List of Best Agile Testing Interview Questions To Help Prepare for Upcoming Interviews:
Agile Testing interview questions and answers will help you prepare for Agile methodology
and agile process interviews for Software testers or developers.
We have listed the top 25 Agile interview questions with detailed answers. You can also
search for our other Agile Testing topics published for more details.
Answer: Burn-up and burn-down charts are used to keep track of the progress of the
project.
Burn-up charts represent how much work has been completed in any project whereas
Burn-down chart represents the remaining work in a project.
Answer:
1. Project Owner has the responsibility of managing the product backlog. Works with
end-users and customers and provides proper requirements to the team to build the
proper product.
2. Scrum Master works with the scrum team to make sure each sprint gets completed
on time. Scrum master ensures proper workflow for the team.
3. Scrum Team: Each member of the team should be self-organized, dedicated and
responsible for the high quality of the work.
Answer: The Product backlog is maintained by the project owner which contains every
feature and requirement of the product.
Sprint backlog can be treated as the subset of product backlog which contains features
and requirements related to that particular sprint only.
Answer: Velocity is a metric that is calculated by the addition of all efforts estimates
associated with user stories completed in an iteration. It predicts how much work Agile
can complete in a sprint and how much time will it require to complete a project.
Q #6) Explain the difference between a traditional Waterfall model and Agile testing?
Answer: Agile testing is done parallel to the development activity whereas a traditional
waterfall model testing is done at the end of the development.
As done in parallel, agile testing is done on small features whereas, in a waterfall model,
testing is performed on the whole application.
Benefits:
Improved code quality: As the second partner reviews the code simultaneously, it
reduces the chances of mistake.
Knowledge transfer is easy: One experienced partner can teach another partner
about the techniques and codes.
Answer: Modification of the code without changing its functionality to improve the
performance is called Re-factoring.
Answer:
Iterative Development: Software is developed and delivered to the customer and based on
the feedback again developed in cycles or releases and sprints. Example: Release 1
software is developed in 5 sprints and delivered to the customer. Now, the customer wants
some changes, then the development team plan for 2nd release which can be completed in
some sprints and so on.
The answer can be: Work with PO to understand the exact requirement to update test
cases. Also, understand the risk of changing the requirement. Apart from this, one should
be able to write a generic test plan and test cases. Don’t go for the automation until
requirements are finalized.
Q #11) What is a test stub?
Answer: Test stub is a small code that mimics a specific component in the system and can
replace it. Its output is the same as the component it replaces.
Answer:
Q #13) What is the difference between Epic, User stories & Tasks?
Answer:
User Stories: It defines the actual business requirement. Generally created by the business
owner.
Task: To accomplish the business requirements development team create tasks.
Epic: A group of related user stories is called an Epic.
It contains:
Answer: QA can provide value addition by think outside the box about the various
scenarios to test a story. They can provide quick feedback to the developers about
whether new functionality is working fine or not.
Q #17) What is Scrum ban?
Answer: It can be defined as a pre-preparation step to the first sprint. Activities like
setting development environment, preparing backlog, etc need to be done before starting
the first sprint and can be treated as Sprint zero.
Answer: There may be some technical issues or design problem in the project which needs
to be resolved first. To provide the solution to this problem “Spikes” are created.
1. Re-factoring
2. Small feedback cycles
3. Dynamic code analysis
4. Iteration
Answer: Daily stand up meeting is essential for any team in which team discuss,
Answer: It can be defined as a spike with the current architecture or the current set of
best practices. The purpose of a tracer bullet is to examine how an end-to-end process
will work and examine feasibility.
Q #24) How the velocity of the sprint is measured?
I Hope, these questions will help you in preparing for the Agile testing and methodology
interview.
Recommended Reading
Interview Questions and Answers
ETL Testing Interview Questions and Answers
Some Interesting Software Testing Interview Questions
Top 25 Functional Testing Interview Questions and Answers
Top 20 Most Important API Testing Interview Questions and Answers
Software Testing Questions and Answers (Part 1)
Top 30 Security Testing Interview Questions and Answers
Top 31 Agile Interview Questions and Answers
About SoftwareTestingHelp
Helping our community since 2006! Most popular portal for Software professionals
with 240 million+ visits and 300,000+ followers! You will absolutely love our
creative content on Software Tools and Services Reviews!
Recommended Reading