This document outlines the contents of an Environmental Impact Statement (EIS) for a proposed project. The EIS will be a maximum of 250 pages and include an executive summary, description of the project and environmental review process, analysis of environmental baseline conditions and potential impacts, and an environmental management plan. The executive summary will provide a brief overview of the project description, environmental review process, baseline characterization, impact assessment, environmental monitoring plan, and commitments made. The main body of the EIS will provide details on these areas, including the project location and components, environmental baseline studies of land, water, air and human settings, assessment of potential impacts, and plans for mitigation, monitoring and management of impacts.

Uploaded by

Emmán
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
51 views2 pages

EIS Outline

This document outlines the contents of an Environmental Impact Statement (EIS) for a proposed project. The EIS will be a maximum of 250 pages and include an executive summary, description of the project and environmental review process, analysis of environmental baseline conditions and potential impacts, and an environmental management plan. The executive summary will provide a brief overview of the project description, environmental review process, baseline characterization, impact assessment, environmental monitoring plan, and commitments made. The main body of the EIS will provide details on these areas, including the project location and components, environmental baseline studies of land, water, air and human settings, assessment of potential impacts, and plans for mitigation, monitoring and management of impacts.

Uploaded by

Emmán
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

EIS Outline

(Maximum of about 250 pages)

Project Fact Sheet


Table of Contents
Executive Summary
1) Brief Project Description
2) Brief Summary of Project’s EIA Process
3) Summary of Baseline Characterization
4) Summary of Impact Assessment and Environmental Management Plan
5) Summary of Environmental Monitoring Plan
6) EMF and EGF Commitments

Draft Main EIS


1. Basic Project Information

2. Description of the Project’s EIA Process


2.1 Terms of Reference of the EIA Study
2.2 EIA Team
2.3 EIA Study Schedule
2.4 EIA Study Area
2.5 EIA Methodology
2.6 Public Participation

3. Project Description
3.1 Project Location and Area
3.2 Project Rationale
3.3 Project Alternatives
3.4 Project Development Plan, Process/Technology Options and Project
Components
3.5 Description of Project Phases (Activities/Environmental Aspects, Associated
Wastes and Built-in Pollution Control Measures)
3.5.1 Pre-construction/Pre-operational Phase
3.5.2 Construction/Development Phase
3.5.3 Operational Phase
3.5.4 Abandonment Phase
3.6 Manpower Requirement
3.7 Project Cost
3.8 Project Duration and Schedule
4. Baseline Environmental Conditions, Impact Assessment and Mitigation
4.1 The Land (Discuss only relevant modules)
4.1.1 Land Use and Classification
4.2 The Water (Discuss only relevant modules)
4.2.1 Hydrology and Hydrogeology
4.2.2 Oceanography
4.2.3 Water Quality
4.2.4 Freshwater Biology
4.2.5 Marine Biology
4.3 The Air (Discuss only relevant modules)
4.3.1 Meteorology
4.3.2 Air Quality and Noise
4.4 The People

5. Environmental Risk Assessment (When Applicable)


6. Environmental Management Plan
6.1 Impacts Management Plan
6.2 Social Development Framework
6.3 IEC Framework
6.4 Emergency Response Policy and Generic Guidelines
6.5 Abandonment/Decommissioning
6.6 Environmental Monitoring Plan
6.6.1 Self-Monitoring Plan
Note: Attach under this section the Project Environmental Monitoring
and Audit Prioritization Scheme (PEMAPS)
6.6.2 Multi-sectional Monitoring Framework
6.6.3 Environmental Guarantee and Monitoring Fund Commitment
6.7 Institutional Plan for EMP Implementation

7. Bibliography/References
8. Annexes
8.1 Scoping Checklist
8.2 Original Sworn Accountability Statement of Proponent
8.3 Original Sworn Accountability Statement of Key EIS Consultants
8.4 Proof of Public Participation
8.5 Baseline Study Support Information
8.6 Impact Assessment and EMP Support Information