QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 1 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION
CONTRACT TITLE:
TITLE:
COMPANY
CONTRACTOR
Table of Contents
1. PURPOSE ......................................................................................... 3
2. SCOPE .............................................................................................. 3
3. REFERENCES .................................................................................. 4
3.1 DEFINITIONS ........................................................................................ 4
3.2 ABBREVIATIONS ................................................................................. 5
4. RBI DATA PREPARATION............................................................... 6
4.1 PIPING AND EQUIPMENT SAP UPLOAD ............................................ 6
4.2 CORROSION LOOP & PIPING GROUP TEMPLATE ........................... 6
4.3 INVENTORY GROUP DEVELOPMENT ................................................ 6
4.4 RBI SYSTEM FILE ................................................................................ 8
4.5 MERIDIUM APM RBI TEMPLATE FILES .............................................. 8
5. ATTACHMENTS ............................................................................... 8
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 3 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION
1. PURPOSE
Risk Based Inspection (RBI) is a module in GE Digital APM that allows to, firstly, analyze the risk of
the components of a piece of equipment failing due to specific degradation mechanisms, through
defining both the consequence and probability of failure and, secondly, to define an Inspection
Strategy for each mechanism.
The RBI Analysis will be performed following the 580 and 581 modules.
This specification defines the templates to be filled in for the Risk Assessment to be updated to APM
software as part of the RBI Program. Data Collection requirements include process data, equipment
technical data and history data (inspection results) obtained during the review of each unit as part of
the RBI data preparation.
• Process Flow Diagrams, Block Flow Diagrams and Material of Construction Diagrams
2. SCOPE
This document includes all the template files provided by COMPANY with information populated by
CONTRACTOR to be uploaded by COMPANY in the GE APM software. These templates will include
information of corrosion loops, piping groups, inventory groups, piping and equipment components
as part of the RBI data preparation for the RLTO Expansion and Offplot Facilities of the North Field
Expansion project (EPC-3).
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 4 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION
In addition, this document includes also a set of marked MSD’s that serve as a visual representation
for the inventory groups. IG’s are described and further detailed in section 4.3.
3. REFERENCES
[2] 999-175-CE-REP-00001 MEG - Risk Based Inspection (RBI) - Corrosion Loop Report
LTC/C/NFE/3998/18
[5] Project Facilities Description and Philosophy
EPC-3 ITT – Exhibit 6
3.1 DEFINITIONS
PROJECT: RLTO Expansion and Offplot Facilities of the North Field Expansion
project (EPC-3)
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 5 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION
3.2 ABBREVIATIONS
The following are the additional definition of the terms to be used for this document
Abbreviation Definition
CA Corrosion Allowance
-
CI SCC Chloride Stress Corrosion Cracking
CCSL Common Condensate Storage and Loading
CL Corrosion Loop
CS Carbon Steel
CUI Corrosion Under Insulation
IG Inventory Group
IOW Integrity Operating Windows
KCS Killed Carbon Steel
MOC Material of Construction
MSD Material Selection Diagram
NFE North Field Expansion
NACE National Association of Corrosion Engineers
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 6 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION
Abbreviation Definition
PG Piping Group
PWHT Post-Welding Heat-Treatment
P&ID (or PID) Piping & Instrumentation Diagram
RLTO Ras Laffan Terminal Operations
SS Stainless Steel
An inventory group (IG) is a simple term used to determine the mass of fluid that could realistically
be released in the event of a leak. This is used to designate a group of equipment that can be remotely
isolated, within a short period of time, from other sections of the plant in an emergency situation.
Detection and isolation system that are present in the unit can have a significant impact on the
magnitude and duration of the hazardous fluid release. These systems can reduce the duration of
the release. This isolation system shall be considered as “A” as per the following API 581 type of
isolation system classification:
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 7 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION
Following abovementioned criteria, Emergency Shut Down Valves (ESDVs) have been considered
as battery limit for the IG development. These valves will isolate components under assessment
within a specific inventory group.
The below table shows the ESDVs that have been identified for the MEG unit:
PID ESDV identification
999-175-PR-PID-00001 175ESDV 310
999-175-PR-PID-00002 175ESDV 309
999-175-PR-PID-00008 175ESDV 305
999-175-PR-PID-00009 175ESDV 311
999-175-PR-PID-00020 175ESDV 312
999-175-PR-PID-00013 175ESDV 701
999-175-PR-PID-00013 175ESDV 702
999-175-PR-PID-00020 175ESDV 312
999-175-PR-PID-00021 175ESDV 313
FAP-D-175-1225-200 175ESDV 107
These valves have been identified using PIDs and IGs have been marked up at the MSD level and it
can be found in Attachment 03. Inventory groups are clearly identified with a unique tag (i.e. IG-01).
Once IGs have been marked up, all data required for inventory group template has been gathered
and it has been filled in the corresponding GE-APM RBI Template. It can be found in attachment 3.1.
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 8 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION
This file contains relevant information including all the RBI components (piping and equipment)
applicable por the risk assessment. Each type of asset, component type, damage mechanism,
consequences related data as per corresponding GE-APM template fields detail.
Information and Data required is gathered for the upload in the software APM for a proper risk
assessment. This information is gathered in a template that can be found in the following attachments:
• Piping: attachment 05.
• Pressure vessels: attachment 06.
• Tanks (tank bottom not included): attachment 07.
• Tank Bottom: attachment 08.
5. ATTACHMENTS