100% found this document useful (1 vote)
2K views4 pages

Boq - Demolition

This document is a bill of quantities for demolition works at a Woolworths store. It lists over 100 line items with descriptions and quantities of elements to be demolished, including walls, ceilings, fixtures, fittings and floors in various areas of the store like the front end, bakery, deli, seafood prep areas, toilets, offices and cool rooms. The demolition works will prepare the site for redevelopment and refurbishment according to the specification and drawings.

Uploaded by

STS-SPARK GAMING
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views4 pages

Boq - Demolition

This document is a bill of quantities for demolition works at a Woolworths store. It lists over 100 line items with descriptions and quantities of elements to be demolished, including walls, ceilings, fixtures, fittings and floors in various areas of the store like the front end, bakery, deli, seafood prep areas, toilets, offices and cool rooms. The demolition works will prepare the site for redevelopment and refurbishment according to the specification and drawings.

Uploaded by

STS-SPARK GAMING
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

BOQ - DEMOLITION

13319 Woolworths Narellan


Ref. Description Quantity Unit Rate Total

2 DEMOLITION

Specification and Drawings


2/1.A The Tenderer is referred to the specification and note
drawings for full particulars and descriptions of
workmanship and materials and is to allow in his
prices for the full intent and meaning thereof.
Method of Measurement and Prices
2/1.B The following Bill of Quantities is an abbreviated note
document not measured in accordance with the
Australian Standard Method of Measurement.
General Items
Allow in the following items or in the rates of
measured items for all costs incurred in executing the
works in accordance with the intent of the drawings
and specification
2/1.C Inspection of site. 1 item
2/1.D Disposal of demolished materials 1 item
2/1.E Disconnection of all services will be by others. note

Demolition Works
Front End/Trading floor
2/1.F Remove 66 x 66mm timber floor rail to trolley park 14 m
2/1.G Demolish low height stud wall, 1100mm high 13 m2
2/1.H Remove chrome railings, 1000mm high 8 m2
2/1.I Demolish plasterboard and SS column cladding, 17 m2
3000mm high :[4 no]
2/1.J Demolish SS bollards 8 no
2/1.K Remove TBR rails to front wall 16 m
Bakery Prep/Dry
2/1.L Remove existing oven hood, 3300 x 1700mm wide 1 no
2/1.M Remove existing oven hood, 2000 x 800mm wide 1 no
2/1.N Remove existing hooks, racks, benches, sinks, shelves 102 m2
and fixtures and fittings
2/1.O Demolish flush plasterboard ceiling to bakery dry area, 10 m2
2700mm high
2/1.P Saw cut and remove concrete slab up to 150mm thick 10 m2
to new bakery freezer area, 3650 x 2500mm wide

Page 2/1 DEMOLITION


Mainbrace Constructions
BOQ - DEMOLITION
13319 Woolworths Narellan
Ref. Description Quantity Unit Rate Total

2 DEMOLITION (Continued)

2/2.A Remove spoil for new frozen food freezer setdown, 2.0 m3
150­300mm deep
Deli Prep
2/2.B Remove existing hooks, racks, benches, sinks, shelves 70 m2
and fixtures and fittings
2/2.C Demolish existing concrete plinth under refrigeration 22 m2
cases, 100mm high
2/2.D Remove/scabble existing epoxy floor finish including 70 m2
falls
Seafood Prep
2/2.E Demolish blockwork wall, 3000mm high 112 m2
2/2.F Demolish existing concrete plinth under refrigeration 11 m2
cases, 100mm high
2/2.G Remove existing hooks, racks, benches, sinks, shelves 74 m2
and fixtures and fittings
2/2.H Remove/scabble existing epoxy floor finish including 74 m2
falls
2/2.I Demolish flush plasterboard ceiling, 2700mm AFFL 77 m2
2/2.J Demolish existing ceramic wall tiling, 2700mm high 20 m2
Butcher Shop BOH
2/2.K Remove existing single swing door and frame, 900 x 1 item
2100mm high
2/2.L Remove/scabble existing epoxy floor finish including 12 m2
falls
2/2.M Remove existing hooks, racks, benches, sinks, shelves 72 m2
and fixtures and fittings
2/2.N Demolish ICP wall including galvanised steel posts 14 m2
including for 5 x steel legs , 2700mm high
2/2.O Demolish ICP ceiling, 2700mm AFFL 12 m2
2/2.P Form penetration through blockwork, 2500 x 1500mm 1 item
wide
Produce Prep
2/2.Q Remove existing hooks, racks, benches, sinks, shelves 33 m2
and fixtures and fittings
Loading Dock
2/2.R Remove existing dock ladder 2 no

Page 2/2 DEMOLITION


Mainbrace Constructions
BOQ - DEMOLITION
13319 Woolworths Narellan
Ref. Description Quantity Unit Rate Total

2 DEMOLITION (Continued)

2/3.A Form penetration through precast wall, 1080 x 1 item


2400mm high
Male Toilets
2/3.B Demolish vanitys, basins, urinals, toilet partitions, 14 m2
fixtures and fittings
2/3.C Demolish floor tiles and bedding to toilets 14 m2
2/3.D Demolish ceramic wall tiles, 2700mm high 41 m2
2/3.E Demolish existing grid ceiling and tiles, 2700mm AFFL 14 m2
Male Lockers
2/3.F Remove shelving, fixtures an fittings to male lockers 11 m2
2/3.G Demolish existing grid ceiling and tiles, 2700mm AFFL 11 m2
Store Rooms
2/3.H Demolish blockwork wall, 3000mm high 32 m2
2/3.I Demolish existing grid ceiling and tiles, 2700mm AFFL 13 m2
2/3.J Demolish floor tiles and bedding to toilets 4 m2
2/3.K Demolish existing kitchenette, 2050mm long 1 item
2/3.L Demolish existing servery, 1850mm long 1 item
2/3.M Remove existing joinery, desks, shelves, chairs, tables, 52 m2
bump rails and all fixtures and fittings
General Office & Records Room
2/3.N Demolish blockwork wall, 3000mm high 40 m2
2/3.O Demolish existing grid ceiling and tiles, 2700mm AFFL 21 m2
2/3.P Remove existing joinery, desks, shelves, chairs, bump 21 m2
rails and all fixtures and fittings
Female Toilets
2/3.Q Demolish vanitys, basins, toilet partitions, fixtures and 13 m2
fittings
2/3.R Demolish floor tiles and bedding to toilets 13 m2
2/3.S Demolish ceramic wall tiles, 2700mm high 41 m2
2/3.T Demolish existing grid ceiling and tiles, 2700mm AFFL 13 m2
2/3.U Demolish blockwork wall to toilets and lockers, 44 m2
3000mm high
Female Lockers
2/3.V Remove shelving, fixtures an fittings to male lockers 27 m2

Page 2/3 DEMOLITION


Mainbrace Constructions
BOQ - DEMOLITION
13319 Woolworths Narellan
Ref. Description Quantity Unit Rate Total

2 DEMOLITION (Continued)

2/4.A Demolish existing grid ceiling and tiles, 2700mm AFFL 27 m2


General, Managers, System and Cashiers Offices
2/4.B Remove 'L' shaped desk, 3000 x 3400mm wide 1 item
2/4.C Remove 'L' shaped desk, 3350 x 3400mm wide 1 item
2/4.D Remove 'U' shaped desk, 2200 x 4750mm wide 1 item
2/4.E Remove desk, 1800 x 900mm wide 1 no
2/4.F Demolish door and frame, 1000 x 2100mm high 1 no
2/4.G Remove existing joinery, shelves, bump rails, chairs 51 m2
and all fixtures and fittings
Coolrooms
2/4.H Demolish existing seafood coolroom complete 1 item
including coolroom walls, ceiling, doors, racks and all
fixtures and fittings (sealed floor, no floor insulation),
4500mm long x 3100mm wide x 2700mm high
2/4.I Demolish existing chicken coolroom complete 1 item
including coolroom walls, ceiling, doors, racks and all
fixtures and fittings (sealed floor, no floor insulation),
3400mm long x 2500mm wide x 2350mm high
2/4.J Demolish existing bloom coolroom complete including 1 item
coolroom walls, ceiling, doors, racks and all fixtures
and fittings (scabble and remove epoxy floor, no floor
insulation), 4950mm long x 2120mm wide x 2450mm
high
Direct To Boot External (Day Works)
2/4.K Form penetration through 150mm thick precast panel, 1 item
2100 x 1150mm wide
2/4.L Remove bird mesh from existing awning, 4150mm 64 m2
AFFL
2/4.M Allow to remove FC facia to expose structural steel, 23 m2
1900mm high
2/4.N Sawcut and remove concrete pavement slab, 1000 x 2 no
1000 x 150mm thick
2/4.O Remove handrail, 1200mm high 10 m

Misc
2/4.P Allow for staged night works to Woolworths tenancy 1 item
DEMOLITION TOTAL

Page 2/4 DEMOLITION


Mainbrace Constructions

You might also like