0% found this document useful (0 votes)
81 views43 pages

VILAS HDSCM TOT GPM 4 (Global Info System)

Uploaded by

Nguyễn Châu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views43 pages

VILAS HDSCM TOT GPM 4 (Global Info System)

Uploaded by

Nguyễn Châu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 43

GPM – Chapter 4

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Global Information
Systems
Chapter 4

__________________________________________
1
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
Learning Objectives
➢ Overview of the e-Supply Chain Information

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
systems
➢ Identify the drivers of new supply chain
systems and applications
➢ Discuss Enterprise Resource Planning Systems
and other collaborative systems
➢ Discuss purchasing database and data
warehouse
➢ Discuss the relevance of Electronic Data
Interchange (EDI) in today’s modern MNCs
➢ Explain how EDI can help in inventory
management thru Vendor Managed Inventory
__________________________________________
2
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
Overview of E-SC Information Systems
Solution Time Focus Primary Use of Systems
Period
MRP-DRP 1970s Internal/inventory Inventory planning, inventory
control and distribution efficiencies
EDI 1980s External Electronic transmission of Purchase
documents
ERP 1990s Internal Integration of all business ( multi
plants multi divisions)functions for
processing and reporting
SRM & CRM 2000s External Managing and controlling the
interface between buyers, suppliers
and customers
Collaborative 2000s External-Internal CPFR systems permit constant
communication within the supply
chain via RFID and point of sales
systems
Advanced 2010 and External-Internal Sourcing Analytics and computerised
sourcing beyond negotiations
Analytic
3
GPM – Chapter 4
A stand-alone Purchasing System

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
__________________________________________
4
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
SCM Map
Based on Strategic, Tactical or Operations decisions

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
__________________________________________
5
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4 Kahoot

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Drivers for eSCM needs

1. Internal and External Strategic Integration


2. Globalisation and Communication
3. Consistent Data Information Management
4. New Business Processes ( “E”)
5. Replacement of Legacy Systems
6. Strategic Cost Management

__________________________________________
6
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Enterprise Resource Planning (ERP)

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
ERP is a packaged business software system that
processes transactions on a single software
platform and a single database

kairoticsoft.com

__________________________________________
7
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

What does an ERP system do?

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
➢ Integrates information across all departments
➢ Facilitates the flow of information among the
different functions and processes of an
enterprise
✓ functions: manufacturing, finance, HR
✓ processes: order entry
➢ Tracks a wide range of events in the enterprise
in an integrated fashion
➢ Plans future activities based on these events
➢ Supports analysis of trends in these events, to
improve the performance of the enterprise.
__________________________________________
8
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
What does an ERP system do?

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Allows users to:
❑ input data in one
location, that can be
processed with
other data and
accessed as
informational
reports in a real-
time environment
❑ share common data
and practices across
the entire
enterprise
❑ Re-engineer the
majority of its
processes
__________________________________________
9
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

A Single Platform

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
__________________________________________
10
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
Purchasing Process in an ERP

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
__________________________________________
11
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
ERP Market
One of the fastest growing
markets in software industry
34.5% of companies with
revenues over $1 billion plan to
purchase or upgrade
Small and Medium Size
companies following suit
$28 billion in sales in 2006
Maybe as much as $48billion by
2010
Source: AMR Research 2007

__________________________________________
12
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Steps in implementing an eSCM System

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
➢ Development and implementation of an eSCM system is a
complex process
➢ Multiple resources are required
➢ Project may take months or years to complete
➢ Project will go thru a life cycle with different stages
✓ Planning, Analysis and Design, Implementation and
Operation

Stage 1 Stage 2 Stage 3 Stage 4

Analysis
Planning ImplementationOperation
& Design

__________________________________________
13
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
Planning Phase

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Stage 1 Stage 2 Stage 3 Stage 4

Analysis Implemen
Planning Operation
& Design tation

❑ Establishing the needs ❑ Establish a control


❑ Recognizing the problem mechanism-
❑ Define the problem ❑ Steering committee/
Project Team
❑ Set system objectives
❑ Tools
❑ Establish system ❖ Bar Chart/Gantt Chart
constraints ❖ Network chart
❑ Prepare Study Project ❖ Project repository
Proposal
❑ Approve__________________________________________
the Study Project
14
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
Set up a Steering Committee

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
❑ Establish organization objectives
❑ Set priorities for each stage/milestones
❑ Assign resources for different departments
❑ Organize the project team
❑ Approve project plan and budget
❑ Approve organization
change

__________________________________________
15
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Roles and Responsibilities of

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Steering Committee members
➢ Support Change
❑Change in process, incentives, and workflow
➢ Exercise leadership
❑Management (CEO, CIO, CFO, etc.) to kick-off
projects
➢ Make long-term judgment
❑Examine each recommendation for long term
benefits
__________________________________________
16
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
Analysis & Design Phase

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Stage 1 Stage 2 Stage 3 Stage 4

Analysis Implemen
Planning Operation
& Design tation

❑ Announcement of system ❑ Approval of proposal by


study Steering Committee
❑ Organise for the study
❑ Finalise system objectives
❑ Design the system
❑ Prepare implementation
proposal
__________________________________________
17
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
Implementation Stage

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Stage 1 Stage 2 Stage 3 Stage 4
Analysis Implemen
Planning Operation
& Design tation

❑ Project implementation ❑ Cutover to new


announcement systems
❑ Supplier selection to provide ❑ System in use
systems. Purchaser involvement
❑ Install system & Programming
❑ Prepare the database
❑ Prepare the physical facilities
❑ Educate __________________________________________
the users
18
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4 Kahoot

Different Ways to Cut-Over

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Type of Pros Cons Application
Cutover
Cold Turkey Less efforts to Very high risk From manual
( Direct) maintain 2 system
systems
Parallel Least risky Most effort Mission
needed critical
Phase Systematic Constraint by Most common
Software ( based on
functions)
Pilot Allow for Take longer Large
mistake time organization
( different
sites)
__________________________________________
19
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Operation Stage

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Stage 1 Stage 2 Stage 3 Stage 4

Analysis Implemen
Planning Operation
& Design tation

❑ Post installation audit or ❑ Cost Benefit Analysis


survey ❑ Has the system met its
❑ Operate the system objectives?
❑ Maintaining the system

__________________________________________
20
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

ERP implementation

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Main Challenge
Moving away from
functional silos
and creating
effective cross-
functional
processes that are
truly integrated
via an ERP system
__________________________________________
21
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
Kahoot
GPM – Chapter 4

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
What are the main challenges in
technology adoption?

❑ Resistance to change

❑ Complexity of technology

❑ Lack of visibility into benefits to the user!

__________________________________________
22
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Electronic Data Interchange

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
The transmission of documents

from one computer directly

to another computer

using standardized formats...


No paper, No human touch, No delay ( real time)
__________________________________________
23
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
Electronic Data Interchange (EDI)

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Direct computer transmission of orders and
other transaction information based on an
agreed standards set.

In purchasing, EDI is usually used for the


electronic transmission of orders, invoices,
and payment between buyer and seller.

The main elements of an EDI system are:


❑ computer hardware,
❑ ERP software,
❑ EDI Translator
❑ Internet
__________________________________________
24
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Paper Purchase Order to EDI

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
To: 1047689 PO#5905
General Supply Co. 1/31/02
240 E. Main Street
Anywhere, IN 60143

Bill to: A/P 410 Ship to: 2442


Uniform Code Council Paul Smith
Box 1741 635 Elm Street
Dayton, OH 35168 Cicero, IL 60303

vendor unit of price per


Qty Description UPC # style # measure unit
3 V Architecture Guide 614141000500 003082 each 50.00

2 EDI 2001 614141004232 004232 each 250.00


__________________________________________
25
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
PAPER Purchase Order EDI 850 PO
ST*850*0001

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
PO# Date
BEG**00*5905**20020131
5905 1/31/02
Ordered from: N1*SE*General Supply Co.
General Supply Co.#1047689 N3*240 East Main
240 East Main N4*Anywhere*IN*60143
Anywhere, IN 60143
N1*BT*Uniform Code Council
Bill To: Convert to EDI N3*Box 1741
Uniform Code Council A/P 410
Box 1741
Format N4*Dayton*OH*35168

Dayton, OH 35168 N1*ST*Paul Smith


Ship To: N3*635 Elm Street
Paul Smith 2442 N4*Cicero*IL*60303
635 Elm Street
PO1**3*EA*50**UP*614141000500*VA*003082
Cicero, IL 60303
PID*F**08***V Architecture Guide

3 ea V Architecture Guides
upc# v style price PO1**2*EA*250**UP*614141004232*VA*004232
614141000500 003082 50.00 PID*F*08***EDI 2001

2 ea EDI 2001 CTT*2


SE*17*0001
upc# v style price
614141004232 004232 250.00 EDI Format Message
__________________________________________
26
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
__________________________________________
27
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
To do EDI you need….

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Agreement
(Contract)
P.O 123

Transaction Sets
(the format required)
❑ (Ex Purchase Order).
There are different
EDI Translation formats
software
(Change to
different Data Transmission
format) Using Internet

__________________________________________
28
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Ways to implement EDI

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
(Direct Method)

__________________________________________
29
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Ways to implement EDI

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Using Value Added Network (VAN)

__________________________________________
30
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
EDI usage in Practice

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
❑ 34% of purchase orders are transmitted electronically
in North America.
❑ In Europe and Middle East (EMEA), 36% of orders are
transmitted electronically
❑ In Asia Pacific (APAC) 41% of orders are transmitted
electronically.
❑ They also report that the average paper requisition to
order costs a company :-
✓ US$37.45 in North America,
✓ US$42.90 in EMEA and
✓ US$23.90 in APAC.
❑ With an EDI requisition to order costs are reduced to
✓ US$23.83 in North America,
✓ US$34.05 in EMEA and
✓ US$14.78 in APAC.
Source: Aberdeen report 2008
__________________________________________
31
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4
Using EDI in VMI

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
__________________________________________
32
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4 Kahoot
VMI Benefits To Supplier

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Improved Forecast:
❑ Enabling suppliers to plan production to meet
customer demand. The goal is to have an
improvement in fill rates from the manufacturer and
to the end customer. This will result in a decrease in
stock-outs and a decrease in inventory levels.
Improve Service Level:
❑ The overall service level is improved by having the
right product at the right time. The supplier is more
focused than ever in providing great service.
Higher Switching cost :
❑ Due to higher interactivity between Supplier and
Customer, there is a higher switching cost for the
customer to change to another supplier.
__________________________________________
33
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

VMI Benefits To Customer

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Better Inventory Management:
❑ Customers (e.g. retailers) are able to manage
their inventory level better and more
efficient.
Better Visibility to Stock Levels:
❑ helps to identify priorities (replenishing for
stock or a stock-out?)
❑ Before VMI, a retailer may have no visibility
to the quantity and the products that are
ordered.
__________________________________________
34
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

VMI Benefits to Both Parties

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Reduced Data entry errors :
❑ Reduced errors due to computer to
computer communications. Speed of the
processing is also improved.
Better Service:
❑ Both parties are interested in giving better
service to the end customer. Having the
correct item in stock when the end customer
needs it, benefits all parties involved.
__________________________________________
35
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

VMI Benefits to Both Parties

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
True Partnership:
❑ A true partnership is formed between the
Customer and the Suppliers. They work
closer together and strengthen their ties for
win-win collaborations.
Stabilize the timing of Purchase Orders -
PO’s are now generated on a predefined basis.

__________________________________________
36
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

VMI – Implementation Pitfalls

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
❑Need Extensive testing – Long time to
validate data being sent by both parties.
Many rounds of testing needed.
❑Acceptance by all: Make sure that all
employees involved in
the process fully
understand and
accept this new way
of doing business.
__________________________________________
37
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

VMI – Implementation Pitfalls

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
❑Effects of Promotions/Events: Anything
that adds or takes away from the normal
ordering pattern must be properly
communicated.
❑Need Time to stabilise: Both parties
involved must understand that this is a
learning process. Errors will occur.

__________________________________________
38
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

VMI – Implementation Pitfalls

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
❑Change in Customer Base: Any large
customers, either gained or lost, must be
communicated to the manufacturer. The
distributor must guide
the manufacturer on
how this will affect
sales.

__________________________________________
39
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

VMI – Implementation Pitfalls

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
❑Effects of Over/Obsolete Stock: An
agreement must exist between the
manufacturer and the distributor on
what to do if an overstock does occur
(or in the case of an ordering error).
Also, both parties must agree on how
to handle obsolete stock.

__________________________________________
40
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

More information on VMI

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
http://www.vendormanagedinventory.com

__________________________________________
41
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Questions ?
[email protected]
Prepared & Edited by Thomas SIM – June 2019

__________________________________________
42
VILAS HDSCM TOT Programme HCMC/Vietnam May - June 2019 (Thomas SIM)
GPM – Chapter 4

Copyright © 2006. All rights reserved by International Freight Consultants (S) Pte.Ltd.
Thomas Sim
[email protected]
Prepared & edited by Thomas SIM – June 2019