COMPANY
PROFILE
This company seeks to become well-known for its construction work
in the Philippines. The Dream Real Company aspires to construct a
nice and sustainable home. We also produce our own materials,
which are cost-effective and slow to deteriorate.
2350 SULU ST Sta. Cruz, Manila
About
Company
The Dream Real Company was established on January 20, 2013. People in
the Philippines choose structures or homes with distinctive designs that
are made of high-quality materials but at a lower cost. Dream Real
Company was founded in Santa Maria, Bulacan, and everything began
there in a small office with a few passionate employees who genuinely
loved what they did. Eventually, after much sacrifice and struggle, we
relocated to 2350 SULU ST Sta. Manila Cruz In the future, we also intend to
invest in building our second branch in Cebu City.
Dream Real Company offers a variety of services, including the actual
design of anything, the production of our own building materials, and the
creation of any desired designs by our own construction team. This
business is fully staffed, so you won't have any trouble reaching someone
because the Dream Real Company will help you find your way to
establish a secure home.
Your Company
Table of
1 About Company
Contents 2 Vision & Mission
3 Our Service
4 Our Project
5 Achievements
6 Meet The Team
7 Our Contact
Vision
Dream Real Company has set the goal of becoming the
greatest supplier of construction materials. We want to be
the industry leader in terms of client happiness,
professionalism, and the highest-quality products we are
able to provide.
Mission
To establish valuable, long-lasting relationships with our
customers and business partners while providing high-
quality construction materials and providing the best level of
customer satisfaction possible.
Our
Service
We supply high-quality construction materials nationwide and
delivers exquisite construction services that satisfies every
customer’s and client’s construction desires. Our materials are
known for its excellent quality, affordability, and durability. We
offer an all-out service for our clients, provided that our team is
composed of the best Architectural, Structural, Electrical, and
Plumbing Experts.
Our
Project
CMB Enterprises Building
Permit No. 2013-546823
#18 F&G Bldg Bypass Road Sta Clara Sta Maria, Bulacan
September 2013- March 2014
Villa Ezperanza Town House
Permit No. 2014-636998
Alapista street, road to Balasing, Santa Maria, Bulacan
December 2014- January 2018
Top Construction
Permit No: 2016-723278
Bustos Bulacan
October 2016 - October 2020
Santa Elena Chapel
Permit No. 2019-093748
Cabuyao City, Laguna
December 2019- July 2020
Top Notch Building
Permit No: 2020-724590
Malolos Bulacan
October 2020 - June 2022
The Building Construction
Permit No: 2021-0907785
Gilia Anne Ville, Toclong Kawit, Cavite
November 2021- March 2022
Pumping Station
Permit No. 2022-873402
Brgy. Daang Bakal, Mandaluyong City
August 2022 - October 2023 (Estimated Date)
Your Company
Our
Achievements
Aced the Philippine Excellence in Concrete and Formwork Construction Awards
(PECFCA) 2020
Recognized for proficiency in Quality Management in the 24th PQA Awards
International Partnership with Shanghai Construction Group Co Ltd (SCG)
Received the Perfect Safety Record for Utility Attachment Management in 2022
Acknowledge as one of the Most Outstanding and Efficient Companies by the
UK's Europe Business Assembly.
Obtained the title "2017 Most Outstanding Design and Construction Company"
Meet
The Team
Jomar C. Arangco
Justinn Charles Francisco
Geotech Engineer
Plumbing Expert
Christian James Mangoma
Construction Manger
Jocel Marcelo
Human Resource Patricia Anne Llanes
Manager Structural Engineer
Rona Liezel Bacolod
Architect
Jericho Bobonao
Finance Manager Karl Eisley Salandanan
Electrical Engineer
Let's
Connect
With
Us!
Our
Contact
+356-589-8889/ 09612828295
[email protected]
www.dreamrealcompany.com
2350 SULU ST Sta. Cruz, Manila
THREE-STOREY
RESIDENTIAL-
COMMERCIAL HOUSE
W/ ROOFDECK
Business Presentation by Dream Real Inc.
MARCH 2023
LOT
REFERENCE
FIREWALL SHOULD BE DESIGNED IN LINE A
TO B, AS SHOWN IN THE LOT REFERENCE.
CLIENT
REQUIREMENTS
GROUND FLOOR: SECOND FLOOR:
Residential - Main Door at South Half Floor (Residential) - 1 Bedroom
- Small Garden at South - Terrace
- Living Room
- Dining Half Floor (Commercial) - 1 Room
- Kitchen - 1 Door
- 1 Bedroom
- Toilet with Laundry Area
THIRD FLOOR: ROOF DECK
Commercial - 2 Rooms with details
- Kitchen Sink
- Toilet
PROJECT TIMELINE
JANUARY APRIL
01, 2023 30, 2023
ARCH IT E CTU RA L P LAN
PERSPECTIVE
FLOOR PLANS
GRO U ND FLOOR P LAN
Commercial :
Room 2:
Small Garden at South Direction
Living Area
Kitchen Area
Dining Area
Toilet with Laundry Area
P R O1 J
Bedroom
ECT 2
Separate Stairs for residential and
commercial
SE C OND FLOOR P LAN
Residential :
1 Bedroom
Terrace
Commercial :
Room 1:
P R OOffice
JECT Area
2
Toilet
Terrace
THIRD FLOOR P LAN
Commercial :
Room 2:
Office Area
Kitchen Area
Toilet
Room 3:
P R O J Office
E C T 2Area
Kitchen
Toilet
ROO F DE CK FLO OR P LAN
Accessible for Residential and
Commercial
With Inclined Roof Slab
ELEVATION PLANS
FRO NT E LE V A TI ON AND RE AR EL E V AT ION
RIGHT E LE V A TI ON AND LE F T E L E V AT ION
C RO S S -S E CTIONAL AND LONG IT UDINAL V IE W
STAIR DETAILS
SPIRAL S TA IRS AND RE C T ANG LUL AR U S T AIR S
Stair/Floor
3.1
Height
Maximum
0.17
Riser Height
Minimum
0.25
Tread Depth
Minimum
1
Run Width
Tread
0.03
Thickness
Riser
0.019
Thickness
TOP VIEW
Nosing Length 0.025
Actual Run
1
Width
TOP VIEW
DOOR DETAILS
D1 D2 D3
Main Gate Main Door Back Door
Back Gate Terrace
QTY Width Height QTY Width Height QTY Width Height
2 0.9 2.07 1 0.9 2.1 3 0.7 2
D4 D5 D6
Toilet/Bathroom Bedroom Door Commercial
Door Rooms
QTY Width Height QTY Width Height QTY Width Height
4 0.75 2 1 0.75 2 3 0.8 2
WINDOW
DETAILS
W1 W2
Sliding Window Sliding Window
QTY Width Height QTY Width Height
3 1 1.2 7 1.5 1.2
STRUCTURAL PLANS
FRAMING PLANS
FOUNDATION PLAN AND SECOND FLOOR FRAMING PLANS
THIRD FLOOR AND ROOF DECK FRAMING PLANS
STRUCTURAL MEMBERS
FOOTING
DETAILS
Width Length Thickness
Type Description QTY Reinforcements
(mm) (mm) (mm)
26 - 16M @ 150
Isolated
F1 4 1200 1800 450 spacing w/ 9-16M
Footing
Horizontal bars
26 - 16M @ 150
Combined
F2 3 1200 2600 450 spacing w/ 8-16M
Footing
Horizontal bars
FOOTING TIE BEAM (FTB) DETAILS
Width Height
Type Reinforcements
(mm) (mm)
6 - 16M Horizontal bars w/ 10M Ties, 2 @ 50, 5@ 100, rest @ 150
FTB 1200 1800
spacing
FRONT VIEW
COLUMN DETAILS
Width Thickness Length
Type Reinforcements
(mm) (mm) (m)
C1 300 300 11.20 4 - 16M Horizontal bars w/ 10M Ties @ 150 spacing
C2 300 300 8.50 4 - 16M Horizontal bars w/ 10M Ties @ 150 spacing
C3 300 300 11.05 4 - 16M Horizontal bars w/ 10M Ties @ 150 spacing
C4 300 300 10.9 4 - 16M Horizontal bars w/ 10M Ties @ 150 spacing
TOP VIEW
SLAB DETAILS
Thickness
Type Reinforcements
(mm)
S1 125 12mm ⌀ @ 150 O.C.
GIRDER DETAILS
Width Height
Type Reinforcements
(mm) (mm)
6 - 16M Horizontal bars w/ 10M Ties, 2 @ 50, 10@ 100, rest @ 150
G1 300 400
spacing
TOP VIEW
BEAM DETAILS
Width Height
Type Reinforcements
(mm) (mm)
B1 250 300 6 - 16M Horizontal bars w/ 10M Ties, 2 @ 50, rest @ 150 spacing
TOP VIEW
WALL DETAILS
Thickness Height
Type Reinforcements
(m) (m)
W1 0.2 3.1 9 - 16M Horizontal bars w/ 14 - 16M Vertical bars
W2 0.15 2.7 9 - 16M Horizontal bars w/ 14 - 16M Vertical bars
W3 0.1 2.7 9 - 16M Horizontal bars w/ 14 - 16M Vertical bars
W4 0.2 2.7 9 - 16M Horizontal bars w/ 14 - 16M Vertical bars
Spacings Spacing
Type
(mm) Layer
Vertical bars 400
Horizontal bars
3
MEPF PLANS
(MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION)
MECHANICAL PLAN
ELECTRICAL PLAN
ELECTRICAL PLAN
PLUMBING PLAN
PLUMBING PLAN
FIRE PROTECTION PLAN
FIRE PROTECTION PLAN
PROJECT
ESTIMATIONS
ESTIMATION OF
REINFORCING BARS
FOOTING REINFORCEMENT ESTIMATION
COLUMN REINFORCEMENT ESTIMATION
GIRDERS/ BEAMS/FTB REINFORCEMENT ESTIMATION
WALL REINFORCEMENT ESTIMATION
SUMMARY OF
REINFORCEMENT
ESTIMATION
Total kgs of Reinforcement Bars 13,366 kgs
Total Reinforcement Cost ₱331,650.00
ESTIMATION OF
TIE WIRES
TIE WIRES ESTIMATION
Total kgs of
147.026 kgs
Tie Wires
Total Tie
₱13,368.00
Wire Cost
ESTIMATION OF
CONCRETE WORKS
CONCRETE WORKS ESTIMATION
BEAM & GIRDER
SLAB
FTB
FOOTING & COLUMN
SUMMARY OF CONCRETE WORKS
ESTIMATION
Total Concrete Cost ₱331,650.00
ESTIMATION OF
FORMWORKS
FOOTINNG AND COLUMN FORMWORKS ESTIMATION
PLYWOOD
SLAB AND BEAM FORMWORKS ESTIMATION
PLYWOOD
FOOTING, COLUMN, AND BEAM FORMWORKS
ESTIMATION
FORM LUMBER
COLUMN, BEAM, AND SLAB FORMWORKS
ESTIMATION
SCAFFOLDING
SUMMARY OF FORMWORKS ESTIMATION
Total Formwork Cost ₱140,315.00
ESTIMATION FOR
MASONRY
MASONRY ESTIMATION
Total Masonry Cost ₱263,764.24
ESTIMATION FOR
PLASTERING
COMPUTATION FOR WALL NET AREA
FOR PLASTERING PURPOSES
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
First Floor 101.70
SECOND FLOOR
SECOND FLOOR
SECOND FLOOR
SECOND FLOOR
SECOND FLOOR
SECOND FLOOR
SECOND FLOOR
Second
104.35
Floor
THIRD FLOOR
THIRD FLOOR
THIRD FLOOR
THIRD FLOOR
THIRD FLOOR
THIRD FLOOR
THIRD FLOOR
Third Floor 110.21
ROOF DECK
Roof Deck 31.67
WALL NET AREA COMPUTATION
WALL NET AREA COMPUTATION
PLASTERING ESTIMATION
PLASTERING ESTIMATION
Plastering Cost ₱49,818.1
Skimcoat Cost ₱11,760
Total Plastering Cost ₱61,578.1
ESTIMATION FOR
MECHANICAL WORKS
AIRCONDITIONER ESTIMATION
EXHAUST FAN ESTIMATION
RANGE HOOD ESTIMATION
VENTILATION HOSE ESTIMATION
SUMMARY OF MECHANICAL ESTIMATION
Total Mechanical Cost ₱96,017
ESTIMATION FOR
PLUMBING WORKS
WASTE PIPE-LINE ESTIMATION SERVICE PIPE-LINE ESTIMATION
FIXTURE ESTIMATION SUMMARY OF PLUMBING
ESTIMATION
Total
Plumbing ₱96,017.00
Cost
ESTIMATION FOR
ELECTRICAL WORKS
ELECTRICAL ESTIMATION
Total Electrical Cost ₱62,233.00
ESTIMATION FOR
CEILING WORKS
GROUND AND SECOND FLOOR CEILING AREA
COMPUTATION
THIRD FLOOR AND ROOF DECK CEILING AREA
COMPUTATION
CEILING AREA COMPUTATION
CEILING WORKS ESTIMATION
Total Ceiling
₱41,435.391
Works Cost
ESTIMATION FOR
RAILING WORKS
RAILINGS ESTIMATION
Total
Railings ₱124,046.93
Cost
ESTIMATION FOR
STAIRS
STAIRS ESTIMATION
Total Stairs Cost ₱124,046.93
ESTIMATION FOR
TILES
TILING ESTIMATION
Total Tiling Cost ₱182,230.00
ESTIMATION FOR
DOORS AND WINDOWS
DOORS AND WINDOWS ESTIMATION
Total Door and
₱119,687.00
Window Cost
ESTIMATION FOR
WATERPROOFING
WATERPROOFING ESTIMATION
Total Waterproofing Cost ₱8,405.00
ESTIMATION FOR
PAINTING
PAINTING ESTIMATION
Total Painting Cost ₱29,800.00
ESTIMATION FOR
FIRE PROTECTION
FIRE PROTECTION ESTIMATION
Total Fire Protection Cost ₱10,800
ESTIMATION FOR
EQUIPMENTS AND TOOLS
EQUIPMENTS AND TOOLS ESTIMATION
Total Fire Protection Cost ₱10,800
ESTIMATION FOR
LABOR AND MANPOWER
LABOR AND MANPOWER ESTIMATION
Total Labor and
₱919,334.96
Manpower Cost
SUMMARY OF
PROJECT
ESTIMATION COST
SUMMARY OF PROJECT ESTIMATION COST
PROJECT ESTIMATED
TIMELINE
JANUARY APRIL
01, 2023 03, 2023
+356-589-8889/ 09612828295
You dream [email protected]
we build www.dreamrealcompany.com
2350 SULU ST Sta. Cruz, Manila