100% found this document useful (1 vote)
108 views10 pages

1-Load On Box

The document describes the design of a box structure under an earth bank or canal. It provides dimensions and specifications of the box and calculations for various load cases when the box is empty or full of water. Load parameters such as weight, water pressure, and earth pressure are calculated.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
108 views10 pages

1-Load On Box

The document describes the design of a box structure under an earth bank or canal. It provides dimensions and specifications of the box and calculations for various load cases when the box is empty or full of water. Load parameters such as weight, water pressure, and earth pressure are calculated.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

DESIGN OF BOX ( UNDER EARTH BANK)

No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including wearing coa = 1.275 mts.
Thickness of wc = 0.075 mts.
Thickness of Top Hor. Mem = 0.350 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
Height of Box excluding wc = 1.200 mts.
Sill level = 195.538 M
Live Load Surcharge = 0.200 t/sqm
Top of Bank level = 202.228 M
Height of earth over box = 5.140 mts.
Top level of box = 197.088 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361
Width of Box = 3.200 m.

TBL 202.228

197.088
0.350
196.738

1.275

195.538
0.350

0.35 2.50 0.00 0.00 0.00 0.00 0.35

3.200
Loads on RCC box per mt.

Wt. of top member = 3.200 x 0.350 x 2.500 = 2.800 t


Wt. of bottom member = 3.200 x 0.350 x 2.500 = 2.800 t
Wt. of vertical walls (end = 2 x 1.275 x 0.350 x 2.500 = 2.231 t
Wt. of vertical walls (mid) = 0 x 1.275 x 0.000 x 2.500 = 0.000 t
Wt. of water = 1 x 1.200 x 2.500 x 1.000 = 3.000 t
Wt. of wc = 1 x 2.500 x 0.075 x 2.400 = 0.450 t
Wt. of Earth over the box = 5.140 x 3.200 x 2.100 = 34.541 t
Load due to Live load = 0.200 x 3.200 = 0.640 t
TOTAL 46.462

CASE 1 BOX EMPTY


Total wt. of box(without water) = 46.462 - 3.000 = 43.462 t

net upward soil reaction B = 43.462 - 2.800 - 0.450 = 12.566 t/m2


3.200
load on top of slab A = 34.541 + 0.640 + 2.800 = 11.869 t/m2
3.200
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 2.100 x 5.315 = 4.029 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 6.940 = 5.261 t/m2


CASE 2 BOX FULL
Total wt. of box = = 46.462 t

net upward soil reaction B = 46.462 - 2.800 - 0.450 = 13.504 t/m2


3.200
load on top of slab A = 34.541 + 0.640 * 2.800 = 11.869 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 1.200 t/m2

earth pr. At top E = 0.361 x 2.100 x 5.315 = 4.029 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 6.940 = 5.261 t/m2

A
E E

5 6 7 8
C C C C C C

F D D D F

1 2 3 4

B
DESIGN OF BOX ( UNDER CANAL)
No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including sealing coat = 1.240 mts.
Thickness of wc = 0.075 mts.
Thickness of sc = 0.040 mts.
Thickness of Top Hor. Mem = 0.300 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
FSL of canal = 201.478 M
CBL of canal = 197.078 M
Sill level = 195.538 M
Tail water level of drain = 198.335 M
Top of Bank level = 202.228 M
Top level of box = 197.038 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361

TBL 202.228

197.038
0.300
196.738

1.240

195.538
0.350

0.35 2.50 0.00 0.00 0.00 0.00 0.35

3.200
Loads on RCC box per mt.

Wt. of top member = 3.200 x 0.300 x 2.500 = 2.400 t


Wt. of bottom member = 3.200 x 0.350 x 2.500 = 2.800 t
Wt. of vertical walls (end = 2 x 1.240 x 0.350 x 2.500 = 2.170 t
Wt. of vertical walls (mid) = 0 x 1.240 x 0.000 x 2.500 = 0.000 t
Wt. of sealing coat = 1 x 2.500 x 0.040 x 2.400 = 0.240 t
Wt. of water = 1 2.500 x 1.200 x 1.000 = 3.000 t
Wt. of wc = 1 x 2.500 x 0.075 x 2.400 = 0.450 t
Wt. of water over the box = 3.200 x 4.400 x 1.000 = 14.080 t
TOTAL 25.140

CASE 1 BOX EMPTY - CANAL EMPTY


Total wt. of box(without water) = 25.140 - 3.000 - 14.080 = 8.060 t

net upward soil reaction B = 8.060 - 2.400 - 0.450 = 1.628 t/m2


3.200
load on top of slab A = 2.400 + 0.450 = 0.891 t/m2
3.200
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 2.100 x 0.225 = 0.171 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 1.750 = 1.327 t/m2


CASE 2 BOX FULL - CANAL EMPTY

Total wt. of box(with water) = 25.140 - 14.080 = 11.060 t

net upward soil reaction B = 25.140 - 2.400 - 0.450 = 6.966 t/m2


3.200
load on top of slab A = 2.400 + 0.450 * 0.000 = 0.891 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 0 TO 1.200 t/m2

earth pr. At top E = 0.361 x 2.100 x 0.225 = 0.171 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 1.750 = 1.327 t/m2

upward thrust on top slab G = 1.597 x 1.000 = 1.597 t/m3

CASE 3 BOX EMPTY - CANAL FULL

Total wt. of box = 25.140 - 3.000 = 22.140 t

net upward soil reaction B = 22.140 - 2.400 - 0.450 = 6.028 t/m2


3.200
load on top of slab A = 14.080 + 2.400 + 0.450 = 5.291 t/m2
3.200
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 1.100 x 0.225 = 0.089 t/m2

earth pr. At bottom F = 0.361 x 1.100 x 1.750 = 0.695 t/m2

water pr. At top H = 4.590 x 1.000 = 4.590 t/m2

water pr. At bottom J = 6.155 x 1.000 = 6.155 t/m2

CASE 4 BOX FULL - CANAL FULL

Total wt. of box = = 25.140 t

net upward soil reaction B = 25.140 - 2.400 - 0.450 = 6.966 t/m2


3.200
load on top of slab A = 14.080 + 2.400 + 0.450 = 5.291 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 0 TO 1.200 t/m2

earth pr. At top E = 0.361 x 1.100 x 0.225 = 0.089 t/m2

earth pr. At bottom F = 0.361 x 1.100 x 1.750 = 0.695 t/m2

water pr. At top H = 4.590 x 1.000 = 4.590 t/m2

water pr. At bottom J = 6.155 x 1.000 = 6.155 t/m2


A
H
E E H
5 6 7 8
C C C C C C
G G G
J
J D D D

1 2 3 4
F F
B
DESIGN OF BOX ( UNDER HEAD WALL)
No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including sealing coat = 1.240 mts.
Thickness of wc = 0.075 mts.
Thickness of sc = 0.040 mts.
Thickness of Top Hor. Mem = 0.300 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
FSL of canal = 201.478 M
CBL of canal = 197.078 M
Sill level = 195.538 M
Live load surcharge = 0.200 m
Tail water level of drain = 198.335 M
Top of Bank level = 202.228 M
Top of head wall level = 199.650 M
Stress under head wall level = 10.605 t/m2
Top level of box = 197.038 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361
Width of Box = 3.2

TBL 202.228

197.038
0.300
196.738

1.240

195.538
0.350

0.35 2.50 0.35 2.50 0.35 2.50 0.35

3.200
Loads on RCC box per mt.

Wt. of top member = 3.200 x 0.300 x 2.500 = 2.400 t


Wt. of bottom member = 3.200 x 0.350 x 2.500 = 2.800 t
Wt. of vertical walls (end = 2 x 1.240 x 0.350 x 2.500 = 2.170 t
Wt. of vertical walls (mid) = 0 x 1.240 x 0.350 x 2.500 = 0.000 t
Wt. of water = 1 x 2.500 x 1.200 x 1.000 = 3.000 t
Wt. of wc = 1 x 2.500 x 0.075 x 2.400 = 0.450 t
Stress under head wall = 10.605 x 3.200 = 33.936 t
TOTAL 44.756

CASE 1 BOX EMPTY


Total wt. of box(without water) = 44.756 - 3.000 = 41.756 t

net upward soil reaction B = 41.756 - 2.400 - 0.450 = 12.158 t/m2


3.200
load on top of slab A = 10.605 + 0.300 * 2.500 = 11.355 t/m2
1.000
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 2.100 x 2.962 = 2.245 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 3.312 = 2.511 t/m2


CASE 2 BOX FULL

Total wt. of box(with water) = = 44.756 t

net upward soil reaction B = 44.756 - 2.400 - 0.450 = 13.096 t/m2


3.200
load on top of slab A = 10.605 + 0.300 * 2.500 = 11.355 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 0 TO 1.200 t/m2

earth pr. At top E = 0.361 x 2.100 x 2.962 = 2.245 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 3.312 = 2.511 t/m2

A
H
E E H
5 6 7 8
C C C C C C
G G G
J
J D D D

1 2 3 4
F F
B
DESIGN OF BOX ( UNDER CANAL)
No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including sealing coat = 1.240 mts.
Thickness of wc = 0.075 mts.
Thickness of sc = 0.040 mts.
Thickness of Top Hor. Mem = 0.350 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
FSL of canal = 201.478 M
CBL of canal = 197.078 M
Sill level = 195.538 M
Tail water level of drain = 198.335 M
Top of Bank level = 202.228 M
Top level of box = 197.088 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361

TBL 202.228

197.088
0.350
196.738

1.240

195.538
0.350

0.35 2.50 0.00 0.00 0.00 0.00 0.35

3.200
Loads on RCC box per mt.

Wt. of top member = 3.200 x 0.350 x 2.500 = 2.800 t


Wt. of bottom member = 3.200 x 0.350 x 2.500 = 2.800 t
Wt. of vertical walls (end = 2 x 1.240 x 0.350 x 2.500 = 2.170 t
Wt. of vertical walls (mid) = 0 x 1.240 x 0.000 x 2.500 = 0.000 t
Wt. of sealing coat = 1 x 2.500 x 0.040 x 2.400 = 0.240 t
Wt. of water = 1 2.500 x 1.200 x 1.000 = 3.000 t
Wt. of wc = 1 x 2.500 x 0.075 x 2.400 = 0.450 t
Wt. of water over the box = 3.200 x 4.400 x 1.000 = 14.080 t
TOTAL 25.540

CASE 1 BOX EMPTY - CANAL EMPTY


Total wt. of box(without water) = 25.540 - 3.000 - 14.080 = 8.460 t

net upward soil reaction B = 8.460 - 2.800 - 0.450 = 1.628 t/m2


3.200
load on top of slab A = 2.800 + 0.450 = 1.016 t/m2
3.200
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 2.100 x 0.250 = 0.190 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 1.800 = 1.365 t/m2


CASE 2 BOX FULL - CANAL EMPTY

Total wt. of box(with water) = 25.540 - 14.080 = 11.460 t

net upward soil reaction B = 25.540 - 2.800 - 0.450 = 6.966 t/m2


3.200
load on top of slab A = 2.800 + 0.450 * 0.000 = 1.016 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 0 TO 1.200 t/m2

earth pr. At top E = 0.361 x 2.100 x 0.250 = 0.190 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 1.800 = 1.365 t/m2

upward thrust on top slab G = 1.597 x 1.000 = 1.597 t/m3

CASE 3 BOX EMPTY - CANAL FULL

Total wt. of box = 25.540 - 3.000 = 22.540 t

net upward soil reaction B = 22.540 - 2.800 - 0.450 = 6.028 t/m2


3.200
load on top of slab A = 14.080 + 2.800 + 0.450 = 5.416 t/m2
3.200
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 1.100 x 0.250 = 0.099 t/m2

earth pr. At bottom F = 0.361 x 1.100 x 1.800 = 0.715 t/m2

water pr. At top H = 4.565 x 1.000 = 4.565 t/m2

water pr. At bottom J = 6.155 x 1.000 = 6.155 t/m2

CASE 4 BOX FULL - CANAL FULL

Total wt. of box = = 25.540 t

net upward soil reaction B = 25.540 - 2.800 - 0.450 = 6.966 t/m2


3.200
load on top of slab A = 14.080 + 2.800 + 0.450 = 5.416 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 0 TO 1.200 t/m2

earth pr. At top E = 0.361 x 1.100 x 0.250 = 0.099 t/m2

earth pr. At bottom F = 0.361 x 1.100 x 1.800 = 0.715 t/m2

water pr. At top H = 4.565 x 1.000 = 4.565 t/m2

water pr. At bottom J = 6.155 x 1.000 = 6.155 t/m2


A
H
E E H
5 6 7 8
C C C C C C
G G G
J
J D D D

1 2 3 4
F F
B