1) The document provides instructions to calculate the materials needed for a concrete work including a footing, columns, beams, and gravel bedding. 2) It specifies the dimensions of the concrete elements and calculates their volumes. 3) It then uses a concrete proportion table to determine the number of cement bags, sand, gravel, and amount of water needed based on the total concrete volume.

Uploaded by

Nemo Secret
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views3 pages

Assignment Number 01

1) The document provides instructions to calculate the materials needed for a concrete work including a footing, columns, beams, and gravel bedding. 2) It specifies the dimensions of the concrete elements and calculates their volumes. 3) It then uses a concrete proportion table to determine the number of cement bags, sand, gravel, and amount of water needed based on the total concrete volume.

Uploaded by

Nemo Secret
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Assignment Number 01.

Compute the number of 40kg cement, gravel, sand, and water for the given
concrete works. Provide a 50-mm gravel bedding at the bottom of your footing. Compute the volume
of water if 6 gallons of water is equivalent to one bag of your cement.

6 meters O.C.

5.5 m
n
4 meters O.C.

W E
Bin 0.30m x 0.45m BEAM

0.50m x 0.50m x 4.50m COLUMN


1.60m x 1.60m x 0.50m FOOTING
No Given Class use Default ClassA 1 2 4
Step 1 Footing slab solve for volume
Y L X WX H
i fam x t.am X 05m
1 1.28m3
110.5m Total Footing volume
1am I 1.28m3 4 5 12m3
1 i am
Columns
step 2

y L W

1 125m3
Total
Ethan ME m3
05m
y g
Step 3 Beams solve for Volume
Y L X WX H
0.45m x 0.3m43.5M

Total Beam1 volume


j 04725m 2 0.945m

3.5m

É
solve for Volume
Y L X WX H
0.45m x 0.3m45.5M

yjao.gg
mysrowm 0

jpg
a 7425m3 2 1485m3
Step 4 Find the amount of gravel bedding
for volume

Myo.o
Solve

i.am m
V L X WX H
fam x I 6m x0.05m
0128 m3
1 ram Total Biggs118592m3

Step 5 MultiplyConcrete Proportions


Table 1 2 p 6 simplified Estimate by Fajardo
Totalvolume of concreteworks 12.05m3 Add 51 for wastage
12.05m3 1.05 12 6525m3

L
For 40kg bag 95 12.6525m3 g bags 1138725 114 bags
Why
sand m3
12.6525 10 5 6.326 m3
126525 m3 I 0512m3 13 1645ms
qq.GEymgt

Water bags ggatag ratio Amount of water


using 0.4ratio
273.6 gallons
6,9 10.41
114 bags