0% found this document useful (0 votes)
173 views2 pages

19.pre-Piling Template Baltic II

The document summarizes the design of a pre-piling template created by TWD for driving piles at the Baltic II offshore wind farm project. The customized 3-sleeve template was designed to constrain the piles, minimize pile inclination, and control mutual distance for jacket foundations with 3 legs. It was horizontally guided by 2 frames interfacing with the spud legs of the jack-up barge used to install the 123 piles driven at 41 locations. Key aspects included the triangular piling template design, horizontal constraining system using the spud legs, and easy-to-use lifting and winch foundations.

Uploaded by

김대환
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
173 views2 pages

19.pre-Piling Template Baltic II

The document summarizes the design of a pre-piling template created by TWD for driving piles at the Baltic II offshore wind farm project. The customized 3-sleeve template was designed to constrain the piles, minimize pile inclination, and control mutual distance for jacket foundations with 3 legs. It was horizontally guided by 2 frames interfacing with the spud legs of the jack-up barge used to install the 123 piles driven at 41 locations. Key aspects included the triangular piling template design, horizontal constraining system using the spud legs, and easy-to-use lifting and winch foundations.

Uploaded by

김대환
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Pre-piling Template

Baltic II
A customized pre-piling template for 3-
legged offshore wind jacket foundations
Pre-piling Template for
Baltic II
Template Design
Back in 2011, the joint venture Hochtief Solutions, GeoSea, To optimize the efficiency of the piling operation, we
and Nordsee requested TWD to design a pre-piling template customized the pre-piling template for this jacket installation
for driving the piles at the Baltic II offshore wind farm (OWF). project and vessel. We designed a 3-sleeve template, tailored
Baltic II OWF is located 30 km north of the German Rügen for the jacket leg distance and pin-pile diameter, that constrains
island in the Baltic Sea. The OWF consists of 39 monopiles the piles, minimizes the pile inclination, and controls the mutual
and 41 jacket foundations for 80 wind turbines. Using our distance. The template was horizontally guided by 2 frames
pre-piling template, 123 piles were driven and installed at 41 that interfaced with the spud legs of the JUB. The lowering was
locations from the jack-up barge (JUB) Goliath. operated using 3 winches on the JUB deck.

With over a decade experience in method engineering and


equipment design, we at TWD have developed our expertise in
creating effective piling methodologies and translating them to
robust template designs.

Project highlights

• A triangular piling template


• Horizontal constraining system using the spud legs

• Easy-to-use lifting system and winch foundations

• Interfacing with measurement systems for pile driving


depth

TWD Rotterdam Science Tower


+31 10 294 03 74 Marconistraat 16
www.twd.nl 3029 AK Rotterdam