Check List Form (Bored Pile)
Check List Form (Bored Pile)
DEPARTMENT OF BRIDGE
BORED PILE CONSTRUCTION INSPECTION CHECK LIST
MEASURING AND CHECKING OF PILE POSITION
PROJECT NAME :
PROJECT TEAM :
PROJECT LOCATION :
CONTRACTOR NAME :
PIER/ABUTMENT No. :
BM
__Thayet Side
CL
Aung Lan Side
5 4 3 2 1
( D /S) ( U /S)
10 9 8 7 6
15 14 13 12 11
DEPARTMENT OF BRIDGE
BORED PILE CONSTRUCTION INSPECTION CHECK LIST
CAST IN PLACE BORED PILE DRILLING LOG
Msda Top Rock : Bot: Elev:(mm) -150 PILE BOTTOM INSPECTION CLEANOUT METHOD
Msda Avg: Pile Bot: Length (m) 14.5 Visual ⃞ Tape/Probe ✓ Bucket ✓ Airlift ⃞ Pump ⃞
DRILLING SLURRY Record 5 Depth to the bottom of finished Other
Type Brand Manufacture shaft(m): 1. 46.94m_ Meet Cleanout Specifications? Yes_✓__ No____
3 2. 46.90m
Grade A TK Local 3. 47.00m Meet Alingment Specifications? Yes_✓__ No____
4. 46.95m
TEST RESULTS OF SLURRY PROPERTIES 1 5 2 TYPE OF CONSTRUCTION
5. 46.90m
Density(g/cm3) Viscosity(sec/L) Sand Content(%) pH Dry ⃞ Wet ✓
4
1.07 41.59 0.9 a
Measured b
Temporary cPermanent
Slurry meets Specification of ACI 336.1? Yes___ No___ Avg: Pile Bottom Elevation(m): 46.938m d
Construction
Symbols
Start Finished Sounding Elevation for Soils
Date Soil and Material Description Remark
hr:min(AM/PM) hr:min(AM/PM) ft or m ft or m and
Rocks
23.12.2021 10:15 AM 11:15 AM 7m Stand Pipe Driving
23.12.2021 4:50 PM 5:15 PM 12 m Greyish Brown SAND some Silt
24.12.2021 8:00 AM 8:50 AM 15.5 m Greyish Brown SAND some Silt
24.12.2022 10:00 AM 10:30 AM 19.5 m Greyish Brown SAND some Silt
24.12.2023 10:48 AM 11:18 AM 23.5 m Greyish Brown SAND some Gravel
24.12.2024 1:30 PM 2:00 PM 27.8 m Greyish Brown SAND some Silt some Gravel
24.12.2025 2:15 PM 2:48 PM 31.7 m Grey SAND some Silt trace Gravel
24.12.2023 3:05 PM 3:45 PM 35.8 m Grey SAND some Silt trace Gravel
24.12.2024 4:05 PM 4:45 PM 39.8 m Grey SAND some Silt trace Gravel
24.12.2025 5:11 PM 5:52 PM 43.5 m Grey SAND some Gravel some Silt
24.12.2023 6:10 PM 6:45 PM 44.3 m Grey SAND some Gravel some Silt
24.12.2024 7:26 PM 7:50 PM 46.5 m Grey SAND some Gravel some Silt
24.12.2025 7:53 PM 8:05 PM 47.1 m Grey SAND some Gravel some Silt
24.12.2025 8:45 PM 8:50 PM 47.8 m Grey SAND some Gravel some Silt
Remarks: 1. Record and describe all materials encountered during pile excavation. (Water table information, obstruction encountered,
equipment used and equipment breakdowns)
2. Used additional sheet if necessary.
Time(hr)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Remarks
Depth(m)
3
6
9
12
15
18
21
24
27
30
33
36
39
42
45
48
51
54
57
60
Type Brand Manufacture Density(g/cm3) Viscosity(sec/L) Sand Content(%) pH
Slurry Information: Test Results of Slurry
Properties:
Pile Top Elevation :16.014m Pile Diameter: 1.5m Rebar Cage Top Elevation:16.014m
Pile Bottom Elevation :(-)29.786m Pile Length : 44m Rebar Design Elevation :16.014m
Pile Cap Bottom Elevation:14.214m Depth to Water Table: Depth to Slurry:
Design Concrete Compressive Strength (Cylinder/Cube): Rebar Cage Centered Within Specification:
____35__MPa / ______psi Yes ✓ No ⃞
Placement Method: Concrete Volume m3
Termie ✓ Free Fall ⃞ Volume in stand pipe :
Concrete Pouring Date Time Volume in thin sheet : 31.81
Start 25/12/2021 7:05 AM Volume in the rest portion : 49.13
End 25/12/2021 2:45 PM Total estimated volume (TEV): 80.94
Pile Completion time (including Total volume delivered (TVD): 83.00
casing removal) Difference Volume (TVD-TEV): (+)2.06
46.9
1 7:00 AM 2 12 7:05AM 7:55AM 45.4 5.5
Total Concrete Volume Delivered 83m³ *NOTES - (delays, additives, breaching, casing removal, bucket number)
APPROVED BY:
INSPECTED BY: CHECKED BY:
(ကို ကို ထက္ႏို င္) (လႊမ္းေဝသက္) (ေဌးေအာင္) ၫႊန္ၾ
အငယ္တ န္းအင္ဂ်င္နီယာ(၂)(ၿမိဳ႕ျပ) ဦးစီးအရာရွိ(ၿမိဳ႕ျပ) ကားေရးမွဴ း(ၿမိဳ႕ျပ)
တည္ေဆာက္ေရးအဖြဲ႕(၃) တည္ေဆာက္ေရးအဖြဲ႕(၃) တံ တားဦးစီးဌာန
(______/ ______/ _____)
(ေဌးေအာင္) ၫႊန္ၾ
ကားေရးမွဴ း(ၿမိဳ႕ျပ)
တံ တားဦးစီးဌာန
(MOC/DOB/BP/F-8)
DEPARTMENT OF BRIDGE
BORED PILE CONSTRUCTION INSPECTION CHECK LIST
CAST IN PLACE BORED PILE CONCRETE VOLUME
Prior to concreting a plot should be made showing the theorectical concrete surface (by depth or elev.) vs theorectical concrete volume
placed. During concreting, the actual concrete surface vs the actual concrete volume placed is then plotted.
PILE TOP
48
DEPTH/ELEVATION(m)
40
30
20
10
0 10 20 30 40 50 60 70 80 90
PILE BOTTOM CONCRETE VOLUME (m ) 3
NOTES: _______________________________________________________________________
(____/____/______)
3.65
(ေဌးေအာင္) ၫႊ
န္ၾကားေရးမွဴး(ၿမိဳ႕ျပ)
တံ တားဦးစီးဌာန
(MOC/DOB/BP/F-9)
DEPARTMENT OF BRIDGE
BORED PILE CONSTRUCTION INSPECTION CHECK LIST
CAST IN PLACE BORED PILE INSPECTION REPORT
Date/Time REINFORCEMENT
Started Finished Elev.(Top): ______16.014m___________
Excavation
23/12/2021 10:15AM_24/12/2021 8:50PM_ Elev.(Bot): ______(-29.786m)____
Pile Bottom Inspection __________________________________
CASING INFORMATION
Started Finised
Concreting
25/12/2021 7:05AM_ 25/12/2021 2:45PM_ Top Elev.: _16.349 m________
As Built
Measurement Cap Base Elev.: __14.214m_____
Design Measurement
Top Elevation (m): 16.014m_ 16.014m_
Bottom Elevation (m): (-)29.786m (-)29.786m
Pile Diameter (m): 1.5m 1.5m
Rock Socket Diameter (m) (if
_______________ _______________
applicable)
Pile Length * (m) 45.8m 45.8m
*Was Pile Length approved? Yes ✓ No ⃞ River Bed Elev.: 8.214m
Concrete Volume 83.0m 3
(or) Ground Water Elev.
Concrete Mixed Design Casing Bot Elev.: _(-)0.15m____
Cylinder/35MPa Cylinder/35MPa
(Cylinder /Cube)(Mpa or psi)
Concrete Placement Method: Tremie ✓ Free Fall ⃞
(____/____/______)
(MOC/DOB/BP/GPR)
DEPARTMENT OF BRIDGE
BORED PILE CONSTRUCTION
GENERAL PROGRESS PHOTO REPORT
(_____/_____/_____)