Documents No: GL/PGCIL-MEP/AMC-001 Ref NOA No:
ERTCC/CS/20-21/1-248/T-181/ AFSS/NOA/Service.
Revision No: 000 Dated-18,01.2021.
ANNUAL MAINTENANCE TEST PROCEDURE
FOR NOVEC 1230 GAS SUPPRESSION SYSTEM
Client:
POWERGRID
POWER GRID CORPORATIONOF INDIALIMITED
CF-17,Action Area-1C, New Town, Kolkata-700156
Submitted By:
GLYPTIC
Time Will Change Tomorrow
GLYPTIC
Raipur, Bhita,Burdwan, 713102, W.B
For POWER GRID CORPORATION OF INDIA
For GLYPTIC
LIMITED
GLYPTIC
Time Will Change Tomorrow
POWERGRID
NAME.Kamanngingon Mohya
DESIGNATION:
NAME:oun Kum
DESIGNATION:
Date: 07:0|1o3 Date:
Page 1
Documents No: GL/PGCIL-MFP/AMC-001 Ref NOA No:
ERTCC/CS/20-21/1-248/T-181/AFSS/NOA/Service.
Revision No: 000
Dated-18.01.2021.
ANNUAL MAINTENANCE TEST PROCEDURE
FOR NOVEC 1230 GAS SUPPRESSION SYSTEM
PROJECT:
Supply of Goods Contract for Automatic Fire
Suppression System at Muzaffarpur,Bihar
NOA No:
ERTCC/CS/20-21/-248/T-181/AFSS/NOA/Service. Dated-18.01.2021.
NAME OFTHE SITE:
POWER GRID CORPORATION OF INDIA LIMITED
400/220 K.V MUZAFFARPUR SUB STATION
SITE LOCATION:
POWER GRID CORPORATION OFINDIA LIMITED
400/220 K.V MUZAFFARPUR SUB STATION
For GLYPTIC For POWER GRID CORPORATION OF INDIA
LIMITED
GLYPTIC
Time WIli Change Tomorrow POWERGRID
NAME VAHKuma Metkya NAME:
fassen kuns
DESIGNAT*ON:
Date:
noer DESIGNATION:
Date:
le g
Page2
Documents No: GL/PGCIL-MFP/AMC-001 Ref NOA No:
ERTCC/CS/20-21/1-248/T-181/ AFSS/NOA/Service.
Revision No: 000 Dated - 18.01.2021.
Annual Maintenance Testing conducted at:
|Mu2affarpurt 4oo| 9A0 KV Substahon powen gtct
Address: Coreporahon of hia imited.
|Vll P.o- ayapen Kafen.
|NH 77, atna roac
Mu2adfaep un. Bihat - 8u4|24:
Annual Maintenance Testing period:
From:
06-I1-9093
To:
Test Result Passed/ Failed
Testing Conducted by Testing Witnessed by
Waknar Mekiya fuwen n
oh1leg
M/s GLYPTIC POWERGRID CORPORATION OF INDIA
LIMITED
For POWER GRID CORPORATION OF INDIA
For GLYPTIC LIMITED
GLYPTIC
Time WIII Change Tomorrow
POWERGRID
NAME:
NAME:oHKurnouS DESIGNATION:
DESIGNATION: EgRA
Date: 07 093 Date:
Page 3
Documents No: GL/PGCIL-MEP/AMC-001 Ref NOA No:
Revision No: 000 ERTCCICS/20-21/-248/T-181/AFSS/NOA/Service.
Dated-18.01.2021.
SL No. Type of Test Page No.
A
Introduction 5
1 Visual Check 6
2 System Level Functional Test
3 Maintenance Successful of the System
For POWER GRID CORPORATION OF INDIA
For GLYPTIC
LIMITED
GLYPTIC
Time WIIChange Tomorrow POWERGRID
NAME:akumaMehya
DESIGNATION: ngingon
NAME:
DESIGNATION:
auan
d
Kumah
Date: U: Dos. Date:
Page 4
Documents No:GL/PGCIL-MFP/AMC-001 Ref NOA No:
ERTCCICS/20-21/1-248/T-181AFSS/NOA/Service.
Revision No: 000
Dated-18.01.2021.
A. Introduction
Novec1230 gas suppression system:
Maintenance of Novec1230 gas sUppression system following its installation is of utmost
importance. Maintenance of fire safety systems, if not done properly and thoroughly, can have
disastrous implications.
Maintenance of fire and life safety systems may be the periodical operational test of the system
and alarms before there is an event requiring the system (i.e. fire) to function. Proper maintenance
will always keep the system ready for each and every events/lincident may/willoccur.
This Checklist outlines general requirements for maintenance of Clean Agent Fire Extinguishing
Systems. Information contained herein applies to typical instances.
The approved drawings and documentation for clean agent Fire Extinguishing System shall
maintain and compare with the present condition of the system or system availability at site to
compare the system error if any at site. Maintenance shall be scheduled in advance.
For GLYPTIC
For POWER GRID CORPORATION OF INDIA
LIMITED
e
GLYPTIC
Time WilChange Tomorrow POWERGRID
NAME:akumatMeya
DESIGNATION: Ehingen
NAME:
DESIGNATION:
Date: 0 D6N3 Date:
Page5
Documents No: GL/PGCIL-MEP/AMC-001 ERTCCICS/20-21/1-248/T-181/AFSSINOAService.
Ref NOA No:
Revision No: 000
Dated-18.01.2021.
1. Visual Check
Aim: The aim of visual check is to check for proper system availability/ damage of equipment as per
guidelines of manufacturer/OEM for their satisfactory operatlon.
Parameters to be checked:
1. ldentification and verification of items Installed at site as per BOQ.
2. Check for physical damage or faulty if any.
3. If any device / parts the faulty immediately repair / replace.
4. Periodic cleaning of detectors have to do during preventive maintenance.
Item Description Testing Result
MS Seamless Cylinder with valve, PESO
appd Visual and Check
Cylinder Pressure
Capacities: t20L Q46 K
Master Cyl accessories:
Electric Control Head 24VDC with Manual Visual
lever (Electrical Actuator)
Discharge Hose Visual OK
Seamless Pipes with pipe fittings Visual
Discharge Nozzles Visual
2 Zone Fire Alarm cum Gas Release Panel
with bateries &battery charger Visual OK
Manual Release Switch Visual 0K
Manual Abort Switch Visual
OK
As perr prsss ure gouse ylindar I 24"8 bart, cHlindat - 24-8 bar
And Glinden 3 - Q4-8 bar.
For GLYPTIC For POWER GRIDCORPORATION OF INDIA
LIMITED
GLYPTIC
Time Wil Change Tomorrow POWERGRID
NAME:aiuna
DESIGNATION: ngine
Mattyo NAME:
DESIGNATION:
awen Kumn
Date: O7I12023 Date:
Page 6
Documents No: GL/PGCIL-MFP/AMC-001 Ref NOA No:
ERTCCICS/20-21/-248/T-181/AFSSINOAService.
Revision No: 000
Dated-18.01.2021.
Control Cables 2 core x 1.5 sq.mm FRLS Visual
PVCarmoured copper conductor OK
Photoelectric Smoke Detectors Visual
oK
Electronic Hooter with strobe Visual
OK
Caution &Warning Sign Visual
Test Result Passed/ Failed
Testing Conducted by Testing Witnessed by
Mafya
M/s GLYPTIC POWERGRID CORPORATION OF INDIA
LIMITED
For POWER GRID CORPORATION OF INDIA
For GLYPTIC
LIMITED
GLYPTIC
Time WIIIChange Tomorrow POWERGRID
NAME: oKuno MGkya NAME:
DESIGNATION: Lneer DESIGNATION:
Date: O7-903 Date:
Page|7
Documents No: GL/PGCIL-MFP/AMC-001 Ref NOA No:
ERTCCICS/20-21/1-248/T-181/AFSS/NOA/Service.
Revision No: 000
|Dated-18.01.2021.
2. System Level Functional Test
Aim: The functionality and various parameters of AFSS as a complete shall be tested as per the
specification.
Parameters to be checked:
1. First of all, removed the electric actuator from master cylinder head before start the system
level functional test.
2. Details provided in the column "Test willbe performed and to be verified at site.
Item Description Test Result
Electric Control Head 24VDC with
Manual lever (Electrical Actuator)
Functional test (only
actuation to be checked) OK
2 Zone Fire Alarm cum Gas
Release Panel with batteries & Functional test
OK
battery charger
Manual Release Switch Functional test
OK
Manual Abort Switch Functional test
Photoelectric Smoke Detectors Functional test
OK
Electronic Hooter with strobe Functional test
OK
Test Result Passed/ Failedu)991
Testing Conducted by Testing Witnessed by
Hajkuamon Maiy
POWERGRID CORPORATION OF INDIA
LIMITED
M/s GLYPTIC
For GLYPTIC
For POWER GRID CORPORATION OF INDIA
LIMITED
GLYPTIC
Time Will Change Tomorrow POWERGRID
NAME: NAME: Yaeun kumes
DESIGNATION: hginoot DESIGNATION: Helel
Date: Date:
Page 8
Documents No: GL/PGCIL-MEP/AMC-001 Ref NOA No:
ERTCCICS/20-21/-248/T-181/AFSS/NOA/Service.
Revision No: 000 Dated - 18.01.2021.
3. Acceptance of Successful Maintenance
1. On successful testing of electrical actuator operation by simulating fire conditions at the
panel, final acceptance to be given.
2. The electrical actuator can now be placed on the master cylinder and System is made
operational.
Test Result Passed/ Failed
Testing Conducted by Testing Witnessed by
M/s GLYPTIC POWERGRID CORPORATION OF INDIA
LIMITED
For GLYPTIC
For POWER GRID CORPORATION OF INDIA
LIMITED
GLVPTIC
Time Will Change Tomorrow POWERCRID
NAME: aikanan Memya NAME:
fawnkums.
DESIGNATION: Aginler DESIGNATION: lad Engg
Date: Date: 07ul23
Page 9