Risk - Probability X Consequence Probability Consequence: How To Complete ERA
Risk - Probability X Consequence Probability Consequence: How To Complete ERA
Probability Consequence
3. Short term impacts, minor spill or damage. Soil, water, air, flora/fauna
C. Could occur or heard of it happening
adversely affected in short term.
Probability
How to Complete ERA:
1 2 3 4 5
1. Assess probability of impact from activity e.g. 2
2. Assess consequence of impact e.g. 4 5 M (5) M (10) H (15) H (20) H (25)
3. Identify hazard rating on matrix e.g. 2 x 4 = 8 (MEDIUM)
M
Consequence
4 L (4) M (8)
(12)
H (16) H (20)
The Hazard rating number will determine the degree of environmental risk.
**Refer to Environmental Aspects & Impacts Guidelines for further information on completing the ERA 3 L (3) M (6) M (9) M (12) H (5)
Assess the
Specify what risk
action/procedures score 1 – 25
Identify and nominate the undertaken to eliminate or with actions /
Break the job down into stages. Each
hazards associated with each minimize the hazards, the Control Specify
stage should progress in a logical
step. Examine how the Assess the Environmental risk of injury / damage, and measures in person
sequence starting from the
activity interacts with the Impact or potential severity place. responsible
commencement of the work to the
environment and could lead factors. Including the .
handover.
to an incident. measure to be taken to NA = if
ensure the proposed activity does
controls are maintained. not occur on
your site
1 General maintenance
designated skip
Removed off site and
disposed by approved
contractors to approved
Visual pollution landfill sites (if hazardous).
Loss of natural resources Shall recycle and reuse
Creation of greenhouse gas plastic storage containers
when possible.
Waste disposal shall be
done by ENEC appointed
ESP
Actions / Control
No. Activity Aspect Impact Risk Score Action By
Measure / Comments
Use secondary
containment while handling
the paint materials
Plastering Hazardous chemical to sewer Extra loading on sewer All Inspire integrated
8 SFM, AFM,
Generation of waste Liquid waste to storm water employees and contractors
QHSEO,FE
need to take care when MEDIUM
using plastering chemicals.
2 Cleaning
Actions / Control
No. Activity Aspect Impact Risk Score Action By
Measure / Comments
Internal common areas Internal air quality Toxic emissions to air Inspire integrated will use
8 SFM, AFM,
Generation of waste Land filling nonhazardous chemical to
QHSEO,FE
Human impacts maintain a standard indoor MEDIUM
air quality.
Hazardous chemicals
WILL NOT be used.
External common areas Toxic air emissions Land & water contamination The site will be maintained
8 SFM, AFM,
Internal air quality Toxic emissions to air in a tidy state at all times.
QHSEO,FE
Hazardous chemicals to Land filling MEDIUM
Hazardous chemicals
sewer Human impacts WILL NOT be used.
Impact of flora & fauna
All employees and
contractors need to take
care when using or
discharge of chemicals to
ensure not to spray or spill
on to the ground of any
flora or spill to sewer.
Amenities Land & water contamination Land & water contamination Inspire integrated will use
12 SFM, AFM,
Toxic air emissions Toxic emissions to air nonhazardous chemical to
QHSEO,FE
Internal air quality Land filling maintain a standard of MEDIUM
indoor air quality.
Hazardous chemicals to Human impacts
sewer Impact of flora & fauna
Waste generated shall to
be collected, deposited to
appropriate location or skip
and disposal is by
approved ESP appointed
by ENEC
Actions / Control
No. Activity Aspect Impact Risk Score Action By
Measure / Comments
Land & water contamination Land & water contamination Inspire integrated will use
16 SFM, AFM,
Catering Toxic air emissions Toxic emissions to air nonhazardous chemical to
QHSEO,FE
Hazardous chemicals to Land filling maintain a standard of HIGH
indoor air quality.
sewer Human impacts
Food waste Impact of flora & fauna All employees and
contractors need to take
care when using or
discharge of chemicals to
ensure not to spray or spill
on to the ground of any
flora or spill to sewer.
Plant rooms and Mechanical Hazardous chemicals to Land & water contamination All employees and
8 SFM, AFM,
sewer Toxic emissions to air contractors need to take
QHSEO,FE
Generation of waste Land filling care when using or MEDIUM
discharge of chemicals to
Human impacts ensure not to spill on to the
Impact of flora & fauna ground of any flora or spill
to sewer.
Fuels – storage & handling Storage & use of fuel Land & water contamination Spill Kits will be available
16 SFM, AFM,
Underground & above ground Creation of air emissions to enable spillages to be QHSEO,FE
storage area Creation of greenhouse gas cleaned up as soon as HIGH
Use of fossil fuel possible.
Human impact
All the wastes generated
shall to be disposed in
accordance with local
regulation through an
approved ESP appointed
by ENEC
delivered on an on-going
basis as ‘continued
training’ and following any
significant incident.
Actions / Control
No. Activity Aspect Impact Risk Score Action By
Measure / Comments
Oils & lubricants Storage & use de-greasers, Land & water contamination Spill Kits will be available
16 SFM, AFM,
lubricants, oils & other Creation of air emissions to enable spillages to be QHSEO,FE
Human impact cleaned up as soon as HIGH
possible.
Coolants/Refrigerants Storage & use of chemicals & Land & water contamination Spill Kits will be available
8 SFM, AFM,
refrigerants Creation of air emissions to enable spillages to be QHSEO,FE
Human impact cleaned up as soon as MEDIUM
possible.
4 Waste Management
Actions / Control
No. Activity Aspect Impact Risk Score Action By
Measure / Comments
Lack of separation
Plastic drums, empty SFM, AFM,
increases waste to land fill plastic bottles, scrap metal, QHSEO,FE
Separation Separation waste types into 8
Loss of salvageable and waste paper will be
waste streams MEDIUM
materials Loss of natural segregated on site and
resources sent to recycling.
Disposal Waste to landfill Land & water contamination All the wastes generated
16 SFM, AFM,
Land filling other than food and green QHSEO,FE
Loss of land waste shall to be disposed HIGH
Loss of salvageable in accordance with local
materials regulation through an
Use of natural resources approved ESP appointed
by ENEC
Past incidents
Bunding All categories of spillage
Spill kits will be reported by both
Local environment employees and Contractor.
Actions / Control
No. Activity Aspect Impact Risk Score Action By
Measure / Comments
7 Pest Control
Land filling
Waste Generation of waste All the wastes generated 16 SFM, AFM,
Health impacts
Disposal of pests other than food and green HIGH QHSEO,FE
Vermin control
waste shall to be disposed
in accordance with local
regulation through an
approved ESP appointed
by ENEC
8 Fire Protection
Use of hazardous substances Use of chemicals as part of Land & water contamination
Chemicals will be stored 16 SFM, AFM,
fire management system Toxic air emissions properly. QHSEO,FE
Storage of hazardous Human health risks HIGH
Fire extinguishers will be
chemicals Loss of native flora & fauna
available at all locations.
Fire contractors shall be
Actions / Control
No. Activity Aspect Impact Risk Score Action By
Measure / Comments
appointed to regularly
inspect all firefighting and
fire alarm equipment.
Actions / Control
No. Activity Aspect Impact Risk Score Action By
Measure / Comments
10 Asbestos
13 Landscaping
Generation of dust
Generation of noise
Actions / Control
No. Activity Aspect Impact Risk Score Action By
Measure / Comments
SUSTAINABILITY INITIATIVES
14 Water Consumption
TBD
15 Energy Consumption
TBD
16 CO2
TBD