Survey Report For SWCC Pipeline Access Road

The survey report summarizes the findings of an inspection of the access roads for a SWCC 48" pipeline. The pipeline was split into three zones - green, red, and yellow - based on the severity of damage observed. In the green zone, various repairs like erosion control, grading, and replacing missing lids were needed along the access road from the pump station to chainage 10+226 and from 68+981 to the HPR. Similar repairs like erosion control, grading, rising chambers, and replacing missing lids were needed in the red and yellow zones from 10+226 to 31+492 and 31+492 to 68+981 respectively. Detailed observations and photos were provided for each zone and chainage noting the

Uploaded by

Iftikhar 000
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
182 views44 pages

Survey Report For SWCC Pipeline Access Road

The survey report summarizes the findings of an inspection of the access roads for a SWCC 48" pipeline. The pipeline was split into three zones - green, red, and yellow - based on the severity of damage observed. In the green zone, various repairs like erosion control, grading, and replacing missing lids were needed along the access road from the pump station to chainage 10+226 and from 68+981 to the HPR. Similar repairs like erosion control, grading, rising chambers, and replacing missing lids were needed in the red and yellow zones from 10+226 to 31+492 and 31+492 to 68+981 respectively. Detailed observations and photos were provided for each zone and chainage noting the

Uploaded by

Iftikhar 000
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 44

SWCC 48” Pipeline Access Road Repair

Survey Report

1. General Information

Company Name BARQ AL MUSTAQBAL CO


Project Name SWCC 1200 mm pipeline access road repair
Instructed by Mr. Dugald Wood (NEOM)

2. Introduction
A site visit survey was conducted By BARQ AL MUSTAQBAL Company between 01/01/2023 to
01/05/2023 for SWCC 1200 mm pipeline access road repair. And we found various damages,
restrictions, and inaccessibility to access chambers which required serious intentions for
current and future maintenance and safe pipeline operations. In particular, we observed that
portions of the access roads were affected by critical erosive or damaged by flood
phenomena. In the following pages we will explain, facts, solution and suggestions.

3. Description
The pipeline is split into three zones with respect to severity and damage.
1. Green Zone (Pump station to 10+226,68+981 to HPR)
2. Red Zone (10+226 to 31+492)
3. Yellow zone (31+492 to 68+981)

Survey Report P a g e 1 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

4. Facts from Site Inspection

4.1. Green Zone (Pump station to 10+226,68+981 to HPR)

Description Pictures

• Chainage(00+000-00+886)
• Erosion Control
• Grading

• Chainage(00+886-01+543)
• Grading
• Erosion Control
• Lid missing

Survey Report P a g e 2 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage(01+543-03+008)
• Grading

• Chainage(05+018-06+836)
• Grading
• Need to be rise

• Chainage(06+836-07+246)
• Erosion control
• Need to be rise
• Grading

Survey Report P a g e 3 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage(07+246-07+318)
• Grading

• Chainage(07+318-07+707)
• Need to be rise
• Grading

• Chainage(07+707-08+336)
• Lid missing

Survey Report P a g e 4 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage(08+336-08+764)
• Need to be rise
• Erosion Control
• Grading
• Access road repair

• Chainage(08+764-08+969)
• Lid missing

• Chainage(08+969-09+443)
• Erosion Control
• Grading

Survey Report P a g e 5 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage(09+443-09+499)
• Lid missing
• Grading
• Erosion control

• Chainage(09+499-09+924)
• Grading
• Need to be rise

• Chainage(09+924-10+226)
• Need to be rise
• Erosion control
• Grading for access road

Survey Report P a g e 6 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage(68+981-70+088)
• Erosion control
• Grading for access road

• Chainage(70+088-70+154)
• Small lid missing
• Concrete slab not properly
placed
• Need to be rise
• Grading

• Chainage(70+154-71+160)
• Chamber Need to be rise

Survey Report P a g e 7 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage(71+160-73+738)
• Lid missing
• Need erosion control

• Chainage(73+738-74+689)
• Need to be rise
• Grading

• Chainage(74+689-76+654)
• Need to be rise
• Erosion control
• Grading

Survey Report P a g e 8 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chiange(76+654-78+606)
• Need rising
• Erosion Control

• Chainage(78+606-78+729)
• Grading for access road
• Erosion control

• Chainage(78+729-80+362)
• Need little rising
• Erosion control

Survey Report P a g e 9 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage(80+362-81+140)
• Grading

• Chainage(81+140-81+382)
• Grading

Survey Report P a g e 10 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

4.2. Red Zone (10+226 to 31+492)

From chainage 10+226 to 17+660 is not accessible for us due to fencing wall. Chambers under
this region located inside the fencing area.

Description Chamber Picture

• Chainage (17+660-17+800)
• Lid missing
• Erosion Control
• Grading required for
access road

• Chainage (17+800-17+997)
• Need chamber rising
• Erosion control
• Access road repairing
• Concrete slab not properly
placed

Survey Report P a g e 11 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (17+997-18+789)
• Erosion control
• Access road repairing
• Grading

• Chainage (18+789-19+041)
• Lid missing
• Erosion control needed
• Grading of access road

• Chainage (19+041-19+478)
• Lid missing
• Access road needed
grading and erosion
control

Survey Report P a g e 12 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (19+478-19+613)
• Lid missing
• Access road need grading

• Chainage (19+613-19+901)
• Grading for access road

• Chainage (19+901-20+048)
• Erosion control
• Grading repair for access
road

Survey Report P a g e 13 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (20+048-20+125)
• Need to be rise
• Erosion control

• Chainage (20+125-20+302)
• Grading of access road

• Chainage (20+302-20+495)
• Grading of access road

Survey Report P a g e 14 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (20+495-20+619)
• Grading

• Chainage (20+619-20+697)
• Erosion control
• Grading

• Chainage (20+697-22+585)
• Grading

Survey Report P a g e 15 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (22+585-23+845)
• Need to be r

• Chainage (23+845-23+920)

• Chainage (23+920-24+120)

Survey Report P a g e 16 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (24+120-24+614)
• Chamber need to be rised.
• Erosion control around the
chamber

• Chainage (24+614-25+363)
• Access road need repair

• Chainage (25+363-26+076)
• Lid missing
• Grading of access road

Survey Report P a g e 17 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (26+076-26+717)
• Grading and minor repair
of access road

• Chainage (26+717-26+881)
• Erosion control around the
chamber

• Chainage (30+198-30+272)
• Need to be rise
• Erosion control required
around the chamber

Survey Report P a g e 18 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (30+272-30+487)
• Grading required for access
road

• Chainage (30+487-30+603)
• No direct access inside of
fence wall.

• Chainage (30+603-31+127)
• Repair and grading of
access road

Survey Report P a g e 19 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (31+127-31+492)

Survey Report P a g e 20 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

4.3. Yellow zone (31+492 to 68+981)

Description Chamber Picture

• Chainage (31+492-31+630)

• Chainage (31+630-31+788)
• Erosion control around the
chamber

Survey Report P a g e 21 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (31+788-31+888)
• Grading required for access
road

• Chainage (31+888-32+392)

• Chainage (32+392-32+670)
• Chamber rising
• Erosion control needed
around the chamber

Survey Report P a g e 22 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (32+670-32+756)

• Chainage (32+756-33+868)
• Proper grading required
• Erosion control and
repairing of access road

• Chainage (33+868-35+781)
• Lid missing
• Grading and erosion
required

Survey Report P a g e 23 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (35+781-36+275)
• Erosion and repair required
for access road

• Chainage (36+275-36+508)
• Retaining wall required
backside of chamber
• Grading for access way

• Chainage (36+508-36+621)
• Almost no access way
• Erosion required

Survey Report P a g e 24 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (36+621-36+987)
• Grading
• Erosion

• Chainage (36+987-37+225)
• Bad access road need to be
repair
• Erosion control
• Grading

• Chainage (37+225-37+523)
• Repairing and erosion
control for access road

Survey Report P a g e 25 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (37+523-37+993)
• No proper access way

• Chainage (37+993-39+150)
• Access way passes through
a steep slope(need cutting)

• Chainage (39+150-39+423)
• Complete repair of access
way

Survey Report P a g e 26 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (39+423-39+711)
• Erosion control
• Repair

• Chainage (39+711-39+992)
• Grading required

• Chainage (39+992-40+138)
• Grading of access road

Survey Report P a g e 27 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (40+138-40+409)
• Steep access (need cutting)

• Chainage (40+409-43+500)
• Complete repair of access
road

• Chainage (43+500-43+921)
• Grading
• Erosion Control needed

Survey Report P a g e 28 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (43+921-44+045)
• Grading
• Repair

• Chainage (44+045-44+442)
• No proper access road
• Erosion control required

• Chainage (44+442-45+244)
• Grading
• Erosion control

Survey Report P a g e 29 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (45+244-46+072)
• Access road need complete
repair

• Chainage (46+072-46+902)
• Access way need erosion
control and grading

• Chainage (46+902-47+160)
• Access way need repair,
erosion control as well as
grading

Survey Report P a g e 30 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (47+160-48+644)
• Chamber rising
• Repair of access

• Chainage (48+644-49+041)
• Repair

• Chainage (49+041-49+119)
• Repair of access way

Survey Report P a g e 31 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (49+119-49+788)
• Grading of access way

• Chainage (49+788-49+879)
• Repair access road
• Erosion control

• Chainage (49+879-50+044)
• Grading of access

Survey Report P a g e 32 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (50+044-50+276)
• Grading
• Erosion control

• Chainage (50+276-50+470)
• Grading

• Chainage (50+470-50+630)
• Grading
• Erosion control

Survey Report P a g e 33 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (50+630-50+931)
• Grading
• Erosion control

• Chainage (50+931-51+355)
• Grading

• Chainage (51+355-51+515)
• Road repair
• Erosion control

Survey Report P a g e 34 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (51+515-51+794)
• Complete repair of access
road

• Chainage (51+794-52+237)
• Need complete repair

• Chainage (52+237-53+383)
• Chamber rising
• Access road repair
• Grading
• Erosion control

Survey Report P a g e 35 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (53+383-53+761)
• Access way need complete
repair

• Chainage (53+761-54+084)
• Access road need repair

• Chainage (54+084-54+412)
• Repair of access way

Survey Report P a g e 36 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (54+412-54+518)
• Chamber rising
• Erosion control

• Chainage (54+518-59+460)
• Rising of chamber
• Grading
• Erosion control

• Chainage (59+460-60+837)
• Access road need repair

Survey Report P a g e 37 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (60+837-62+059)
• Access way need grading
and erosion control

• Chainage (62+059-62+314)
• Grading
• repair

• Chainage (62+314-62+629)
• Erosion control
• Grading

Survey Report P a g e 38 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (62+629-63+150)
• Grading
• Erosion control

• Chainage (63+150-63+290)
• Grading

• Chainage (63+290-63+387)
• Chamber rising
• Erosion control
• Grading of access road

Survey Report P a g e 39 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (63+387-63+470)
• Repair of access way
• Grading
• Erosion control

• Chainage (63+470-64+757)
• Chamber need rising
• Repair of access road
• Grading
• Erosion control

• Chainage (64+575-65+003)
• Access road needs erosion
control and grading

Survey Report P a g e 40 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (65+003-65+059)
• Chamber need little rising
• Grading and repair

• Chainage (65+059-65+566)
• Erosion control and grading

• Chainage (65+566-65+715)
• Access road need repair,
grading and erosion control

Survey Report P a g e 41 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (65+715-65+907)

• Chainage (65+907-66+013)
• Repair
• Grading

• Chainage (66+013-66+562)
• Grading

Survey Report P a g e 42 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (66+562-67+258)
• Grading

• Chainage (67+258-68+454)

• Chainage (68+454-68+738)

Survey Report P a g e 43 | 44
SWCC 48” Pipeline Access Road Repair
Survey Report

• Chainage (68+738-68+981)

Survey Report P a g e 44 | 44