BT Written Exercise 1 - LAGAT
BT Written Exercise 1 - LAGAT
jhartzerlagatgmail.com
Prepared By:
JULES HARTZER T. LAGAT
BS-ARCH 3A
Submitted to:
AR. ROEL MOZART ACEBES
BUILDING TECHNOLOGY 4 INSTRUCTOR
1|Page
JHTL ARCHITECTURAL DESIGN FIRM
jhartzerlagatgmail.com
ARCHITECTURAL
Perspective
Site Development
Vicinity Map
Schedule Of Windows
Front Side Elevation
Left Side Elevation
Right Side Elevation
Rear Side Elevation
Cross Section
Longitudinal Section
2|Page
JHTL ARCHITECTURAL DESIGN FIRM
jhartzerlagatgmail.com
Section A, B, C And D
Section A, B, C, And D
Masters’ Closet Plan Section
Bedroom 1, 2, And 3 Closet
Plan, Section, Elevation Balcony Railing Detail
STRUCTURAL
Ground Floor Foundation Plan
Schedule of Footing and Column
Lintel Beam Section Detail
Porch Stairs Section Detail
Footing Tie Beam Section
Concrete Pavement Section
C1-F1 Section
C2- F2, F3 Section Detail
Wf-1 Section
C1-F1, C2-F2, C3-F3, C4-F4
3|Page
JHTL ARCHITECTURAL DESIGN FIRM
jhartzerlagatgmail.com
4|Page
JHTL ARCHITECTURAL DESIGN FIRM
jhartzerlagatgmail.com
REAR ELEVATION-
PERMACOAT SEMI-GLOSS LATEX
Tulle White B-706
PVC WOODEN PLANKS CEILING BELOW CONCRETE CANOPY SLAB
OUTDOOR WALL LAMP
RECTANGULAR TUBE (2"x 4") RAILINGS
SQUARE TUBE (1"x 2") RAILINGS SQUARE TUBE (1"x 1") RAILINGS
PERMACOAT SEMI-GLOSS LATEX
Tulle White B-706
PERMACOAT SEMI-GLOSS LATEX
Antique White BSC-27
ANALOK AWNING WINDOW FRAMES WITH FLOAT BRONZE GLASS
GROOVED WOODEN SOLID DOOR
WITH SMALL STRIP
PERMACOAT SEMI-GLOSS LATEX
Mud Pie B-7581
1. THESE NOTES CONTAIN GENERAL INFORMATION AND ARE NOT COMPLETE FOR
CONSTRUCTION PURPOSES. CONTRACTOR SHALL VERIFY INFORMATION GIVEN HERE WITH
THE SPECIFICATIONS AND OTHER DOCUMENTS AND BRING ANY CONFLICTS TO THE
ATTENTION OF THE ENGINEER BEFORE BEGINNING AFFECTED WORK. THE ENGINEER WILL
RESOLVE ANY SUCH CONFLICTS.
2. BEFORE FABRICATION AND/OR CONSTRUCTION ALL DIMENSIONS SHALL BE VERIFIED AND
COORDINATED WITH ARCHITECTURAL, ELECTRICAL, PLUMBING AND MECHANICAL
DRAWINGS.
3. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE. THEY DO NOT INDICATE THE METHODS OF CONSTRUCTION, UNLESS SO
STATED. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY MEASURES TO PROTECT THE
5|Page
JHTL ARCHITECTURAL DESIGN FIRM
jhartzerlagatgmail.com
STRUCTURES, ADJACENT PROPERTY, WORKMEN AND OTHER PERSONS DURING ALL PHASES
OF CONSTRUCTION
4. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACING AND SHORING FOR
ALL STRUCTURAL MEMBERS AS REQUIRED FOR STRUCTURE STABILITY DURING ALL PHASES
OF CONSTRUCTION.
5. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
FOUNDATION
FOUNDATION DESIGN WAS BASED ON ASSUMED ALLOWABLE SOIL BEARING CAPACITY
OF 5730 PSF (275 KPa). THE CONTRACTOR SHALL VERIFY SOIL CONDITION AT SITE & SHALL
NOTIFY STRUCTURAL ENGINEER IF ACTUAL SOIL PROPERTY APPEARS WEAKER TO THAT
ASSUMED. FOUNDATION SHALL REST ON NATURAL SOIL UNLESS OTHER WISE NOTED BY
THE ENGINEER. NO PART OF FOUNDATION SHALL REST ON FILL. THE CONTRACTOR SHALL
NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION HAVE BEEN COMPLETED AND PRIOR
TO CONCRETING TO CONFIRM THE DESIGN SOIL BEARING CAPACITY.
DIVISION 3: CONCRETE
BASIC CONCRETE MATERIALS & METHODS
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BUILDING CODE
OF AMERICAN CONCRETE INSTITUTE (ACI-318).
2. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY
EIGHT (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS
FOLLOWS.
3. ALL REINFORCING BARS SHALL CONFORM TO ASTM SPECS GRADE 33 (227 MPa) FOR 12Ø &
SMALLER AND GRADE 40 (275 MPa) FOR 16Ø TO 25Ø BARS.
4. IN GENERAL THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE DETAILING
REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO UNLESS OTHERWISE SHOWN
OR NOTED.
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS.
6|Page
JHTL ARCHITECTURAL DESIGN FIRM
jhartzerlagatgmail.com
6. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE
W/ TABLE 1 (TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWN
ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE.
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED &
SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS,
EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL,
ELECTRICAL, AND MECHANICAL DRAWINGS.
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP FOG SPRAYING, CURING
COMPOUNDS OR OTHER APPROVED METHODS.
10. STRIPPING OF FORMS AND SHORES:
FOUNDATION 24 HRS.
7|Page
JHTL ARCHITECTURAL DESIGN FIRM
jhartzerlagatgmail.com
FOOTING TIE BEAM - TIE BEAM IS A TYPE OF BEAM WHICH IS USED TO TIES THE
FOOTING AND TO AVOID THE SLENDER COLUMN EFFECT IN THE STRUCTURE. IT
INCREASES THE STIFFNESS OF THE OVERALL STRUCTURE.
DIVISION 4: MASONRY
DIVISION 5: METALS
DIVISION 6: WOOD AND PLASTICS
DIVISION 7: THERMAL & MOISTURE PROTECTION
DIVISION 8: DOORS & WINDOWS
DIVISION 9: FINISHES
DIVISION 10: SPECIALTIES
DIVISION 11: EQUIPMENT
DIVISION 12: FURNISHINGS
8|Page
JHTL ARCHITECTURAL DESIGN FIRM
jhartzerlagatgmail.com
9|Page