soil + gravel) and so on. The total percentage of aggregates is always 100 %, as the binder is not yet
included: the percentage of stabiliser will be calculated on the basis of the total mix of soil and sand.
Note: * Total weight = (Approximated volume of each aggregate x its density) + stabiliser weight
- 31 -
Procedure
Follow this procedure to use the formulas and to determine the values:
1. Define the parameters Stabiliser type, percentage and weight of stabiliser, which is wanted.
(For cement, weight shall be calculated for not more than 250 litres of
aggregates. For 5 %, it often corresponds to max 1/3 of a bag per mix)**.
Percentage of sand, gravel or others, which might need to be added.
Volume in litres of the containers available (Wheelbarrows, buckets, etc).
Check the density of every aggregate = Weight of 1 litre (Formula 1).
2. Total theoretical weight Calculate the total theoretical weight of aggregates required to get the
of aggregates percentage of stabiliser wanted (Formula 2).
3. Transformation of Transform the weight of every aggregate into theoretical volume (Formula
weights into volumes 3).
4. Approximation Approximate the theoretical volume of aggregates, according to the
containers, which are available on site: the aim being to define practical
measurements and an accurate process for the site.
5. Exact % stabiliser Calculate the exact percentage of stabiliser according to the weight of
approximated aggregates (Formula 4).
6. Selection Select the result if it is within a tolerance of ~ 3% maximum from the
percentage of stabiliser wanted (i.e. 4.85 to 5.15 instead of 5%).
7. Adaptation If the result is not satisfactory, repeat the entire process with another
approximation for the volume or with other parameters.
Note: ** Mixes shall not be bigger than 250 litres, because the mix shall be compressed before the cement
starts to set. If the volume of mix is larger than 250 litres of aggregates (soil or soil + sand) the
compression of the entire mix will be too long and cement will set before being compressed. This will
result in loss of strength.
Example 1
1. Parameters: 5% cement wanted and 1/3 bag (16.67 Kg)
200 litres wheelbarrows and 15 litres buckets
100% soil required (no sand added)
Dry density checked for the soil: soil = 1.35
16 .67 x ( 100 - 5 )
2. Theoretical weight of aggregates (Formula 2): Soil 316 .73 Kg
5
316.73 x 100
3. Theoretical volume of aggregates (Formula 3): Volume of soil 234.61 Litres
1.35 x 100
4. Approximation: According to the containers available, we choose 230 Litres for the volume of soil:
1 wheelbarrow of 200 Litres + 2 buckets of 15 Litres
16.67 x 100
5. Exact % of cement (Formula 4): % cement 5.095%
(230 x 1.35) 16.67
6. Selection: 5.095% is within the 3% tolerance for the cement percentage and we select it.
- 32 -
Example 2
1. Parameters: 6% cement wanted and 1/4 bag (12.5 Kg)
100 litres wheelbarrows and 10 litres buckets
70% of soil and 30% of sand required
Dry densities checked: soil = 1.2 and sand = 1.45
12.5 x (100 - 6)
2. Theoretical weight of aggregates (Formula 2): Soil + Sand 195.83 Kg
6
195.83 x 70
3. Theoretical volume of aggregates (Formula 3): Volume of soil 114.23 Litres
1.2 x 100
195.83 x 30
Volume of sand 40.51Litres
1.45 x 100
4. Approximation: According to the containers available and to transport the materials easily, we choose:
Sand = 40 Litres = 4 buckets of 10 Litres
Soil = 100 Litres = 1 wheelbarrow of 100 Litres
12.5 x 100
5. Exact % of cement (Formula 4): % cement 6.56%
(100 x 1.2) (40 x 1.45) 12.5
6. Selection: 6.56 % is too high compared to the requirements. It is 9% above the desired percentage.
It cannot be selected.
7. Adaptation: Repeating the entire process is required. We have to add 1 bucket of soil (10 Litres) to get
6.17% cement or change the wheelbarrow or other parameters.
- 33 -
- 34 -
4. PRODUCTS AND CSEB EQUIPMENT
Solid blocks can be used for load bearing masonry up to 3 or 4 floors, depending on the building design and the
block quality. Solid blocks have normally a rectangular shape, but they can also be square, trapezoidal or
polygonal.
Hollow blocks can also be used for load bearing masonry but for reduced building heights. They will have better
insulation properties. They are found also in rectangular or square shapes.
Interlocking blocks can be solid or hollow. Solid blocks can be laid faster by unskilled labour, but they cannot be
used in seismic zones. Hollow interlocking blocks will be used only for disaster resistance, as they have the
possibility to be reinforced with reinforced concrete. They can be available in rectangular or square shapes.
Special blocks are used for various purposes such as hollow round blocks for columns, indentation blocks for
provisions for electrical conduits, U blocks for casting ring beams, thinner blocks for building vaults and domes,
floor tiles, hourdi blocks for floors and roofs, etc. Special blocks are often produced by a basic mould with
various kinds of inserts, and they are used in different parts of the building.
Round hollow Round hollow Indentation for Indentation for Square U block for
290mm 240mm Vertical pipes Horizontal pipes Ring beams
- 35 -
Rectangular U block Rectangular U block 5 cm block for 2.5 cm tiles for Coping block for
for ring beams for ring beams vaults and domes flooring parapet wall
Chamfer block for Flashing block for Indentation for Hourdi block for floors Mini block for
corners waterproofing Horizontal pipes and roofs domes
To select the most adapted product for design requirements, these factors should also be looked into:
Nominal block size
It is important to check if the nominal size of the blocks is correctly dimensioned. Often manufacturers of
presses don’t take into account the mortar thickness, which is vital for a proper bond pattern, especially with
headers and stretcher bonds (English bond). The proportion of rectangular block shall be such:
Block length = (2 x block width) + Mortar thickness
Fractional block sizes (3/4, 1/2)
It is advisable that the press can fit different moulds for making 3/4 or 1/2 size blocks. Some presses have
moulds which can produce 3/4 or 1/2 size blocks by adding some inserts and changing plates. It is necessary
to use 3/4 or 1/2 size blocks for a correct bond pattern and to avoid cutting blocks on site.
- 36 -
Module of the block
This is the nominal block size plus the mortar thickness. It is advisable to choose an easy module in the decimal
system (such as 30 x 15 x 10 cm or 25 x 25 x 10 cm), to avoid wasting time for the design calculations and
dimensioning of the building. It is advisable to select also the module with the thinnest mortar joint possible, as
large joints induce shrinkage cracks in stabilised earth mortars.
Possibilities of wall thickness
According to the module of a block, various thicknesses of walls can be achieved with easy bond patterns. The
possibility of various wall thicknesses is dependent on the nominal size of the block. Blocks shall enable the
construction of walls with 1, 1.5 and 2 blocks thickness.
Block bearing area
This parameter is important to know for two reasons:
1. The block bearing area is in fact the area of the bottom plate of the mould to be pressed by the piston of the
machine. The larger the area, the weaker the block will be. A large area will require a great energy of
compaction: a manual press with a 15 Ton force will not be able to properly compress more than 650 cm2
of block area. This block bearing area has to be considered in relation to the choice of the press.
2. The block load bearing area of hollow blocks is equivalent to the area of the block minus the cores. It is
necessary to know this area in order to design the building and its load bearing capacity. Note that the load
bearing walls shall not be less than 140 mm wide.
Where L4/4 is the length of the nominal size (full size) block, w is the width and mj is the mortar joint thickness
Note that the mortar joint shall be adapted to the block size and it shall not exceed 1 cm thickness, both
horizontally and vertically, as the stabilised earth mortar will shrink and induce cracks in the masonry.
The height of the blocks listed below is the nominal height of the block, but some presses can manufacture
blocks of various thicknesses. Special blocks are not listed here, as more detailed dimensioning and
specifications are required pertaining to their shapes.
The following table gives the main block types which can be manufactured by the Auram Press 3000.
- 37 -
MAIN AURAM BLOCK TYPES
Dimensions (mm)
Block name Type Use Void (%)
Length Width Height
Plain 240 * Solid Load bearing walls Nil 240 240 90
Plain 290 * Solid Load bearing walls Nil 290 140 90
Plain 190 Solid Partition walls Nil 190 90 90
Mini block Solid Vaults & domes Nil 140 70 50
Round 240 Hollow Columns 14 240 90
Round 290 Hollow Columns 8 290 90
Hollow 240 * Hollow Load bearing walls 21.6 240 240 90
Hollow 290 * Hollow Load bearing walls 19.5 290 140 90
Hollow 390 * Hollow Load bearing walls 29.7 390 190 90
HI 245 * Hollow interlocking Disaster resistance 8 245 245 95
HI 295 * Hollow interlocking Disaster resistance 9.3 295 145 95
HI Dry 300 * Hollow interlocking Disaster resistance 10 300 149 100
HI Dry 250 * Hollow interlocking Disaster resistance 7.5 250 249 100
* Moulds of these blocks can do 3/4 and 1/2 size blocks, according to the guidelines described in 4.2.1.1
Note that the main deviation in dimensions from the nominal block size will be due to these factors:
Block length and width
Variation will occur when the mould gets older: the abrasion of the soil will wear out the steel mould and the
block will become slightly larger. The abrasion speed of the mould depends on the soil quality.
Block height
This will change according to how the mould is filled, the moisture content of the mix and the type of soil.
The wear and tear of the press due to aging can also influence the block height. Some presses can adjust
their block height with a micro adjustment, to ensure a 0.5 mm accuracy.
- 38 -
4.2.1.5 Visual appearance
Visual appearance just after production
Blocks shall have homogeneous colour and texture.
Vertical edges shall not be damaged due to friction of soil in the mould.
Pitting due to adhesion of the block to the top and bottom plates of the mould shall not exceed 10 % of
the area of that face, and the pits shall not be deeper that 3 mm.
Visual appearance after curing
Blocks shall be free from cracks, broken edges, honey comb and other defects that would interfere with
the proper placing of blocks or impair the strength or performance of construction.
Blocks shall not be crumbly or friable when touching the edges and corners.
Efflorescence due to curing on soil cement stabilised blocks shall not exceed 20 % of the side area.
Pitting due to curing or weathering shall not exceed 10 % of the total area of the block, and pits shall not
be deeper than 3 mm.
Embodied energy (m3 raw material)* 1,112.36 MJ / m3 The embodied energy and carbon
Carbon emission (CO2/m3 raw material)** 110.11 Kg / m3 emission are for 5 % cement blocks
* Embodied energy value to be compared with: ** Carbon emission value to be compared with:
Kiln fired bricks = 2,247.28 MJ/m3 Kiln fired bricks = 202.25 Kg/m3
Country fired bricks = 4,501.25 MJ/m3 Country fired bricks = 441.12 Kg/m3
Notes:
Classes A, B and C are defined by the wet compressive strength of the blocks.
The other values given in the table above are indicative to give an idea of the characteristics to be expected.
- 39 -
Motorised presses
The mechanism of the press is operated by an engine or an electrical motor. Two to three labourers will still be
needed to feed the press, operate it and handle the blocks after pressing. More labour will be needed for mixing,
either by hand or with a separate motorised mixer. The transmission of energy can be mechanical or hydraulic.
Motorised presses can be mobile and be trailed behind a car. Their productivity can vary from 3,000 to 10,000
strokes per day. Motorised presses can be found in two categories:
Single machines, which in general need peripheral machinery such as crusher and mixer.
Mobile units, which often integrate a mixer with the moulding unit. The degree of integration, with more or
less accessories, such as crusher, belt conveyors, etc. will increase the potential and the cost
proportionally.
Semi-industrial plants
These are fixed production units, which integrate a lot of equipment into the production line: crusher, sieve,
mixer, multi-mould presses, belt conveyors, frontal loaders, forklifts, etc. Their productivity fits in a totally
different scale of production and cannot be given here as it varies a lot from case to case. Heavy plants have
been prototyped in the 1960’s and 1970’s, but often are not adapted to the local market. Their cost and
maintenance is very high. What can work is medium scale production units with 2 to 5 motorised presses and
peripheral equipment.
- 40 -
Nominal compression force
The minimum compression force shall be 5 Tons, otherwise the blocks will be under-compressed.
The maximum compression force shall be 50 Tons, otherwise the blocks will be laminated.
A nominal compression force of 20 Tons is more than sufficient for CSEB. The aim of CSEB is not to
compete with concrete, but to propose a durable building material which has better environmental qualities.
Note that when the block is over-compressed, it gains in strength but it loses thermal characteristics and
environmental advantages.
Nominal compression pressure
The minimum compression pressure shall not be less than 2 N/mm2, as blocks will be under-compressed.
The maximum compression pressure shall be 10 N/mm2, otherwise the blocks will be laminated.
Operating energy: Manual or motorised
Number of labour required to operate only the press
Mobility of the press
Manual presses shall have the possibility to be moved on site with small wheels.
Motorised presses shall have the possibility to be trailed behind a vehicle.
Net weight, including frame and mould
Working encumbrance of the press
- 41 -
4.4 PERIPHERAL EQUIPMENT
- 42 -
4.5 PRODUCTION LINES
4.5.1 Types
Various types of production lines can be set up depending on the project requirements. Five types of production
lines are generally considered, and these are linked with the type of presses, the integration of peripheral motorised
machinery and the scale of production:
Type 1 = Totally manual
This is the minimum set-up with only 1 manual press, light or heavy. The rest of the equipment is manual.
The infrastructure is minimal. This is often the type of production line for a construction site.
Type 2 = Half manual and half motorised
Two manual presses are used along with a motorised mixer and more elaborate infrastructure.
A motorised crusher/pulveriser or mechanised sieve can also be integrated.
Type 3 = Fully motorised
The production unit is totally mechanised but with separate machinery:
A motorised press is used with a motorised crusher/pulveriser or mechanised sieve and a motorised mixer.
The built infrastructure is larger.
Type 4 = Mobile unit
An automated unit integrates all machinery into a single machine with large infrastructure:
Sieve, motorised mixer, the pressing unit and belt conveyor
Note that a motorised crusher/pulveriser can be part of the set-up but it is most commonly separate
equipment on account of the disturbance of noise and dust.
Mechanised transport need also to be integrated with loader, forklift and truck.
Type 5 = Semi-industrial plant
These have generally a lot of separate machinery which can include:
Motorised crusher/pulveriser, mechanised sieve, mixers, multi-mould pressing units, belt conveyors, and
mechanised transport with loaders, forklifts and trucks.
This has the large infrastructure of a plant.
The table hereafter gives some example analysis of various types of production line, from totally manual to semi-
industrial units.
- 43 -
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5
Totally manual Half motorised Fully motorised Mobile unit Semi-industrial
Daily productivity 400 to 850 800 to 1700 2,000 to 4,000 4,000 to 10,000 + 20,000
Labour force 8 to 12 17 to 21 14 to 20 11 to 13 23 to 27
Main equipment 1 manual press 2 manual presses 1 motorised press 1 mobile unit 1 motorised press
1 crusher 1 crusher with mixer (multi mould)
1 mixer 1 mixer 1 belt conveyor 1 crusher
1 crusher 1 mixer
1 loader 4 belt conveyors
1 forklift 1 loader
1 forklift
1 truck
1 storeroom 25 m21 storeroom 50 m2 1 storeroom 75 m2 1 store 100 m2 1 store 200 m2
Covered premises Office 25 m2 Office 25 m2 Office 25 m2
Display 50 m2
Production area
Notes
The daily productivity for Type 1 and 2 is given for 1 block per stroke. If a press produces 2 blocks per stroke,
the productivity given above has to be doubled. The daily productivity for motorised equipment can vary
considerably depending on the type of press and the type of set-up. Type 4 and 5 often produce several blocks
per stroke as they have multi-mould presses.
The labour force given above is what is needed for soil preparation, block making and stacking: materials
sieving, mixing, pressing, initial curing & stacking and final curing & stacking. For the production lines Type 1
and 2, the labour force does not include the soil preparation (digging and sieving). The labour force can be
mixed with men and women.
The open stacking area is not proportional for the Types 1, 2 and 3 compared to Types 4 and 5, as the blocks
are stacked on palettes and 2 or 3 palettes can be stacked above each other. Types 4 and 5 also require more
circulation space for a forklift.
The infrastructure is minimal for the Type 1, as is often the case at a construction site.
The values given above, particularly for the costs, are indicative to allow a broad comparison.
- 44 -
5. PRODUCTION OF CSEB
The open area for stacking blocks, outlined below, is limited to 2 months of production for the reason that the
blocks shall be sold only 2 months after production: 1 month for curing and 1 month for drying. Nevertheless, this
area could be increased if it is necessary to have a larger stock.
Notes
Fully motorised production unit (Type 3)
The initial curing and stacking of blocks is under the production shed but the area is not proportional to
the Types 1 and 2 for the reason that the piles are wider and the blocks can be stacked higher as they
are normally stronger.
Mobile unit and semi industrial production unit (Type 4 & 5)
The initial curing and stacking space is not necessarily under the production shed, as it is mentioned
above. The reason is that blocks are stacked on palettes near the press and then moved outside with a
forklift. Palettes of blocks are wrapped with plastic sheets. At that stage palettes are not stacked above
each other as the blocks are still fragile. Palettes will be moved after 2 days to the final stacking area.
The area for final stacking of blocks is not proportional to the other types of production line for the
reason that blocks are stacked on palettes and several palettes can be stacked upon each other (only
after 2 days of initial curing).
- 45 -
5.1.2 Site preparation for a temporary block yard
Temporary block yards are normally set up for the duration of construction sites and they use manual presses.
Therefore they need a minimum set-up as described below.
Storage
200 to 400 m2 open storage for raw materials.
Earth and sand shall be protected from rain with UV stabilised tarpaulins.
25 m2 storeroom for storing tools and for a weeklong supply of cement and tools.
It can be also used as site office.
Water connection from the site with barrels for storage.
Production area
75 m2 (5 x 15 m) covered production shed per press. The shed is made with simple means as it will be
dismantled at the end of the construction site: i.e. with granite pillars, casuarinas poles and coconut leaves
or UV stabilised tarpaulins.
Mixing and pressing area:
The flooring for this area shall have a flat and strong pavement: i.e. CSEB or bricks which are laid on a
sand bed.
The height of the shed above the press shall be enough for the encumbrance of the lever rising up and
which shall not touch the roof. It can be nearly 3 m for some manual presses.
Initial curing and stacking area:
The pavement for this area can be done only on a thin and levelled bed of sand.
The height of the shed above this area can be only 2.20 m for the access of the workers only.
Final curing and stacking area
A flat and stable open area near the production shed to stack the blocks for final curing. It shall be calculated
on the basis of 8 to 10 m² per 1,000 blocks.
- 46 -
Qualification details per job (Motorised process)
Soil preparation
A motorised sieve, crusher or pulveriser requires skilled labour (which can be men or women) for operating
the machine or loading it with a loader. Unskilled labour is needed if the machine is loaded by hand.
Mixing
The mixer’s operator operates the belt conveyor also and is a skilled worker, man or woman. If the mixer is
loaded by a belt conveyor, unskilled workers are needed only for handling materials. But in this case, a lot of
unskilled labour will be needed to load the mixer.
Pressing
The operator of the press must be skilled and can be a man or woman.
Initial curing and stacking
If the production unit has mechanised transport, blocks will be stacked on palettes. In any case this job
requires a semi-skilled labourer, which is preferably a man to move blocks alone all the day long.
Final curing and stacking
If the production unit has mechanised transport, the forklift driver is a skilled worker, man or woman, who is
assisted by unskilled labour for curing.
Transportation
Mechanised transportation of blocks will require a skilled driver for the forklift and /or truck.
Maintenance of the machinery
One skilled technician per block yard is needed to check and maintain the equipment.
- 47 -
5.1.4 Equipment requirements
Requirements vary according to the type of press used and the type of production line. The following equipment is
recommended for the efficient production of good quality blocks for various types of block yards.
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5
EQUIPMENT TYPE Totally Half Fully Mobile Semi
manual motorised motorised Unit industrial
Main manual equipment
Manual press, light or heavy 1 No. 2 Nos. - - -
Wheelbarrow 200 litres (Measuring & transporting soil or mix) 1 No. 2 Nos. 1 No. 1 No. 1 No.
Wheelbarrow 75 litres (Measuring & transporting materials) 1 No. 1 No. 2 Nos. 2 Nos. 2 Nos.
Flat wheelbarrow for transporting blocks 1 No. 2 Nos. 4 Nos. - -
Sieve with an adapted mesh for sieving soil 1 No. 2 Nos. - - -
Field block tester (for testing cured blocks by bending) 1 No. 1 No. 1 No. 1 No. -
- 48 -
5.1.5 Block yard layout
The organisational principle for the block yard layout is that it shall follow a linear organisation: from soil
preparation to measuring components and mixing, pressing, initial curing and final stacking.
When the process is manual, it is important to have the minimum distance of transportation between the different
posts. Motorised production lines should also take advantage to follow the same principle of minimum
transportation between the posts.
The organisation of the initial curing and stacking will vary according to the type of production line:
Production lines Type 1, 2 and 3:
Blocks are laid on the ground near the press after production.
The block yard shall be wide enough to accommodate 3 piles of blocks for the initial curing and stacking.
Blocks are stacked on the ground as described below:
First day
The blocks are stacked in a long pile and covered with a plastic sheet.
Second day
The blocks are stacked in a long pile, next to the pile of the 1st day.
Blocks are covered with a plastic sheet.
Third day
The blocks are stacked in a long pile, next to the pile of the 2nd day.
Blocks are covered with a plastic sheet.
At the same time the team of final stacking removes the blocks from the 1st day to stack them
outside.
At the end of the 3rd day, the space of the 1st day’s pile is empty and ready to store the blocks of
the 4th day.
Fourth day
The blocks are stacked in a long pile, in the space where the blocks were stored on the 1st day.
Blocks are covered with a plastic sheet.
At the same time, the team of final stacking removes the blocks from the pile of the 2nd day to
stack them in the open area.
At the end of the 4th day, the space of the 2nd day’s pile is empty and ready to store the blocks of
the 5th day.
And the process goes on like this for the coming days.
This process ensures that the blocks remain two entire days under plastic sheets for the initial curing and
stacking. This is illustrated in the following page with the block yard layout for the production line Type 1.
Note that the various examples of block yard layouts shown in the following pages are examples of efficient
layouts. The layout of the mobile and semi-industrial units may vary considerably, depending on the type of
equipment available and especially for the method of initial curing and stacking.
- 49 -
Block yard layout for production line Type 1 (Totally manual)
This type of block yard is comprised of only one manual press under the production shed.
Levelled ground with CSEB floor or ground just levelled CSEB floor Natural ground
sand spread on it with some sand spread on it
- 50 -
Block yard layout for production line Type 2 (half motorised)
This type of block yard is comprised of the following main equipment:
2 Manual presses + 1 mixer with ramp + 1 crusher with ramp
If the mixer is run by a diesel engine, the exhaust pipe is to be directed towards the outside. The crusher with
the ramp is placed outside at minimum 10 m distance because of the dust that it creates.
Levelled ground with CSEB floor or ground just CSEB floor Natural ground
sand spread on it levelled with sand spread on it
The crusher with the ramp is placed outside at minimum 10 m because of the dust that it creates.
- 51 -
Block yard layout for production line Type 4 (Mobile unit)
This type of block yard is comprised of the following main equipment:
1 mobile unit with a sieve, a mixer and a belt conveyor + 1 crusher with belt conveyor + 1 loader + 1 forklift
The mobile unit is not often under a production shed, since the latter has to be high to facilitate clearance
needed for the loader which supplies the mixer of the mobile unit. Nevertheless, it is advisable that the mobile
unit is under a shed, as shown below, in order to prevent damage from rain.
The initial curing and stacking area is outside: the blocks are first stacked on palettes near the press and then
moved with a manual forklift. The crusher is loaded by the loader and is placed outside at minimum 10 m
because of the dust that it creates.
Levelled ground Cement floor Natural ground
- 52 -
5.2 BLOCK MAKING PROCESS AND QUALITY CONTROL
Producing good quality block requires following the correct process and conducting regular quality control tests.
The following procedure is detailed and illustrated for a manual production unit, Type 1. Apart from the soil
preparation and mixing, the process is identical for mechanised production units.
5.2.1 Soil preparation
Almost all soils have to be sieved. Sieving a soil is necessary to remove
gravel larger than 10 mm and most of the lumps.
The size of the mesh is to be adapted according to the soil type: from 5 to 10
mm. (See for the mesh size paragraph 2.1.3.2 “Improvement and
stabilisation of soils according to their classification”, page 10.)
It is important to control the angle of the sieve to check what is passing through and how much waste is generated.
Once a mesh size has been chosen, the angle of the sieve can be adjusted to control the gradation of the soil:
A very flat sieve will allow more coarse particles to pass through.
A very vertical sieve will remove more coarse particles and the soil will be thinner.
A maximum of 15 % of gravel or lumps shall be allowed through the sieve. If they are too many lumps or gravel, the
sieve shall be laid more vertically. On the other hand, if more gravel is needed, the sieve shall be laid flatter.
Some soils, especially clayey ones with hard lumps, may need to be crushed. Crushing by hand is very difficult and
labour intensive. It is preferable to use a motorised crusher of pulveriser. For both processes, manual or motorised,
the soil to be crushed shall be absolutely dry.
- 53 -
Dry mixing
First, deliver the soil and spread it. Pour sand, if needed according to the mix ratio, onto the soil and spread it
also. Pour the stabiliser onto the sand and spread it carefully.
Start mixing by moving the location of the pile. It is necessary to move the pile 2 times to get a homogenous dry
mix. The pile will be homogeneous when it has a uniform colour.
Pour the stabiliser last Mix minimum 2 times Always move the pile while mixing
Humid mixing
Pour water onto the dry mix uniformly. Do not make a crater to pour water into (like for a mortar mix), as this
will create a lot of lumps which will be difficult to crush. It is necessary to sprinkle water gently all over the pile.
Start mixing by moving the location of the pile. Always mix it two times by moving the pile, as it insures a better
and more homogeneous mix. Lumps of soil are crushed by pressing them on the pile with the palm of the hand.
The mix will be homogeneous when it has a uniform colour.
Pour water onto the dry mix Mix a first time Mix 2nd time & crush lumps by hand
3-4 pieces = Mix is OK Ball bursts apart = Mix too dry Ball is in shape = Mix too wet
- 54 -
5.2.3 Pressing and quality control
The following successive steps need to be followed.
Usually block makers directly fill the soil into the mould with a hand shovel called a scoop, then the soil is
levelled by hand. But this process does not ensure regular levelling of the soil, and the compression quality will
not be regular.
Therefore levelling the soil by hand shall never be done, as the mould is never filled with the same amount of
soil. Levelling of the soil must be done with a ripper, in order to always level the mould in the same manner.
Filling the hopper with the scoop Levelling the soil by hand Levelling the soil with a ripper
Lever shall be pressed down fully till the end of the mechanism. The lid
shall not be opened until the lever has been fully operated (i.e. the lever is
pulled fully down), otherwise the block will not be fully compressed.
Handling a fresh block
Blocks shall be rejected if the lever has not been operated till the end.
This is essential, especially for presses with automatic opening of the lid.
Immediately after being pulled out, blocks shall be moved away by handling them as shown in the illustration
above: they shall be pressed firmly from the sides and stacked in the initial curing and stacking area.
Scraping the bottom plate Cleaning the top plate Cleaning the corners
- 55 -
Quality control
Immediately after ejection, the first block of every new mix shall be checked first with the pocket penetrometre
and then with the block height gauge. These quality control checks at this stage are essential to insure regular
quality of the blocks.
It is not necessary to check every block with the pocket penetrometre and the block height gauge. Once the
compression ratio of the press has been adjusted to the soil, the main variation in the resistance of the block is
the moisture content. Block height will change when the press is getting older and worn out.
Pocket Penetrometre
The pocket penetrometre checks the strength of a fresh block. The block shall
not be moved after ejection and it shall be kept on the bottom plate.
1. Press the pocket penetrometre down to compress the calibrated spring.
2. Stop pressing the penetrometre at the first mark: the calibrated spring
gives the desired pressure. Do not press more than the first mark.
3. The head of the penetrometre shall not penetrate the block more than 6
mm. If it does, the block shall be rejected.
4. At 6 mm penetration, the block is resisting 5 Kg/cm2 pressure.
Every soil will give different results with the pocket penetrometre:
Gravely soil
Penetrometre penetrates a little, as the soil is highly compressible.
Sandy soil
Penetrometre does not penetrate so much, as the soil is compressible.
Silty soil
Penetrometre penetrates quite a lot, as the soil is not very compressible.
Clayey soil
Penetrometre penetrates a lot, as the soil has low compressibility.
Therefore the test with the penetrometre is to be calibrated for the particular soil. But in any case blocks
which have more than 6 mm penetration shall be rejected.
If the penetrometre penetrates less than 6 mm, the block is more compressed than required; thus the block
is stronger.
Once the compression ratio has been adjusted to the soil and the result with a penetrometre has been
calibrated for the optimum moisture content of that soil, any change in the penetration will indicate a change
in moisture content of the mix:
A mix which is too wet will produce blocks not well compressed and the penetrometre will penetrate the
block more than normal. Accordingly, the next mix has to be dryer.
A mix which is too dry will also produce blocks not well compressed, but the penetrometre will
penetrate less than normal. Accordingly, the next mix has to be more humid.
Be aware that if the mix is dryer than the optimum moisture content which has been initially defined, the
penetrometre will penetrate less than it should. However, this does not mean that the block is stronger. It just
implies that the block has not been compressed to a maximum. Therefore, the next mixes should be more
humid in order to compress the blocks properly.
- 56 -
Block height gauge
The block height gauge checks the height of a fresh block. The block should be
moved from the bottom plate and laid vertically on one of its side.
Every corner of the block should be checked with the block height gauge. The
maximum tolerance shall be 1 mm more or 1 mm less than the nominal block
size (see paragraph 4.2.1.3 “Block dimensional tolerances”, page 38).
Once the block height has been adjusted on the press, any change in the height
will indicate a change in moisture content of the mix:
A mixes which are too wet will give thinner blocks.
A mixes which are too dry will give thicker blocks.
In either of these cases, the adjustment of the block height on the press should not be changed, but the
moisture content of the next mix has to be corrected.
The initial curing and stacking is essential for beginning the curing of the blocks properly. They shall be stacked and
covered with a plastic sheet as soon as a row of the pile is complete. The plastic sheet shall be as air tight as
possible to prevent evaporation of the initial moisture:
Blocks stabilised with cement shall not dry at all, in order to allow cement to start setting properly.
Blocks stabilised with lime shall not dry at all, in order to allow the pozzolanic reaction to start properly.
If there is a lot of evaporation due to extreme heat and/or a lot of wind, prior to covering the row with plastic sheets,
it shall be covered with a strip of humid jute cloth. The width of this jute cloth shall be the length of the block and its
length the width of the pile (270 cm as shown below).
Stacking rectangular blocks and Stacking square blocks and Cover the pile with a plastic sheet
unrolling the plastic after every row unrolling the plastic after every row when it is complete
If blocks are stacked on palettes, they shall be wrapped immediately with a plastic sheet, which will remain around
it for the whole duration of the initial and final curing.
The width of the pile depends on the block size and the size or plastic sheet
available. Usually plastic sheets of 2.7 m wide can cover the pile. The length
of the plastic sheet will mostly depend on the daily productivity of the press.
The following illustrations demonstrate stacking principles. The size of the piles shall be adapted to the block size.
- 57 -
Stacking rectangular blocks (29 x 14 x 9 cm) for the initial curing and stacking
Rectangular blocks are
stacked by rows of 6 blocks
wide and 6 & 7 blocks high,
for a total of 40 blocks per
row, as shown in this figure.
Stacking square blocks (24 x 24 x 9 cm) for the initial curing and stacking
Square blocks are stacked in
rows of 4 blocks wide and 7
& 8 blocks high, for a total of
30 blocks per row, as shown
in this figure.
- 58 -
Final stacking of rectangular blocks 290 (29 x 14 x 9 cm)
Blocks shall be stacked in
piles of 505 blocks as such:
Final curing
The type of curing depends on the type of stabiliser:
Final curing for cement stabilised blocks
As soon as a pile is complete, it should be covered with strips of jute cloth. The pile should be cured for 4
weeks and the jute cloth shall never be allowed to dry out during that time. Water shall be sprinkled as many
times as necessary every day.
Final curing for lime stabilised blocks
As soon as a pile is complete, it should be wrapped with plastic sheets, which shall be sealed with adhesive
tape. The pile shall be as air-tight as possible to prevent evaporation. The pile should be cured for 1 to 4
weeks depending on clay quality.
- 59 -
5.2.6 Quality control during production
Quality control is an on-going process and it shall be done at every stage, as described below.
- 60 -
5.2.7 Monitoring the production
The entire production process shall be monitored, to ensure proper data recording for the daily productivity and
cost of blocks. The production data sheet example below gives the average daily cost of blocks, but it also shows if
workers have consistent production.
Once the average number of blocks per mix is known, there shall be very little variation in the production per mix. A
major difference between the average and the actual number of blocks produced per mix will indicate that workers
don’t feed the press consistently. This is shown in the highlighted cells below:
The average production is around 27 blocks per mix. For about the same number of blocks (~850), the number of
mixes per day varies from 29 to 32, giving an output per mix between 26.6 to 29.3 blocks. This implies that the
blocks are not compressed in the same manner, which is detrimental to their quality. Such a result often occurs
because workers don’t fill the wheelbarrows and / or the mould of the press properly.
The maximum difference number of blocks per mix shall be limited to ± 1 block.
- 61 -
5.3.2 Example of quality control monitoring sheet
- 62 -
5.3.3 Volumic mass of blocks, Block
The compression achieved with the press shall be such that no block shall have a volumic mass under 18 kN/m3
(1800 Kg/m3). Procedure is as follows:
The volumic mass shall be calculated by dividing the air-dry mass of a block (in Kg) by the volume of material (in
m3). The volume of material of a block is calculated from its outside dimensions, deducting the indents and
cavities.
The wet compressive strength shall be conducted on samples immersed in water for 24 hours at a temperature
close to 27 C. The wet compressive strength of any individual block shall not be less than:
3 MPa for blocks of Class A
2 MPa for blocks of Class B
1.5 MPa for blocks of Class C
See section 4.2.2 “Physical requirements and characteristics of CSEB”, page 39, for the dry compressive strength
Cd and wet compressive strength Cw according to the class of blocks.
- 63 -
5.3.4.1 Compressive strength with the field block tester
The field block tester enables a block to be tested in bending, as the load to break it is much less than in
compression. Field block testers can be of various proportions and types but it is advised to use devices with
leverage in order to reduce the load required to break the block. Such a device is shown below.
- 64 -
5.3.4.2 Compressive strength with a compression testing machine
The test consists of subjecting a block sample to simple compression until failure. A calibrated crushing press
for hard materials shall be used, and it shall have a capacity of a minimum of 1,000 kN (~100 tons).
The loading plates shall be absolutely flat and one of them shall be mounted on a ball allowing the plate to
adjust itself to any unevenness in height of the block. The size of the plates shall be large enough to
accommodate samples up to 40 cm x 40 cm x 40 cm.
Preparation of specimens
1. Samples shall be oven dried for 24 hours at 90˚C.
2. After 24 hours, check the weight of the oven dried samples.
3. Leave the samples in ambient conditions for another 24 hours before testing.
4. After 24 hours in ambient air conditions, check the weight of samples again.
5. For blocks to be tested in wet compression, immerse these samples in water for 24 hours. After 24
hours immersion, check the weight of samples again.
6. The upper and lower faces of each specimen shall be coated with a pure mortar paste made of a mix of
high alumina melted cement and Portland cement in a proportion which sets within a maximum time of
10 to 15 min. Frogs shall also be filled with the same mortar quality.
7. Alternatively, instead of this coating, plywood sheets or solid cardboard of 3 mm thick shall be laid on
the faces in contact with the loading plates.
- 65 -
- 66 -
6. BASIC DESIGN GUIDELINES FOR MASONRY WITH CSEB
Therefore, the basic principle for good design with CSEB is to have
“Good boots and a good hat”; meaning that the building should have
a good plinth, minimum 25 cm high, and good roof with minimum
50 cm wide overhangs.
- 67 -
6.2 COMPRESSIVE STRENGTH AND SAFETY FACTORS FOR LOAD BEARING WALLS
Walls shall be designed according to the load bearing capacity of wet CSEB. Keep a safety factor from the wet
crushing strength:
5-safety factor for conventional buildings in seismic zones 2 and 3 (Indian seismic zones)
10-safety factor for earthquake resistant buildings in seismic zones 4 and 5 (Indian seismic zones)
Example: A CSEB has a cw wet of 20 Kg/cm2: the maximum load bearing on the foundation will be:
20
4 kg/cm2 on the foundation level for the seismic zones 2 and 3
5
20
2 kg/cm 2 on the foundation level for the seismic zones 4 and 5
10
- 68 -
6.4 EXAMPLE OF PLAN
See page 71 for the symbols of the various types of blocks shown on the plan.
- 69 -
6.5 MORTAR QUALITY AND BLOCK LAYING PRINCIPLES
- 70 -
6.6 BONDS PRINCIPLES FOR MASONRY
Faces of the blocks
Blocks shall be laid in the same position that
they have been compressed, on one of their
laying faces.
2 laying faces 2 stretchers 2 headers
Note that 1/4 blocks must be used very seldom, as they will allow only a 1/8 cover of the full size block: this
must be used only in extreme cases, as the preferred minimum cover is 1/4 of the full size block.
Basic principle
Blocks between odd and even layers shall overlap properly in
all directions to prevent creating split joints.
Joints should never align one above the other, and the
intersection must always be a square.
According to the type of bond pattern, the cover will vary as such:
- 71 -
Main types of bond patterns
Three main types of bond patterns are outlined here: Stretcher bond, English bond and Flemish bond.
Many other bond patterns exist, which notably include the American bond and Rat Trap bond.
The stretcher bond is used for a single bond pattern, where the wall thickness is the width of the block.
The English bond is a double bond pattern, and the wall thickness is the length of the block.
The Flemish bond is also a double bond pattern, and the wall thickness is also the length of the block.
The English bond is preferred to the Flemish bond for CSEB as it is simpler to assemble. Nevertheless, the
Flemish bond can be used as well for CSEB walls.
The examples shown on the following pages give examples of stretcher bonds and English bonds.
- 72 -
6.7 EXAMPLES OF BOND PATTERNS
STRETCHER BONDS FOR TYPICAL WALLS WITH RECTANGULAR BLOCKS
- 73 -
ENGLISH BOND FOR TYPICAL WALLS – SINGLE BOND PATTERN
- 74 -
ENGLISH BOND FOR TYPICAL WALLS – ONE & A HALF BOND PATTERN
- 75 -
ENGLISH BOND FOR TYPICAL WALLS – DOUBLE BOND PATTERN
- 76 -
STRETCHER BOND WITH SQUARE BLOCKS – SINGLE BOND PATTERN
- 77 -
STRETCHER BOND WITH SQUARE BLOCKS – ONE & A HALF BOND PATTERN
- 78 -
STRETCHER BOND WITH SQUARE BLOCKS – DOUBLE BOND PATTERN
- 79 -
BOND EXAMPLES FOR VARIOUS WALLS – STRETCHER BOND PATTERN WITH RECTANGULAR BLOCKS
- 80 -
BOND EXAMPLES FOR VARIOUS WALLS – ENGLISH BOND PATTERN
- 81 -
BOND EXAMPLES FOR VARIOUS WALLS – ONE & A HALF BOND PATTERN WITH RECTANGULAR BLOCKS
- 82 -
BOND EXAMPLES FOR VARIOUS WALLS – DOUBLE BOND PATTERN WITH RECTANGULAR BLOCKS
- 83 -
BOND EXAMPLES FOR VARIOUS WALLS – SINGLE BOND PATTERN WITH SQUARE BLOCKS
- 84 -
BOND EXAMPLES FOR VARIOUS WALLS – ONE & A HALF BOND PATTERN WITH SQUARE BLOCKS
- 85 -
BOND EXAMPLES FOR VARIOUS WALLS – DOUBLE BOND PATTERN WITH SQUARE BLOCKS
- 86 -
BOND EXAMPLES FOR VARIOUS WALLS – ENGLISH BOND PATTERN AND STRETCHER BOND PATTERN
- 87 -
BOND EXAMPLES FOR VARIOUS WALLS – ONE & A HALF BOND AND STRETCHER BOND PATTERN
- 88 -
BOND EXAMPLES FOR VARIOUS WALLS – DOUBLE BOND AND SINGLE STRETCHER BOND PATTERN
- 89 -
BOND EXAMPLES FOR VARIOUS WALLS – ONE & A HALF BOND AND ENGLISH BOND PATTERN
- 90 -
BOND EXAMPLES FOR VARIOUS WALLS – DOUBLE BOND AND ENGLISH BOND PATTERN
- 91 -
BOND EXAMPLES FOR VARIOUS WALLS – DOUBLE BOND PATTERN AND ONE & A HALF BOND PATTERN
- 92 -
BOND EXAMPLES FOR VARIOUS WALLS – STRETCHER BOND (SQUARE BLOCKS) AND SINGLE STRETCHER BOND
- 93 -
BOND EXAMPLES FOR VARIOUS WALLS – ONE & A HALF BOND (SQUARE BLOCKS) & SINGLE STRETCHER BOND
- 94 -
BOND EXAMPLES FOR VARIOUS WALLS – ONE & A HALF BOND AND STRETCHER BOND (SQUARE BLOCKS)
- 95 -
BOND EXAMPLES FOR VARIOUS WALLS – DOUBLE BOND (SQUARE BLOCKS) AND SINGLE STRETCHER BOND
- 96 -
BOND EXAMPLES FOR VARIOUS WALLS – DOUBLE BOND AND STRETCHER BOND (SQUARE BLOCKS)
- 97 -
BOND EXAMPLES FOR VARIOUS WALLS – DOUBLE BOND AND ONE & A HALF BOND (SQUARE BLOCKS)
- 98 -
VARIOUS TYPES OF BONDS
- 99 -
6.8 COMPOSITE TECHNIQUES WITH CSEB AND STABILISED EARTH TECHNIQUES
The soil is excavated from the trench foundation. It is sieved and then measured at the
same time on the side of the trench. Sand always needs to be added.
In Auroville, mixes are with 5 % by weight of cement, as follow: 500 litres soil + 200 litres
sand + 1 bag cement (50 Kg). Note that this mix is only for Auroville soil, and it has to be
adapted to every situation with consideration for the soil quality and local requirements.
The principle is that the mix should be calculated for 1 bag of cement per mix. This type of
foundation has been used in Auroville since 1990 for all kinds of buildings, up to 4 floors
high.
A team is composed of 4 workers who dig, sieve and measure the soil, add the various
components, mix and ram. This team of 4 people can do about 2 m3 per day of stabilised
rammed earth foundations rammed in situ (including measuring the components, mixing Foundation section
and ramming). These foundations are the cheapest foundations in Auroville. for 2 floors building
Usually the top level of the foundation is at the level of the original ground. The section of the foundation should
normally be square. It is essential that this section is not wider than deeper, as the load of the wall will create a
pointed load which the foundation could not bear.
As an example, a foundation of 80 cm wide x 50 cm deep will not work, and it may break under the load of the
building. Alternately, it is not a problem to dig deeper and to obtain a foundation deeper than it is wide. This
orientation is used in the case when the ground does not have the proper load bearing capacity at the required
depth and one has to dig deeper for better bearing capacity. As an example, it will be OK to have a foundation of
1.5 m deep and 75 cm wide.
As a basic thumb rule, these sections can be used according to the building type:
One-floor building: 50 x 50 cm
Two-floor building: 60 x 60 cm
Three-floor building: 75 x 75 cm
Four-floor building: 90 x 90 cm
- 100 -
PROCEDURE
1. Carefully remove the top soil on the entire site. Pile it in a corner of the site, as it can be reused after
construction for landscaping purposes.
2. Mark the dimensions of the foundations very accurately. It is important to exactly mark the proper width of the
trench; if the trench is too wide, some stabilised mix will have to be wasted to fill it up.
3. Prepare references on either end of the trench for the top level of the plinth (this can be done with stacked
blocks or wooden batter boards before starting to excavate). Pull masons line to mark the axis; mark the
edges of the foundation on the ground with lime.
4. Excavation of trenches for foundation: Dig the trench for the foundations very accurately according to the
requirements (width, length and depth), using steel pickaxes, hoes, shovels and pans.
5. The soil should be sieved and measured continuously throughout the excavation. Do not move the excavated
soil away from the trench. Fill a 500 litre frame (with a removable sieve incorporated, # 25 mm), with the
excavated soil. This frame should be set at a distance of about 2 m from the trench.
6. Once the frame is filled, remove the sieve and level the soil in the frame properly to measure out the exact
volume desired.
7. Lift the frame. Move it further along the trench excavation, and continue the procedure.
8. Before the foundation is fully excavated, mark the top level of the foundation with a spirit level at each corner.
Mark the top level of the foundation on the trench side (CSM 1: 3 plaster with 1 mark).
9. Once all the trenches have been excavated, add the required sand and 1 bag of cement on every pile of soil
according to the specifications.
10. Mix the dry components (the piles of soil, sand and cement) at least 2 times, shifting the pile with each mix.
Check to ensure a uniform colour and homogeneous mix.
11. Add water to get the optimum moisture content (same as for the CSEB) and mix it again 2 or 3 times.
Work Procedure:
12. Sprinkle a little water on the ground before pouring the mixed soil.
13. Fill the trench with 12 cm of loose mix.
14. Level and check the height of this layer with a layer gauge in many places to ensure that it has a consistent
height of 12 cm per course.
15. Start ramming with a large rammer (200 cm2), 2 times minimum (back and forth).
16. Continue ramming with a smaller rammer (100 cm2), 2 more times minimum (back and forth).
17. Ram until a clear, sharp sound is heard and the rammer no longer imprints the layer.
18. Check the compressive strength of the layer with the pocket penetrometer (in various places). It should not
penetrate more than 6 mm under 5 kg/cm2 pressure (with the pocket penetrometer calibrated for the Auram
equipment).
- 101 -
19. Once the entire course is completed, sprinkle some water on the previous course and proceed further in the
same manner for the next layers.
20. Ensure that no plain soil falls in the trench.
21. In the case that it is not possible to complete a full course in one day, create “steps” between the layers to
provide an overlap for the work of the following day. The length of the step should be equal to the width of the
foundation. Never chamfer the edge of the step; ram a clean, vertical step. Scratch the previous layer if
necessary to establish a good bond.
22. In the case that the foundation is slightly above the ground level, a formwork (e.g. of blocks laid along the side
of the foundation) can be used.
23. Wooden beams can also be used as formwork if the top of the foundation is higher than 10 cm above ground
level. The foundation must not be higher than 15 cm above ground level.
24. Every morning: Sweep the trench to remove fallen soil. Moisten the previous layer. Repeat the ramming
procedure of the previous day.
25. Once the foundation is almost complete, check the level of the top layer with a masons’ line (between the two
marks set by the mason), and ram accordingly to level the surface and to complete the top of the foundation.
26. When the last course is completed, check the level of the top layer again with a masons’ line (between the two
marks set by the mason). If the level is too high, scrape the top of the foundation to achieve a level surface. If
the top level is slightly depressed by 1 to 3 cm in some points, do not fill it, as rammed earth cannot be
rammed in thin layers. The mortar of the DPC will fill up these gaps.
27. Check all levels again from the reference masons’ line at the top level of the plinth.
28. Lay the Damp Proof Course, 2.5 cm thick, over the top of the foundation.
29. If the basement cannot be built immediately, cure the foundation for 4 weeks (2 or 3 times daily) or until the
basement is begun. If the basement is built directly after the foundation, the foundation and the basement can
be cured together.
- 102 -
Mixing dry Mixing wet
Pouring the mix in the trench Checking the layer thickness Ramming the foundation
Scraping the top to level the foundation Checking the level of the foundation
- 103 -
6.8.2 Composite basement and plinth beam
Basements shall be made with CSEB stabilised with 5% cement. Above the stabilised rammed earth foundation
starts a step plinth with 1.5 bond pattern for two courses. Two more courses are laid with the normal thickness (24
or 29 cm) and then U-shaped CSEB are laid in which is cast reinforced cement concrete.
Reinforcement bars are usually made of 8 TS rods and assembled with stirrups at 25 cm c/c. Concrete is made
with 1 cement, 2 sand and 4 gravel (1/2” size).
The composite plinth beam is plastered with a Damp Proof Course (DPC), 2.5 cm thick, made of cement sand
mortar 1: 3, to which is added a waterproof compound.
U blocks 240 of the composite plinth beam Casting concrete in the composite plinth beam 240
U blocks 290 of the composite plinth beam Casting concrete in the composite plinth beam 290
- 104 -
6.8.3 Composite columns
Two types of round hollow Auram blocks can be
used: the round block 240 and the round block
290. These blocks are reinforced with reinforced
cement concrete. Both types of blocks are laid with
a cement sand mortar CSM 1: 3 of 1 cm
thickness.
Block 240
( 240 mm)
Vertical reinforcements should be 12 mm for
the blocks 240.
Stirrups must be 6 mm and placed every 20
cm c/c.
The cores where the reinforcement are inserted
are cast with concrete (1 cement: 2 sand: 4
1/2” gravel).
The columns 240 must be linked on 2 sides of
the building (through a beam or ring beam).
They cannot be left free standing (without any
link through a beam to the building).
This block/ column shall not be used for
seismic zones.
Vertical reinforcements shall be 10 mm for the blocks 290, as the cores are not large
enough to accept a bigger diameter.
Stirrups must be 6 mm and placed every 20 cm c/c. Note that for seismic zones, stirrups
should be 8 TS and placed at 10 cm c/c.
The cores, where the reinforcement are inserted, are cast with concrete (1 cement: 2 sand:
4 gravel chips).
Block 290 The columns 290 can be linked only on 1 side of the building (through a beam or ring
( 290 mm) beam). It cannot be left free standing (without any link through a beam to the building).
This block/ column can be used for seismic zones.
- 105 -
Steel mat of the column Sliding a stirrup down
Casting concrete in the core (1: 2: 4 gravel chips) Laying mortar and stirrups
- 106 -
6.8.4 Composite beams and lintels
U-shaped CSEB are reinforced with reinforced cement concrete. Reinforcements vary with the span, but the rod
diameter cannot exceed 12 mm for the Auram blocks 290 & 295 and 16 mm for the Auram blocks 240 &
245.
The bottom part of the beam is precast in a reversed position on the ground. Once cured, it is lifted and the middle
and top parts are built above it in situ.
The U blocks are used as lost shuttering, but they also aid the compressive strength of the beam. Hence it is a
composite technique, as the reinforced concrete works in tension and the U blocks work in compression.
The concrete cast into the U-shape is normally 1 cement: 2 sand: 4 gravel ½”. The vertical mortar in between the U
blocks is cement sand mortar CSM 1: 3 of a 1 cm thickness. Three types of beams have been developed:
Casting a single height Single height beam reversed Single height beam section
Beam on the ground on the wall
Casting a double height Lifting a double height Double height beam Double height beam
beam on the ground beam reversed & cast on the wall section
- 107 -
Triple height beams (1 U blocks downwards, 1 plain block in the middle, 1 U block upwards)
The bottom part of the beam is cast first in a reversed position.
After 1 month it is turned, the incomplete beam is lifted with a lot of care, and the rest of the beam (plain block
in the middle and U block on top) is done in situ in.
The maximum span for a triple height beam shall be limited to 3 m, with 2 steel bars Ø 12 mm on the top and 2
steel bars Ø 16 mm on the bottom.
6 mm stirrups are laid in the thickness of the vertical mortar to link the tensile and compressive bars of the
beam. Note that this triple height beam is rarely precast fully on site as it is too heavy to lift.
The horizontal mortar joint is with cement sand mortar CSM 1: 3
Casting a triple height Lifting a triple height Triple height beam reversed Triple height beam section
beam on the ground beam and cast on the wall
The magnitude of the horizontal thrust is determined by the geometry of the arch. The flatter the arch is, the
greater the horizontal thrust is. The Horizontal Thrust (HT), when seen at the on top of the arch, represents the
balance of the second half of the arch. The horizontal thrust can be minimized by the optimization of the arch
profile. Nevertheless, there will always be a thrust which should be neutralized by means of buttresses, tie rods
or ring beams.
The successive action of the thrust between voussoirs of the arch may be represented by a Line of Thrust (LT).
An arch or vault is stable and safe as long as LT remains within the middle third of the arch section.
When LT moves towards the inner third of the arch, the arch will tend to burst outwards.
When LT moves towards the outer third of the arch, the arch will tend to collapse inwards.
- 108 -
W = Weight of the masonry and overload
(Dead load & Live load)
T = Thrust
(Resultant force of the weight and horizontal thrust)
LT = Line of thrust
(Represents the successive action of the voussoirs)
For more details on the design and construction of arches, vaults and domes, please see the Auroville Earth
Institute’s: “TM 04: Building with Arches, Vaults and Domes: Training Manual for Architects and Engineers”.
Arch laid on wedges and loaded with blocks Adjusting the wedges
After laying the mortar, slide the block laterally Check that the block is laid at a right angle to the
centring
- 109 -
Triangular joint and blocks touching at the intrados Building the arch symmetrically
Closing the arch with a very tight mortar Sliding out wedges progressively for decentring
When a dome is generated by the intersection of two vaults, the forces involved are identical to those of vaults.
However, when a dome is created by the rotation of an arch around a vertical axis, other forces are acting in it:
the hoop forces (HF). The hoop force is the result of forces acting circumferentially in the dome.
The hoop force in a “circular dome” is acting in a horizontal plan, a ring, and can be assimilated to the thrust
which acts downwards in a vertical plan, in the case of arches or vaults. This force explains why it is possible to
build circular domes without support. The dome is self-supporting at every stage of its construction, because
the horizontal thrust of one half of the dome is transferred to the other half by the various rings. The force of
gravity will transfer hoop forces vertically into the line of thrust.
Forces in domes
- 110 -
Building a vault with the Nubian technique
The traditional Nubian technique, from Egypt, requires a gable wall to stick the blocks onto. The vault is built
successively arch after arch and therefore the courses are laid vertically, in a leaning position. The binder is
made of a cement-stabilised earth glue of 1-2 mm only in thickness.
The gable wall should be built first. It can have exactly the shape of the
extrados of the vault or it can be quadrangular and the extrados of the vault
can be drawn onto it.
Back wall
Window as a template
Depending on the shape of vaults, a structure can be built either with horizontal courses, vertical courses or a
combination of both. For horizontal courses, the stability is not conferred by the adhesive quality of the mortar
(like it is for vertical courses), but rather by equilibrium of gravity loads. The section of vault built with horizontal
courses is studied to ensure that the centre of gravity of the masonry never goes beyond the springers, i.e. that
the section of the vault will never be able to rotate and collapse. For this, it is essential to study the location of
the centres of gravity in the masonry, and to calculate the sum of the moments of the horizontal courses.
It is necessary to calculate such structures and to develop an understanding of how the forces behave in the
masonry. The transfer of loads always takes the shape of catenary or funicular curves, and assumes the most
direct path. All vault shapes are calculated for proper load transfer in the masonry. Their thickness and span can
therefore be optimised.
- 111 -
The vault rises with horizontal courses Building with horizontal and vertical courses
The control of the shape is ensured from the inner diameter and thus a cursor or any kind
of mark made on the compass is needed.
Compass
- 112 -
6.8.6 Disaster resistant buildings
CSEB can be used for disaster resistance. The Auroville Earth Institute has developed a disaster resistant
technology using hollow interlocking CSEB. Its principle is to reinforce the masonry by grouting a concrete into the
cores of the blocks, where steel reinforcement rods are placed at the critical locations (corners, ends, near
openings, etc.). Horizontal reinforcements are also cast in blocks with a U-shape.
The advantage of hollow interlocking CSEB is that they offer keys, which interlock the masonry. Thus these walls
offer more resistance to shear and buildings are even stronger. They can better resist earthquakes without major
damage.
Government approval
The technology developed by the Auroville Earth Institute has been approved by:
The Government of Gujarat, India, (GSDMA) as a suitable construction method for the rehabilitation of the zones
affected by the 2001 earthquake in Kutch district. It is allowed to build up to 2 floors.
The Government of Iran (Housing Research Centre) as a suitable construction method for the rehabilitation of
the zones affected by the 2003 earthquake of Bam. It is allowed to build up to 2 floors (8 m high).
The Government of Tamil Nadu, India, (Relief and Rehabilitation) as a suitable construction method for the
rehabilitation of the zones affected by the 2004 tsunami of Indonesia.
Ring beams
Ring beams tie the building horizontally. The maximum vertical spacing between them shall be 120 cm and
the minimum shall be 50 cm (below the roof). There are 5 or 6 ring beams, depending on the case:
- Roof with a concrete slab or ferrocement channels = 5 ring beams.
- Roof with a vault or dome and a parapet wall = 6 ring beams.
If windows have arches and not lintels, the lintel ring beam should be on top of the arch. Reinforcements are
made with 2 bars of Ø 10 TS and stirrups Ø 6 MS @ 15 cm c/c.
- 113 -
Ring beams for ferrocement channels Ring beams for RCC slab roof Ring beams for vaulted roof
Reinforcement bars are made with Tor steel bars of Ø 10mm. It is preferable to prepare long reinforcements and to
join them in the corners with angle bars. These angle bars are also made with Ø 10 mm Tor Steel (TS) rods and
their side length should be 50 times the diameter of the bar (50 cm side):
Vertical ties
The ring beams are tied together with vertical ties (Ø 10 TS), in order to establish a net of reinforcement. The
vertical ties are laid on the foundation and anchored in a PCC 1: 1.5: 3, just above the foundations. The bars
should be bent 30 cm into the PCC and their height shall not exceed 150 cm, in order to slide down the blocks.
The overlap of the extension rod shall be 50 times the bar diameter (50 cm for Ø 10 TS). They should follow the
spacing shown as follows.
For more details on disaster resistance with hollow interlocking blocks, please see the Auroville Earth Institute’s:
“TM 03: Earthquake Resistant Buildings with Hollow Interlocking Blocks: Training Manual for Architects and
Engineers”.
- 114 -
7. BUILDING EXAMPLES WITH CSEB
Most of the examples hereafter are taken from Auroville. The international city of Auroville, which was founded in
1968, is under construction in Tamil Nadu, South India. One of its aims is to harmonize material and spiritual
research, to give a living embodiment to an actual human unity. In this framework, research in appropriate building
technologies, architecture and renewable energies are part of the daily activities of Auroville.
- 115 -
7.2 APARTMENTS IN AUROVILLE
- 116 -
7.3 PUBLIC BUILDINGS IN AUROVILLE
- 117 -
7.4 VARIOUS BUILDINGS WORLDWIDE
Earthquake resistant house at Istanbul, Turkey Earthquake resistant school at Jantanagar, Nepal
Exhibition centre at Janadryah, Saudi Arabia Al Medy Mosque at Riyadh, Saudi Arabia
2010 Prince Sultan Bin Salman Award for Urban Heritage
- 118 -
8. ANNEXES
8.1 REFERENCES
1. IS: 1725-1982 – Specification for soil based blocks used in general construction –BIS – New Delhi, India
2. SP 36-Part 1-1987 – Compendium of Indian standards on soil engineering – BIS – New Delhi, India
3. IS: 1905-1987 – Code of Practice for structural use of unreinforced masonry – BIS – New Delhi, India
4. IS: 2110-1980 – Code of Practice - In situ construction of walls in buildings with soil-cement masonry – BIS –
New Delhi, India
5. IS: 3495-1992 – Methods of test of burnt building bricks – BIS – New Delhi, India
1. Part 1: Determination of compressive strength
6. IS: 3495-1992 – Methods of test of burnt building bricks – BIS – New Delhi, India
1. Part 2: Determination of water absorption
7. IS: 712-1973 – Specification for building limes – BIS – New Delhi, India
8. IS: 8112-1989 – Specification for 43 grades ordinary Portland cement – BIS – New Delhi, India
9. NZS 4297: 1998 – Engineering design of earth buildings – New Zealand Standards – Wellington, New Zealand
10. NZS 4298: 1998 – Materials and workmanship for earth buildings – New Zealand Standards – Wellington,
New Zealand
11. NZS 4299: 1998 – Earth buildings not requiring specific design – New Zealand Standards – Wellington, New
Zealand
12. HB195-2002 – The Australian earth building handbook – Australian Standards – Sydney, Australia
13. ASTM D 422-63-2007 Test Particle-Size Analysis Soils – Standards from the American Society for Testing
and Materials – USA
14. BS 5628-1:2005 – Code of Practice for the use of masonry, Part 1: Structural use of unreinforced masonry –
British Standards Institute – United Kingdom
15. BS 5628-3:2005 – Code of Practice for the use of masonry, Part 3: Materials and components, design and
workmanship – British Standards Institute – United Kingdom
16. Sri Lanka Standard, 2006 – Specification for compressed stabilised earth blocks, Part 1: Requirements– Sri
Lanka Standards Institution – Colombo, Sri Lanka
17. Sri Lanka Standard, 2006 – Specification for compressed stabilised earth blocks, Part 2: Test methods – Sri
Lanka Standards Institution – Colombo, Sri Lanka
18. Sri Lanka Standard, 2006 – Production, design and construction of compressed stabilised earth blocks, Part
3: Code of Practice – Sri Lanka Standards Institution – Colombo, Sri Lanka
19. Production and use of CSEB, Summary of lecture of training courses (SL 01) – Satprem Maïni, Auroville Earth
Institute – Auroville 1991/2009
20. Production of CSEB, A training manual for technicians and entrepreneurs – Alexandre Douline, Satprem Maïni,
Sylvain Arnoux, CRATerre/Earth Institute – France, Auroville 1996/1997
21. Masonry with compressed stabilised earth blocks – Satprem Maïni, Auroville Earth Institute – Auroville 1997
22. Building with arches, vaults and domes, A training manual for architects and engineers (TM 04) – Satprem
Maïni, Auroville Earth Institute – Auroville 2002, revised 2010
23. Earthquake resistant buildings with hollow interlocking blocks, A Training manual for architects and engineers
(TM 03) – Satprem Maïni – Auroville Earth Institute – Auroville 2001, revised 2005
24. Compressed earth blocks, Standards – Centre for the Development of Industry – CRATerre / EAG / BASIN –
Belgium 1998
25. Compressed earth blocks, Vol. I Manual of production – Vincent Rigassi, CRATerre-EAG – Germany 1995
26. Compressed earth blocks, Vol. II Manual of design and construction – Hubert Guillaud, Thierry Joffroy, Pascal
Odul, CRATerre-EAG – Germany 1995
27. Compressed earth blocks: testing procedures – CDE, CRATerre-EAG, ENTPE, Centre for the Development of
Enterprise – France 2000
28. Earth construction, a comprehensive guide – Hugo Houben, Hubert Guillaud, CRATerre-EAG – France 1994
- 119 -
8.2 TERMINOLOGY FOR SOILS, EARTH RELATED TERMS AND RAW MATERIALS
- 120 -
Hardpan
Hardpan is a general term for a dense layer of soil, usually found below the upper-most topsoil layer. Hardpan is
formed by precipitation of dissolved materials, such as calcium carbonate or silica at depths below the surface
year after year.
Humus
A brown or black material formed by the partial decomposition of vegetable or animal matter; the organic
portion of soil.
Illite
A non-expanding clay which contains mica. Illite is a phyllosilicate or layered alumino-silicate. Illite possesses
good cation exchange capacity and it undergoes less volume change and therefore shows low shrinkage.
Kaolinite
A type of clay which has a low shrink-swell capacity and a low cation exchange capacity. Kaolinite has the
lowest cation exchange capacity among three groups of clay.
Laterite
Laterite is a soil type formation in hot and wet tropical areas which is rich in iron oxides. The clay type in
laterites is mostly kaolinite. They have a red-brown colour and they follow a process of induration. They will
harden in time due to a chemical reaction within the soil and with the carbon dioxide of the air. Laterites are now
defined by two scientific names, according to their quality: Plinthite and Petro Plinthite (see further down).
Loam
Loam is soil composed of sand, silt, and clay in relatively even concentration. Loam may or may not contain
organic matter.
Loess
Loess is aeolian uniform sediment formed by the accumulation of wind-blown silt and lesser and variable
amounts of sand and clay. It has a relatively high cohesion due to cementation of clay or calcareous materials.
A characteristic of loess deposits is that they can stand with nearly vertical slopes.
Montmorillonite
A type of clay, very soft phyllosilicate group of minerals that typically form in microscopic crystals.
Montmorillonite is a member of the smectite family and it a very active particle.
Moraine
A moraine is any glacially formed accumulation of unconsolidated glacial debris (soil and rock) which can
occur in currently glaciated and formerly glaciated regions. Moraines may be composed of debris ranging in
size from silt-like glacial flour to large boulders. The debris is typically sub-angular to round in shape.
Muck
Muck is a soil made up primarily of humus from drained swampland. It has a very soft consistency and it is not
suitable for CSEB.
Mud
A mixture of soil and water in a fluid or weak solid-state.
Organic soil
A soil which contains high humus content. In general, organic soils are very compressible and have poor load
sustaining properties. They are not suitable for CSEB.
Peat
An accumulation of partially decayed vegetation matter. Peat forms in wetlands or peatlands. These soils are
not suitable for CSEB.
- 121 -
Plinthite
Plinthite is a soil rich in iron, with kaolinite clay, quartz and other minerals. Plinthite follows a process of
induration and changes irreversibly to an “ironstone” hardpan on exposure to repeated wetting and drying, and
the contact with carbon dioxide of the air. The induration process of plinthite occurs only when the soil becomes
exposed to the air. Over the months a plinthite becomes a petro plinthite.
Petro Plinthite
Petro plinthite is a similar soil to plinthite: it is a soil rich in iron, with also kaolinite clay, quartz and other
minerals. But the difference from plinthite is that the process of induration has already occurred in the ground
over the years and that petro plinthite forms a crust similar to a soft stone.
Sand
A component of soil with a grain size between 2 mm and 0.06 mm. It is cohesion-less particle of unaltered
rocks or mineral. It is used for reducing plasticity of clay and it shall conform to IS: 2116-1980.
Sandy soil
A soil in which the sand size component is predominant. The sand size most influences the behaviour of the
soil. Sandy soils can produce strong CSEB if the clay content in the soil is sufficient.
Silt
A component of soil with a grain size between 0.06 mm to 0.002 mm (60 to 2 microns). Silt exhibits little or no
plasticity and has little or no strength when air-dried.
Silty soil
A soil in which the silt size component is predominant. It is a fine soil which has in general not much structure
and sometimes need to be corrected by adding coarse sand.
Soil (Earth)
Soils are the result of transformation of the parent rock under the influence of a range of physical, chemical and
biological processes related to biological and climatic conditions and to animal and plant life. Soils may or may
not contain organic matter.
Soil / combined
Combined soils are defined as such when two of the components of the soil are influencing its behaviour: i.e.
“Silty sand” when the soil is mostly sandy with an influential proportion of silt, or “clayey gravel” when the soil
is mostly gravely with an influential proportion of clay.
Soil / typical
Typical soils are defined as gravely, sandy, silty and clayey soils. They are the soils for which one component
mostly influences the behaviour of the soil: i.e. gravely when the gravel most influences behaviour, sandy when
sand most influences behaviour, etc.
Smectite
A group of clay minerals that includes montmorillonite. This type of mineral tends to swell a lot with water.
Subsoil
The soil profile occurring below ‘A’ horizon.
Talus
Rock fragments mixed with soil at the foot of a natural slope from which they have been separated.
Topsoil
The surface soil which usually contains organic matter in decomposition (humus). It cannot be used for building
purposes.
Varved Clay
Alternating thin layers of silt (or fine sand) and clay formed by variations in sedimentation during the various
seasons of the year, often exhibiting contrasting colours when partially dried.
- 122 -
8.2.2 Terminology for soil properties, characteristics and earth related terms
Absorbed water
Water held mechanically (by surface tension) in a soil mass and having physical properties not different from
ordinary water at the same temperature and pressure.
Activity
The ratio of the plasticity index to the clay fraction. It characterises how plastic a soil is and how clay binds the
grains, shrinks and swells.
Adhesion
Shearing resistance between soil and another material under zero externally applied pressure.
Analyses / laboratory
Laboratory analysis is meant to identify the soil and its characteristics, in particular, the grain size distribution by
sieving and sedimentation, plasticity indexes, compressibility, cohesion, etc.
Analyses / sensitive (field test)
Sensitive analysis, also known as field testing, is also meant to identify the soil and its characteristics, including
grain size distribution, plasticity, compressibility and cohesion. It is not as accurate as laboratory analysis, but
in most of cases it can give enough information on the soil’s suitability.
Bearing capacity
The maximum intensity of loading that the soil will safely carry with a factor of safety against shear failure
irrespective of any settlement that may result.
Bulb of pressure
The zone in a loaded soil mass bounded by an arbitrarily selected isobar of stress. The angle of the bulb of
pressure varies with the soil quality, but it is around 45 from the vertical.
Bulking ratio
A coefficient due to the increase in volume of a material as a result of excavation and/or handling: it is the ratio
of the volume of loosened material to the original volume into the ground. The bulking ratio for a soil will vary as
per the quality of soil.
California Bearing Ratio (CBR)
The ratio of the force per unit area required to penetrate a soil mass with a circular piston of 50 mm diameter at
the rate of 1.25 mm/ min to that required for corresponding penetration of a standard material.
The ratio is usually determined for penetrations of 2.5 mm and 5 mm. Where the ratio at 5 mm is consistently
higher than that at 2.5 mm, the ratio at 5 mm is used.
Capillary action (Capillarity)
The rise or movement of water in the interstices of a soil due to capillary forces.
Coefficient of permeability (Permeability)
The rate of flow of water under laminar flow conditions through a unit cross-sectional area of porous medium
under a unit hydraulic gradient and standard temperature conditions (usually 27 C).
Cohesion
The capacity of the grains of soil to remain together. This property is linked to the plasticity.
Compaction, Compression
The densification of a soil by means of mechanical pressure.
Compressibility
The property of a soil to be compressed to a maximum. It is related to the energy of compaction and the
moisture content (OMC).
- 123 -
Deflocculant
A deflocculant is an agent for thinning suspensions or slurries. It is used to reduce viscosity or prevent
flocculation. It prevents the soil particles in suspension from coalescing to form flocs.
Density,
The mass (Kg) of a unit volume (Litre).
Density / Apparent bulk, APB
The apparent bulk density is the weight per unit volume of a material, including voids that exist in the tested
material. It is also called bulk density.
Density / Air Dry, AD
The air dry density is the apparent bulk density of an air dry soil sample (weight in Kg of 1 litre).
Density / Oven Dry, OD
The dry density is the apparent bulk density of an oven dry soil sample (weight in Kg of 1 litre).
Density / Specific (Specific gravity), SG
Specific density is normally called specific gravity. It is the ratio of the density of a substance to the density
(mass of the same unit volume) of a reference substance, which is normally water.
Note: Specific gravity shall not be confused with specific weight, which is the weight per unit volume of a
material.
Fines
The portion of a soil finer than 60 microns (0.06 mm), which are silt and clay.
Floc
A loose, open-structured mass formed in a suspension by the aggregation of small particles.
Flocculation
A process where clay particles and colloids come out of suspension in the form of flocs or flakes. This occurs
normally in a solution of soil and water. But it occurs also in a humid soil stabilised with lime as the clay
particles are more attracted to each other and they create flocs because of the effect of lime.
Gradation (Grain size distribution or texture)
The grain size distribution of a soil which represents the percentage by weight of the different grain sizes.
Grain size analysis
The process of determining gradation. It is done by sieving and sedimentation.
Horizon (Soil horizon)
One of the layers of the soil profile, distinguished by its texture, colour, structure and chemical content:
‘A’ Horizon : The uppermost layer of a soil profile from which inorganic colloids and other soluble
materials have been leached. It usually contains remnants of organic matter.
‘B’ Horizon : The layer of a soil profile in which material leached from the overlying A Horizon is
accumulated.
‘C’ Horizon : Undisturbed parent material from which the overlying soil profile has been developed.
Induration
The process of forming indurated horizons or hardpans that have a high bulk density. They will harden in time
due to alternation of wetting and drying. There is also a chemical reaction within the soil and with the carbon
dioxide of the air. This process occurs in every soil to various extents but it can be reversible. In laterites the
process is irreversible and once induration has occurred, the soil remains as a soft stone, as petro plinthite.
Leaching
Leaching is the removal of soluble soil elements and colloids by percolating water.
Linear shrinkage, L
Decrease in one dimension of a soil mass, expressed as a percentage of the original dimension, when the water
content is reduced from a given value to the shrinkage limit.
- 124 -
Liquid limit, WL
The water content, expressed as a percentage of the weight of the oven dry soil, at the boundary between liquid
and plastic states of consistency of soil.
Modulus of elasticity, E
The ratio of stress to strain for a material under given loading conditions; numerically equal to the slope of the
tangent or the secant of stress-strain curve. It is expressed in force per unit area.
Moisture content (Water content), WC
The ratio expressed as percentage of the weight of water in a given soil mass to the weight of solid particles
under a specified testing condition.
Optimum Moisture Content, WOMC
The water content at which a soil can be compacted to the maximum dry unit weight by a given compaction
force. It is expressed as a percentage of the weight of water to the weight of the dry soil.
Permeability
The property of a soil which permits percolation.
Plasticity
The property of a soil to be shaped or formed and to be submitted to deformation without elastic failure.
Plasticity index, IP
The numerical difference between the liquid limit and the plastic limit.
Plastic limit, WP
The water content, expressed as a percentage of the weight of oven dry soil, at the boundary between the
plastic and the semi-solid states of consistency of the soil. For purposes of determination, plastic limit is
defined as the water content at which a soil will just begin to crumble when rolled into a thread approximately 3
mm in diameter.
Plastic soil
A soil that exhibits plasticity.
Porosity, n
The ratio, usually expressed as a percentage of the volume of voids of a given soil mass, to the total volume of
the soil mass.
Shrinkage limit (Undisturbed Soil), WSU
The maximum water content expressed as a percentage of oven-dry weight at which any further reduction in
water content will not cause a decrease in volume of the soil mass.
Skeleton
The soil skeleton is related to the quantity and grain size of coarse grains. In general the soil skeleton considers
the particles larger than 2 mm (gravel size). For CSEB, the skeleton will include the coarse sand and gravel:
from 1 to 20 mm. Fine soils (silty and clayey) have little or no skeleton as they have few coarse particles.
Soil profile (Profile)
The vertical section of soil, showing the nature and sequence of the various layers, as developed by deposition
or weathering or both.
Soil stabilisation
Chemical or mechanical treatment designed to increase or maintain the stability of a soil when wet or to
improve its engineering properties.
- 125 -
Soil structure
Soil structure is determined by how individual soil particles clump or bind together and aggregate. It is therefore
the arrangement of soil pores between them. The soil structure is also related to the quantity of the different
grain size. We differentiate mostly these structures:
- Granular structure : Arrangement composed of coarse individual particles: i.e. gravel and coarse sand.
- Fragmented structure : Discontinuous arrangement of soil particles, having large differences in size between
themselves: i.e. gravel and clay.
- Continuous structure : Continuous arrangement of particles from clay to gravel. This is the best soil structure
for CSEB.
Soil texture
See ‘Gradation’.
Strain, e
The change in length per unit length in a given direction.
Stress,
The force per unit area acting within the soil mass.
Volume mass,
The mass (Kg) of a unit volume (m3). It is expressed by the unit Kg/m3.
- 126 -
8.3 TERMINOLOGY FOR STABILISERS AND SOIL STABILISATION
Binder
An active material which binds inert grains such as sand or gravel. Clay is a natural binder but is not stable with
water. Cement and lime are processed products which are water resistant.
Bitumen
Bitumen is originally a natural organic liquid - viscous, black and sticky. Bitumen is also obtained by fractional
distillation of crude oil. Bitumen can now be made from non-petroleum based renewable resources such as
sugar, molasses and rice, corn and potato starches. Bitumen for soil stabilisation can be used as a cutback or
as an emulsion. A cutback bitumen or asphalt is a solution of bitumen in a solvent.
Cement (Ordinary Portland Cement)
Cement is a binder which hardens independently when mixed with water. It can bind other materials together
and stabilise soils. Cement is made by heating limestone at 1450°C with small quantities of clay & other
materials. Cement is a hydraulic binder which can harden under water. Cement shall conform to IS: 8112-1989.
Fly ash
One of the residues generated in the combustion of coal. Depending upon the source and makeup of the coal
being burned, the components of fly ash vary considerably, but all fly ash include substantial amount of silicon
dioxide (SiO2) and calcium oxide (CaO).
Lime
Hydrated or slaked lime Ca(OH)2 is used for stabilising CSEB. The name lime in this standard will refer to
hydrated lime. It is an aerial binder, which especially hardens with the carbon dioxide of the air. Lime shall
conform to IS: 712-1980. Hydraulic lime (which can harden in water) is not considered here as lime.
Lime fixation point
This corresponds to the point at which further addition of lime does not alter the plastic limit of the soil. It is
expressed as a percentage of lime to the soil by weight of dry materials. This percentage is therefore the
optimum amount of lime needed to modify the plasticity of soil, and it is normally between 1 and 3% of lime
added. Beyond this point, lime will increase the strength of the soil.
Pozzolan
Pozzolan has primarily a volcanic origin. Pozzolans are primarily vitreous siliceous materials which react with
calcium hydroxide to form calcium silicates.
Pozzolanic reaction
The Pozzolanic reaction primarily occurs between amorphous siliceous materials (pozzolan) and slaked lime
(calcium hydroxide) to form calcium silicate hydrates. The pozzolanic reaction gives hydraulic properties to
slaked lime and allows it to harden in water. Powdered fired brick can have a pozzolanic reaction, as it was the
basis of the Roman concrete. When a soil is stabilised with lime, the pozzolanic reaction between clay and lime
is the most important reaction, which will reduce the plasticity of clay.
Retention time
Normally the time gap between the hydration of a binder and the compression of the blocks. Practically, it is the
time that a binder needs to hydrate and before it starts to set. Retention time is about 30 to 40 minutes for
cement. Retention time for lime can be any time as long as the lime mix does not dry and reacts with air.
Setting
A chemical reaction of binder which hardens after hydration. This process can occur in the presence of water
for cement or only with air for lime. Cement sets due to a crystallisation process. Lime sets through a
carbonation process with carbon dioxide of the air.
- 127 -
Soil stabilisation
A chemical or mechanical treatment of soil which aims to increase or maintain the stability of silt and clay
against water, in order to obtain lasting properties and strength when the soil gets wet.
Soil stabiliser
A processed product which has a chemical action on the soil. Not only does it increase the mechanical
properties of soil, but it also increases the soil’s water resistance.
- 128 -
Compressed stabilised earth block (CSEB)
A masonry unit which is manufactured by mixing a suitable soil, cement, water and sometimes sand in correct
quantities. The mix is compressed straight away in a press, which can be manually operated or mechanized.
Frog
An indent on the laying face of a block, which is meant to increase the bond with the mortar. A frog will also
,also make it possible to lay blocks more easily, as the mortar will flow in and the workability will be increased.
Note that frogs shall not be put upwards but downwards on the bed face of the block.
Hollow block
A block which has one or more cores or cavities throughout the height of the block. Blocks are considered to be
hollow when voids are between 8 % and 30 % of the total gross volume. (Volume of the block calculated from
its overall dimensions).
Hollow interlocking blocks
A hollow block which has keys and frogs, which interlock into each other. Cores allow vertical reinforcement to
be inserted. Hollow interlocking blocks are especially designed for earthquake resistance.
Honey comb
A structure of small holes on the surface of the block due to pitting. This occurs mostly when the soil-stabiliser
mix has not been mixed properly and the un-stabilised lumps of clay expand during weathering.
Interlocking block (solid)
A block which has keys and frogs, which interlock into each other. Masonry with interlocking blocks offers
more resistance to shear. They are solid and cannot be used for earthquake resistance.
Lamination
The process when over-pressure on the block creates an organisation by thin layers of agglomerated clay
particles: The over-compression induces an expansion of the clay particles when the block is pulled out of the
mould, and this creates a laminated structure of the blocks which reduces its water resistance significantly. The
possible lamination of the soil is due to the combination of an over force and an excessive compression ratio.
Mega Pascal, MPa
A Mega Pascal is 106 Pascal. Pascal, (symbol Pa) is the SI derived unit of pressure.
1 Pa = 1 Newton/m2 and 1 MPa = 10.19716 Kg/cm2
Pitting
The presence of small holes on the surface of the block. Pitting can be due to lumps of clay bursting during
curing or weathering, due to a non-homogeneous mix of the soil stabiliser.
Solid block
A block which has solid material not less than 90 % of the gross total volume. (Volume of the block calculated
from its outside dimensions).
Special block
These are blocks used for particular applications in a building. They can be U block (channel section) for lintels
and beams, Chamfer block, Coping block for parapet walls, Flashing block for the protection of waterproofing,
Indented blocks with indentation for pipes, tiles, etc.
Strength (Bending, Compression, Shear)
Bending strength, B
The average flexural tensile strength under which three or more blocks break in a testing machine. The
bending strength, expressed in Mega Pascals, shall be tested in accordance to the relevant standard. Note
that the bending strength is not the admissible strength, as it is the failure point of blocks. The bending
strength shall be tested under dry condition (Bd) and wet conditions, after 24 hours immersion, (Bw).
- 129 -
Compressive strength, C
The average pressure under which three or more blocks crush in a testing machine. The compressive
strength, expressed in Mega Pascals, shall be tested in accordance to the relevant standard. Note that the
compressive strength is not the admissible strength, as it is the failure point of blocks. The compressive
strength shall be tested under dry condition (Cd) and wet conditions, after 24 hours immersion, (Cw).
Shear stress,
The average shear strength under which three or more blocks break in a testing machine under a stress
which is applied parallel or tangentially to a face of the block. The shear stress, expressed in Mega Pascals,
shall be tested in accordance to the relevant standard. Note that the shear stress is not the admissible
strength, as it is the failure point of blocks. The shear stress shall be tested under dry condition (d) and wet
conditions, after 24 hours immersion, (w).
Void
The ratio of the total volume of voids to the gross volume of the block. It is expressed in percentage.
Volume (gross)
The volume of a block calculated from its overall dimensions, including the volume of voids (e.g. cavities and
cores) if blocks are hollow.
Volume (net)
The gross volume of the block, deducting the volume of voids if blocks are hollow. Note that the volume of the
frog is not deducted here, as it is in general not significant.
Water absorption
The increase in mass of an air-dried specimen due to immersion in water for 24 hours.
- 130 -
Presses types (Manual, Motorised, Mobile Units, Semi-industrial plants)
Manual presses
Manual presses are manually operated, light or heavy presses. Light presses are generally inexpensive but
not long lasting, because of their simple design and light weight. Their productivity can vary from 400 to 850
strokes per day.
Motorised presses
Motorised presses employ an engine or electrical motor to operate the press. The transmission of energy
can be mechanical or hydraulic. Motorised presses can be mobile and be hooked behind a car. But they are
single units, which only compress the block without including a crusher or mixer. Their productivity can vary
from 3,000 to 10,000 strokes per day.
Mobile Units
Mobile units are integrated machinery, which can be moved on site behind a truck. They always integrate a
mixer and sometimes a sieve and / or crusher. Belt conveyors can also be attached to the unit.
Semi-industrial plants
Semi-industrial plants are fixed production units with a lot of integrated equipment: crusher, sieve, mixer,
multi mould presses, belt conveyors, frontal loaders, forklifts, etc. Their productivity fits in a totally different
scale of production and cannot be specified here as it varies considerably from case to case.
Mould
The steel frame with a bottom and top plate, into which is poured the mix to be compressed. Moulds can be
interchangeable on the frame of the press, and they can have insert plates to produce 3/4 and 1/2 blocks sizes.
Nominal compression force
The potentially available force to compress the earth. This force can be classified as follows:
Very low force: 3 to 5 tons
Low force: 5 to 10 tons
Medium force: 10 to 20 tons
High force: above 20 tons
Note that it is not advisable to compress with greater than 50 tons, as it may create lamination.
Nominal compression pressure
The pressure theoretically applied to the mix. It is the ratio of the nominal compaction force to the area of the
block on which the force is applied. This nominal compression pressure can be classified as follows:
Very low pressure: 1 to 2 N/mm2
Low pressure: 2 to 3 N/mm2
Medium pressure: 3 to 5 N/mm2
High pressure: 5 to 10 N/mm2
Operating energy (Manual, Motorised)
Manual operation
The press is totally manually operated, and the compression force is given by the labour force only.
Motorised operation
The piston mechanism and sometimes more operations of the press are powered by an engine or an
electrical motor. The transmission of energy can be mechanical or hydraulic.
- 131 -
Output (Practical, Theoretical)
Practical output
The output which can be practically accomplished by a trained team. This takes into account the various
breaks spent to clean the press, adjust it, and so forth. The output can be given per hour or per day.
Theoretical output
Calculated on the basis of the time required to compress 1 block. It does not take into account the time
wasted to clean the press, and so forth. The output can be given per hour or per day. The theoretical output
given by the manufacturer can often be 20 % greater than the practical output.
Stroke
The action of the compression piston travelling the full height of the mould.
- 132 -
Pulverising / Crushing
Consists of powdering the soil with a motorised machine, in order to break pebbles and lumps.
Sieving
Consists of sieving the soil, in order to remove gravel and lumps. Sieving can be done manually or mechanically
with a motorised machine.
Soil preparation
Consists of sieving or crushing/ pulverizing the soil to remove gravel, coarse particles or lumps. Sieving can be
done manually or mechanically, but crushing/ pulverizing is done with a motorised machine.
8.6 TERMINOLOGY FOR DESIGN GUIDELINES WITH CSEB AND FOR LOAD BEARING MASONRY
Arch
Curved element of masonry built with masonry units and mortar to span an opening.
Beam
Horizontal member to support the load of masonry above a large opening.
Beam – Composite beam
Beam composed of U-shape CSEB’s and reinforced cement concrete.
Bond pattern
An arrangement of masonry units to create a cohesive wall system. This arrangement shall be such that the odd
and even courses do not coincide with each other, to establish a staggered pattern.
Bond – Double bond wall
This bond pattern is also called double leaf wall. Blocks are laid alternately in headers and stretchers, and the
wall thickness is the same as the length of the block. Blocks overlap by ¼ of their length between odd and even
courses. English and Flemish bonds are typical examples of double bond walls.
Bond – English Bond
A bond pattern in which rows of stretchers alternate with rows of headers. Blocks overlap by ¼ of their length
between odd and even courses.
Bond – Flemish Bond
For every course, blocks are laid alternately in stretchers and headers: the headers of each row are centred on
the stretchers of the row below. Blocks overlap by ¼ of their length between odd and even courses.
Bond – Header Bond
Blocks are laid only in headers, and the wall thickness is the same as the length of the block. Blocks overlap by
¼ of their length between odd and even courses. This bond pattern is not recommended for earthquake prone
areas.
Bond – Single bond wall
This bond pattern is also called single leaf wall or stretcher bond. Blocks are laid in stretcher and the wall
thickness is the width of the block. Blocks overlap each other between courses by ½ of their length.
Bond – Stretcher Bond
A bond pattern made using only stretchers, meaning that blocks are laid lengthwise in the direction of the wall.
Blocks overlap by ½ of their length between odd and even courses.
Buttress
A structural member which is perpendicular to the wall, to strengthen it and to aid in resisting lateral loads.
Column
An isolated vertical load bearing member for which the width is not more than four times its thickness.
- 133 -
Coping
The upper part of the building, which protects the top of a wall or parapet from rainwater.
Course
A single layer of masonry units of the same height, which include the bed joint.
Damp proof course
A waterproof layer, which prevents water from rising by capillary force into the wall.
Design strength
The compressive crushing strength of the block multiplied by a partial safety factor.
Dome
Doubly curved structure made of masonry units and mortar to span a room, which can be circular or polygonal.
Drip
Projection below a horizontal surface and away from the wall, which prevents water from flowing back to a wall.
Effective height
Height of a wall, pier or column to be considered for calculation of the slenderness ratio.
Effective thickness
Thickness of a wall, pier or column assumed for calculation of the slenderness ratio.
Efflorescence
A crystalline deposit of minerals and salts on the surface of a wall caused by evaporation of water containing
soluble salts. Efflorescence is normally caused by mineral salts in the soil.
Free standing wall
A wall or part of a wall that stands above any horizontal support and which is not connected to a roof or a
beam.
Footing
A spread constructed in brickwork, masonry or concrete under the base of a wall or column, used to distribute
the load of the super-story structure over a larger area.
Grout
A liquid mortar, fluid enough to be poured.
Flashing
Continuous member of masonry projecting out of a wall, to protect the top of waterproofing along the wall.
Foundation
The underground part of the structure, which is in direct contact with the ground and transmits loads to it.
Foundation – Stabilised rammed earth foundation
A foundation made from a mix of earth, sand and stabilised (mostly with cement), which is rammed in situ.
Foundation – Trench foundation
Also called a strip foundation, this foundation is made by digging a trench, which is then filled with appropriate
materials.
Jamb
Vertical part of a wall on the side of an opening.
Joint
Horizontal or vertical space between two masonry units.
Joint – Bed joint
The horizontal mortar joint of a course in a wall.
- 134 -
Lintel
Short span beam supporting the masonry above an opening.
Lintel – Composite lintel
Lintel composed of U-shape CSEB’s and reinforced cement concrete.
Load bearing wall
Wall primarily designed to carry the vertical load of the building, its own weight and required live loads.
Load – Dead loads
Dead loads are the weights of all materials for walls, floors, roofs, ceilings, stairways, built-in partitions,
finishes, cladding and other items which are part of a building. All permanent loads are considered dead loads.
Load – Live loads
Live loads include all the forces that are variable within and on the building, such as weight of inhabitants,
furniture and the environmental loads: wind load, snow load, rain load, earthquake load, flood load.
Masonry
Assemblage of masonry units, either laid in situ or constructed with prefabricated components, in which the
masonry units are bonded solidly together with mortar or grout.
Masonry unit
A building component, generally of a small size, which is used to build walls or other parts of a building.
Masonry units can be CSEB, concrete block, fired bricks, stones, etc.
Mortar
A workable paste used to bind masonry units together and fill in the gaps between them. Mortar is composed of
aggregates (sand and or soil), a binder (usually cement or lime) and water.
Mortar – Cement sand mortar
A mortar based on cement and sand in various proportions, intended to meet the particular requirements.
Composition of cement sand mortar shall be indicated as CSM 1: 3 (1 cement and 3 sand).
Mortar – Stabilised earth mortar
A mortar based on cement, soil and sand in various proportions, intended to meet the particular requirements.
Composition of stabilised earth mortar shall be indicated as SEM 1: 4: 8 (1 cement, 4 soil and 8 sand).
Partition wall
A relatively thin non load bearing wall inside a room.
Pier
A structural member, which is placed between openings in a wall. It can be placed perpendicularly to the wall to
act as a buttress.
Pile foundation
A thin column, which is introduced or cast into soils of low bearing capacity. It can either be inserted until a
deep strata which can bear the load, or it can be driven into the soil and transfer the building’s loads by friction
to the ground.
Plaster
A workable paste used to cover walls, in order to protect them from rain and to obtain a smooth finish. Plaster is
composed of aggregates (sand and or soil), a binder (usually cement or lime) and water.
Plaster – Stabilised earth plaster
A plaster based on cement, soil and sand in various proportions, intended to meet the particular requirements
for strength. Composition of stabilised earth plaster shall be indicated as SEP 1: 3: 6 (1 cement, 3 soil and 6
sand).
Plinth
Also called basement, it is the bottom part of a wall just above the foundation.
- 135 -
Plinth beam
A horizontal course on the basement of a wall which is reinforced, usually with reinforced cement concrete, to
stiffen the basement.
Plinth beam – Composite plinth beam
Ring beam located on top of the last course of the basement, which is composed of U-shape CSEB’s and
reinforced cement concrete.
Ring beam
A horizontal course in a wall which is reinforced, usually with reinforced cement concrete, to increase lateral
and longitudinal resistances of that wall.
Ring beam – Composite ring beam
Ring beam composed of U-shape CSEB’s and reinforced cement concrete.
Safety factor
A coefficient taken into account to safely calculate a building.
Shear wall
A wall designed to withstand horizontal forces acting within the plane of the wall, with or without vertical
imposed loads.
Shrinkage stress
Stress induced by shrinkage of clay in the material, which creates cracks in a wall.
Sill
Wall below an opening.
Slenderness ratio
Ratio of the effective height of a wall, column or pier to the effective thickness.
Split joint
Vertical joints created by masonry units that are laid above each other without a staggered bond pattern. Split
joints are not acceptable for proper bond pattern in masonry, because they create weak planes through the
masonry system.
Vault
Arched roof structure to span a room, which is made of masonry units and mortar.
- 136 -