PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Number: SEP-2019 Contractor: AL OSAIS CO.
INSPECTION CORRECTION
Date: 07/9/2019 Date:
REPORT REPORT
Inspected by: MOHAMED TOFIQ Corrected by:
Photo
Photo before Risk matrix Photo after Action required
No
Concrete waste need to
1
remove.
2 Poor housekeeping
Open manhole need to
cover properly with warning
3
tab. And make good
housekeeping
Page 2 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
4 Poor housekeeping
Concrete waste need to
5
remove
6 Poor housekeeping
7 Poor housekeeping
Page 3 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Number: SEP-2019 Contractor: AL OSAIS CO.
INSPECTION CORRECTION
Date: 07/9/2019 Date:
REPORT REPORT
Inspected by: MOHAMED TOFIQ Corrected by:
Photo
Photo before Risk matrix Photo after Action taken
No
Poor housekeeping step
ladder remove from the
8
location. Provide safe
platform for entrance.
Safety signage need to
9
standing properly
Page 4 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Wooden material need to
remove from the manhole.
10
Provide hard barricading
around the manhole,
11 Step ladder need to remove
Combustible material need
12 to remove. Provide good
housekeeping
Page 5 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Wood stacking should be
13
correct.
14 Poor housekeeping
Photo
Photo before Risk matrix Photo after Action taken
No
15 Poor housekeeping
Page 6 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Garbage need to remove
16 from the outside. It can be
effect to environmental. .
17 Poor housekeeping
18 Poor housekeeping
Page 7 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Concrete waste need to
19 remove from outside of
fence area.
Concrete waste need to
20 remove from outside of
fence area
Concrete waste need to
remove from outside of
21
fence area (environmental
hazards)
Photo Photo before Risk matrix Photo after Action taken
Page 8 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
No
Concrete waste need to
remove from outside of
22
fence area (environmental
hazards)
Concrete waste need to
remove from outside of
23
fence area (environmental
hazards)
Concrete waste need to
remove from outside of
24
fence area (environmental
hazards)
Page 9 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
25 Poor housekeeping
Concrete waste need to
remove from outside of
26
fence area (environmental
hazards)
Concrete waste need to
remove from outside of
27
fence area (environmental
hazards)
Concrete waste need to
remove from outside of
28
fence area (environmental
hazards)
Page 10 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Photo
Photo before Risk matrix Photo after Action taken
No
Concrete waste need to
remove from outside of
29
fence area (environmental
hazards)
Garbage nee to remove
30
from outside area.
Garbage nee to remove
31
from outside area.
Page 11 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Garbage nee to remove
32
from outside area.
Garbage nee to remove
33
from outside area.
Wooden material need to
34
scoured wooden yard.
Wooden material need to
35
scoured wooden yard.
Page 12 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Photo
Photo before Risk matrix Photo after Action taken
No
Safety signage need to be
36
correct.
37 Poor housekeeping
Main entrance should be
38
free from any obstruction
Page 13 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Concrete waste need
39
remove from the area.
Concrete waste need
40
remove from the area
41 Provide good housekeeping
Concrete waste need
42
remove from the area
Page 14 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Photo
Photo before Risk matrix Photo after Action taken
No
Secured properly hard
43
barrication
44 Poor housekeeping
45 Poor housekeeping
Page 15 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
46 Poor housekeeping
47 Poor housekeeping
48 Poor housekeeping
Secured properly hard
49 x
barricading for manhole.
Page 16 of 16 Rev.2 [08April-2019] Projects Business Unit
PROJECT NAME : AL AFLAJ S/S 8766
ELEMENT 5.16.1 c
SAFETY REPRESENTATIVES’ WEEKLY INSPECTION REPORT
Page 17 of 16 Rev.2 [08April-2019] Projects Business Unit