0% found this document useful (0 votes)
285 views1 page

Database Cycle Time DT

The document reports cycle time data for three hauler units transporting overburden waste from various locations to a disposal site over a period of time. It includes details like unit names, loaded by, material hauled, total time per cycle including wait, maneuver, load, haul, unload times, number of loads, haul distance, and speed. The total cycle times for the three units ranged from 4.24 to 7.52 minutes to complete a full cycle from loading to disposal.

Uploaded by

SETIO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
285 views1 page

Database Cycle Time DT

The document reports cycle time data for three hauler units transporting overburden waste from various locations to a disposal site over a period of time. It includes details like unit names, loaded by, material hauled, total time per cycle including wait, maneuver, load, haul, unload times, number of loads, haul distance, and speed. The total cycle times for the three units ranged from 4.24 to 7.52 minutes to complete a full cycle from loading to disposal.

Uploaded by

SETIO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CYCLE TIME SKM'S UNIT

Date : June 09th 2018


NO Front/Location Kasuari Timur Maleo Hauler Distance
1 Unit Name HINO-202 HINO-178
No Location
Loaded By Volvo-350 Volvo-350
Material OB/Waste OB/Waste 1 ETO-21
Total Times Minutes 5,05 7,47 2 ETO-23
Waiting to loading Minutes 0,11 0,18 3 ETO Cendrawasi
Manuver-Loading Minutes 0,39 0,49 4 ETO Maleo
Loading time Minutes 1,33 0,48 5 ETO Kasuari
Manuver-unloading Minutes 0,48 0,28 6 Disposal Kasuari
Unloading time Minutes 0,28 0,56
Haul Duration (PIT-Disposal) Minutes 2,46 5,484
Jumlah Pengisian Times 4 5
Jarak Angkut Meter 205 457
Speed KM/Hr 10 10 ???
Lokasi Disposal/ETO Disposal Kasuari
Total Cycle time (Full) Minutes 5,23 7,20
2 Unit Name HINO-175 HINO-206
Loaded By Volvo-350 Volvo-350
Material OB/Waste OB/Waste
Total Times Minutes 4,39 7,90
Waiting to loading Minutes 0 0,39
Manuver-Loading Minutes 0,28 0,23
Loading time Minutes 1,06 1,02
Manuver-unloading Minutes 0,38 0,3
Unloading time Minutes 0,21 0,48
Haul Duration (PIT-Disposal) Minutes 2,46 5,484
Jumlah Pengisian Times 4 5
Jarak Angkut Meter 205 457
Speed KM/Hr 10 10 ???
Lokasi Disposal/ETO Disposal Kasuari
Total Cycle time (Full) Minutes 4,26 7,52
3 Unit Name HINO-202 HINO-205
Loaded By Volvo-350 Volvo-350
Material OB/Waste OB/Waste
Total Times Minutes 4,57 7,484
Waiting to loading Minutes 0,22 0,18
Manuver-Loading Minutes 0,25 0,49
Loading time Minutes 1,06 0,51
Manuver-unloading Minutes 0,35 0,32
Unloading time Minutes 0,23 0,5
Haul Duration (PIT-Disposal) Minutes 2,46 5,484
Jumlah Pengisian Times 4 5
Jarak Angkut Meter 205 457
Speed KM/Hr 10 10 ???
Lokasi Disposal/ETO Disposal Kasuari
Total Cycle time (Full) Minutes 4,24 7,46