EIS Outline
(Maximum of about 250 pages)
Project Fact Sheet
Table of Contents
Executive Summary
1) Brief Project Description
2) Brief Summary of Project’s EIA Process
3) Summary of Baseline Characterization
4) Summary of Impact Assessment and Environmental Management Plan
5) Summary of Environmental Monitoring Plan
6) EMF and EGF Commitments
Draft Main EIS
1. Basic Project Information
2. Description of the Project’s EIA Process
2.1 Terms of Reference of the EIA Study
2.2 EIA Team
2.3 EIA Study Schedule
2.4 EIA Study Area
2.5 EIA Methodology
2.6 Public Participation
3. Project Description
3.1 Project Location and Area
3.2 Project Rationale
3.3 Project Alternatives
3.4 Project Development Plan, Process/Technology Options and Project
Components
3.5 Description of Project Phases (Activities/Environmental Aspects, Associated
Wastes and Built-in Pollution Control Measures)
3.5.1 Pre-construction/Pre-operational Phase
3.5.2 Construction/Development Phase
3.5.3 Operational Phase
3.5.4 Abandonment Phase
3.6 Manpower Requirement
3.7 Project Cost
3.8 Project Duration and Schedule
4. Baseline Environmental Conditions, Impact Assessment and Mitigation
4.1 The Land (Discuss only relevant modules)
4.1.1 Land Use and Classification
4.2 The Water (Discuss only relevant modules)
4.2.1 Hydrology and Hydrogeology
4.2.2 Oceanography
4.2.3 Water Quality
4.2.4 Freshwater Biology
4.2.5 Marine Biology
4.3 The Air (Discuss only relevant modules)
4.3.1 Meteorology
4.3.2 Air Quality and Noise
4.4 The People
5. Environmental Risk Assessment (When Applicable)
6. Environmental Management Plan
6.1 Impacts Management Plan
6.2 Social Development Framework
6.3 IEC Framework
6.4 Emergency Response Policy and Generic Guidelines
6.5 Abandonment/Decommissioning
6.6 Environmental Monitoring Plan
6.6.1 Self-Monitoring Plan
Note: Attach under this section the Project Environmental Monitoring
and Audit Prioritization Scheme (PEMAPS)
6.6.2 Multi-sectional Monitoring Framework
6.6.3 Environmental Guarantee and Monitoring Fund Commitment
6.7 Institutional Plan for EMP Implementation
7. Bibliography/References
8. Annexes
8.1 Scoping Checklist
8.2 Original Sworn Accountability Statement of Proponent
8.3 Original Sworn Accountability Statement of Key EIS Consultants
8.4 Proof of Public Participation
8.5 Baseline Study Support Information
8.6 Impact Assessment and EMP Support Information