0% found this document useful (0 votes)
31 views2 pages

CoolingLoad Estimator - Imtiaz - Admin - GRD - BLK Kaunselor01

This document estimates the cooling load for Room 01 in the Bilik Kaunselor building. It provides details on the room dimensions and outdoor/indoor temperatures. It then calculates the sensible and latent cooling loads based on conduction, solar, internal sources, ventilation, and infiltration. The total sensible cooling load is estimated at 2,778.83W (9,481.77 Btu/hr) and total latent load is 562.11W (1,918 Btu/hr). The total space cooling load is estimated at 11,399.78 Btu/hr with a sensible heat ratio of 0.83. The required supply air flow is calculated to be 493.27 cubic feet per minute.

Uploaded by

Jeghi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views2 pages

CoolingLoad Estimator - Imtiaz - Admin - GRD - BLK Kaunselor01

This document estimates the cooling load for Room 01 in the Bilik Kaunselor building. It provides details on the room dimensions and outdoor/indoor temperatures. It then calculates the sensible and latent cooling loads based on conduction, solar, internal sources, ventilation, and infiltration. The total sensible cooling load is estimated at 2,778.83W (9,481.77 Btu/hr) and total latent load is 562.11W (1,918 Btu/hr). The total space cooling load is estimated at 11,399.78 Btu/hr with a sensible heat ratio of 0.83. The required supply air flow is calculated to be 493.27 cubic feet per minute.

Uploaded by

Jeghi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

COOLING LOAD ESTIMATOR - Bilik Kaunselor 01

Temperature DB (oC) WB (oC) Hum Ratio


Outdoor temp to 33.3 28 0.0219 Room area 16.5 m2 è Imtiaz - Blok Pentadbiran (Ground)
Room temp ti 23 17 0.00969 Room Height 3.0 m
Daily Range DR 11

SENSIBLE COOLING LOAD


Conduction (A) Solar (B) Total Cooling (A) + (B)
Area (m2) U (W/m2.oC) CLTD Load-C (W) SC SGHF CLF Load-S (W) Load (W) Load (Btu/hr)
Windows
North 8.8 è 0.00 347 0 0.00 0.00
NE 8.8 è 0.00 637 0 0.00 0.00
East 8.8 è 0.00 618 0 0.00 0.00
SE 8.8 è 0.00 230 0 0.00 0.00
South 8.8 è 0.00 120 0 0.00 0.00
SW 2.7 6.3 8.8 è 149.69 0.88 230 0.83 453.5784 603.27 2,058.43
West 8.8 è 0.00 618 0 0.00 0.00
NW 8.8 è 0.00 637 0 0.00 0.00

Conduction Total Cooling


Area (m2) U (W/m2.oC) CLTD Load-C (W) Load (W) Load (Btu/hr)
Walls (Less glass)
North 12.9 è 0.00 0.00 0.00
NE 15.9 è 0.00 0.00 0.00
East 19.9 è 0.00 0.00 0.00
SE 20.9 è 0.00 0.00 0.00
South 22.9 è 0.00 0.00 0.00
SW 6.3 1.49 24.9 è 233.74 233.74 797.54
West 22.9 è 0.00 0.00 0.00
NW 15.9 è 0.00 0.00 0.00

Conduction Total Cooling


Area (m2) U (W/m2.oC) CLTD Load-C (W) Load (W) Load (Btu/hr)
Roof
w/o ceiling 33.8 è 0.00 0.00 0.00
wth ceiling 0 0.761 29.8 è 0.00 0.00 0.00

Conduction Total Cooling


Area (m2) U (W/m2.oC) Δt Load-C (W) Load (W) Load (Btu/hr)
Partition
Partition 16 1.695 10 è 271.20 271.20 925.37
Floors 16.5 0.8 10 è 132.00 132.00 450.40

Total Cooling
Numbers SHG CLF Load (W) Load (W) Load (Btu/hr)
Internal sources
People 3 70 1 è 210.00 210.00 716.55

Total Cooling
Area (m2) Density (W/m2) CLF Factor Load (W) Load (W) Load (Btu/hr)
Internal sources
Light 16.5 18 1 1.2 356.40 356.40 1,216.09
Power 16.5 50 1 1 825.00 825.00 2,815.02

Total Cooling
No of people Rate (Lps/p) Vent (L/s) Δt Load (W) Load (W) Load (Btu/hr)
Ventilation
People vent 3 2.5 7.5 10.3 95.02 95.02 324.21
Infilteration (base on ACH = 0.3) 4 10.3 52.21 52.21 178.16

GRAND TOTAL SENSIBLE COOLING LOAD 2,778.83 9,481.77

LATENT COOLING LOAD Total Cooling


Numbers SHG CLF Load (W) Load (W) Load (Btu/hr)
Internal sources
People 3 45 1 è 135.00 135.00 460.64

Total Cooling
No of people Rate (Lps/p) Vent (L/s) Δw Load (W) Load (W) Load (Btu/hr)
Ventilation
People vent 3 2.5 7.5 0.01221 275.64 275.64 940.52
Infilteration (base on ACH = 0.3) 4 0.01221 151.47 151.47 516.84

GRAND TOTAL LATENT COOLING LOAD 562.11 1,918.00

SPACE COOLING LOAD (Btu/hr) 11,399.78


Engineering check (Btuh/sq.ft) 64.21
Sensible Heat Ratio (SHR) 0.83
Supply air (Cfm) 493.27
Engineering check (Cfm/ton) 519.24
Supply Air Flow = Sensible Heat Gain Notes:
1210 (Room Db - Supply Db) Supply air temperature = T air leaving coil

= 2,778.83 Nos of row 4


1210 (23 - 13.1) BPF (By Pass Factor) 0.10

= 0.23 m3/s Troom 23 Deg C


= 493 Cfm Tapparatus dew point,room 12.07 Deg C
Tair leaving coil 13.1 Deg C
% Outside air = Ventilation
Supply air

= 25
493
= 4.99
say 5%

Mixture air = Outside air x % OA


Room air x (100-%OA)

= 33.3 x 0.05 = 1.66


23 x 0.95 = 21.85
Mixture 23.51
o
say 23.51 C

You might also like