1.2 20cm. Clearing on wet & black soil. " 3.77 Birr/m2
1.3 Bulk excav. to a depth not exceeding 150cm loose and dry soil. m3 9.52 Birr/m3
1.4 Ditto. but on wet and black soil. " 15.36 Birr/m3
1.5 Trench excavation not exceeding 150cm. in loose and dry soil. " 13.31 Birr/m3
1.6 Trench excavation not exceeding 150cm. in loose and dry soil. " 22.19 Birr/m3
1.7 Excavation foundation pits to adepth of 150-300cm. In loose soil. " 24.96 Birr/m3
1.8 Excavation foundation pits to adepth not exceeding 150cm.on wet and black soil. " 22.19 Birr/m3
1.10 Ditto. but, 150cm. - 300cm. But, on wet clay and black soil. " 33.28 Birr/m3
1.11 Excavation on soft rock to a depth not exceeding 150cm. " 36.61 Birr/m3
1.13 Back fill excavated materials from the site. " 5.79 Birr/m3
1.14 Back fill selected excavated mats. from out side the site. " 35.21 Birr/m3
1.15 Cart away surplus excavated mats. 1km. from the site. " 12.18 Birr/m3
2 . MASONRY WORKS
2.1 50cm. thick masonry foundation (B.G.L). M3 196.19 Birr/m3
2.3 40cm. thick elevation wall (One side dressed) . M2 132.66 Birr/m2
2.4 40cm. thick elevation wall (Two side dressed). " 144.83 Birr/m2
-3-
3. CONCRETE WORKS
3.1 C-7 Lean Concrete (Hand mix) 1:2:7 m2 17.85 Birr/m2 5 cm. Thick
3.7 C-20 Concrete Slab 10 cm. thick (Hand mix) 1:2:4 m2 46.66 Birr/m2 10 cm. Thick
3.8 C-20 Concrete Slab 10 cm. thick (Mech. Mix) 1:2:4 " 51.03 Birr/m2 10 cm. Thick
-4-
4. REINFORCEMENTS
4.1 dia. 6 & dia. 8 mm. plain bars kg. 8.83 Birr/kg.
4.3 dia. 18 mm. and above deformed bars " 7.88 Birr/kg. 0.00
-5-
5.4 For Suspended slab & shear wall. " 94.06 Birr/m2
-6-
6 . WALLING
6.1 Chicka Wall ( 18 cm. Thick ) m2 33.03 Birr/m2
6.4 12cm. thick Brick Wall Both Sides Left For Plastering. " 75.18 Birr/m2 Mortar Ratio ( 1:3 )
6.5 12cm. thick Brick Wall One Side Left For Plast. The Other For Poiting. " 76.78 Birr/m2 " "
6.6 25cm. thick Brick Wall Both Sides Left For Plastering. " 144.21 Birr/m2 " "
6.7 25cm. thick Brick Wall One Side Left For Plast. The Other For Poiting. " 147.69 Birr/m2 " "
6.8 10 cm. thick HCB Wall Both Sides Left For Plastering. " 45.40 Birr/m2 " "
6.9 15 cm. thick HCB Wall Both Sides Left For Plastering. " 64.56 Birr/m2 " "
6.10 15cm. thick HCB Wall One Side Left For Plast. The Other For Poiting. " 65.73 Birr/m2 " "
6.11 20 cm. thick HCB Wall Both Sides Left For Plastering. " 71.82 Birr/m2 " "
6.12 20cm. thick HCB Wall One Side Left For Plast. The Other For Poiting. " 73.16 Birr/m2 " "
6.13 20 cm.thick HCB Wall Both Sides Left For Pointing " 74.70 Birr/m2 " "
6.14 10 cm. thick Solid Bloket Wall Both Sides Left For Plastering. " 59.95 Birr/m2 " "
6.15 10cm. thick Solid Blocket Wall One Side Left For Plast. The Other For Poit. " 61.29 Birr/m2 " "
6.16 10 cm.thick Solid Blocket Wall Both Sides Left For Pointing. " 62.84 Birr/m2 " "
6.17 15 cm. thick Solid Bloket Wall Both Sides Left For Plastering. " 71.00 Birr/m2 " "
6.18 15cm. thick Solid Blocket Wall One Side Left For Plast. The Other For Poit. " 72.34 Birr/m2 " "
6.19 15 cm.thick Solid Blocket Wall Both Sides Left For Pointing. " 73.89 Birr/m2 " "
-7-
7. ROOFING WORKS
7.1 G32 CIS Roofing ( Including Truss & Purlins ) M2 59.37 Birr/m2
7.2 G30 CIS Roofing ( Including Truss & Purlins ) " 64.34 Birr/m2
7.3 G28 CIS Roofing ( Including Truss & Purlins ) " 76.63 Birr/m2
7.4 G32 C I S Roofing ( Without Truss & Purlin ) " 36.25 Birr/m2
7.5 G30 C I S Roofing ( Without Truss & Purlin ) " 41.23 Birr/m2
7.6 G28 C I S Roofing ( Without Truss & Purlin ) " 52.59 Birr/m2
7.7 10 cm. dia. Upper & Lower Chords Eucaliptus Wood. ml. 5.37 Birr/ml.
7.8 6 cm. dia. Vertical & Diagonal Members of a Truss " 3.52 Birr/ml.
7.10 EGA 300 & 4mm. Thick Roof cover m2 58.49 Birr/m2
7.11 Steel Truss & Purlin With RHS kg. 15.03 Birr/kg.
-8-
8.4 Tanged & Groved ( T & G ) Tidwood Ceiling. " 186.38 Birr/m2 0.00
8.5 (90x210 cm.) Flush wooden door Coverd With Kerero Plywood. " 274.13 Birr/m2
8.6 (90x210 cm.) Flush wooden door Coverd With Mahogony Plywood. " 489.15 Birr/m2
8.7 Framed & Panelled solid Doors & Windows . " 293.26 Birr/m2 0
8.8 Built In Cupboard ( Four drawers & openings ) . " 625.98 Birr/m2
-9-
9. METAL WORKS
9.1 Fully metal doors of 28LTZ without grill Pcs. 253.07 Br./m2
9.2 Fully metal doors of 38LTZ without grill " 268.95 Br./m2
9.6 90 cm high verndah grill & RHS post . " 150.20 Br./m2
- 10 -
11.3 2 Coats of cement plastering to exposed beams and columns. " 19.70 Birr/m2
11.5 Cement pointing to brick wall surface (1:3). " 10.86 Birr/m2
11.7 Recessed pointing to dressed masonry wall surface. " 4.44 Birr/m2
11.8 3cm. Thick cement screed flooring (1:3). " 23.43 Birr/m2
11.9 5cm. Thick cement screed flooring (1:3). " 39.00 Birr/m2
11.12 2cm. thick granolythic tile flooring (1:3). " 75.35 Birr/m2
11.13 2cm thick Harar marble flooring (1:3). " 267.11 Birr/m2
11.14 2cm thick white marble flooring (1:3). " 420.11 Birr/m2
11.22 10cm. High cement tile skirting (1:3). ml. 10.64 Birr/ml
11.23 10cm. High terrazzo tile skirting (1:3). " 13.16 Birr/ml
11.24 10cm. High Granolythic tile skirting (1:3). " 11.91 Birr/ml
- 12 -
11.29 8cm. high PVC tile skirting.( ITALY) " 13.83 Birr/ml
11.30 8cm. high PVC tile skirting.( ENGLAND) " 14.08 Birr/ml
11.33 30mm. thick terrazo window cill (1:3) on HCB. " 29.38 Birr/ml
11.34 30mm. thick terrazo window cill (1:3) on brick. " 32.70 Birr/ml
11.35 30mm. thick terrazo window cill (1:3) on stone. " 42.68 Birr/ml
11.36 30mm. thick Granite window cill (1:3) on HCB. " 118.63 Birr/ml
11.37 30mm. thick Granite window cill (1:3) on brick. " 138.58 Birr/ml
11.38 30mm. thick Granite window cill (1:3) on stone. " 191.08 Birr/ml
11.39 30mm. thick white marble window cill (1:3)on HCB. " 103.33 Birr/ml
11.40 30mm.thick white marble window cill (1:3) on Brick. " 119.08 Birr/ml
11.41 30mm. thick white marble window cill (1:3) on Stone. " 165.88 Birr/ml
11.42 30mm. thick HARAR marble window cill (1:3)on HCB . " 80.38 Birr/ml
11.43 30mm. thick HARAR marble window cill (1:3)on Brick . " 92.19 Birr/ml
11.44 30mm. thick HARAR marble window cill (1:3)on Stone . " 127.63 Birr/ml
11.45 30mm.thick granolythic window cill (1:3) on HCB . " 56.15 Birr/ml
11.46 30mm.thick granolythic window cill (1:3) on Brick . " 87.22 Birr/ml
11.51 20mm. thick Granite marble riser. (1:3). " 107.06 Birr/ml
11.52 20mm. thick white marble riser. (1:3). " 94.31 Birr/ml
- 13 -
11.53 20mm. thick Harar marble riser. (1:3). ml. 63.71 Birr/ml
11.54 20mm. thick Granolythic marble riser. (1:3). " 47.56 Birr/ml
11.55 20mm. thick Granite marble trechholds. (1:3). " 116.34 Birr/ml
11.56 20mm. thick white marble trechholds. (1:3). " 103.59 Birr/ml
11.62 2cm. thick Granite wall marble (1:2) . " 480.54 Birr/m2
11.63 2cm. thick Harar wall marble (1:2). " 263.79 Birr/m2
11.64 2cm. thick white Gojam wall marble (1:2). " 416.79 Birr/m2
11.65 Semi dressed stone pavement on 20cm. thick granular mats. " 46.49 Birr/m2
11.66 C-15 8cm thick mass concrete pavement under hard core. " 47.87 Birr/m2
- 14 -
12.4 Three coats of synthetic paint to metal surface. " 12.44 Birr/m2
12.5 Two coats of varnish paint to wooden surface. " 12.82 Birr/m2
13.2 WC. Low Flash ( Tabor Ceramics ) " 610.83 Birr/pcs. 0.00
13.21 1/2 " Galvanaized Steel Pipe ( GSP ) ml. 35.36 Birr/ml.
- 16 -
13.32 75 mm. dia. PVC Pipe " 57.00 Birr/ml. Average of 13.31%13.33
13.43 1 m3 cap. Water tank ( Black Iron Sheet ) pcs. 864.72 Birr/pcs.
13.44 2 m3 cap. Water tank ( Black Iron Sheet ) " 1456.58 Birr/pcs.
13.45 1 m3 cap. Water tank (Galvanized Sheet Metal) " 1486.46 Birr/pcs.
13.46 2 m3 cap. Water tank ( Galvanaized Sheet Metal ) " 2450.37 Birr/pcs.
- 17 -
14.14 Flourecent fitting type philips TMS 012/136 with 1xTLD 36watt No. 182.75 Birr/No.
14.15 Flourecent fitting type philipsTMW 065/136 with 1xTLD 36watt No. 320.25 Birr/No.
14.16 Flourecent fitting type philipsTMW 065/236 with 1xTLD 36watt No. 570.25 Birr/No.
14.17 Fitting type Simense 5NL-510 with 60 wattglobe No. 57.75 Birr/No.
A= Materials Unit Cost 0 Birr/m2B= Manpower Unit Cost 1.615 Birr/m2 C= Equipment Unit Cost 0.18 Birr/m2
Total of (1:02) 1.44 Total of (1:03)
Hourly Output: 0.89 Hourly output: ______________
Direct Cost of Work Item = A+B+C = 1.79 Birr/m2
Over head cost : 10% 0.18 "
Profit Cost: 15% 0.27 "
Total Unit Cost : 2.24 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-2-
A= Materials Unit Cost 0 Birr/m2B= Manpower Unit Cost 2.712 Birr/m2 C= Equipment Unit Cost 0.30 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: _______________
Direct Cost of Work Item = A+B+C = 3.01 Birr/m2
Over head cost : 10% 0.30 "
Profit Cost: 15% 0.45 "
Total Unit Cost : 3.77 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-3-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 DL 1 1 1.25 1.25 Tools 1 0.16 0.16
0 G.Chief 1 0.1 1.88 0.1875 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 1.4375 Total (1:03) 0.16
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 DL 1 1 1.25 1.25 Tools 1 0.16 0.16
0 G.Chief 1 0.1 1.88 0.1875 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 1.4375 Total (1:03) 0.16
A= Materials Unit Cost 0 Birr/m3B= Manpower Unit Cost 11.06 Birr/m3 C= Equipment Unit Cost 1.23 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: ______________
Direct Cost of Work Item = A+B+C = 12.29 Birr/m3
Over head cost : 10% 1.23 "
Profit Cost: 15% 1.84 "
Total Unit Cost : 15.36 Birr/m3
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-5-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 DL 1 1 1.25 1.25 Tools 1 0.16 0.16
0 G.Chief 1 0.1 1.88 0.1875 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 1.4375 Total (1:03) 0.16
-6-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 DL 1 1 1.25 1.25 Tools 1 0.16 0.16
0 G.Chief 1 0.1 1.88 0.1875 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 1.4375 Total (1:03) 0.16
-7-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 DL 1 1 1.25 1.25 Tools 1 0.16 0.16
0 G.Chief 1 0.1 1.88 0.1875 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 1.4375 Total (1:03) 0.16
A= Materials Unit Cost 0 Birr/m3 B= Manpower Unit Cost 17.97 Birr/m3 C= Equipment Unit Cost 2.00 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: _____________
Direct Cost of Work Item = A+B+C = 19.97 Birr/m3
Over head cost : 10% 2.00 "
Profit Cost: 15% 3.00 "
Total Unit Cost : 24.96 Birr/m3
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-8-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 DL 1 1 1.25 1.25 Tools 1 0.16 0.16
0 G.Chief 1 0.1 1.88 0.1875 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 1.4375 Total (1:03) 0.16
A= Materials Unit Cost 0 Birr/m3 B= Manpower Unit Cost 15.97 Birr/m3 C= Equipment Unit Cost 1.78 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: ____________
Direct Cost of Work Item = A+B+C = 17.75 Birr/m3
Over head cost : 10% 1.78 "
Profit Cost: 15% 2.66 "
Total Unit Cost : 22.19 Birr/m3
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-9-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 DL 1 1 1.25 1.25 Tools 1 0.16 0.16
0 G.Chief 1 0.1 1.88 0.1875 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 1.4375 Total (1:03) 0.16
A= Materials Unit Cost 0 Birr/m3 B= Manpower Unit Cost 10.27 Birr/m3 C= Equipment Unit Cost 1.14 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: ____________
Direct Cost of Work Item = A+B+C = 11.41 Birr/m3
Over head cost : 10% 1.14 "
Profit Cost: 15% 1.71 "
Total Unit Cost : 14.26 Birr/m3
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 10 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 DL 1 1 1.25 1.25 Tools 1 0.16 0.16
0 G.Chief 1 0.1 1.88 0.1875 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 1.4375 Total (1:03) 0.16
A= Materials Unit Cost 0 Birr/m3 B= Manpower Unit Cost 23.96 Birr/m3 C= Equipment Unit Cost 2.67 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: _______________
Direct Cost of Work Item = A+B+C = 26.63 Birr/m3
Over head cost : 10% 2.66 "
Profit Cost: 15% 3.99 "
Total Unit Cost : 33.28 Birr/m3
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 11 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 DL 1 1 1.25 1.25 Tools 2 0.16 0.32
0 G.Chief 1 0.1 1.88 0.1875 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 1.4375 Total (1:03) 0.32
A= Materials Unit Cost 0 Birr/m3 B= Manpower Unit Cost 23.96 Birr/m3 C= Equipment Unit Cost 5.33 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: ______________
Direct Cost of Work Item = A+B+C = 29.29 Birr/m3
Over head cost : 10% 2.93 "
Profit Cost: 15% 4.39 "
Total Unit Cost : 36.61 Birr/m3
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-12 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 Foreman 1 0.067 5.00 0.34 tool 8 0.16 1.28
0 DL 4 1 1.25 5 0
0 helper 2 1 1.91 3.8125 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 9.1475 Total (1:03) 1.28
A= Materials Unit Cost 0 Birr/m3 B= Manpower Unit Cost 130.4 Birr/m3 C= Equipment Unit Cost 18.29 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: _______________
Direct Cost of Work Item = A+B+C = 148.72 Birr/m3
Over head cost : 10% 14.87 "
Profit Cost: 15% 22.31 "
Total Unit Cost : 185.89 Birr/m3
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-13 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 Foreman 1 0.1 5.00 0.50 tool 1 0.16 0.16
0 DL 1 1 1.25 1.25 0
0 G.CHIEF 1 0.05 1.88 0.09375 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 1.84375 Total (1:03) 0.16
A= Materials Unit Cost 0 Birr/m3 B= Manpower Unit Cost 4.23 Birr/m3 C= Equipment Unit Cost 0.40 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: ______________
Direct Cost of Work Item = A+B+C = 4.63 Birr/m3
Over head cost : 10% 0.46 "
Profit Cost: 15% 0.69 "
Total Unit Cost : 5.79 Birr/m3
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-14 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
selected material m3 1.05 23.00 24.15 Foreman 1 0.1 5.00 0.50 tool 1 0.16 0.16
0 DL 1 1 1.25 1.25 0
0 G.CHIEF 1 0.05 1.88 0.09375 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 24.15 Total (1:02) 1.84375 Total (1:03) 0.16
A= Materials Unit Cost 24.15 Birr/m3 B= Manpower Unit Cost 3.67 Birr/m3 C= Equipment Unit Cost 0.35 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: ______________
Direct Cost of Work Item = A+B+C = 28.17 Birr/m3
Over head cost : 10% 2.82 "
Profit Cost: 15% 4.23 "
Total Unit Cost : 35.21 Birr/m3
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-15 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
0 Operator 1 1 4.33 4.33 Loader 1 167.8 167.8
0 Driver 4 4 2.88 46.15 Dump truck 4 130.09 520
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 0 Total (1:02) 50.4807692 Total (1:03) 688.16
A= Materials Unit Cost 0 Birr/m3 B= Manpower Unit Cost 0.19 Birr/m3 C= Equipment Unit Cost 9.56 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: _____________
Direct Cost of Work Item = A+B+C = 9.75 Birr/m3
Over head cost : 10% 0.97 "
Profit Cost: 15% 1.46 "
Total Unit Cost : 12.18 Birr/m3
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-16 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
basaltic stone m3 0.28 40.00 11.2 Foreman 1 0.25 5.00 1.25 tools 3 0.16 0.48
0 Mason 1 1 3.13 3.13
0 DL 4 1 1.88 7.5 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 11.2 Total (1:02) 11.875 Total (1:03) 0.48
A= Materials Unit Cost 11.2 Birr/m2B= Manpower Unit Cost 4.7 Birr/m2 C= Equipment Unit Cost 0.24 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: Hourly output: ______________
Direct Cost of Work Item = A+B+C = 16.14 Birr/m2
Over head cost : 10% 1.61 "
Profit Cost: 15% 2.42 "
Total Unit Cost : 20.18 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
DEEP INC PLC
BUILDING CONSTRUCTION MATERIALS AND THEIR UNIT PRICES
Total List of Manpower
Foreman 0.00
Mason II 0.00
Chisler 0.00
D/L 0.00
Foreman 0.00
Mason II 0.00
Mason I 0.00
Chisler 0.00
D/L 0.00
Foreman 0.00
Barbender 0.00
D/L 0.00
Formwork 0.00
Foreman 0.00
Carpenter 0.00
Helper 0.00
D/L 0.00
DEEP INC PLC
BUILDING CONSTRUCTION MATERIALS AND THEIR UNIT PRICES
Total List of Manpower
D . WALLING 0.00
Forman 0.00
Mason I 0.00
Mason II 0.00
carpentor 0.00
Helper 0.00
D/L 0.00
E . ROOFING 0.00
Carpenter2 0.00
Carpenter1 0.00
Helper 0.00
Welder 0.00
D/L 0.00
1 Welder 0.00
Helper 0.00
Forman 0.00
D/L 0.00
Forman 0.00
Carpenter I 0.00
Carpenter II 0.00
Helper 0.00
Chiseler 0.00
DEEP INC PLC
BUILDING CONSTRUCTION MATERIALS AND THEIR UNIT PRICES
Total List of Manpower
G . CARPENTERY 0.00
1 Foreman 0.00
Carpenter II 0.00
Carpenter I 0.00
Helper 0.00
Painter 0.00
D/L 0.00
I . FINISHING 0.00
Foreman 0.00
Mason I 0.00
Mason II 0.00
Plasterer 0.00
Chilser 0.00
D/L 0.00
Helper I 0.00
Helper II 0.00
Tiler 0.00
Carpenter I 0.00
Carpenter II 0.00
J . GLAZING 0.00
Foreman 0.00
Glazer 0.00
D/L 0.00
K . PAINTING 0.00
foreman 0.00
painter 0.00
DL 0.00
DEEP INC PLC
BUILDING CONSTRUCTION MATERIALS AND THEIR UNIT PRICES
Total List of Manpower
L . SANITARY 0.00
Forman 0.00
Plumber 0.00
Helper 0.00
Chisler 0.00
D/L 0.00
M . ELECTRICAL 0.00
Foreman 0.00
EL 0.00
Mason 0.00
Plaster 0.00
D/L 0.00
DEEP INC PLC
BUILDING CONSTRUCTION MATERIALS AND THEIR UNIT PRICES
Total List of Manpower
REMARKS
DEEP INC PLC
BUILDING CONSTRUCTION MATERIALS AND THEIR UNIT PRICES
Total List of Manpower
REMARKS
DEEP INC PLC
BUILDING CONSTRUCTION MATERIALS AND THEIR UNIT PRICES
Total List of Manpower
REMARKS
DEEP INC PLC
BUILDING CONSTRUCTION MATERIALS AND THEIR UNIT PRICES
Total List of Manpower
REMARKS
-4-
A= Material unit cost 59.7 Birr/m2B=Manpower Unit Cost 46.429 Birr/m2 C=Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output Hourly output: _________________
Direct Cost of work item = A + B + C = 106.13 Birr/m2
Overhead Cost : 10% 10.61 "
Profit Cost: 15% 15.92 "
Total Unit Cost : 132.66 Birr/m2
Remark : ____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-2-
A= Material unit cost 131.45 Birr/m3 B=Manpower Unit Cost 58.043 Birr/m3 C=Equipment Unit Cost 0 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output7.08/0.24 29.5 Hourly output: __________________
Direct Cost of work item = A + B + C = 189.49 Birr/m3
Overhead Cost : 10% 18.95 "
Profit Cost: 15% 28.42 "
Total Unit Cost : 236.87 Birr/m3
Remark : _____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-1-
A= Material unit cost 118.55 Birr/m3 B=Manpower Unit Cost 38.4 Birr/m3 C=Equipment Unit Cost 0 Birr/m3
Total of (1:02) Total of (1:03)
Hourly Output Hourly output: __________________
Direct Cost of work item = A + B + C = 156.95 Birr/m3
Overhead Cost : 10% 15.70 "
Profit Cost: 15% 23.54 "
Total Unit Cost : 196.19 Birr/m3
Remark : _____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-1-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly
Type of Material Unit Qty * Rate Unit Trade No. UF Cost Cost Equipment No. Rental Hourly Cost
Cement Qnt. 2.13 60.00 127.8 Mason I 1 1 3.15 3.15 - 0
Sand m3 0.27 95.00 25.65 D/L 2 1 1.25 2.5 - 0
Gravel (02) m3 0.95 120.00 114 0 0
Water m3 0.054 0.75 0.041 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 267.4905 Total (1:02) 5.65 Total (1:03) 0
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly
Type of Material Unit Qty * Rate Unit Trade No. UF Cost Cost Equipment No. Rental Hourly Cost
Cement Qnt. 3.44 60.00 206.4 Foreman 0.167 1 5 0.835 - 0
Sand m3 0.44 95.00 41.8 Mason II 1 1 3.75 3.75 - 0
Gravel (02) m3 0.88 120.00 105.6 D/L 6 1 1.25 7.5 0
Water m3 0.231 0.75 0.173 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 353.97325 Total (1:02) 12.09 Total (1:03) 0
A= Materials Unit Cost 353.97 Birr/m3 B=Manpower Unit Cost 19.34 Br./m3 C= Equipment Unit Cost 0 Br./m3
Total of (1:02) 12.08 Total of (1:03)
Hourly Output 0.625 Hourly output: ________________
Direct Cost of work item = A+B+C = 373.31 Birr/m3
Overhead Cost: 10% 37.33 "
Profit Cost: 15% 56.00 "
Total Unit Cost : 466.64 Birr/m3
Remark ________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-3-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly
Type of Material Unit Qty * Rate Unit Trade No. UF Cost Cost Equipment No. Rental Hourly Cost
Cement Qnt. 3.35 60.00 201 Foreman 1 1 5 5 Mixer 1 36.37 36.37
Sand m3 0.43 95.00 40.85 Mason II 2 1 3.75 7.5 Vibrator 1 5.24 5.24
Gravel (02) m3 0.86 120.00 103.2 D/L 45 1 1.25 56.25 0
Water m3 0.19 0.75 0.143 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 345.1925 Total (1:02) 68.75 Total (1:03) 41.61
A= Materials Unit Cost 345.19 Birr/m3 B=Manpower Unit Cost 39.29 Br./m3 C= Equipment Unit Cost 23.78 Br./m3
Total of (1:02) 68.75 Total of (1:03)
Hourly Output 1.75 Hourly output: __________________
Direct Cost of work item = A+B+C = 408.26 Birr/m3
Overhead Cost: 10% 40.83 "
Profit Cost: 15% 61.24 "
Total Unit Cost : 510.32 Birr/m3
Remark ________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-4-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly
Type of Material Unit Qty * Rate Unit Trade No. UF Cost Cost Equipment No. Rental Hourly Cost
Cement Qnt. 3.97 60.00 238.2 Foreman 1 1 5 5 Mixer 1 36.37 36.37
Sand m3 0.51 95.00 48.45 Mason II 2 1 3.75 7.5 Vibrator 2 5.24 10.48
Gravel (02) m3 0.76 120.00 91.2 D/L 25 1 1.25 31.25 0
Water m3 0.213 0.75 0.160 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 378.00975 Total (1:02) 43.75 Total (1:03) 46.85
A= Materials Unit Cost 378.01 Birr/m3 B=Manpower Unit Cost 58.33 Br./m3 C= Equipment Unit Cost 62.47 Br./m3
Total of (1:02) 43.75 Total of (1:03) 46.85
Hourly Output 0.75 Hourly output: 0.75
Direct Cost of work item = A+B+C = 498.81 Birr/m3
Overhead Cost: 10% 49.88 "
Profit Cost: 15% 74.82 "
Total Unit Cost : 623.51 Birr/m3
Remark ________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-5-
** Indexed
Cost per Labour Hourly Hourly Type of Hourly
Type of Material Unit Qty * Rate Unit byTrade No. UF Cost Cost Equipment No. Rental Hourly Cost
Cement Qnt. 4.1 60.00 246 Foreman 0.167 1 5 0.835 0
Sand m3 0.53 95.00 50.35 Mason II 1 1 3.75 3.75 0
Gravel (02) m3 0.79 120.00 94.8 D/L 6 1 1.25 7.5 0
Water m3 0.26 0.75 0.195 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 391.345 Total (1:02) 12.09 Total (1:03) 0
A= Materials Unit Cost 391.34 Birr/m3 B=Manpower Unit Cost 19.34 Br./m3 C= Equipment Unit Cost : 0.00 Br./m3
Total of (1:02) 12.08 Total of (1:03)
Hourly Output 0.625 Hourly output:
Direct Cost of work item = A+B+C = 410.68 Birr/m3
Overhead Cost: 10% 41.07 "
Profit Cost: 15% 61.60 "
Total Unit Cost : 513.35 Birr/m3
Remark ________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-6-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly
Type of Material Unit Qty * Rate Unit Trade No. UF Cost Cost Equipment No. Rental Hourly Cost
Cement Qnt. 4.85 60.00 291 Foreman 1 1 5 5 Mixer 1 36.37 36.37
Sand m3 0.31 95.00 29.45 Mason II 2 1 3.75 7.5 Vibrator 2 5.24 10.48
Gravel (02) m3 0.93 120.00 111.6 D/L 25 1 1.25 31.25 0
Water m3 0.24 0.75 0.180 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 432.23 Total (1:02) 43.75 Total (1:03) 46.85
A= Materials Unit Cost 432.23 Birr/m3 B=Manpower Unit Cost 58.33 Br./m3 C= Equipment Unit Cost 62.47 Br./m3
Total of (1:02) 43.75 Total of (1:03) 46.85
Hourly Output 0.75 Hourly output: 0.75
Direct Cost of work item = A+B+C = 553.03 Birr/m3
Overhead Cost: 10% 55.30 "
Profit Cost: 15% 82.95 "
Total Unit Cost : 691.29 Birr/m3
Remark ________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-7-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly
Type of Material Unit Qty * Rate Unit Trade No. UF Cost Cost Equipment No. Rental Hourly Cost
Cement Qnt. 3.44 60.00 206.4 Foreman 0.167 1 5 0.835 - 0
Sand m3 0.44 95.00 41.8 Mason II 1 1 3.75 3.75 - 0
Gravel (02) m3 0.88 120.00 105.6 D/L 6 1 1.25 7.5 0
Water m3 0.231 0.75 0.173 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 353.97325 Total (1:02) 12.09 Total (1:03) 0
A= Materials Unit Cost 353.97 Birr/m3 B=Manpower Unit Cost 19.34 Br./m3 C= Equipment Unit Cost 0 Br./m3
Total of (1:02) 12.08 Total of (1:03)
Hourly Output 0.625 Hourly output: ________________
Direct Cost of work item = A+B+C = 373.31 Birr/m3
Overhead Cost: 10% 37.33 "
Profit Cost: 15% 56.00 "
Total Unit Cost : 466.64 Birr/m3
Remark ________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-8-
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: CONCRETE WORK LABOUR HOURLY OUTPUT: 1.75 m3 / hr.
WORK ITEM: ( 3.8 ) C-20 Concrete Slab 10 cm. thick (Mech. Mix) 1:2:4 EQUIPEMENT: Mixer & Vibrator
TOTAL QUANTITY OF WORK ITEM: 1 m3 0.1 m. thick RESULT: 51.03 Birr/m2
** Indexed
Cost per Labour Hourly Hourly Type of Hourly
Type of Material Unit Qty * Rate Unit byTrade No. UF Cost Cost Equipment No. Rental Hourly Cost
Cement Qnt. 3.35 60.00 201 Foreman 1 1 5 5 Mixer 1 36.37 36.37
Sand m3 0.43 95.00 40.85 Mason II 2 1 3.75 7.5 Vibrator 1 5.24 5.24
Gravel (02) m3 0.86 120.00 103.2 D/L 45 1 1.25 56.25 0
Water m3 0.19 0.75 0.143 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 345.1925 Total (1:02) 68.75 Total (1:03) 41.61
A= Materials Unit Cost 345.19 Birr/m3 B=Manpower Unit Cost 39.29 Br./m3 C= Equipment Unit Cost 23.78 Br./m3
Total of (1:02) Total of (1:03)
Hourly Output Hourly output: __________________
Direct Cost of work item = A+B+C = 408.26 Birr/m3
Overhead Cost: 10% 40.83 "
Profit Cost: 15% 61.24 "
Total Unit Cost : 510.32 Birr/m3
Remark ________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-1-
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT : REINFORCEMENT BARS LABOUR HOURLY OUTPUT: 9 kg/hr.
WORK ITEM: ( 4.1 ) dia. 6 & dia. 8 mm. plain bars EQUIPEMENT:
A= Materials Unit Cost 6.28 birr/kg B= Manpower Unit Cost 0.79 Birr/kg. Equipment Unit Cost 0.00 Birr/kg.
Total of (1:02) Total of (1:03)
hourly output: 7.08/9=0.79 Hourly output: ____________
Direct Cost of Work Item = A+B+C = 7.06 Birr/kg.
Over head cost : 10% 0.71 "
Profit Cost: 15% 1.06 "
Total Unit Cost : 8.83 Birr/kg.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-2-
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT : REINFORCEMENT BARS LABOUR HOURLY OUTPUT: 12.5 kg./hr
WORK ITEM: ( 4.2 ) dia. 10 - dia. 16 mm. deformed bars EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: _ 1 kg RESULT: 7.45 Birr/kg.
A= Materials Unit Cost 5.06 Birr/kg. B= Manpower Unit Cost 1.00 Birr/kg. C= Equipment Unit Cost 0 Birr/kg.
Total of (1:02) Total of (1:03)
Hourly Output: 12.5/12.5=1.00 Hourly output: ____________
Direct Cost of Work Item = A+B+C = 6.06 Birr/kg.
Over head cost : 15% 0.91 "
Profit Cost: 15% 0.91 "
Total Unit Cost : 7.88 Birr/kg.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-1-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
2.5cm thick timber M2 1.05 55.00 57.75 Foreman 1 0.167 5 0.83 0
40 x 50 cm. battens M 0.32 12 3.84 Carpenter 1 1 3.75 3.75 0
Nails Kg 0.05 7.00 0.35 Helper 1 1 1.9 1.90 0
Mould Oil Lit. 0.015 4 0.06 D/L 1 1 1.25 1.25 0
Total (1:-01) 62 Total (1:02) 7.73 Total (1:03) 0
Over Over head cost : 10% 7.49 Birr/m2
Profit Profit Cost: 15% 11.23 Birr/m2
Total Total Unit Cost : 93.61 Birr/m2
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
2.5cm thick timber M2 1.05 55.00 57.75 Foreman 1 0.167 5 0.84 0
50 x 70 cm battens M 0.11 7.5 0.825 Carpenter 1 1 3.75 3.75 0
Strut 0 60 mm M 0.1 1.2 0.12 Helper 1 1 1.9 1.90 0
Nails Kg 0.25 7.00 1.75 D/L 1 1 1.25 1.25 0
Total (1:-01) 60.69 Total (1:02) 7.74 Total (1:03) 0
Over head cost : 10% 7.62 Birr/m2
P Profit Cost: 15% 11.42 Birr/m2
T Total Unit Cost : 95.19 Birr/m2
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
2.5cm thick timber M2 1.05 55.00 57.75 Foreman 1 0.167 5 0.84 0
50 x 70 cm battens M 0.46 7.5 3.45 Carpenter 1 1 3.75 3.75 0
Strut 60 mm. dia. M 0.2 1.2 0.24 Helper 1 1 1.9 1.90 0
Nails Kg 0.3 7.00 2.1 D/L 1 1 1.25 1.25 0
Total (1:-01) 63.78 Total (1:02) 7.74 Total (1:03) 0.00
Over head cost : 10% 7.93 Birr/m2
P Profit Cost: 15% 11.89 Birr/m2
T Total Unit Cost : 99.06 Birr/m2
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
2.5cm thick timber M2 1.05 55.00 57.75 Foreman 1 0.167 5.00 0.84 0
50 x 70 cm battens M 0.84 7.5 6.3 Carpenter 1 1 3.75 3.75 0
50 x 70 cm battens M 0.1 10 1 Helper 1 1 1.9 1.90 0
Strut 0 60 mm M 0.1 1.2 0.12 D/L 1 1 1.25 1.25 0
Total (1:-01) 67.51 Total (1:02) 7.74 Total (1:03) 0.00
Over head cost : 10% 7.52 Birr/m2
P Profit Cost: 15% 11.29 Birr/m2
T Total Unit Cost : 94.06 Birr/m2
-1-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Red clay soil m3 0.227 40.00 9.08 Helper 1 1 1.9 1.9 0
diam.10 cm tid wood post pcs. 1 10.00 10 D/L 2 1 1.25 2.5 0
Total (1:-01) 25.43 Total ( 1:02 ) 4.4 Total (1:03) 0.00
Over head cost : 7% 1.98 "
Profit Cost: 10% 2.82 "
Total Unit Cost : 33.03 Birr/m2
-3-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
G-28 CIS Wall m2 1.2 37.50 45.000009 Forman 1 0.17 4.4 0.75 0
diam.10-12 Eucal.wood post ml 1.1 13 14.3 carpentor 1 1 3.75 3.75 0
diam. 6cm purlin ml 1.32 6 7.92 Helper 1 1 1.9 1.9 0
Nails kg 0.3 9 2.70 D/L 1 1 1.2 1.2 0
Total (1:-01) 69.92 Total ( 1:02 ) 7.60 Total (1:03) 0.00
Over head cost : 10% 6.02 "
Profit Cost: 15% 9.02 "
Total Unit Cost : 75.21 Birr/m2
-2-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
G-32 CIS Wall m2. 1.2 24.4 29.28 Forman 1 0.17 4.4 0.75 0
diam.10-12 Eucal.wood post ml. 1.1 13 14.3 carpentor 1 1 3.75 3.75 0
diam. 6cm purlin ml. 1.32 6 7.92 Helper 1 1 1.9 1.9 0
Nails kg. 0.3 9 2.70 D/L 1 1 1.2 1.2 0
Total (1:-01) 54.20 Total ( 1:02 ) 7.60 Total (1:03) 0.00
Over head cost : 10% 4.71 "
Profit Cost: 15% 7.06 "
Total Unit Cost : 58.83 Birr/m2
-4-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
6 x 12 x 24 cm. Brick Pcs. 57.7 0.61 35.197 Foreman 1 1 5 5.00 0
Cement Qt. 0.115 60 6.9 Mason 1 1 3.75 3.75 0
Sand m3 0.028 95 2.66 D/L 1 1 1.25 1.25 0
Total (1:-01) 44.76 Total ( 1:02 ) 10.00 Total (1:03) 0.00
Over head cost : 10% 6.01 "
Profit Cost: 15% 9.02 "
Total Unit Cost : 75.18 Birr/m2
-5-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
6 x 12 x 24 cm. Brick Pcs. 57.7 0.61 35.197 Foreman 1 1 5 5.00 0
Cement Qt. 0.115 60 6.9 Mason 1 1 3.75 3.75 0
Sand m3 0.028 95 2.66 D/L 1 1 1.25 1.25 0
Total (1:-01) 44.76 Total ( 1:02 ) 10.00 Total (1:03) 0.00
Over head cost : 10% 6.14 "
Profit Cost: 15% 9.21 "
Total Unit Cost : 76.78 Birr/m2
-6-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
6 x 12 x 24 cm. Brick Pcs. 115.4 0.61 70.394 Foreman 1 1 5 5.00 0
Cement Qt. 0.273 60 16.38 Mason 1 1 3.75 3.75 0
Sand m3 0.067 95 6.365 D/L 1 1 1.25 1.25 0
Total (1:-01) 93.15 Total ( 1:02 ) 10.00 Total (1:03) 0.00
Over head cost : 10% 11.54 "
Profit Cost: 15% 17.31 "
Total Unit Cost : 144.21 Birr/m2
-7-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
6 x 12 x 24 cm. Brick Pcs. 115.4 0.61 70.394 Foreman 1 1 5 5.00 0
Cement Qt. 0.273 60 16.38 Mason 1 1 3.75 3.75 0
Sand m3 0.067 95 6.365 D/L 1 1 1.25 1.25 0
Total (1:-01) 93.15 Total ( 1:02 ) 10.00 Total (1:03) 0.00
Over head cost : 10% 11.81 "
Profit Cost: 15% 17.72 "
Total Unit Cost : 147.69 Birr/m2
- 8-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
10 cm. Thick HCB Pcs. 13 1.7 22.1 Foreman 1 1 5 5.00 0
Cement Qt. 0.032 60 1.92 Mason 1 1 3.75 3.75 0
Sand m3 0.011 95 1.045 D/L 2 1 1.25 2.5 0
Total (1:-01) 25.07 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 3.63 "
Profit Cost: 15% 5.45 "
Total Unit Cost : 45.40 Birr/m2
-9-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
15 cm. Thick HCB Pcs. 13 2.5 32.5 Foreman 1 1 5 5.00 0
Cement Qt. 0.061 60 3.66 Mason 1 1 3.75 3.75 0
Sand m3 0.015 95 1.425 D/L 2 1 1.25 2.5 0
Total (1:-01) 37.59 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 5.16 "
Profit Cost: 15% 7.75 "
Total Unit Cost : 64.56 Birr/m2
- 10 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
15 cm. Thick HCB Pcs. 13 2.5 32.5 Foreman 1 1 5 5.00 0
Cement Qt. 0.061 60 3.66 Mason 1 1 3.75 3.75 0
Sand m3 0.015 95 1.425 D/L 2 1 1.25 2.5 0
Total (1:-01) 37.59 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 5.26 "
Profit Cost: 15% 7.89 "
Total Unit Cost : 65.73 Birr/m2
- 11 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
20 cm. Thick HCB Pcs. 13 2.75 35.75 Foreman 1 1 5 5.00 0
Cement Qt. 0.08 60 4.8 Mason 1 1 3.75 3.75 0
Sand m3 0.02 95 1.9 D/L 2 1 1.25 2.5 0
Total (1:-01) 42.45 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 5.75 "
Profit Cost: 15% 8.62 "
Total Unit Cost : 71.82 Birr/m2
- 12 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
20 cm. Thick HCB Pcs. 13 2.75 35.75 Foreman 1 1 5 5.00 0
Cement Qt. 0.08 60 4.8 Mason 1 1 3.75 3.75 0
Sand m3 0.02 95 1.9 D/L 2 1 1.25 2.5 0
Total (1:-01) 42.45 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 5.85 "
Profit Cost: 15% 8.78 "
Total Unit Cost : 73.16 Birr/m2
- 13 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
20 cm. Thick HCB Pcs. 13 2.75 35.75 Foreman 1 1 5 5.00 0
Cement Qt. 0.08 60 4.8 Mason 1 1 3.75 3.75 0
Sand m3 0.02 95 1.9 D/L 2 1 1.25 2.5 0
Total (1:-01) 42.45 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 5.98 "
Profit Cost: 15% 8.96 "
Total Unit Cost : 74.70 Birr/m2
- 14 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
10 cm. thick Solid Blocket Pcs. 13 2.02 26.26 Foreman 1 1 5 5.00 0
Cement Qt. 0.08 60 4.8 Mason 1 1 3.75 3.75 0
Sand m3 0.02 95 1.9 D/L 2 1 1.25 2.5 0
Total (1:-01) 32.96 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 4.80 "
Profit Cost: 15% 7.19 "
Total Unit Cost : 59.95 Birr/m2
- 15 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
10 cm. thick Solid Blocket Pcs. 13 2.02 26.26 Foreman 1 1 5 5.00 0
Cement Qt. 0.08 60 4.8 Mason 1 1 3.75 3.75 0
Sand m3 0.02 95 1.9 D/L 2 1 1.25 2.5 0
Total (1:-01) 32.96 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 4.90 "
Profit Cost: 15% 7.36 "
Total Unit Cost : 61.29 Birr/m2
- 16 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
10 cm. thick Solid Blocket Pcs. 13 2.02 26.26 Foreman 1 1 5 5.00 0
Cement Qt. 0.08 60 4.8 Mason 1 1 3.75 3.75 0
Sand m3 0.02 95 1.9 D/L 2 1 1.25 2.5 0
Total (1:-01) 32.96 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 5.03 "
Profit Cost: 15% 7.54 "
Total Unit Cost : 62.84 Birr/m2
- 17 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
15 cm. thick Solid Blocket Pcs. 13 2.7 35.1 Foreman 1 1 5 5.00 0
Cement Qt. 0.08 60 4.8 Mason 1 1 3.75 3.75 0
Sand m3 0.02 95 1.9 D/L 2 1 1.25 2.5 0
Total (1:-01) 41.80 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 5.68 "
Profit Cost: 15% 8.52 "
Total Unit Cost : 71.00 Birr/m2
- 18 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
15 cm. thick Solid Blocket Pcs. 13 2.7 35.1 Foreman 1 1 5 5.00 0
Cement Qt. 0.08 60 4.8 Mason 1 1 3.75 3.75 0
Sand m3 0.02 95 1.9 D/L 2 1 1.25 2.5 0
Total (1:-01) 41.80 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 5.79 "
Profit Cost: 15% 8.68 "
Total Unit Cost : 72.34 Birr/m2
- 19 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
15 cm. thick Solid Blocket Pcs. 13 2.7 35.1 Foreman 1 1 5 5.00 0
Cement Qt. 0.08 60 4.8 Mason 1 1 3.75 3.75 0
Sand m3 0.02 95 1.9 D/L 2 1 1.25 2.5 0
Total (1:-01) 41.80 Total ( 1:02 ) 11.25 Total (1:03) 0.00
Over head cost : 10% 5.91 "
Profit Cost: 15% 8.87 "
Total Unit Cost : 73.89 Birr/m2
- 21 -
A= Materials Unit Cost 16.80 Birr/ml.B= Manpower Unit Cost 2.76 Birr/ml. C= Equipment Unit Cost 0 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: _________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 19.56 Birr/ml.
Over head cost : 10% 1.96 "
P Profit Cost: 15% 2.93 "
T Total Unit Cost : 24.45 Birr/ml.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 22 -
A= Materials Unit Cost 14.94 Birr/m B= Manpower Unit Cost 2.76 Birr/m C=Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output 7.73/2.8 = 2.75 Hourly output: _________________
Direct Cost of Work Item = A+B+C = 17.70 Birr/m.
Over Head : 10% 1.77 Birr/m.
P Profit Cost: 15% 2.66 Birr/m.
Total Unit Cost : 22.13 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-17 -
A= Materials Unit Cost 17.7 Birr/mB= Manpower Unit Cost 2.28 Birr/m C=Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 7.73/3.4 Hourly output: _________________
Direct Cost of Work Item = A+B+C = 19.98 Birr/m.
Over head cost : 10% 2.00 Birr/m.
P Profit Cost: 15% 3.00 Birr/m.
T Total Unit Cost : 24.97 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 18 -
A= Materials Unit Cost 20.85 Birr/m B= Manpower Unit Cost 2.28 Birr/m C=Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 7.73/3.4 Hourly output: ________________
Direct Cost of Work Item = A+B+C = 23.13 Birr/m.
Over head cost : 10% 2.31 Birr/m.
P Profit Cost: 15% 3.47 Birr/m.
T Total Unit Cost : 28.91 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 19 -
A= Materials Unit Cost 25.58 birr/m. B= Manpower Unit Cost 2.28 Birr/m C=Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 7.73/3.4 Hourly output: ______________
Direct Cost of Work Item = A+B+C = 27.85 Birr/m.
Over head cost : 10% 2.79 Birr/m.
P Profit Cost: 15% 4.18 Birr/m.
T Total Unit Cost : 34.81 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 20 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: ROOFING WORKS LABOUR HOURLY OUTPUT: 3.4 m/hr
WORK ITEM: (7.20) Down Pipe Development Size 60 cm. EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1m RESULT: 40.06 Birr/m.
A= Materials Unit Cost 29.78 birr/m. B= Manpower Unit Cost 2.28 Birr/m C=Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 7.73/3.4 Hourly output: __________________
Direct Cost of Work Item = A+B+C = 32.05 Birr/m.
Over head cost : 10% 3.21 Birr/m.
P Profit Cost: 15% 4.81 Birr/m.
T Total Unit Cost : 40.06 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 12 -
A= Materials Unit Cost 17.7 birr/m. B= Manpower Unit Cost 2.98 Birr/m C=Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 7.73/2.6 Hourly output: _________________
Direct Cost of Work Item = A+B+C = 20.68 Birr/m.
Over head cost : 10% 2.07 Birr/m.
P Profit Cost: 15% 3.10 Birr/m.
T Total Unit Cost : 25.84 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 13 -
A= Materials Unit Cost 20.85 birr/m. B= Manpower Unit Cost 2.98 Birr/m C=Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 7.73/2.6 Hourly output: _________________
Direct Cost of Work Item = A+B+C = 23.83 Birr/m.
Over head cost : 10% 2.38 Birr/m.
P Profit Cost: 15% 3.57 Birr/m.
T Total Unit Cost 29.78 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 14 -
A= Materials Unit Cost 25.58 birr/m. B= Manpower Unit Cost 2.98 Birr/m C=Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 7.73/2.6 Hourly output: _________________
Direct Cost of Work Item = A+B+C = 28.55 Birr/m.
Over head cost : 10% 2.86 Birr/m.
P Profit Cost: 15% 4.28 Birr/m.
T Total Unit Cost : 35.69 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 15 -
A= Materials Unit Cost 29.78 birr/m. B= Manpower Unit Cost 2.98 Birr/m C= Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 7.73/2.6 Hourly output: _________________
Direct Cost of Work Item = A+B+C = 32.75 Birr/m.
Over head cost : 10% 3.28 Birr/m.
P Profit Cost: 15% 4.91 Birr/m.
T Total Unit Cost : 40.94 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 16 -
A= Materials Unit Cost 47.63 birr/m. B= Manpower Unit Cost 2.98 Birr/m C= Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 7.73/2.6 Hourly output: _____________________
Direct Cost of Work Item = A+B+C = 50.60 Birr/m.
Over head cost : 10% 5.06 Birr/m.
P Profit Cost: 15% 7.59 Birr/m.
T Total Unit Cost : 63.25 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 23 -
A= Materials Unit Cost 18.12 birr/m. B= Manpower Unit Cost 4.17 Birr/m C= Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 13.2/0.48 Hourly output: ________________
Direct Cost of Work Item = A+B+C = 22.28 Birr/m.
Over head cost : 10% 2.23 Birr/m.
P Profit Cost: 15% 3.34 Birr/m.
T Total Unit Cost : 27.85 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 24 -
A= Materials Unit Cost 23.62 birr/m. B= Manpower Unit Cost 4.17 Birr/m C= Equipment Unit Cost 0 Birr/m
Total of (1:02) Total of (1:03)
Hourly Output: 10.88/7 Hourly output: ________________
Direct Cost of Work Item = A+B+C = 27.78 Birr/m.
Over head cost : 10% 2.78 Birr/m.
P Profit Cost: 15% 4.17 Birr/m.
T Total Unit Cost : 34.73 Birr/m.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-1-
A= Materials Unit Cost 41.17 Birr/m2 B= Manpower Unit Cost 2.21 2.28 1.83 6.32 C= Equipment Unit Cost
-2-
A= Materials Unit Cost 45.15 Birr/m2 B= Manpower Unit Cost 2.21 2.28 1.83 6.32 C= Equipment Unit Cost
-3-
A= Materials Unit Cost 54.98 Birr/m2 B= Manpower Unit Cost 2.21 2.28 1.83 6.32 C= Equipment Unit Cost
-7-
-4-
A= Materials Unit Cost 26.79 Birr/m2 B= Manpower Unit Cost 2.21 Birr/m2 C= Equipment Unit Cost 0
Total of (1:02) Total of (1:03)
Hourly Output: _________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 29.00 Birr/m2
Over head cost : 10% 2.90 "
P Profit Cost: 15% 4.35 "
T Total Unit Cost : 36.25 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-5-
A= Materials Unit Cost 30.77 Birr/m2 B= Manpower Unit Cost 2.21 Birr/m2 C= Equipment Unit Cost 0
Total of (1:02) Total of (1:03)
Hourly Output: _________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 32.98 Birr/m2
Over head cost : 10% 3.30 "
P Profit Cost: 15% 4.95 "
T Total Unit Cost : 41.23 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-6-
A= Materials Unit Cost 39.86 Birr/m2 B= Manpower Unit Cost 2.21 Birr/m2 C= Equipment Unit Cost 0
Total of (1:02) Total of (1:03)
Hourly Output: _________________ Hourly output: __________________
Direct Cost of Work Item = A+B+C = 42.07 Birr/m2
Over head cost : 10% 4.21 "
P Profit Cost: 15% 6.31 "
T Total Unit Cost : 52.59 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 8 -
-9-
-10 -
A= Materials Unit Cost 41.97 Birr/m2 B= Manpower Unit Cost 4.82 Birr/m2 C= Equipment Unit Cost
Total of (1:02) Total of (1:03)
Hourly Output: _________________ Hourly output: __________________
41.97+4. Direct Cost of Work Item = A+B+C = 46.79 Birr/m2
Over head cost : 10% 4.68 "
P Profit Cost: 15% 7.02 "
T Total Unit Cost : 58.49 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-11 -
A= Materials Unit Cost 10.91 Birr/kg. B= Manpower Unit Cost 0.44 Birr/kg. C= Equipment Unit Cost 0.67 Birr/kg.
Total of (1:02) Total of (1:03)
Hourly Output: _________________ Hourly output: __________________
41.97+4. Direct Cost of Work Item = A+B+C = 12.03 Birr/kg.
Over head cost : 10% 1.20 "
P Profit Cost: 15% 1.80 "
T Total Unit Cost : 15.03 Birr/kg.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-8-
A= Material unit cost 437.97 Birr/m2B=Manpower Unit Cost Making Painting Fixing C= Equipment Unit Cost 11.82 Birr/m2
Total of (1:02) 32.44 4.67 13.89 Total of (1:03)
Hourly Output 50.99 Birr/m2 Hourly output: _______________
Direct cost of work item= A+B+C= 500.78 Birr/m2
Overhead Cost : 10% 50.08 "
Profit Cost: 15% 75.12 "
Total Unit Cost : 625.98 Birr/m2
Remark ____________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-1-
A= Material unit cost 26.18 Birr/m2B=Manpower Unit Cost 12.8107 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output Hourly output: _____________
Direct Cost of work item= A+B+C 26.18 Birr/m2
Overhead Cost : 10% 2.62 "
Profit Cost: 15% 3.93 "
Total Unit Cost : 32.72 Birr/m2
Remark ______________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-2-
A= Material unit cost 37.85 Birr/m2B=Manpower Unit Cost 11.9567 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output Hourly output: _____________
Direct Cost of work item= A+B+C = 37.85 Birr/m2
Overhead Cost : 10% 3.78 "
Profit Cost: 15% 5.68 "
Total Unit Cost : 47.31 Birr/m2
Remark _____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-3-
A= Material unit cost 338.219 Birr/pcs.B=Manpower Unit Cost 24.27 Birr/pcs. C=Equipment Unit Cost 52.00 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output Hourly output:
Direct Cost of work item = A + B + C = 414.49 Birr/pcs.
Overhead Cost : 10% 41.45 "
Profit Cost: 15% 62.17 "
Total Unit Cost : 518.11 Birr/pcs.
Remark : _____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-6-
A= Material unit cost 663.32 Birr/pcs.B=Manpower Unit Cost 24.27 Birr/pcs. C=Equipment Unit Cost 52.00 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output Hourly output:
Direct Cost of work item = A + B + C = 739.59 Birr/pcs.
Overhead Cost : 10% 73.96 "
Profit Cost: 15% 110.94 "
Total Unit Cost : 924.49 Birr/pcs.
Remark : _____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-4-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
T & G Tidwood m2 1.05 100.00 105 Foreman 1 0.25 0.83 0.21 wood 0
4 X 5 cm. Zigba purlin lm 3.4 3.00 10.2 Carpenter II 1 1 3.75 3.75 Machine 1 20 20
Corner list lm 3.4 3.00 10.2 Helper 1 1 1.88 1.88 0
Nails of diff. Size kg 0.14 7 0.98 Helper 1 1 1.90 1.90 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:-01) 126.38 Total (1:02) 7.74 Total (1:03) 20
A= Material unit cost 126.38 Birr/m2B=Manpower Unit Cost 8.79 Birr/m2 C= Equipment Unit Cost 22.73 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output Hourly output: _________________
Direct Cost of work item = A+B+C = 149.11 Birr/m2
Overhead Cost : 10% 14.91 "
Profit Cost: 15% 22.37 "
Total Unit Cost : 186.38 Birr/m2
Remark ______________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-7-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Making & Fixing Compinanto 2 10.00 20.00
Tid wood frame (external) m3 0.051 1400.00 71.40 Carpenter II 1 1 3.75 3.75 Vice 1 6.00 6.00
Tid wood frame (internal) m3 0.03 1400.00 42.00 Helper 1 1 1.9 1.90 0.00
T & G Tidwood panel. m2 1.26 80.00 100.8 Foreman 1 0.167 5 0.84 0.00
Door list. ml. 5.1 4.00 20.4 Carpenter I 1 1 2.5 2.50 0.00
Cylinderical Lock(Hungary) Pcs. 1 80.00 80 Helper 1 1 1.9 1.90 0.00
Hinges " 3 24.00 72 0.00 0.00
Screw " 10 0.10 1 0.00 0.00
Colla lit. 0.4 25.00 10 0.00 0.00
Nails of diff. Sizes. kg. 0.2 8.00 1.6 0.00 0.00
0 0.00 0.00
Total (1:-01) 399.20 Total (1:02) 10.89 Total (1:03) 26.00
A= Material unit cost 399.2 Birr/pcs. B=Manpower Unit Cost 18.21 Birr/pcs. C=Equipment Unit Cost 26.00 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output Hourly output:
Direct Cost of work item = A + B + C = 443.41 Birr/pcs.
Overhead Cost : 10% 44.34 "
Profit Cost: 15% 66.51 "
Total Unit Cost : 554.26 Birr/pcs.
Remark : _____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-1-
-2-
-3-
-4-
-5-
A= Materials Unit Cost 80.7 m2 B=Manpower Unit Cost 20.1 13.4 Br./pc C= Equipment Unit Cost 8.00 Br./M2
Total of (1:02) Total of (1:03) 11.4
Hourly Output Hourly output: 0.375
Direct Cost of work item = A+B+C = 122.1 Br./M2
Overhead Cost: 10% 12.21 "
Profit Cost: 15% 18.32 "
Total Unit Cost : 152.68 " Br./m2
Remark ________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-6-
A= Materials Unit Cost 11.8249 Birr/m2 B= Manpower Unit Cost 8.98 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 20.80 Birr/m2
Over head cost : 10% 2.08 "
Profit Cost: 15% 3.12 "
Total Unit Cost : 26.01 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-2-
A= Materials Unit Cost 6.33 Birr/m2 B= Manpower Unit Cost 10.05 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 16.38 Birr/m2
Over head cost : 10% 1.64 "
Profit Cost: 15% 2.46 "
Total Unit Cost : 20.47 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-3-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
cement qt. 0.097 60 5.82 Foreman 1 0.167 5 0.84 0
sand m 3
0.024 95 2.28 Plasterer 1 1 2.5 2.5 0
water m3 0.0045 0.75 0.003 Chilser 1 1 2.15 2.15 0
0 D/L 1 1 1.25 1.25 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 8.10 Total (1:02) 6.74 Total (1:03) 0
A= Materials Unit Cost 8.10 Birr/m2 B= Manpower Unit Cost 7.65 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 15.76 Birr/m2
Over head cost : 10% 1.58 "
Profit Cost: 15% 2.36 "
Total Unit Cost : 19.70 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-4-
A= Materials Unit Cost 4.02 Birr/m2 B= Manpower Unit Cost 2.26 Birr/m2 C= Equipment Unit Cost 1.78 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 8.06 Birr/m2
Over head cost : 10% 0.81 "
Profit Cost: 15% 1.21 "
Total Unit Cost : 10.07 Birr/m2
Remark 3.Coats of rendering ( 3+4 ) 29.77
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-5-
A= Materials Unit Cost 0.37 Birr/m2 B= Manpower Unit Cost 8.31 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 8.69 Birr/m2
Over head cost : 10% 0.87 "
Profit Cost: 15% 1.30 "
Total Unit Cost : 10.86 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-6-
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
cement qt. 0.009 60 0.54 Foreman 1 0.167 5 0.84 0
sand m3 0.002 95 0.19 Plasterer 1 1 2.5 2.5 0
water m3 0.01 0.75 0.008 Chilser 1 1 2.15 2.15 0
0 D/L 1 1 1.25 1.25 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 0.74 Total (1:02) 6.74 Total (1:03) 0
A= Materials Unit Cost 0.74 Birr/m2 B= Manpower Unit Cost 4.13 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 4.87 Birr/m2
Over head cost : 10% 0.49 "
Profit Cost: 15% 0.73 "
Total Unit Cost : 6.09 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 7-
A= Materials Unit Cost 0.72 Birr/m2 B= Manpower Unit Cost 2.83 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 3.55 Birr/m2
Over head cost : 10% 0.36 "
Profit Cost: 15% 0.53 "
Total Unit Cost : 4.44 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-8-
A= Materials Unit Cost 15.24 Birr/m2 B= Manpower Unit Cost 3.50 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 18.74 Birr/m2
Over head cost : 10% 1.87 "
Profit Cost: 15% 2.81 "
Total Unit Cost : 23.43 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-9-
A= Materials Unit Cost 25.37 Birr/m2 B= Manpower Unit Cost 5.83 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 31.20 Birr/m2
Over head cost : 10% 3.12 "
Profit Cost: 15% 4.68 "
Total Unit Cost : 39.00 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 10 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
cement qt. 0.168 60 10.08 Foreman 1 0.25 5 1.25 0
sand m3 0.041 95 3.895 mason ii 1 1 3.75 3.75 0
water m3 0.008 0.75 0.006 D/L 1 1 1.25 1.25 0
cement grout qt. 0.014 60 0.84 helper 1 1 1.9 1.9 0
20 x 20 cm. cement tile no 25.5 1.05 26.775 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 41.60 Total (1:02) 8.15 Total (1:03) 0
A= Materials Unit Cost 41.60 Birr/m2 B= Manpower Unit Cost 6.52 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 48.12 Birr/m2
Over head cost : 10% 4.81 "
Profit Cost: 15% 7.22 "
Total Unit Cost : 60.15 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 11 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
cement qt. 0.168 60 10.08 Foreman 1 0.25 5 1.25 0
sand m3 0.041 95 3.895 mason ii 1 1 3.75 3.75 0
water m3 0.008 0.75 0.006 D/L 1 1 1.25 1.25 0
cement grout qt. 0.014 60 0.84 helper 1 1 1.9 1.9 0
20 x 20 cm. terrazzo tile no 25.5 1.8 45.9 0 0
polish lit 0.1 12 1.20 0 0
0 0 0
0 0 0
Total (1:01) 61.92 Total (1:02) 8.15 Total (1:03) 0
A= Materials Unit Cost 61.92 Birr/m2 B= Manpower Unit Cost 6.52 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 68.44 Birr/m2
Over head cost : 10% 6.84 "
Profit Cost: 15% 10.27 "
Total Unit Cost : 85.55 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 12 -
A= Materials Unit Cost 53.76 Birr/m2 B= Manpower Unit Cost 6.52 Birr/m2 C= Equipment Unit Cost 0 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 60.28 Birr/m2
Over head cost : 10% 6.03 "
Profit Cost: 15% 9.04 "
Total Unit Cost : 75.35 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 13 -
- 14 -
- 15 -
- 16 -
A= Materials Unit Cost 188.98 Birr/m2 B= Manpower Unit Cost 7.72 Birr/m2 C= Equipment Unit Cost 0.00 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 196.70 Birr/m2
Over head cost : 10% 19.67 "
Profit Cost: 15% 29.50 "
Total Unit Cost : 245.87 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 17-
A= Materials Unit Cost 58.90 Birr/m2 B= Manpower Unit Cost 2.06 Birr/m2 C= Equipment Unit Cost 0.00 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 60.96 Birr/m2
Over head cost : 10% 6.10 "
Profit Cost: 15% 9.14 "
Total Unit Cost : 76.20 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 18 -
A= Materials Unit Cost 81.34 Birr/m2 B= Manpower Unit Cost 2.06 Birr/m2 C= Equipment Unit Cost 0.00 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 83.40 Birr/m2
Over head cost : 10% 8.34 "
Profit Cost: 15% 12.51 "
Total Unit Cost : 104.25 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 19 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
PVC tile m2 1.02 70 71.4 Foreman 1 0.17 5 0.85 0
adhesive glue gal 0.11 98 10.78 tiler 1 1 3.75 3.75 0
polish lit 0.1 12 1.20 D/L 2 1 1.25 2.5 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 83.38 Total (1:02) 7.10 Total (1:03) 0
A= Materials Unit Cost 83.38 Birr/m2 B= Manpower Unit Cost 2.06 Birr/m2 C= Equipment Unit Cost 0.00 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 85.44 Birr/m2
Over head cost : 10% 8.54 "
Profit Cost: 15% 12.82 "
Total Unit Cost : 106.80 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 20 -
A= Materials Unit Cost 65.02 Birr/m2 B= Manpower Unit Cost 2.06 Birr/m2 C= Equipment Unit Cost 0.00 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 67.08 Birr/m2
Over head cost : 10% 6.71 "
Profit Cost: 15% 10.06 "
Total Unit Cost : 83.85 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 21 -
A= Materials Unit Cost 113.30 Birr/m2 B= Manpower Unit Cost 2.84 Birr/m2 C= Equipment Unit Cost 0.00 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 116.14 Birr/m2
Over head cost : 10% 11.61 "
Profit Cost: 15% 17.42 "
Total Unit Cost : 145.18 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 22 -
A= Materials Unit Cost 3.75 Birr/ml B= Manpower Unit Cost 3.26 Birr/ml C= Equipment Unit Cost 1.50 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 8.51 Birr/ml
Over head cost : 10% 0.85 "
Profit Cost: 15% 1.28 "
Total Unit Cost : 10.64 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 23 -
A= Materials Unit Cost 5.77 Birr/ml B= Manpower Unit Cost 3.26 Birr/ml C= Equipment Unit Cost 1.50 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 10.53 Birr/ml
Over head cost : 10% 1.05 "
Profit Cost: 15% 1.58 "
Total Unit Cost : 13.16 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 24 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
granolythic tile ml 1.02 3.7 3.774 Foreman 1 0.25 5 1.25 grinder 1 3.75 3.75
polish lit 0.05 12 0.60 masonii 1 1 3.75 3.75 0
cement q 0.005 60 0.300 helper I 1 1 1.9 1.9 0
sand m3 0.001 95 0.095 D/L 1 1 1.25 1.25 0
water m3 0.001 0.75 0.001 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 4.77 Total (1:02) 8.15 Total (1:03) 3.75
A= Materials Unit Cost 4.77 Birr/ml B= Manpower Unit Cost 3.26 Birr/ml C= Equipment Unit Cost 1.50 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 9.53 Birr/ml
Over head cost : 10% 0.95 "
Profit Cost: 15% 1.43 "
Total Unit Cost : 11.91 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 25 -
A= Materials Unit Cost 21.37 Birr/ml B= Manpower Unit Cost 3.26 Birr/ml C= Equipment Unit Cost 1.50 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 26.13 Birr/ml
Over head cost : 10% 2.61 "
Profit Cost: 15% 3.92 "
Total Unit Cost : 32.66 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 26 -
A= Materials Unit Cost 29.77 Birr/ml B= Manpower Unit Cost 3.26 Birr/ml C= Equipment Unit Cost 1.50 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 34.53 Birr/ml
Over head cost : 10% 3.45 "
Profit Cost: 15% 5.18 "
Total Unit Cost : 43.16 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 27 -
A= Materials Unit Cost 32.47 Birr/ml B= Manpower Unit Cost 3.26 Birr/ml C= Equipment Unit Cost 1.50 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 37.23 Birr/ml
Over head cost : 10% 3.72 "
Profit Cost: 15% 5.58 "
Total Unit Cost : 46.54 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 28 -
A= Materials Unit Cost 4.73 Birr/ml B= Manpower Unit Cost 4.57 Birr/ml C= Equipment Unit Cost Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 9.31 Birr/ml
Over head cost : 10% 0.93 "
Profit Cost: 15% 1.40 "
Total Unit Cost : 11.63 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 29 -
A= Materials Unit Cost 6.49 Birr/ml B= Manpower Unit Cost 4.57 Birr/ml C= Equipment Unit Cost Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 11.06 Birr/ml
Over head cost : 10% 1.11 "
Profit Cost: 15% 1.66 "
Total Unit Cost : 13.83 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 30 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: FINISHING WORKS. LABOUR HOURLY OUTPUT: 2 ml /hr
WORK ITEM: (11.30) 8cm. high PVC tile skirting.( ENGLAND) EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 ml RESULT : 14.08 Birr/ml
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
2mm pvc skirting ml 1.02 5.6 5.71 Foreman 1 0.83 5 4.15 0
adhesive glue gal 0.009 98 0.88 tiler 1 1 3.75 3.75 0
polishing lit 0.008 12 0.096 D/L 1 1 1.25 1.25 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 6.69 Total (1:02) 9.15 Total (1:03) 0
A= Materials Unit Cost 6.69 Birr/ml B= Manpower Unit Cost 4.57 Birr/ml C= Equipment Unit Cost Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 11.26 Birr/ml
Over head cost : 10% 1.13 "
Profit Cost: 15% 1.69 "
Total Unit Cost : 14.08 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 31 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: FINISHING WORKS. LABOUR HOURLY OUTPUT: 2 ml /hr
WORK ITEM: (11.31) 8cm. high PVC tile skirting.(CHINA) EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 ml RESULT : 12.25 Birr/ml
A= Materials Unit Cost 5.22 Birr/ml B= Manpower Unit Cost 4.57 Birr/ml C= Equipment Unit Cost Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 9.80 Birr/ml
Over head cost : 10% 0.98 "
Profit Cost: 15% 1.47 "
Total Unit Cost : 12.25 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 32 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
timber ml 1.1 8 8.80 Foreman 1 0.25 5 1.25 0
nail(=4cm) kg 0.0165 8 0.13 carpenterii 1 1 4.4 4.4 0
0 D/L 1 1 1.25 1.25 0
0 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 8.93 Total (1:02) 6.90 Total (1:03) 0
A= Materials Unit Cost 8.93 Birr/ml B= Manpower Unit Cost 2.30 Birr/ml C= Equipment Unit Cost Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 11.23 Birr/ml
Over head cost : 10% 1.12 "
Profit Cost: 15% 1.68 "
Total Unit Cost : 14.04 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 33 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
terrazzo window cill for HCB m2 0.204 70 14.28 Foreman 1 0.83 5 4.15 grinder 1 3.75 3.75
cement qt 0.02 60 1.20 masonii 1 1 3.75 3.75 0
sand m3 0.005 95 0.48 D/L 2 1 1.25 2.5 0
water m3 0.01 0.75 0.008 0 0
cement grout qt 0.0003 60 0.018 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 15.98 Total (1:02) 10.40 Total (1:03) 3.75
A= Materials Unit Cost 15.98 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 23.50 Birr/ml
Over head cost : 10% 2.35 "
Profit Cost: 15% 3.53 "
Total Unit Cost : 29.38 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 34 -
A= Materials Unit Cost 18.64 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 26.16 Birr/ml
Over head cost : 10% 2.62 "
Profit Cost: 15% 3.92 "
Total Unit Cost : 32.70 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 35 -
A= Materials Unit Cost 26.62 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 34.14 Birr/ml
Over head cost : 10% 3.41 "
Profit Cost: 15% 5.12 "
Total Unit Cost : 42.68 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 36 -
A= Materials Unit Cost 87.38 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 94.90 Birr/ml
Over head cost : 10% 9.49 "
Profit Cost: 15% 14.24 "
Total Unit Cost : 118.63 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 37 -
A= Materials Unit Cost 103.34 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 110.86 Birr/ml
Over head cost : 10% 11.09 "
Profit Cost: 15% 16.63 "
Total Unit Cost : 138.58 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 38 -
A= Materials Unit Cost 145.34 Birr/mlB= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 152.86 Birr/ml
Over head cost : 10% 15.29 "
Profit Cost: 15% 22.93 "
Total Unit Cost : 191.08 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 39 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
white marble cill for HCB m2 0.204 360 73.44 Foreman 1 0.83 5 4.15 grinder 1 3.75 3.75
cement qt 0.02 60 1.20 masonii 1 1 3.75 3.75 0
sand m3 0.005 95 0.48 D/L 2 1 1.25 2.5 0
water m3 0.01 0.75 0.008 0 0
cement grout qt 0.0003 60 0.018 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 75.14 Total (1:02) 10.40 Total (1:03) 3.75
A= Materials Unit Cost 75.14 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 82.66 Birr/ml
Over head cost : 10% 8.27 "
Profit Cost: 15% 12.40 "
Total Unit Cost : 103.33 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 40 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
white marble cill for brick m2 0.239 360 86.04 Foreman 1 0.83 5 4.15 grinder 1 3.75 3.75
cement qt 0.02 60 1.20 masonii 1 1 3.75 3.75 0
sand m3 0.005 95 0.48 D/L 2 1 1.25 2.5 0
water m3 0.01 0.75 0.008 0 0
cement grout qt 0.0003 60 0.018 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 87.74 Total (1:02) 10.40 Total (1:03) 3.75
A= Materials Unit Cost 87.74 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 95.26 Birr/ml
Over head cost : 10% 9.53 "
Profit Cost: 15% 14.29 "
Total Unit Cost : 119.08 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 41 -
A= Materials Unit Cost 125.18 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 132.70 Birr/ml
Over head cost : 10% 13.27 "
Profit Cost: 15% 19.91 "
Total Unit Cost : 165.88 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 42 -
A= Materials Unit Cost 56.78 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 64.30 Birr/ml
Over head cost : 10% 6.43 "
Profit Cost: 15% 9.65 "
Total Unit Cost : 80.38 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 43 -
A= Materials Unit Cost 66.23 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 73.75 Birr/ml
Over head cost : 10% 7.38 "
Profit Cost: 15% 11.06 "
Total Unit Cost : 92.19 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 44 -
A= Materials Unit Cost 94.58 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 102.10 Birr/ml
Over head cost : 10% 10.21 "
Profit Cost: 15% 15.32 "
Total Unit Cost : 127.63 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 45 -
A= Materials Unit Cost 37.40 Birr/ml B= Manpower Unit Cost 5.53 Birr/ml C= Equipment Unit Cost 1.99 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 44.92 Birr/ml
Over head cost : 10% 4.49 "
Profit Cost: 15% 6.74 "
Total Unit Cost : 56.15 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 46 -
- 47 -
- 48 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
30mm white marble m2 0.306 360 110.16 Foreman 1 0.83 5 4.15 grinder 1 3.75 3.75
cement qt 0.03 60 1.80 masonii 1 1 3.75 3.75 0
sand m3 0.008 95 0.76 D/L 2 1 1.25 2.5 0
water m3 0.01 0.75 0.008 0 0
cement grout qt 0.0003 60 0.018 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 112.75 Total (1:02) 10.40 Total (1:03) 3.75
A= Materials Unit Cost 112.75 Birr/ml B= Manpower Unit Cost 11.82 Birr/ml C= Equipment Unit Cost 4.26 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 128.83 Birr/ml
Over head cost : 10% 12.88 "
Profit Cost: 15% 19.32 "
Total Unit Cost : 161.03 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 49 -
A= Materials Unit Cost 85.21 Birr/ml B= Manpower Unit Cost 11.82 Birr/ml C= Equipment Unit Cost 4.26 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 101.29 Birr/ml
Over head cost : 10% 10.13 "
Profit Cost: 15% 15.19 "
Total Unit Cost : 126.61 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 50 -
A= Materials Unit Cost 56.14 Birr/ml B= Manpower Unit Cost 11.82 Birr/ml C= Equipment Unit Cost 4.26 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 72.22 Birr/ml
Over head cost : 10% 7.22 "
Profit Cost: 15% 10.83 "
Total Unit Cost : 90.27 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 51-
A= Materials Unit Cost 73.13 Birr/ml B= Manpower Unit Cost 9.20 Birr/ml C= Equipment Unit Cost 3.32 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 85.65 Birr/ml
Over head cost : 10% 8.57 "
Profit Cost: 15% 12.85 "
Total Unit Cost : 107.06 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 52 -
A= Materials Unit Cost 62.93 Birr/ml B= Manpower Unit Cost 9.20 Birr/ml C= Equipment Unit Cost 3.32 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 75.45 Birr/ml
Over head cost : 10% 7.55 "
Profit Cost: 15% 11.32 "
Total Unit Cost : 94.31 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 53-
A= Materials Unit Cost 38.45 Birr/ml B= Manpower Unit Cost 9.20 Birr/ml C= Equipment Unit Cost 3.32 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 50.97 Birr/ml
Over head cost : 10% 5.10 "
Profit Cost: 15% 7.65 "
Total Unit Cost : 63.71 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 54 -
A= Materials Unit Cost 25.53 Birr/ml B= Manpower Unit Cost 9.20 Birr/ml C= Equipment Unit Cost 3.32 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 38.05 Birr/ml
Over head cost : 10% 3.81 "
Profit Cost: 15% 5.71 "
Total Unit Cost : 47.56 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 55 -
A= Materials Unit Cost 73.13 Birr/ml B= Manpower Unit Cost 15.68 Birr/ml C= Equipment Unit Cost 4.26 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 93.07 Birr/ml
Over head cost : 10% 9.31 "
Profit Cost: 15% 13.96 "
Total Unit Cost : 116.34 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 56 -
A= Materials Unit Cost 62.93 Birr/ml B= Manpower Unit Cost 15.68 Birr/ml C= Equipment Unit Cost 4.26 Birr/ml
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 82.87 Birr/ml
Over head cost : 10% 8.29 "
Profit Cost: 15% 12.43 "
Total Unit Cost : 103.59 Birr/ml
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 57-
A= Materials Unit Cost 57.79 Birr/m2 B= Manpower Unit Cost 7.65 Birr/m2 C= Equipment Unit Cost 7.65 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 73.10 Birr/m2
Over head cost : 10% 7.31 "
Profit Cost: 15% 10.96 "
Total Unit Cost : 91.37 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 58 -
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
20 x 20 cm. ceramic tile pc 25.5 2 51.00 Foreman 1 0.25 5 1.25 grinder 2 3.75 7.5
cement qt 0.065 60 3.90 tiler 1 1 3.75 3.75 0
sand m3 0.01 95 0.95 D/L 2 1 1.25 2.5 0
water m3 0.01 0.75 0.008 0 0
cement grout qt 0.014 60 0.840 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 56.70 Total (1:02) 7.50 Total (1:03) 7.5
A= Materials Unit Cost 56.70 Birr/m2 B= Manpower Unit Cost 7.65 Birr/m2 C= Equipment Unit Cost 7.65 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 72.00 Birr/m2
Over head cost : 10% 7.20 "
Profit Cost: 15% 10.80 "
Total Unit Cost : 90.00 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 59 -
A= Materials Unit Cost 130.14 Birr/m2 B= Manpower Unit Cost 7.65 Birr/m2 C= Equipment Unit Cost 7.65 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 145.44 Birr/m2
Over head cost : 10% 14.54 "
Profit Cost: 15% 21.82 "
Total Unit Cost : 181.80 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 60 -
A= Materials Unit Cost 36.09 Birr/m2 B= Manpower Unit Cost 4.17 Birr/m2 C= Equipment Unit Cost 0.00 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 40.26 Birr/m2
Over head cost : 10% 4.03 "
Profit Cost: 15% 6.04 "
Total Unit Cost : 50.33 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 61 -
A= Materials Unit Cost 5.19 Birr/m2 B= Manpower Unit Cost 4.17 Birr/m2 C= Equipment Unit Cost 0.00 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 9.36 Birr/m2
Over head cost : 10% 0.94 "
Profit Cost: 15% 1.40 "
Total Unit Cost : 11.70 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 62 -
A= Materials Unit Cost 362.69 Birr/m2 B= Manpower Unit Cost 10.87 Birr/m2 C= Equipment Unit Cost 10.87 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 384.43 Birr/m2
Over head cost : 10% 38.44 "
Profit Cost: 15% 57.66 "
Total Unit Cost : 480.54 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 63 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: FINISHING WORKS. LABOUR HOURLY OUTPUT: 0.69 m2 /hr
WORK ITEM: (11.63) 2cm. thick Harar wall marble (1:2). EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 m2 RESULT : 263.79 Birr/m2
A= Materials Unit Cost 189.29 Birr/m2 B= Manpower Unit Cost 10.87 Birr/m2 C= Equipment Unit Cost 10.87 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 211.03 Birr/m2
Over head cost : 10% 21.10 "
Profit Cost: 15% 31.65 "
Total Unit Cost : 263.79 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 64 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: FINISHING WORKS. LABOUR HOURLY OUTPUT: 0.69 m2 /hr
WORK ITEM: (11.64) 2cm. thick white Gojam wall marble (1:2). EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 m2 RESULT : 416.79 Birr/m2
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
gojam marble m2 1.02 300 306.00 Foreman 1 0.25 5 1.25 grinder 2 3.75 7.5
cement qt 0.065 60 3.90 tiler 1 1 3.75 3.75 0
sand m3 0.01 95 0.950 D/L 2 1 1.25 2.5 0
cement qt 0.014 60 0.840 0 0
water m3 0.003 0.75 0.002 0 0
0 0 0
0 0 0
0 0 0
Total (1:01) 311.69 Total (1:02) 7.50 Total (1:03) 7.5
A= Materials Unit Cost 311.69 Birr/m2 B= Manpower Unit Cost 10.87 Birr/m2 C= Equipment Unit Cost 10.87 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 333.43 Birr/m2
Over head cost : 10% 33.34 "
Profit Cost: 15% 50.01 "
Total Unit Cost : 416.79 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 65 -
A= Materials Unit Cost 33.02 Birr/m2 B= Manpower Unit Cost 4.17 Birr/m2 C= Equipment Unit Cost 0.00 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 37.19 Birr/m2
Over head cost : 10% 3.72 "
Profit Cost: 15% 5.58 "
Total Unit Cost : 46.49 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 66 -
A= Materials Unit Cost 30.80 Birr/m2 B= Manpower Unit Cost 7.50 Birr/m2 C= Equipment Unit Cost 0.00 Birr/m2
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: _________________
Direct Cost of Work Item = A+B+C = 38.30 Birr/m2
Over head cost : 10% 3.83 "
Profit Cost: 15% 5.74 "
Total Unit Cost : 47.87 Birr/m2
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
Material Cost (1:01) Labour Cost (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
plastic paint lit 0.25 15.60 3.9 foreman 1 0.2 5 1.00 tools 1 0.16 0.16
stucco kg 0.05 1.80 0.09 painter 1 1 2.5 2.50
animal glue kg 0.013 20.00 0.26 DL 1 1 1.25 1.25 0
Total (1:-01) 4.503 Total (1:02) 4.75 Total (1:03) 0.16
Material Cost (1:01) Labour Cost (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
plastic paint lit 0.18 15.60 2.808 foreman 1 0.2 5 1.00 tools 1 0.16 0.16
stucco kg 0.05 1.80 0.09 painter 1 1 2.5 2.50
animal glue kg 0.013 20.00 0.26 DL 1 1 1.25 1.25 0
Total (1:-01) 3.411 Total (1:02) 4.75 Total (1:03) 0.16
Material Cost (1:01) Labour Cost (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
plastic paint lit 0.23 15.60 3.59 foreman 1 0.2 5 1.00 tools 1 0.16 0.16
stucco kg 0.1 1.80 0.18 painter 1 1 2.5 2.50
animal glue kg 0.013 20.00 0.26 DL 1 1 1.25 1.25 0
Total (1:-01) 4.287 Total (1:02) 4.75 Total (1:03) 0.16
Material Cost (1:01) Labour Cost (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
anti-rust lit 0.04 15.60 0.62 foreman 1 0.2 5 1.00 0
thinner lit 0.035 4.00 0.14 painter 1 1 2.5 2.50 0
synthetic paint kg 0.22 24.18 5.32 DL 1 1 1.25 1.25 0
Total (1:-01) 6.30 Total (1:02) 4.75 Total (1:03) 0
Material Cost (1:01) Labour Cost (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
varnish paint lit 0.18 27.04 4.87 foreman 1 0.2 5 1.00 tools 1 0.16 0.16
thinner lit 0.05 4.00 0.2 painter 1 1 2.5 2.50 0
stucco kg 0.57 1.80 1.03 DL 1 1 1.25 1.25 0
Total (1:-01) 6.33 Total (1:02) 4.75 Total (1:03) 0.16
Material Cost (1:01) Labour Cost (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
anti-rust lit 0.2 15.60 3.12 foreman 1 0.2 5 1.00 tools 1 0.16 0.16
thinner lit 0.05 4.00 0.2 painter 1 1 2.5 2.50 0
brush pcs 0.01 1.50 0.02 DL 1 1 1.25 1.25 0
Total (1:-01) 3.34 Total (1:02) 4.75 Total (1:03) 0.16
Material Cost (1:01) Labour Cost (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
lime kg 0.12 0.39 0.05 foreman 1 0.2 5 1.00 tools 1 0.16 0.16
stucco kg 0.06 1.80 0.11 painter 1 1 2.5 2.50 0
animal glue kg 0.1 20.00 2 DL 1 1 1.25 1.25 0
Total (1:-01) 2.16 Total (1:02) 4.75 Total (1:03) 0.16
-1-
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.38 pcs./hr.
WORK ITEM: ( 13.1 ) Low flash WC ( Italy made ) EQUIPEMENT: Drill ( hand held ) = 4.53 Birr/hr
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 1150.83 Birr/pcs.
-7-
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.18 pcs./hr.
WORK ITEM: ( 13.7 ) Bath tab ( Italy ) EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 1148.67 Birr/pcs.
-8-
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.38 pcs./hr.
WORK ITEM: ( 13.8 ) Bidet EQUIPEMENT: Drilling machine
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 556.83 Birr/pcs.
-9-
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.3 pcs./hr.
WORK ITEM: ( 13.9) Shower plate EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 545.20 Birr/pcs.
A= Materials Unit Cost 420 Birr/pcs. B= Manpower Unit Cost 34.33 Birr/pcs. C= Equipment Unit Cost 0.00 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 10.30/0.30=34.33 Hourly output: ___________
Direct Cost of Work Item = A+B+C = 454.33 Birr/pcs.
Over head cost : 10% 45.43 "
Profit Cost: 10% 45.43 "
Total Unit Cost : 545.20 Birr/pcs.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 10 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.28 pcs./hr.
WORK ITEM: ( 13.10 ) urinals EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 545.98 Birr/pcs.
A= Materials Unit Cost 400 Birr/pcs. B= Manpower Unit Cost 36.79 Birr/pcs. C= Equipment Unit Cost 0.00 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 10.30/0.28 =36.79 Hourly output: ___________
Direct Cost of Work Item = A+B+C = 436.79 Birr/pcs.
Over head cost : 10% 43.68 "
Profit Cost: 15% 65.52 "
Total Unit Cost : 545.98 Birr/pcs.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 11 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.28 pcs./hr.
WORK ITEM: ( 13.11 ) Kitchen sink ( singel bowel) EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 548.14 Birr/pcs.
A= Materials Unit Cost 420 Birr/pcs. B= Manpower Unit Cost 36.79 Birr/pcs. C= Equipment Unit Cost 0.00 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 10.30/0.28 =36.79 Hourly output: __________
Direct Cost of Work Item = A+B+C = 456.79 Birr/pcs.
Over head cost : 10% 45.68 "
Profit Cost: 10% 45.68 "
Total Unit Cost : 548.14 Birr/pcs.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 12 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.24 pcs./hr.
WORK ITEM: ( 13.12 ) Kitchen sink ( double bowel) EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 747.50 Birr/pcs.
A= Materials Unit Cost 580 Birr/pcs. B= Manpower Unit Cost 42.92 Birr/pcs. C= Equipment Unit Cost 0.00 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 10.30/0.24 = 42.92 Hourly output: __________
Direct Cost of Work Item = A+B+C = 622.92 Birr/pcs.
Over head cost : 10% 62.29 "
Profit Cost: 10% 62.29 "
Total Unit Cost : 747.50 Birr/pcs.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 13 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.88 pcs./hr.
WORK ITEM: ( 13.13 ) Towel rack EQUIPEMENT: drilling machine
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 57.29 Birr/pcs.
A= Materials Unit Cost 35 Birr/pcs. B= Manpower Unit Cost 5.68 Birr/pcs. C= Equipment Unit Cost 5.15 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 5.00/0.88 = 5.68 Hourly output: _ 4.53/0.88 = 5.15
Direct Cost of Work Item = A+B+C = 45.83 Birr/pcs.
Over head cost : 10% 4.58 "
Profit Cost: 15% 6.87 "
Total Unit Cost : 57.29 Birr/pcs.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 14 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.88 pcs./hr.
WORK ITEM: ( 13.14 ) Toilet paper holder EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 57.10 Birr/pcs.
- 15 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.88 pcs./hr.
WORK ITEM: ( 13.15 ) soap holder EQUIPEMENT: .
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 50.85 Birr/pcs.
- 16 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1 pcs./hr.
WORK ITEM: ( 13.16 ) Glass mirror EQUIPEMENT: drilling machine
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 161.91 Birr/pcs.
- 17 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1.25 pcs./hr.
WORK ITEM ( 13.17 ) Floor drain EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT 97.80 Birr/pcs.
- 18 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.19 pcs./hr.
WORK ITEM: ( 13.18 ) Water heatr ( 50 Lit. Cap. ) EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT 1097.34 Birr/pcs.
- 19 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.19 pcs./hr.
WORK ITEM: ( 13.19 ) Water heatr ( 80 Lit. capacity ) EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT 1235.34 Birr/pcs.
- 20 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.19 pcs./hr.
WORK ITEM: ( 13.20 ) Water heatr (120 Lit. capacity ) EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT 1442.34 Birr/pcs.
A= Materials Unit Cost 1200 Birr/pcs. B= Manpower Unit Cost 54.21 Birr/pcs. C= Equipment Unit Cost 0.00 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 10.30/0.19 = 54.21 Hourly output: _____________
Direct Cost of Work Item = A+B+C = 1254.21 Birr/pcs.
Over head cost : 5% 62.71 "
Profit Cost: 10% 125.42 "
Total Unit Cost : 1442.34 Birr/pcs.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 21 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1.85 ml./hr.
WORK ITEM: ( 13.21 ) 1/2 " Galvanaized Steel Pipe ( GSP ) EQUIPEMENT: Flera + Kaabaleto
TOTAL QANTITY OF WORK ITEM: 21 m. RESULT: 35.36 Birr/ml.
A= Materials Unit Cost 20.1071 Birr/ml. B= Manpower Unit Cost 6.02 Birr/ml. C= Equipment Unit Cost 2.16 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 11.13/1.85 = 6.02 Hourly output: _ 4/1.85 = 2.16
Direct Cost of Work Item = A+B+C = 28.29 Birr/ml.
Over head cost : 10% 2.83 Birr/ml.
Profit Cost: 15% 4.24 Birr/ml.
Total Unit Cost : 35.36 Birr/ml.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 22 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1.85 ml./hr.
WORK ITEM: ( 13.22 ) 3/4" Galvanaized Steel Pipe ( GSP ) EQUIPEMENT: Flera + Kaabaleto
TOTAL QANTITY OF WORK ITEM: 34 ml. RESULT: 31.71 Birr/ml.
A= Materials Unit Cost 17.1838 Birr/ml. B= Manpower Unit Cost 6.02 Birr/ml. C= Equipment Unit Cost 2.16 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 11.13/1.85 = 6.02 Hourly output: _ 4/1.85 = 2.16
Direct Cost of Work Item = A+B+C = 25.36 Birr/ml.
Over head cost : 10% 2.54 Birr/ml.
Profit Cost: 15% 3.80 Birr/ml.
Total Unit Cost : 31.71 Birr/ml.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 23 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1.5 ml./hr.
WORK ITEM: ( 13.23 ) 1" Galvanaized Steel Pipe ( GSP ) EQUIPEMENT: Flera + Kabaleto
TOTAL QANTITY OF WORK ITEM: 49 ml. RESULT: 39.53 Birr/ml.
A= Materials Unit Cost 21.5357 Birr/ml. B= Manpower Unit Cost 7.42 Birr/ml. C= Equipment Unit Cost 2.67 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 11.13/1.5 = 7.42 Hourly output: _ 4/1.5 = 2.67
Direct Cost of Work Item = A+B+C = 31.63 Birr/ml.
Over head cost : 10% 3.16 Birr/ml.
Profit Cost: 15% 4.74 Birr/ml.
Total Unit Cost : 39.53 Birr/ml.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 24 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1.5 ml./hr.
WORK ITEM: ( 13.24) 2" Galvanaized Steel Pipe ( GSP ) EQUIPEMENT: Flera + Kabaleto
TOTAL QANTITY OF WORK ITEM: 50 ml. RESULT: 67.38 Birr/ml.
A= Materials Unit Cost 43.81 Birr/ml.B= Manpower Unit Cost 7.42 Birr/ml. C= Equipment Unit Cost 2.67 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 11.13/1.5 = 7.42 Hourly output: _ 4/1.5 = 2.67
Direct Cost of Work Item = A+B+C = 53.90 Birr/ml.
Over head cost : 10% 5.39 Birr/ml.
Profit Cost: 15% 8.08 Birr/ml.
Total Unit Cost : 67.38 Birr/ml.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 25 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1 ml./hr.
WORK ITEM: ( 13.25) 3" Galvanaized Steel Pipe ( GSP ) EQUIPEMENT: Flera + Kabaleto
TOTAL QANTITY OF WORK ITEM: 100 ml. RESULT: 95.40 Birr/ml.
A= Materials Unit Cost 61.1875 Birr/ml. B= Manpower Unit Cost 11.14 Birr/ml. C= Equipment Unit Cost 4.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 11.13/1.0 = 11.13 Hourly output: _ 4/1.0 = 4.00
Direct Cost of Work Item = A+B+C = 76.32 Birr/ml.
Over head cost : 10% 7.63 Birr/ml.
Profit Cost: 15% 11.45 Birr/ml.
Total Unit Cost : 95.40 Birr/ml.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 26 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1 pcs./hr.
WORK ITEM: ( 13.26) Gate Valves 1/2" EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 23.75 Birr/pcs.
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
- 27 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1 pcs./hr.
WORK ITEM: ( 13.27) Gate Valves 3/4" EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 27.50 Birr/pcs.
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
- 28 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1 pcs./hr.
WORK ITEM: ( 13.28) Gate Valves 1" EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 37.50 Birr/pcs.
- 29 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1.25 pcs./hr.
WORK ITEM: ( 13.29) Gate Valves 2" EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 88.15 Birr/pcs.
- 30 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1.25 pcs./hr.
WORK ITEM: ( 13.30) Gate Valves 3" EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 156.90 Birr/pcs.
A= Materials Unit Cost 120 Birr/pcs.B= Manpower Unit Cost 5.52 Birr/pcs. C= Equipment Unit Cost 0.00 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 6.90/1.25 = 5.52 Hourly output: ________________
Direct Cost of Work Item = A+B+C = 125.52 Birr/pcs.
Over head cost : 10% 12.55 "
Profit Cost: 15% 18.83 "
Total Unit Cost : 156.90 Birr/pcs.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 31 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1.26 ml./hr.
WORK ITEM: ( 13.31) 50 mm. dia. PVC Pipe EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 14 ml. RESULT: 43.63 Birr/ml.
A= Materials Unit Cost 26.0679 Birr/ml. B= Manpower Unit Cost 8.84 Birr/pcs. C= Equipment Unit Cost 0.00 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 11.14/1.26 = 8.85 Hourly output: ________________
Direct Cost of Work Item = A+B+C = 34.91 Birr/ml.
Over head cost : 10% 3.49 "
Profit Cost: 15% 5.24 "
Total Unit Cost : 43.63 Birr/ml.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 32 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: _______________________
WORK ITEM: ( 13.32 ) 75 mm. dia. PVC Pipe EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: _____________________ RESULT: 57.00 Birr/ml.
A= Materials Unit Cost _______________________ B= Manpower Unit Cost ________________ C= Equipment Unit Cost ____________
Total of (1:02) Total of (1:03)
Hourly Output: _______________________ Hourly output: ________________
Direct Cost of Work Item = A+B+C =
Over head cost :
Profit Cost:
Total Unit Cost : 44.00 + 70.00 = 114/2 = 57 Birr/ml
Remark : Taken Average Of Item No. ( 13.31 ) And ( 13.33 )
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 33 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.93 ml./hr.
WORK ITEM: ( 13.33) 100 mm. Dia. PVC Pipe EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 6.51 ml. RESULT: 70.67 Birr/ml.
A= Materials Unit Cost 44.5642 Birr/ml. B= Manpower Unit Cost 11.97 Birr/ml. C= Equipment Unit Cost 0.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 11.14/0.93 = 11.98 Hourly output: _______________
Direct Cost of Work Item = A+B+C = 56.54 Birr/ml.
Over head cost : 10% 5.65 "
Profit Cost: 15% 8.48 "
Total Unit Cost : 70.67 Birr/ml.
Remark _____________________________________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 34 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 6.88 ml./hr.
WORK ITEM: ( 13.34 ) 10 cm. dia. Concrete Pipe EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 ml. RESULT: 20.32 Birr/ml.
A= Materials Unit Cost 12.343 Birr/ml. B= Manpower Unit Cost 3.91 Birr/ml. C= Equipment Unit Cost 0.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 26.90/6.88 = 3.91 Hourly output: _______________
Direct Cost of Work Item = A+B+C = 16.25 Birr/ml.
Over head cost : 10% 1.63 "
Profit Cost: 15% 2.44 "
Total Unit Cost : 20.32 Birr/ml.
Remark : _________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 35 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 6.88 ml./hr.
WORK ITEM: ( 13.35 ) 15 cm. dia. Concrete Pipe EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 ml. RESULT: 26.10 Birr/ml.
A= Materials Unit Cost 16.9695 Birr/ml. B= Manpower Unit Cost 3.91 Birr/ml. C= Equipment Unit Cost 0.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 26.90/6.88 = 3.91 Hourly output: _______________
Direct Cost of Work Item = A+B+C = 20.88 Birr/ml.
Over head cost : 10% 2.09 "
Profit Cost: 15% 3.13 "
Total Unit Cost : 26.10 Birr/ml.
Remark : ____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 36 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 6.88 ml./hr.
WORK ITEM: ( 13.36 ) 20 cm. dia. Concrete Pipe EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 ml. RESULT: 31.81 Birr/ml.
A= Materials Unit Cost 21.536 Birr/ml. B= Manpower Unit Cost 3.91 Birr/ml. C= Equipment Unit Cost 0.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 26.90/6.88 = 3.91 Hourly output: ________________
Direct Cost of Work Item = A+B+C = 25.45 Birr/ml.
Over head cost : 10% 2.54 "
Profit Cost: 15% 3.82 "
Total Unit Cost : 31.81 Birr/ml.
Remark : ____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 37 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 6.88 ml./hr.
WORK ITEM: ( 13.37 ) 30 cm. dia. Concrete Pipe EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 ml. RESULT: 43.30 Birr/ml.
A= Materials Unit Cost 30.729 Birr/ml. B= Manpower Unit Cost 3.91 Birr/ml. C= Equipment Unit Cost 0.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 26.90/6.88 = 3.91 Hourly output: ______________
Direct Cost of Work Item = A+B+C = 34.64 Birr/ml.
Over head cost : 10% 3.46 "
Profit Cost: 15% 5.20 "
Total Unit Cost : 43.30 Birr/ml.
Remark : ____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 38 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 3.13 ml./hr.
WORK ITEM: ( 13.38 ) 40 cm. dia. Concrete Pipe EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 ml. RESULT: 60.65 Birr/ml.
A= Materials Unit Cost 39.922 Birr/ml. B= Manpower Unit Cost 8.59 Birr/ml. C= Equipment Unit Cost 0.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 26.90/3.13 = 8.60 Hourly output: ________________
Direct Cost of Work Item = A+B+C = 48.52 Birr/ml.
Over head cost : 10% 4.85 "
Profit Cost: 15% 7.28 "
Total Unit Cost : 60.65 Birr/ml.
Remark : ____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 39 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 3.13 ml./hr.
WORK ITEM: ( 13.39 ) 60 cm. dia. Concrete Pipe EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 ml. RESULT: 99.57 Birr/ml.
A= Materials Unit Cost 71.065 Birr/ml. B= Manpower Unit Cost 8.59 Birr/ml. C= Equipment Unit Cost 0.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 26.90/3.13 = 8.60 Hourly output: _______________
Direct Cost of Work Item = A+B+C = 79.66 Birr/ml.
Over head cost : 10% 7.97 "
Profit Cost: 15% 11.95 "
Total Unit Cost : 99.57 Birr/ml.
Remark : ____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 40 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 3.13 ml./hr.
WORK ITEM: ( 13.40 ) 80 cm. dia. Concrete Pipe EQUIPEMENT:
TOTAL QANTITY OF WORK ITEM: 1 ml. RESULT: 163.59 Birr/ml.
A= Materials Unit Cost 122.28 Birr/ml. B= Manpower Unit Cost 8.59 Birr/ml. C= Equipment Unit Cost 0.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 26.90/3.13 = 8.60 Hourly output: _____________
Direct Cost of Work Item = A+B+C = 130.87 Birr/ml.
Over head cost : 10% 13.09 "
Profit Cost: 15% 19.63 "
Total Unit Cost : 163.59 Birr/ml.
Remark : ____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 41 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1.25 ml./hr.
WORK ITEM: ( 13.41 ) 100 cm. dia. Concrete Pipe EQUIPEMENT: Self Propelled Crane
TOTAL QANTITY OF WORK ITEM: 1 ml. RESULT: 270.27 Birr/ml.
A= Materials Unit Cost 173.495 Birr/ml. B= Manpower Unit Cost 21.52 Birr/ml. C= Equipment Unit Cost 40.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 26.90/1.25 = 21.52 Hourly output: 50.00/1.25 = 40.00
Direct Cost of Work Item = A+B+C = 235.02 Birr/ml.
Over head cost : 5% 11.75 "
Profit Cost: 10% 23.50 "
Total Unit Cost : 270.27 Birr/ml.
Remark : ____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 42 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 1.25 ml./hr.
WORK ITEM: ( 13.42 ) 120 cm. dia. Concrete Pipe EQUIPEMENT: Self Propelled Crane
TOTAL QANTITY OF WORK ITEM: 1 ml. RESULT: 307.36 Birr/ml.
A= Materials Unit Cost 205.75 Birr/ml. B= Manpower Unit Cost 21.52 Birr/ml. C= Equipment Unit Cost 40.00 Birr/ml.
Total of (1:02) Total of (1:03)
Hourly Output: 26.90/1.25 = 21.52 Hourly output: 50.00/1.25 =40.00
Direct Cost of Work Item = A+B+C = 267.27 Birr/ml.
Over head cost : 5% 13.36 "
Profit Cost: 10% 26.73 "
Total Unit Cost : 307.36 Birr/ml.
Remark : ____________________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 43 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.19 pcs./hr.
WORK ITEM: ( 13.43 ) 1 m3 cap. Water tank ( Black Iron Sheet ) EQUIPEMENT: Welding Machine
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 864.72 Birr/pcs.
A= Materials Unit Cost 560.154 Birr/pcs. B= Manpower Unit Cost 46.54 Birr/pcs. C= Equipment Unit Cost 179.41 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 8.75/0.188 = 46.54 Hourly output: 33.73/0.188 =179.42
Direct Cost of Work Item = A+B+C = 786.11 Birr/pcs.
Over head cost : 5% 39.31 "
Profit Cost: 5% 39.31 "
Total Unit Cost : 864.72 Birr/pcs.
Remark : __________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 44 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.13 pcs./hr.
WORK ITEM: ( 13.44 ) 2 m3 cap. Water tank ( Black Iron Sheet ) EQUIPEMENT: Welding Machine
TOTAL QANTITY OF WORK ITEM: 1 pcs. RESULT: 1456.58 Birr/pcs.
A= Materials Unit Cost 984.32 Birr/pcs. B= Manpower Unit Cost 70.00 Birr/pcs. C= Equipment Unit Cost 269.84 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 8.75/0.125 = 70 Hourly output: 33.73/0.125=269.84
Direct Cost of Work Item = A+B+C = 1324.16 Birr/pcs.
Over head cost : 5% 66.21 "
Profit Cost: 5% 66.21 "
Total Unit Cost : 1456.58 Birr/pcs.
Remark : __________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 45 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.19 pcs./hr.
WORK ITEM: ( 13.45 ) 1 m3 cap. Water tank (Galvanized Sheet Metal) EQUIPEMENT: Welding Machine
TOTAL QANTITY OF WORK ITEM: 1 pcs. = 6.3m2 RESULT: 1486.46 Birr/pcs.
A= Materials Unit Cost 1125.37 Birr/pcs. B= Manpower Unit Cost 46.54 Birr/pcs. C= Equipment Unit Cost 179.41 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 8.75/0.188 = 46.54 Hourly output: 33.73/0.188=179.42
Direct Cost of Work Item = A+B+C = 1351.33 Birr/pcs.
Over head cost : 5% 67.57 "
Profit Cost: 5% 67.57 "
Total Unit Cost : 1486.46 Birr/pcs.
Remark : __________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 46 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.13 pcs./hr.
WORK ITEM: ( 13.46 ) 2 m3 cap. Water tank ( Galvanaized Sheet Metal ) EQUIPEMENT: Welding Machine
TOTAL QANTITY OF WORK ITEM: 1 pcs.=10.5m2 RESULT: 2450.37 Birr/pcs.
A= Materials Unit Cost 1887.77 Birr/pcs. B= Manpower Unit Cost 70.00 Birr/pcs. C= Equipment Unit Cost 269.84 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 8.75/0.125 = 70 Hourly output: 33.73/0.125=269.84
Direct Cost of Work Item = A+B+C = 2227.61 Birr/pcs.
Over head cost : 5% 111.38 "
Profit Cost: 5% 111.38 "
Total Unit Cost : 2450.37 Birr/pcs.
Remark : __________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
- 47 -
ANALYSIS SHEET FOR DIRECT & INDIRECT UNIT COSTS
PROJECT: SANITARY INSTALLATION LABOUR HOURLY OUTPUT: 0.19 pcs./hr.
WORK ITEM: ( 13.47 ) 1 m3 cap. Water tank ( Aluminium ) EQUIPEMENT: Welding Machine
TOTAL QANTITY OF WORK ITEM: 1 pcs.=6.3m2 RESULT: 1593.59 Birr/pcs.
A= Materials Unit Cost 1236.06 Birr/pcs. B= Manpower Unit Cost 33.24 Birr/pcs. C= Equipment Unit Cost 179.41 Birr/pcs.
Total of (1:02) Total of (1:03)
Hourly Output: 6.25/0.188 = 33.25 Hourly output: 33.73/0.188=179.42
Direct Cost of Work Item = A+B+C = 1448.72 Birr/pcs.
Over head cost : 5% 72.44 "
Profit Cost: 5% 72.44 "
Total Unit Cost : 1593.59 Birr/pcs.
Remark : __________________________________________
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED OUTPUT.
-1-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
MDB with locable door 0 Foreman 1 0.45 5 2.25 0
Including all accesseries. No. 1 6600 6600 EL 1 1 5 5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 6600.00 Total ( 1:02 ) 8.50 Total (1:03) 0.00
Over head cost : 10% 666.80 "
Profit Cost: 15% 1000.20 "
Total Unit Cost : 8335.00 Birr/Pcs
-2-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
SDB with locable door 0 Foreman 1 0.45 5 2.25 0
Including all accesseries. No. 1 1300 1300 EL 1 1 5 5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 1300.00 Total ( 1:02 ) 8.50 Total (1:03) 0.00
Over head cost : 10% 136.80 "
Profit Cost: 15% 205.20 "
Total Unit Cost : 1710.00 Birr/Pcs
-3-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
diam.13mm conduit m 2.4 4.5 10.8 Foreman 1 0.45 5 2.25 0
pvc insulated conductor 0 EL 1 1 5 5 0
of 2x2.5mm2 m 4.7 4 18.8 Mason 1 1 3.75 3.75 0
connectors No. 1 0.4 0.4 Plaster 1 1 2.5 2.5 0
junction box No. 1 1.25 1.25 D/L 1 1 1.25 1.25 0
Total (1:-01) 44.75 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 7.43 "
Profit Cost: 15% 11.14 "
Total Unit Cost : 92.81 Birr/Pt
-4-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
diam.13mm conduit m 2.4 4.5 10.8 Foreman 1 0.45 5 2.25 0
pvc insulated conductor 0 EL 1 1 5 5 0
of 2x2.5mm2 m 4.7 4 18.8 Mason 1 1 3.75 3.75 0
connectors No. 1 0.4 0.4 Plaster 1 1 2.5 2.5 0
junction box No. 1 1.25 1.25 D/L 1 1 1.25 1.25 0
Total (1:-01) 38.75 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 6.83 "
Profit Cost: 15% 10.24 "
Total Unit Cost : 85.31 Birr/Pt
-5-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
diam.13mm conduit m 2.4 4.5 10.8 Foreman 1 0.45 5 2.25 0
pvc insulated conductor 0 EL 1 1 5 5 0
of 2x2.5mm2 m 4.7 4 18.8 Mason 1 1 3.75 3.75 0
connectors No. 1 0.4 0.4 Plaster 1 1 2.5 2.5 0
junction box No. 1 1.25 1.25 D/L 1 1 1.25 1.25 0
Total (1:-01) 31.25 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 6.08 "
Profit Cost: 15% 9.11 "
Total Unit Cost : 75.94 Birr/Pt
-6-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
diam.16mm conduit m 5.6 5.5 30.8 Foreman 1 0.45 5 2.25 0
pvc insulated conductor 0 EL 1 1 5 5 0
of 3x2.5mm2 m 11.2 5.25 58.8 Mason 1 1 3.75 3.75 0
Socket out let 16Amp. No. 1 14.5 14.5 Plaster 1 1 2.5 2.5 0
junction box No. 1 0.4 0.4 D/L 1 1 1.25 1.25 0
Total (1:-01) 104.50 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 13.40 "
Profit Cost: 15% 20.10 "
Total Unit Cost : 167.50 Birr/Pt
-7-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
diam.16mm conduit m 5.6 5.5 30.8 Foreman 1 0.45 5 2.25 0
pvc insulated conductor 0 EL 1 1 5 5 0
of 3x2.5mm2 m 11.2 5.25 58.8 Mason 1 1 3.75 3.75 0
Socket out let 10Amp. No. 1 12 12 Plaster 1 1 2.5 2.5 0
junction box No. 1 0.4 0.4 D/L 1 1 1.25 1.25 0
Total (1:-01) 102.00 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 13.15 "
Profit Cost: 15% 19.72 "
Total Unit Cost : 164.38 Birr/Pt
-8-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
diam.16mm conduit m 2.4 5.5 13.2 Foreman 1 0.45 5 2.25 0
pvc insulated conductor m 4.7 2.5 11.75 EL 1 1 5 5 0
junction box No. 0.33 0.4 0.132 Mason 1 1 3.75 3.75 0
Push button No. 1 11 11 Plaster 1 1 2.5 2.5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 36.08 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 6.56 "
Profit Cost: 15% 9.84 "
Total Unit Cost : 81.98 Birr/Pt
-9-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
diam.16mm conduit m 4 5.5 22 Foreman 1 0.45 5 2.25 0
Telephone cable wire m 2 1.5 3 EL 1 1 5 5 0
junction box No. 1 0.4 0.4 Mason 1 1 3.75 3.75 0
Flush mounted socket No. 1 12 12 Plaster 1 1 2.5 2.5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 37.40 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 6.69 "
Profit Cost: 15% 10.04 "
Total Unit Cost : 83.63 Birr/Pt
- 10 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
diam.16mm conduit m 4 5.5 22 Foreman 1 0.45 5 2.25 0
TV cable wire m 8 2.5 20 EL 1 1 5 5 0
junction box No. 0.5 0.4 0.2 Mason 1 1 3.75 3.75 0
Flush mounted socket No. 1 12 12 Plaster 1 1 2.5 2.5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 54.20 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 8.37 "
Profit Cost: 15% 12.56 "
Total Unit Cost : 104.63 Birr/Pt
-11-
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Indicator 1-8 Pcs 1 795 795 Foreman 1 0.45 5 2.25 0
Buzzer m 1 55 55 EL 1 1 5 5 0
Transformer /220-12Volt No. 1 55 55 Mason 1 1 3.75 3.75 0
0 Plaster 1 1 2.5 2.5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 905.00 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 94.19 "
Profit Cost: 15% 141.28 "
Total Unit Cost : 1177.34 Birr/No.
- 12 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Indicator 1-12 Pcs 1 950 950 Foreman 1 0.45 5 2.25 0
Buzzer m 1 55 55 EL 1 1 5 5 0
Transformer /220-12Volt No. 1 55 55 Mason 1 1 3.75 3.75 0
0 Plaster 1 1 2.5 2.5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 1060.00 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 109.69 "
Profit Cost: 15% 164.53 "
Total Unit Cost : 1371.09 Birr/No.
- 13 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Indicator 1-16 Pcs 1 1370 1370 Foreman 1 0.45 5 2.25 0
Buzzer m 1 55 55 EL 1 1 5 5 0
Transformer /220-12Volt No. 1 55 55 Mason 1 1 3.75 3.75 0
0 Plaster 1 1 2.5 2.5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 1480.00 Total ( 1:02 ) 14.75 Total (1:03) 0.00
Over head cost : 10% 151.69 "
Profit Cost: 15% 227.53 "
Total Unit Cost : 1896.09 Birr/No.
- 14 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Flourecent philips type TMS 0 Foreman 1 0.3 5 1.50 0
012/136with1xTLD36 watt No. 1 140 140 EL 1 1 5 5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 140.00 Total ( 1:02 ) 7.75 Total (1:03) 0.00
Over head cost : 10% 14.62 "
Profit Cost: 15% 21.93 "
Total Unit Cost : 182.75 Birr/No.
- 15 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Flourecent philips type TMW 0 Foreman 1 0.3 5 1.50 0
065/136with1xTLD36 watt No. 1 250 250 EL 1 1 5 5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 250.00 Total ( 1:02 ) 7.75 Total (1:03) 0.00
Over head cost : 10% 25.62 "
Profit Cost: 15% 38.43 "
Total Unit Cost : 320.25 Birr/No.
- 16 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Flourecent philips type 0 Foreman 1 0.3 5 1.50 0
TMW 065/236with1xTLD36 No. 1 450 450 EL 1 1 5 5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 450.00 Total ( 1:02 ) 7.75 Total (1:03) 0.00
Over head cost : 10% 45.62 "
Profit Cost: 15% 68.43 "
Total Unit Cost : 570.25 Birr/No.
- 17 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Simense 5NL-510 with 60watt No. 1 40 40 Foreman 1 0.3 5 1.50 0
0 EL 1 1 5 5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 40.00 Total ( 1:02 ) 7.75 Total (1:03) 0.00
Profit cost 15% 6.93 "
Total Unit Cost : 57.75 Birr/No.
- 18 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Simense 5NL-302/140watt No. 1 180 180 Foreman 1 0.3 5 1.50 0
0 EL 1 1 5 5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 180.00 Total ( 1:02 ) 7.75 Total (1:03) 0.00
Over head cost : 10% 18.62 "
Profit Cost: 15% 27.93 "
Total Unit Cost : 232.75 Birr/No.
- 19 -
Material Cost (1:01) Labour (1:02) Equipment Cost (1:03)
** Indexed
Cost per Labour by Hourly Hourly Type of Hourly Hourly
Type of Material Unit Qty * Rate Unit Grade No. UF Cost Cost Equipment No. Rental Cost
Incandecent with 60 watt lamp No. 1 3 3 Foreman 1 0.3 5 1.50 0
0 EL 1 1 5 5 0
0 D/L 1 1 1.25 1.25 0
Total (1:-01) 3.00 Total ( 1:02 ) 7.75 Total (1:03) 0.00
Over head cost : 10% 0.61 "
Profit Cost: 15% 0.91 "
Total Unit Cost : 7.63 Birr/No.
DEEP INC PLC
BUILDING CONSTRUCTION MATERIALS AND THEIR UNIT PRICES
Total List of Materials
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
B . MASONRY WORKS
C . CONCRETE WORKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
4 Reinforcement Bars
D . WALLING MATERIALS
- CHICKA WALLING
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
E . ROOFING MATERIALS
- CIS ROOFING
4 Corrugated Asbestos
5 Flat Asbestos
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
12 G 28 Gutter
13 G 28 Down Pipe
- CONCRETE ROOFING
17 Pumice M3 0.00 1
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
F . METAL WORKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
4 Angel Iron
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
14 Fisher
15 Flat Iron
G . CARPENTERY
4 Hardbord ( fisit ) 4 mm. thick Pcs. 44.00 44.00 1 1.20 x 2.20 cm.
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
21 Eucalyptus wood
25 Styro Phome
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
H . JOINERY
1 Door hinge
2 Window hinge
I . FINISHING MATERIALS
- WALL FINISHINGS
1 Ceramic tiles
- FLOOR FINISHINGS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
J . GLAZING MATERIALS
1 Clear glass
K . PAINTING MATERIALS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
L . SANITARY MATERIALS
- FITTINGS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
15 Water Boiler
19 Union
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
20 Elbow
21 Tees
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
22 Nipples
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
26 Reducer
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
- SEWERAGE SYSTEM
34 PVC Elbow
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
35 PVC Tees
36 PVC Y - Connection
37 PVC Reducer
38 Vent Cap
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
M . ELECTRICAL MATERIALS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
5 Socket fuse
6 HRS fuse
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
7 Electric wires
8 Cables
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
12 Bell ( buzzer )
13 Bell Transformer
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
14 Bell Indicator
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
18 Telephone Socket
25 Connectors
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
- ELECTRIC FITTINGS
28 Philips Incandicent
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
31 Philips Florecent
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
52 Candel Twisted
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
74 Siemens
No. TYPE OF MATERIALS UNIT UNIT PRICE UNIT UNIT PRICE CONVERTER REMARKS
75 Siemens SLB
The basic cost elements incorporated in each unit cost are mainly grouped in Direct & Indirect
costs .
Material cost : - This cost includes material , transportation , sales , & insurance charges .
Here all building materials are listed and it is suggested that purchasing
costs should be collected and listed at list once or twice in a year .
Also an expensive or aboundetly used types of building materials should
be identified and / or short listed in order to know their market price , at
list four times in a year .
In the determination of this cost different factors witch affect the quality &
quantity of materials like shrinkage , wastage , void spaces , denisities ,
concrete qualities and WCR are also considered .
Labour cost : - Crew formation and production outputs are basic parameters in the dete -
rmination of this labour cost . The type of construction activities done ,
wether conditions & distances are measure factors that affects this cost .
Crews directly involved in the construction activities are mainly grouped in
Skilled & Un - skilled labourers .
- Skilled labourers are : - Office & Site engineers , Formen , Masons ,
Carpenters , Painters , Plumbers , Electricians , Welders , Machine
operators , Chislers , Plasterers , Decorators , etc .
- Un - skilled labourers are : - Helpers , Daily labourers , etc .
Equipment & Machinery cost : - It is also a direct cost to be considered in some construction
activities where machineries and equipments are involved . It is calculated
on the basis of knowing the rental rates of machinories , or by considering
the depreciation values machineries , fuel costs , and wages of machine
operators .
From simple to complex types of machineries & equipments involved under
this construction firms are : - vibrating , cutting , washing , welding , and
drilling machines , concrete mixers , graders , dozers , loaders , scrapers ,
dumpers , rollers , trucks , cranes , pick - ups , automobils , pumps ,
crushers , generators , etc .
Overhead cost : - This cost includes costs of temporary office & store buildings constructed
at the construction sites , depreciation of office equipments & furnitures ,
water , lightning , telephone , & postage charges , costs of tools like
ladders , scaffolds , buckets , facades , hoes , water hoses , barrels ,
etc .
The total sum of the above expences are called the overhead cost of the
project and this is distributed among different items of the construction
activities . Most likely it is estimated to be some percentage of the mate
rial and labour costs in which it depends up on the type of project and /
or grade of contractors . For more informetion refer table No. 1.1
Profit cost : - Similarly the profit cost of a construction project is calculated by taking
some percentage of the " Direct costs " which depends up on the type
of projects . It is most likely smaller in percent for large scale projects
or ( high grade of contractors ) and bigger for small scale projects or ( low
grade of contractors ) . Refer Tabel No. 1 . 1
Table No. 1.1 Percentage of Overhead & Profit costs
Grade 1 35% 8%
Grade 2 30% 8%
AND THEIR
UNIT PRICES
1 Cement Qut.
2 Sand m3
3 Aggregate "
4 Formwork
- Timber formwork m2
5 Reinforcement bars
- dia. 6 mm. plain bars kg.
- dia. 8 mm. deformed bars "
7 Solid Blocket
8 Bricks Pcs.
Page 2
UNIT PRICES IN ( BIRR )
YEAR 1995 E . C . YEAR 1996 E . C .
No. TYPE OF MATERIALS UNIT 1st. Quarter 2st. Quarter 3st. Quarter 4st. Quarter 1st. Quarter 2st. Quarter 3st. Quarter 4st. Quarter REMARKS
- size G 35 Pcs.
- size G 32 "
- size G 28 "
13 Purlin
14 Eucalyptus wood
15 Floor tiles
- Cement tiles m2
- PVC tiles m2
16 Wall tiles
- Ceramic tiles m2
17 Clear glass
19 Paintings
20 Sanitary Fixtures
22 Gate valves
Page 5
UNIT PRICES IN ( BIRR )
YEAR 1995 E . C . YEAR 1996 E . C .
No. TYPE OF MATERIALS UNIT 1st. Quarter 2st. Quarter 3st. Quarter 4st. Quarter 1st. Quarter 2st. Quarter 3st. Quarter 4st. Quarter REMARKS
25 Distrbution Boards
28 Electric wires
29 Electric Cables
Page 6
UNIT PRICES IN ( BIRR )
YEAR 1995 E . C . YEAR 1996 E . C .
No. TYPE OF MATERIALS UNIT 1st. Quarter 2st. Quarter 3st. Quarter 4st. Quarter 1st. Quarter 2st. Quarter 3st. Quarter 4st. Quarter REMARKS
32 Bell Indicator
- 16 in Number "
33 Electrical fittings
UNIT PRICES