This document provides instructions for preparing risk-based inspection (RBI) data in templates for uploading to GE Digital's APM software. It defines templates for corrosion loops, piping groups, inventory groups, and RBI data for static equipment and piping for the RLTO Expansion and Offplot Facilities project. The document references other project documents and standards for RBI analysis.

Uploaded by

Vishwanath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views8 pages

Data Collection

This document provides instructions for preparing risk-based inspection (RBI) data in templates for uploading to GE Digital's APM software. It defines templates for corrosion loops, piping groups, inventory groups, and RBI data for static equipment and piping for the RLTO Expansion and Offplot Facilities project. The document references other project documents and standards for RBI analysis.

Uploaded by

Vishwanath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

COMPANY: Contract No.

:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 1 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION

CONTRACT TITLE:

Engineering, Procurement, Construction and Commissioning Agreement for RLTO


Expansion and Offplot Facilities of the NORTH FIELD EXPANSION PROJECT

TITLE:

MEG – RISK BASED INSPECTION (RBI) – DATA


COLLECTION

B 02-AUG-2023 Issued for Review RR BGM JGL

A 26-JUL-2023 Issued for Inter-Discipline Check RR BGM JGL


Prep’d by Chk’d by App’d by Chk’d by App’d by
Rev. Issue Date Revision Description
CONT. CONT. CONT. COMPANY. COMPANY.

COMPANY

QATARGAS OPERATING COMPANY LIMITED

CONTRACTOR

TÉCNICAS REUNIDAS S.A.

DOCUMENT NO. 999-175-CE-REP-00001 DOC. CLASS 2


COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 2 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION

Table of Contents
1. PURPOSE ......................................................................................... 3
2. SCOPE .............................................................................................. 3
3. REFERENCES .................................................................................. 4
3.1 DEFINITIONS ........................................................................................ 4
3.2 ABBREVIATIONS ................................................................................. 5
4. RBI DATA PREPARATION............................................................... 6
4.1 PIPING AND EQUIPMENT SAP UPLOAD ............................................ 6
4.2 CORROSION LOOP & PIPING GROUP TEMPLATE ........................... 6
4.3 INVENTORY GROUP DEVELOPMENT ................................................ 6
4.4 RBI SYSTEM FILE ................................................................................ 8
4.5 MERIDIUM APM RBI TEMPLATE FILES .............................................. 8
5. ATTACHMENTS ............................................................................... 8
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 3 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION

1. PURPOSE

Risk Based Inspection (RBI) is a module in GE Digital APM that allows to, firstly, analyze the risk of
the components of a piece of equipment failing due to specific degradation mechanisms, through
defining both the consequence and probability of failure and, secondly, to define an Inspection
Strategy for each mechanism.

The RBI Analysis will be performed following the 580 and 581 modules.

This specification defines the templates to be filled in for the Risk Assessment to be updated to APM
software as part of the RBI Program. Data Collection requirements include process data, equipment
technical data and history data (inspection results) obtained during the review of each unit as part of
the RBI data preparation.

Data collection for RBI is obtained from the following documents:

• Process Flow Diagrams, Block Flow Diagrams and Material of Construction Diagrams

• Piping & Instrumentation Diagrams (P&ID) and Isometric drawing

• DCS, process historian or field instrumentation (for operating conditions)

• Process description / operating philosophy

• Manufacturer’s equipment data sheet

• Inspection and test records

• Maintenance records (equipment repair, re-rating, replacement, failure reports, etc.)

• Management of Change (MOC) records on modifications, upgrade, projects, etc.

• Specifications deviation, if any

• Integrity Operating Windows (IOW)

2. SCOPE

This document includes all the template files provided by COMPANY with information populated by
CONTRACTOR to be uploaded by COMPANY in the GE APM software. These templates will include
information of corrosion loops, piping groups, inventory groups, piping and equipment components
as part of the RBI data preparation for the RLTO Expansion and Offplot Facilities of the North Field
Expansion project (EPC-3).
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 4 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION

The following templates are considered:


• Piping & Equipment SAP Upload File (Equipment and piping)
• Meridium APM CL Upload Template (Corrosion Loops)
• Meridium APM IG Upload Template (Inventory Groups)
• RBI System File
• Meridium APM RBI Template Files (Static Equipment and piping)
o Piping
o Tank
o Tank bottom
o Pressure Vessel

In addition, this document includes also a set of marked MSD’s that serve as a visual representation
for the inventory groups. IG’s are described and further detailed in section 4.3.

3. REFERENCES

The requirements of this specification shall be supplemented by Codes, Standards, Regulations,


and others Project Specifications referenced herein.
Document No. Document Title
[1] 999-175-PR-DEC-00001 Basis of Design – MEG

[2] 999-175-CE-REP-00001 MEG - Risk Based Inspection (RBI) - Corrosion Loop Report

[3] 999-175-ME-LIS-00102 MEG - Mechanical Equipment List

[4] TCH-AIG-PRC-055 Risk Based Inspection and Strategies - Procedure

LTC/C/NFE/3998/18
[5] Project Facilities Description and Philosophy
EPC-3 ITT – Exhibit 6

[6] API RP 580 Risk-Based Inspection

[7] API RP 581 Risk-Based Inspection Methodology

3.1 DEFINITIONS

COMPANY: QATARGAS OPERATING COMPANY LIMITED.

PROJECT: RLTO Expansion and Offplot Facilities of the North Field Expansion
project (EPC-3)
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 5 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION

CONTRACTOR: TECNICAS REUNIDAS S.A.

VENDOR: Any person, firm, partnership, company, corporation or


combination thereof with whom CONTRACTOR has sent the
REQUEST FOR QUOTATION or placed the PURCHASE ORDER
to provide materials or equipment.

SUBCONTRACTOR: Any person, firm, partnership, company, corporation or


combination thereof with whom CONTRACTOR has sent the
REQUEST FOR QUOTATION or signed the SUBCONTRACT
for carrying out work or arranging for work to be carried out
and/or for supplying materials/equipment or arranging for them
to be supplied directly or as instructed by CONTRACTOR.

EQUIPMENT: The term "equipment" includes vessels (towers, drums, spheres,


reactors, reboilers, and exchangers), machinery (pumps,
compressors, turbines) and tanks (vertical, cylindrical storage
tanks).

3.2 ABBREVIATIONS

The following are the additional definition of the terms to be used for this document
Abbreviation Definition
CA Corrosion Allowance
-
CI SCC Chloride Stress Corrosion Cracking
CCSL Common Condensate Storage and Loading
CL Corrosion Loop
CS Carbon Steel
CUI Corrosion Under Insulation
IG Inventory Group
IOW Integrity Operating Windows
KCS Killed Carbon Steel
MOC Material of Construction
MSD Material Selection Diagram
NFE North Field Expansion
NACE National Association of Corrosion Engineers
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 6 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION

Abbreviation Definition
PG Piping Group
PWHT Post-Welding Heat-Treatment
P&ID (or PID) Piping & Instrumentation Diagram
RLTO Ras Laffan Terminal Operations
SS Stainless Steel

4. RBI DATA PREPARATION

4.1 PIPING AND EQUIPMENT SAP UPLOAD


This file contains information with relevant details including all the RBI components (piping and
equipment) applicable por the risk assessment. Each type of asset, operating data, design data,
material data as well as any assumption made on this regard is populated in the corresponding GE-
APM template.
Information and Data required is gathered for the upload in the software APM for a proper risk
assessment. This information is gathered in a template that can be found in attachment 01.

4.2 CORROSION LOOP & PIPING GROUP TEMPLATE

Attachment 02 is developed based on information gathered on a deliverable called “Corrosion Loop


Report” MEG - Risk Based Inspection (RBI) - Corrosion Loop Report. Information and Data required
is gathered in the corresponding template for the upload in the software GE-APM for a proper risk
assessment.

4.3 INVENTORY GROUP DEVELOPMENT

An inventory group (IG) is a simple term used to determine the mass of fluid that could realistically
be released in the event of a leak. This is used to designate a group of equipment that can be remotely
isolated, within a short period of time, from other sections of the plant in an emergency situation.

Detection and isolation system that are present in the unit can have a significant impact on the
magnitude and duration of the hazardous fluid release. These systems can reduce the duration of
the release. This isolation system shall be considered as “A” as per the following API 581 type of
isolation system classification:
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 7 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION

Following abovementioned criteria, Emergency Shut Down Valves (ESDVs) have been considered
as battery limit for the IG development. These valves will isolate components under assessment
within a specific inventory group.

The below table shows the ESDVs that have been identified for the MEG unit:
PID ESDV identification
999-175-PR-PID-00001 175ESDV 310
999-175-PR-PID-00002 175ESDV 309
999-175-PR-PID-00008 175ESDV 305
999-175-PR-PID-00009 175ESDV 311
999-175-PR-PID-00020 175ESDV 312
999-175-PR-PID-00013 175ESDV 701
999-175-PR-PID-00013 175ESDV 702
999-175-PR-PID-00020 175ESDV 312
999-175-PR-PID-00021 175ESDV 313
FAP-D-175-1225-200 175ESDV 107

These valves have been identified using PIDs and IGs have been marked up at the MSD level and it
can be found in Attachment 03. Inventory groups are clearly identified with a unique tag (i.e. IG-01).
Once IGs have been marked up, all data required for inventory group template has been gathered
and it has been filled in the corresponding GE-APM RBI Template. It can be found in attachment 3.1.
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/3998/18
PROJECT:
Doc. No.:
RLTO EXPANSION AND OFFPLOT FACILITIES OF THE
999-175-CE-REP-00002
NORTH FIELD EXPANSION PROJECT (EPC-3)
CONTRACTOR: Rev. A
TECNICAS REUNIDAS S.A. PAGE 8 OF 8
Doc. Title: MEG - RISK BASED INSPECTION (RBI) – DATA COLLECTION

4.4 RBI SYSTEM FILE


This file contains detailed information of all the RBI components (piping and equipment) applicable
in the corresponding unit. Each type of asset, operating/design parameters, material data as well as
any assumption made on this regard is filled in the corresponding GE-APM RBI Template.
Information and Data required is gathered for the upload in the software APM for a proper risk
assessment. This information is gathered in a template that can be found in attachment 04.

4.5 MERIDIUM APM RBI TEMPLATE FILES

This file contains relevant information including all the RBI components (piping and equipment)
applicable por the risk assessment. Each type of asset, component type, damage mechanism,
consequences related data as per corresponding GE-APM template fields detail.
Information and Data required is gathered for the upload in the software APM for a proper risk
assessment. This information is gathered in a template that can be found in the following attachments:
• Piping: attachment 05.
• Pressure vessels: attachment 06.
• Tanks (tank bottom not included): attachment 07.
• Tank Bottom: attachment 08.

5. ATTACHMENTS

• Attachment 01: 1_SAP Equipment _ Piping.


• Attachment 02: 2_RBI-581 Corrosion Loops.
• Attachment 03: Inventory Groups marked up on MSDs
• Attachment 03.1: 3_RBI-581 Inventory Group.
• Attachment 04: 4_RBI System Details.
• Attachment 05: RBI-581 Piping PI.
• Attachment 06: RBI-581 pressure vessel.
• Attachment 07: RBI-581 Tank Assessment.
• Attachment 08: Tank Bottom- RBI 580.