19 When terminating cables what procedure should a cut back and tape over
Be adopted when dealing with unused cores b coil up and leave good
Long length
c clamp conductors together
and insulate
d terminate at both ends
38 How may cables for I/S systems be installed a cables must be installed in
In the hazardous area their own ducts and conduits
b all cables can be bunched
c it does not matter how
d they can share the same tray as
power cables if risk of
mechanical damage is low
47 Equipment is marked Exd 11B T4 where may a Cat I and Cat 2 11A T3
This be installed b Cat 2 and 3 11B T5
c Zone 1 Cat 2 11C T4