Curiculum Vitae - Construction Manager Jr-1

This curriculum vitae outlines the personal and professional experience of R. Gesang Wareih Wardhana. He has over 20 years of experience in civil engineering and construction management roles. His experience includes managing offshore oil and gas construction projects, fabrication work, and civil inspection roles. He holds a Bachelor's Degree in Civil Engineering from Muhammadiyah Yogyakarta University.

Uploaded by

lucky fotokopi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
123 views6 pages

Curiculum Vitae - Construction Manager Jr-1

This curriculum vitae outlines the personal and professional experience of R. Gesang Wareih Wardhana. He has over 20 years of experience in civil engineering and construction management roles. His experience includes managing offshore oil and gas construction projects, fabrication work, and civil inspection roles. He holds a Bachelor's Degree in Civil Engineering from Muhammadiyah Yogyakarta University.

Uploaded by

lucky fotokopi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

CURRICULUM VITAE

PERSONAL INFORMATION

Name : R. Gesang Wareih Wardhana, ST


Sex & Status : Male / Married
Place& date : Cilegon, October 02th 1978 Age(year):44
of Birth
Address (Street, : Jl Arga Burangrang D8 no 29 RT 13/03 Cilegon Banten
Village, RT/RW,
Kec, Kab)
ID Card : 3672060210780001
Mobile Phone : +6285228513240
: +6285893357482( WA )
Email Address : [email protected]
Religion : Islam
Weight (kg) : 65
Height (cm) : 163
Language : English : Active
Computer : Microsoft office, AutoCAD, PDMS Review, Navis Work, SAP2000,

EDUCATION
Period School/College/University Major
1997 – 2007 Muhammadiyah Yogyakarta University Bachelor Degree in Civil Engineering
Work Experiences
Period Company Name Position
November 2021- May 2023 Meitech Eka Bintan, PT Construction Manager Jr

• With Project Planner set up Detail Project Schedule.


• Prepare Manpower Planning and Loading
• Control Project Execution.
• Responsible in various constructions activity on Armada KP1 Stinger Lawelawe Project :
- Planning of Tools, Equipments , Consumables and Materials.
- Monitoring Fabrications of Main & Extension Stinger, A Frame, Under Deck Strenghtening.
- Monitoring Armada KP1 Barge Modification and Maintenance.
- Monitoring Engineering Design, Shop drawing and All Procedure.
- Monitoring Completion Test Package KP1 Stinger
• Responsible in various constructions activity on Medco Forel-Bronang Project :
- Fabrication & Erection Forel & Bronang Jacket
- Fabrication & Erection Forel & Bronang Topside
- Fabrication Forel & Bronang Jacket Pile Make Up
- Fabrication & Erection Riser Guard Protection Forel & Bronang Jacket
- Fabrication & Erection Conductor Guard Protection Forel & Bronang Jacket
- Fabrication & Erection Boatlanding Forel & Bronang Jacket
- Load Out Forel & Bronang Jacket, Deck, Pile Make Up ,Boat Landing
- Fabrication & Erection Grillage & Seafastening Forel & Bronang Jacket
- Fabrication & Erection Grillage & Seafastening Forel & Bronang Topside
- Fabrication Riser Guard Protection Forel & Bronang Jacket
Period Company Name Position
August 2021 – October 2021 Gunanusa Utama Fabricators, PT Construction Coordinator

• Responsible in various construction activity at Syntetic Rubber Indonesia :


- Preparation Site Office.
- Monitoring Mobilization of Tools, Equipments , Consumables & Material.
- Monitoring Installation Scaffolding at U31 & U32 Stripping 3Batch.
- Monitoring Replacement Stripping Spools-Pipe Duplex.
- Monitoring Installation Stripping Spools-Pipe Duplex.
- Fabrication Stripping Spools-Pipe Duplex.

Period Company Name Position


July 2019 – November 2020 Gunanusa Utama Fabricators, PT Construction Coordinator

• Responsible in various constructions activity on Becakayu 2A Section Infrastructure Project at


Open Area and Workshop Area:
- Fabrication Box Girder, Cross Beam, Stringer, Splice Plate for Hasibuan Toll Road Bridge
56 meters span.
- Fabrication Box Girder, Cross Beam, Stringer, Splice Plate for A. Yani Dawn Line Toll Road
Bridge 212.6 meters span.
- Fabrication Box Girder, Cross Beam, Stringer, Splice Plate for A. Yani Up Line Toll Road
Bridge 212.6 meters span.
• Responsible in various constructions activity on Saka Sidayu Project at Open Area and
Workshop Area:
- Fabrication & Erection WHP-C & WHP-D Jacket
- Fabrication & Erection WHP-C & WHP-D Deck
- Fabrication WHP-C & WHP-D Jacket Pile Make Up
- Fabrication & Erection Riser Guard Protection WHP-C & WHP-D Jacket
- Fabrication & Erection Conductor Guard Protection WHP-C & WHP-D Jacket
- Fabrication & Erection Boatlanding WHP-C & WHP-D Jacket
- Load Out WHP-C & WHP-D Jacket, Deck, Pile Make Up ,Boat Landing
- Fabrication & Erection Grillage & Seafastening WHP-C & WHP-D Jacket
- Fabrication & Erection Grillage & Seafastening WHP-C & WHP-D Deck
- Fabrication Riser Guard Protection WHP-B Jacket
• Responsible in various constructions activity on YYA Project at Open Area :
- Load In YYA Deck & Jacket
Monitoring in various constructions activity on Mitsui E&S Central Java Project at Open Area and
Workshop area:
- Fabrication & Erection ID 4200x39ML Straight Pipe With Manhole (Intake)
- Fabrication & Erection ID 4200x33ML Straight Pipe With Reducer (Intake)

Period Company Name Position


March 2019- July 2019 Artha Teknik Abadi,PT Site Manager

• Responsible in various construction activity within supply manpower, consumables and tools
rental at Chandra Asri Petrochemical on :
- Routine Daily Maintenance (RDM)
- Additional Work Cleaning Naftha Tank 1801 B
- Additional Work Shutdown Furnace BA 103, BA 104, BA 105, BA 107
- Additional Work Patching Naptha Tank FB 1801 B, FB 1807
- Additional Work Patching Product Purge Bin ( LLDPE Plant )
- Additional Work DeBottle Neck (DBN) Project
Period Company Name Position
June 2017- Feb 2018 Gunanusa Utama Fabricators, PT Construction Coordinator

• Responsible in various constructions activity on Daman Phase 2 ONGC Project :


- Fabrication 5 ( five) Jacket Piles, C24-P2, B12-13, B12-11, B12-15, B12-17 .
- Fabrication 5 ( five) Jacket Conductors C24-P2, B12-13, B12-11, B12-15, B12-17 .
- Fabrication Grillage , Seafastening Jacket & Conductors

Period Company Name Position


August 2015 – March 2016 Gunanusa Utama Fabricators,PT Head of Yard Production Planning

• Responsibility in positions of :
1. Head of YPP :
- Check and ensure completeness of task sheets for the manufacture of basic needs based
document received Fabrication and material readiness.
- Coordinate with fabrication coordinator, supervisor Fabrication, material control, scheduler and
engineering at the time of making the task sheet.
- Ensure that the task sheet is made and handed down has taken into account the existence of
the resources needed by Fabrication.
- Ensure that the entire document for fabrication work received has been created and has been
sent to the task sheetnya Fabrication.

2. Assist Contrac Engineer :


- Produce Construction Time Sheet for Change Order / Back Charge to Client
3. Assist Construction Coordinator :
- Responsible in various constructions activity on DAMAN Project INDIA at C-24 Deck P3, Deck P4

Period Company Name Position


October 2014 – Dec 2014 Gunanusa Utama Fabricators,PT Construction Coordinator

• Responsible in various manufacturing activity on ENI FMC Jangkrik Project :


* Preparation area manufactured inside workshop for 7(seven) Module such as:
- Single Header Manifold (3 item), Dual Header manifold ( 2 item), Export Gas SSIV
- Condensate SSIV+ Mudmate
• Responsible in various constructions activity on Revamping Project :
- Fabrication & Erection Diesel Tanking Storage

Period Company Name Position


April 2014 – September 2014 Takraf Tenova Australia Pty.Ltd Construction Supervisor

• Responsible in various constructions activity on Roy HiLL Iron Ore Project Australia :
- Fabrication & Erection Primary Crushing Module Unit 1 up to unit 3
- Fabrication & Erection Secondary Crushing Module Unit 1 up to unit 3
- Fabrication & Erection Feed Conveyor Bridge Unit 1 up to unit 3

Period Company Name Position


October 2012- January 2014 Gunanusa Utama Fabricator, PT Construction Coordinator

• Responsible in various constructions activity on SisiNubi2B/Peciko7B Project Kalimantan &


Yadana Subsidence Project Myanmar :
- Fabrication SWPJ, WPN3, WPS2 Jacket Piles
- Fabrication & Erection SWPJ, WPN3,WPS2 Jacket Grillage & Conductors
- Fabrication & Erection SWPJ, WPN3,WPS2 Deck Grillage & Vent Boom
- Load Out Piles, Jacket, Deck, Boat Landing, Vent Boom
- Fabrication & Erection Bouyancy Tank at QP2 Jacket
- Fabrication & Erection QP2 Jacket Grillage & Seafastening
- Load Out Piles, QP2 Jacket, MSF Deck
- Fabrication & Erection QP2 MSF Grillage & Seafastening
- Fabrication & Erection QP LQ Grillage & Seafastening

Period Company Name Position


April 2012 – October 2012 Krakatau Engineering, PT Civil/ Structural /Mechanical Inspector

• Responsible in various Structure / Civil Inspector on Krakatau Posco Project:


- Dimensional Control Slab, Footing, Coloumn,& RingBalk
- Dimensional Control Mechanical Equipment
- Lifting Procedure for Installation Mechanical Equipment.

Period Company Name Position


July 2011 – April 2012 Meindo Elang Indah, PT Structural/Civil Engineer

• Responsible in various Civil engineering calculations and designs Structural on


SisiNubi2A/Peciko 7B Project:
- Dimensional Control Extension Module Frame,
- Fabrication & Erection for Platform Extension and CP Guide
Above and Under Water
- Fabrication & Erection for Protection Frame
- Platform Extension Load Out and Seafastening
- CP Guide Load Out and Seafastening
- Platform Extension transferring and Offshore Installation
- CP Guide transferring and Offshore Installation
- Monitoring Structure, Piping Erection for South Mahakam Project
- Anchor Handling or Marine Operational Method
- Diving procedure
- Procedure for Structure Bolt Tightening
- Weighing procedure
- Mooring Analysis of Work Barge
- Lifting Analysis
- Barge Stability Calculation
- Lifting Stability Analysis on work barge
- Review Shop Drawing
- Makes Job Risk Assessment for all activity on yard.
- Check activity directly on Yard
Period Company Name Position
July 2009 – Jan 2011 Gunanusa Utama Fabricators, PT Structural/Civil Engineer
Job Description :
1. Responsible in various Civil engineering calculations and designs Structural on ONGC
Project :
- Dimensional Control Main Structure Frame, Topsides deck and Bridge
- Fabrication and Erection for Main Structure Frame, Topsides deck and Bridge
- Crossbeam Fabrication
- Crossbeam Turning and Transferring
- WPG Transferring, Straightening and Fabrication Procedures
- Siemens Gas Turbine Generator Offloading, transferring and Installation
- Outriggers Erection on Module
- Main Structure Frame, Topsides Deck and Bridge Stacking
- Helideck Stacking
- Main Structure Frame, Topsides Deck and Bridge Load Out
- Pile and Skid ways Capacity Verification
- Skid framing Design and Calculation Note
- Rigging Arrangement Calculation for Load Out
- Mooring Arrangement Calculation for Load Out
- Barge Deck Strength Check for Load Out
- Stability Check for Load Out
- Ballasting Procedure
- Welding Sequence procedure
- Module Jacking Procedure
- Soil Bearing Capacity Check
- Weight Control Report
2. Construction Coordinator of 3(three) Barge(Sealink Pacific, Maritime Pride, JMC )
- Grillage Fabrication and Erection on Barge
- Coordination with HMC (Heerema Marine Contractors) for Sail way
- Coordination with ALE ( Abnormal Load Engineering) Malaysia for Load Out
3. Structural Coordinator for String Test Solar Turbine and Siemens Gas Turbine
4. Echo sounding survey for Jetty Sedimentation”.
5. Review Shop Drawing
6. Makes Job Risk Assessment for all activity on yard.
7. Check activity directly on Yard
8. Coordination with Consultant (Aker Solution) and Company (AFCON)
Period Company Name Position
October 2008 – July 2009 BantenTeknikSemesta, PT Structural/Civil Engineer
Projects :
1. Site Supervisor for Desalination Recondition at Indonesia Power Suralaya, PT
2. Site Supervisor for Pipe Line and Pipe Rack at Dumai Pertamina, PT.
3. Site Supervisor for Kebon Nanas Fly Over Handrail at Jakarta.
4. Site Supervisor for Bogor Highway at IstakaKarya,PT
5. Site Supervisor for Concrete Road at Amoco,PT.
Period Company Name Position
July 2007 – September 2007 Hanazono Engineering, PT Structural/Civil Engineer
Projects :
1. Construction supervisor for fabrication Vessel & Service Platform Tangguh Project.
2. Shipping supervisor Service Platform Tangguh Project.
3. Structure Drafter.

CERTIFICATION
 Total Station SOUTH NTS 352 R+,GeoprimaSolusi Sole Agent Surveying
 Basic Fire Fighting
 Permit to Work
 Cermat Training
 Basic Rigging Safety
 Scaffolding Training
 Introduction ISO 9001 : 2008
 LiaAffiliasi English Course
 First Aid Level Two(2)
 Sea Survival Indosafe Pratama
 Accident Incident Investigation Report