Evaluation of The Implementation of The Paris Declaration On Aid Effectiviness: Phase Ii
Evaluation of The Implementation of The Paris Declaration On Aid Effectiviness: Phase Ii
GHANA
Country Report
Final Report
Conducted by:
Correspondence:
Peter Quartey (PhD)
Institute of Statistical, Social and Economic Research
University of Ghana
Box LG 74, Legon
E-mail: [email protected]; [email protected];
[email protected]
1
ACKNOWLEDGEMENT
We wish to acknowledge the contributions of Gloria Dufu, Godwin Awuah, Lorna Geli, Elvis
Agyare-Boakye and all the members of the National Reference Group especially Captain
Patrick Donkor (Rtd), Mr. Charles Tsegah, Dr. Emmanuel Akwetey, Ms Mary-Anne Addo etc.
We are also grateful to all those who took time off their busy schedules to participate in the
survey. Errors and Omissions are ours.
2
ACRONYMS
4
TABLE OF CONTENTS
Executive Summary
1. INTRODUCTION 10
2. Context
2.1 Background to Ghana’s Economy 14
2.2 Aid in Context 18
3. Findings 23
3.1 Key Factors that shaped & limited PD Implementation & Outcome 23
3.2 Implementation of PD and Efficiency of Aid 29
3.3 Implementation of PD & Sustainable Development Results 45
3.4 Conclusions
5. Annexes 68
5
Executive Summary
Ghana has since the Accra High Level Forum been identified as one of the Anglophone
countries to participate in the Phase II of the Global Evaluation of the PD. This phase of the
evaluation which started in early 2010 is expected to feed into the 4th High Level Forum
scheduled for 2011. As set out in the ToR, the overall purpose of this evaluation is to provide
information about the development results achieved thus far as a result of increased aid
effectiveness practices. Specifically, the evaluation will assess the PD on aid effectiveness,
development effectiveness and poverty reduction. Three key questions were addressed in this
evaluation including:
• “What are the important factors that have affected the relevance and implementation of the
Paris Declaration and its potential effects on aid effectiveness and development results?”
(The PD in context)
• “To what extent and how has the implementation of the Paris Declaration led to an
improvement in the efficiency of aid delivery, the management and use of aid and better
partnerships?” (Process outcomes)
• “Has the implementation of Paris Declaration strengthened the contribution of aid to
sustainable development results? How?” (Development outcomes)
The evaluation methodology involved a mix of both qualitative and quantitative research
techniques. Information and opinions were sought in one of three ways: face to face interviews
with officials drawn from institutions spanning central government, sector ministries, quasi-
government institutions, development partners, civil society and the private sector. Sampling of
respondents was done purposive and priority given to three sectors for case studies: education;
health and agriculture. A total of 29 questionnaires were received comprising donors (12),
government (5), and civil society organizations (9) and others (3). A comprehensive list of key
informants and institutions interviewed are provided at the appendix. In addition, three
projects in three sectors, namely, agriculture, education and health were evaluated in terms of
their development outcomes. The projects spanned the Northern region, Eastern, Ashanti and
Central regions of Ghana. Focus group discussions were held (two separate groups per sector)
with 6-8 beneficiaries per project in addition to face-to-face interviews with project managers
on development outcomes.
The Phase II evaluation of the implementation of the Paris Declaration noted that moderate
progress has been made in terms of Ownership over the past five years. There has been modest
improvement in consultations and coordination; for instance, there have been discussions on
the implementation of national development policies and priorities at Ministerial and Cabinet
level and DPs have provided oversight responsibility in its implementation. Civil society
organizations have also been engaged in CG meetings and other aid effectiveness discussions
although stakeholders were of the view that these engagements have been adhoc and yet to be
institutionalized.
The review also reported that there has been a significant improvement in the alignment of
projects with Ghana’s development strategies although off-budget and off-plan activities still
remain, thus, indicating lack of alignment with GoG priorities and systems. It must be noted
that although a new aid landscape is emerging, aid effectiveness challenges still remain.
6
Challenges with country systems and non-use or partial use by donors due to mistrust has
undermined country systems
Aid harmonization is one of the areas which have seen greater improvement particularly the
decoupling of aid for projects from the consolidated fund. Nevertheless, harmonization within
certain areas has been reported to be slow. Little progress is reported on the way GoG steers
the strength of donors and there is general lack of transparency in the way `non-traditional’ or
`emerging’ donors like the BRICKs operate. Uneven progress is reported of joint analytical
work and shared missions thereby limiting progress on reducing transactions cost of aid.
The PD principle on managing for results has seen modest improvement in the last two years
especially in the way aid conditions or `conditionalities’ have been developed transparently
and in consultation with government and other donors. However, the cost of managing aid
continues to be high for partner and donor countries and this is not likely to decline soon in
view of the increase in aid. Some areas of improvement however include the new guideline on
managing for results developed by the NDPC for MDAs to formulate M&E plans and also
some donors have been providing multi-year indicative funding and quarterly information on
disbursement
Mutual accountability in terms of resource flow and achievement of results has recorded little
improvement over the past two years and goes to confirm Ghana’s recent position on the
Corruption Perception Index. Evidence of improvements can be seen in terms of mutual trust
and respect, open dialogue and flexibility between DPs and government. A high degree of
openness was demonstrated by both parties at the 2010 CG meeting and the renewed
commitment by DPs towards the development of the DP-PAF. Recent debates on the floor of
parliament especially on the STX Housing Agreement are a typical example of improved
accountability. However, accountability it is noted has been more skewed towards GoG and
less towards donors. There is incomplete information on donor contributions to CSOs and
some donors are unwilling to provide such information when requested for.
Development Results has been the focus of aid effectiveness discussions and policies in recent
times with the alignment of donor policies on aid to the national development framework.
There has been a partial improvement in the efficiency of aid delivery over the past five year
according to the 2010 PD evaluation survey. The funding of agricultural value chain as well as
other key interventions particularly in infrastructure development are key areas where aid is
helping to leverage the country’s own policies and programmes to achieve higher national
objective. The provision of aid effectiveness platform which has promoted dialogue between
donors, government and civil society are all clear evidence of improvements in development
outcomes. PD has also helped to institutionalize good governance practices such as press
freedom and the fight on corruption. Project level outcomes have also confirmed the
improvement in aid effectiveness. However, despite these positive outcomes, PD has had
unintended effects which have limited its development outcome. The new complex aid
architecture comprising a mixture of programme and project aid makes a lot of demands on aid
administrators and the government machinery. Significant amount of time is spent at meetings
and other aid related activities thus adding to the transactions cost and reducing the
development outcomes of aid.
The Accra Agenda for Action (AAA) also noted that the predictability of aid has improved
with DPs routinely providing multi-annual indicative funding commitment and quarterly
7
reports on disbursements. Capacity building to strengthen country systems are on-going
especially the Public Procurement Authority and the Audit Service. Capacity building is an
integral part of the PFM. The use of process and policy conditionality by DPs particularly
those subject to the interpretation of donors is undermining aid delivery. Although there have
been some improvements in aid conditionalities over the past five years, DPs continue to put
significant demands on government in terms of time reporting needs uncoordinated missions
and meetings all add to the already high levels of transactions costs. This has been attributed to
the lack of delegation of authority of donor HQ to local offices not forgetting the high staff
turnover rate and in some cases low quality staff used in DPs local offices. Finally, evidence of
de facto untying exists but technical cooperation still remains tied.
In view of the above findings from the 2010 evaluation of the implementation of the PD, the
following recommendations are made:
Government of Ghana
(i) The Government of Ghana should strive to improve its systems to build the trust of
donors to also use them. Annual budget provisions and regular monitoring of progress with
such country systems will gradually build trust and confidence in the systems to encourage
its use by donors which will then lead to its perfection
(ii) The government should ensure better consultation with civil society members by
institutionalizing the consultation process with CSOs. The current consultation process
seems adhoc;
(iii) Transparency with new loans particularly with the BRICKS should be promoted in
order to build mutual trust with other partners;
(iv) Another major issue is corruption and how this is addressed. It is true that there has
been a marginal improvement in corruption and how they are dealt with but there is more
room for improvement. The way corruption investigations are quickly initiated but the end
does not merit the resources committed to such investigations should be checked
(v) Government should also invest in promoting the availability of data at the MDAs to
promote the tracking and monitoring of aid funds to the beneficiary level
Donors
(i) As Ghana continues to develop and improves on its accountability systems, it is
expected that DPs will provide significant amounts of aid that can help transform the
structure of the economy to promote growth and poverty reduction. Donors should also
increase aid to Ghana and ensure that aid is provided in a much more coordinated way
whether in the form of projects or budget support. In addition, in as much as donors strive
to be responsible to their tax payers, they should together with the Government of Ghana
ensure that there is full information on aid projects to the Ghanaian citizens.
(ii) The review indicated that transparency issues surrounding `emerging’ or non-DAC
donors are of concern to DPs and civil society. Thus, non-traditional donors should also be
brought on board the harmonization process in order to ensure that transactions cost is
reduced significantly.
8
(iii) Donors should also harmonize their aid procedures; the recent pace at harmonization is
very slow (see the Ghana Aid Harmonization Matrix. There should be a shift from project
funding towards pooled or programme funding by ensuring that the various projects are
integrated into the GPRS to avoid stand-alone projects.
(iv) The non-use or partial use of country systems continues to challenge aid effectiveness
in the country. DPs are used to `own style’ and coupled with their limited institutional
arrangements, they have made limited improvement in aligning with country systems. It is
only when such systems are used and reformed that the expected `perfect’ system can be
operational. Thus, it is important that as donor continue to provide assistance they strive to
build the capacity of local project managers and implementers
(v) The high turnover of DP project staff and quality issues with field staff were mentioned
as a key challenge to aid effectiveness. Thus, DP HQ should strive to promote continuity of
staff and also address the quality issues that undermine aid effectiveness
(vi) Although the PD requires mutual accountability, it has been reported that accountability
has been skewed towards the partner country with little accountability from DPs. DP
funding to civil society organizations, project funding have not been communicated to
Government thereby encouraging off-budget spending and corruption;
(vii) Aid conditionalities still remain and the mixture of project, programme and
pooled funding has led to a complex aid architecture with its associated high transactions
cost. Thus, donors should continually shift from project funding towards programme of
pooled funding
(viii) A major issue with progress on the AAA is the existence of tied aid. Donors
continue to operate tied aid system particularly with procurement of goods and technical
assistance. As DPs strive to move towards pooled funding, this challenge can be minimized
(ix) Donors and the government should promote accountability of aid funds to civil society
in Ghana by ensuring that aid data in a disaggregated form is made available and
accessible. There should also be a system in place to ensure that funds are tracked to their
recipients. We understand ADMD is working on this and it is hoped this will significant
enhance the impact of aid in Ghana
Civil Society
(i) Civil Society Organizations should be restructured into clusters to serve as stakeholders
and not just watch dogs
(ii) Civil society should form watch dogs to discuss aid projects and also serve as
monitoring tools for aid projects in Ghana, though there is no indication DPs aid in Ghana
are not run adequately. However, tracking aid funds to recipients has been a major
challenge to aid effectiveness in Ghana as revealed by an ODI study. Thus civil society
watchdogs will significantly highlight problems associated with corruption, misapplication
of aid funds and the problem of `white elephant’ projects.
(iii)Civil Society Organizations participation in aid effectiveness discussions should be
inclusive and institutionalized in order to get effective participation and ownership
9
1. Background
Controversies about aid effectiveness date s back decades and although attempts have been
made in the past to address this issue, this has not yielded the desired results. A recent review
of the aid management system was in March 2005 when over one hundred Ministers, Heads of
Agencies, and Senior Officials from 90 countries met in the French capital and agreed on a
substantial re-orientation of international aid dubbed `The Paris Declaration on Aid
Effectiveness’. The Paris Declaration (PD) represents a significant milestone in the process of
reforming aid delivery and management to achieve improved effectiveness and results. The
various countries represented committed to increase efforts towards aid harmonization,
alignment, managing aid for results and ensuring mutual accountability with a set of
monitorable actions and indicators. During the past five years, the debate about the
effectiveness of international aid, in particular, on whether aid predicated on the PD’s five
principles is more effective in generating human development and the fight against poverty,
has intensified.
The first evaluation of the early implementation of the Paris Declaration, from March 2005 to
late 2007 focused on assessing the changes of behavior and identifying better practices for both
donors and their partners in implementing the agreed actions. Phase I of the evaluation
concluded the following 1 : (i) Ownership - moderate progress has been made and the key
challenge is that the operationalization of the Poverty Reduction Strategy is incomplete, with
activities not monitored; (ii) Alignment – progress towards this action was moderate because
government lead and information capture has been weak in some areas; (iii) Harmonization –
low progress was recorded due to uneven harmonization across sectors and donors, with some
major areas of weakness; (iv) managing for results – moderate progress since good poverty
data is not matched by equally good data on budget execution/activities; (v) mutual
accountability – moderate score was given since the aid effectiveness matrix was only seen as a
first step and therefore priority actions require a demonstration that monitoring commitments
can change behavior.
Subsequently, the Accra High Level Forum on Aid Effectiveness (Accra HLF) was held in
2008 where the Accra Agenda for Action (AAA) was drawn up which also builds on the
commitments agreed in the Paris Declaration. The AAA is an agenda to accelerate progress
and has four actions, namely, (i) Predictability – donors will provide 3-5 year forward
information on their planned aid to partner countries; (ii) Country systems – partner country
systems will be used to deliver aid as the first option rather than donor systems; (iii)
conditionality – donors will switch from reliance on prescriptive conditions about how and
when aid money is spent on conditions based on the developing country’s own development
objectives; and (iv) untying – donors will relax restrictions that prevent developing countries
from buying the goods and services they need from whomever and wherever they can get the
best quality at the lowest price.
1
OECD 2007, 2006 Survey on Monitoring the Paris Declaration, Ghana
10
1.2 Purpose and Scope of Phase II
Ghana has since the Accra HLF been identified as one of the Anglophone countries to
participate in the Phase II of the Global Evaluation of the PD. This phase of the evaluation
which started in early 2010 is expected to feed into the 4th High Level Forum scheduled for
2011. As set out in the ToR, the overall purpose of this evaluation is to provide information
about the development results achieved thus far as a result of increased aid effectiveness
practices. Specifically, the evaluation will assess the PD on aid effectiveness, development
effectiveness and poverty reduction. The specific objectives of the evaluation include:
The three core evaluation questions which form this logic chain in this report are as follows:
• Q1: “What are the important factors that have affected the relevance and implementation of
the Paris Declaration and its potential effects on aid effectiveness and development results?”
(The PD in context)
• Q2: “To what extent and how has the implementation of the Paris Declaration led to an
improvement in the efficiency of aid delivery, the management and use of aid and better
partnerships?” (Process outcomes)
• Q3: “Has the implementation of Paris Declaration strengthened the contribution of aid to
sustainable development results? How?” (Development outcomes)
11
the PD evaluation on aid outcomes. In addition, desk-based research and review of relevant
existing reports and secondary data were carried out.
In order to effectively address the issues raised in the ToR, the evaluation ensured that
responses are based on factual and reliable data as well as on valid analyses. The triangulation
of methods used are but not limited to the following:
Limitations
The study had a few limitations including the following: first, it is an opinion survey and
sometimes hard core evidence is unavailable or cannot be provided to support certain
assertions. Secondly, the study was delayed in view of the CG meeting at the time which
coincided with the survey period. Hence, respondents who are knowledgeable on the PD also
had to attend the CG meetings thus the delay in gathering field information.
12
The rest of the report is organized as follows: section two provides a brief overview on the
economy and discusses the aid landscape in Ghana. Section three evaluates the outcome of the
PD principles, specifically key factors that have shaped and limited PD implementation and
outcome; implementation of PD and efficiency of aid and implementation of PD and
sustainable development results. The final section outlines key lessons, challenges and
recommendations.
13
2. CONTEXT
The economy of Ghana is predominantly agricultural based with primary products as the main
export commodities. Ghana’s GDP growth rate of 2009 represented a decrease in real per
capita GDP growth rate of 4.7% down from 7.3% in 2008. However, between 2002 and 2009,
the economy experienced real GDP growth of 5.4%. With the introduction of the price stability
monetary policy, inflation had declined from 40.5% in 2000 to 21.3% and 15.2% in 2001 and
2002 respectively. However, petroleum price increases of about 100% in the first quarter of
2003 led to increased demand for higher wages which led to an increase in end of period
inflation to 23.6% in 2003 but thereafter, it fell to 11.8% in 2004. Although in September
2005, inflation had increased to 13.5%, by June 2007, inflation had declined to 10.7%. From
2008 to 2009 inflation decreased from 18.13% to 15.70% but by September 2010, inflation has
declined to a single digit.
The rate of depreciation in the exchange rate was also relatively stable compared to the period
preceding the price stability policy. The local currency (¢) depreciated by 49.8% against the
US dollar in 2000 but again, due to the policy of price stability, the rate of depreciation in the
local currency against the US dollar declined to 8.3% and 9.3% in 2002 and 2003 respectively.
The Cedi depreciated by 2.3%, 0.4% and 0.2% against the US dollar 2 in 2004, 2005, and 2006
respectively. The Cedi also depreciated by 23% against the Euro in 2002 but the rate of
depreciation declined subsequently and by end 2006 it had depreciated by 14.4% against the
Euro. A similar declining trend was observed for the British pound (Bank of Ghana, 2007). In
2009, as a result of the relatively unstable macroeconomic environment, the cedi depreciated
significantly against the three major currencies, namely, (US dollar (17.7%), the Euro (27.4%)
and the British Pound (19.0%) respectively. The rate of depreciation of the British Pound was
much higher in 2009 than in the preceding year and the major depreciation in the pound
occurred during the second quarter of 2009
One major area of concern is whether the growth rates and recorded have translated into
poverty reduction and improvements in the human development indicators. Evidence obtained
from the 5th Ghana Living Standards Survey, (GLSS 5, 2005/06) indicates that upper poverty
levels have declined from 1998/99 level of about 39.5% to about 28.5%. Extreme poverty also
declined from 26.8% in 1998/99 to 18.2% in 2005/06.
However, the same cannot be said of the ten regions of Ghana; whereas the level of deprivation
in Accra increased, that of the nine regions declined (Ghana Human Development Report,
2004). This is further supported by the GLSS 5, which saw extreme poverty increasing to 6.2%
in Accra. The central and eastern regions experienced the largest decline in poverty during the
period and this may be attributed to the concentration of programmes implemented under the
President’s Special Initiatives on cassava, pineapples and oil Palm (central region) and
2
The dollar was weak against the major international currencies during this period
14
increased export of pineapples and cocoa in the eastern region. With the exception of the Accra
and Upper West, poverty declined in all the regions of the country.
The extent to which this can be sustained can be explained by development in the key sectors
of the economy. The economy can be divided into three broad sectors known as the
agricultural, the industrial and the service sectors with the agricultural sector being the largest
sector of the economy. Notwithstanding, its contribution fell from 38.0% in 2007 to 33.6% in
2008. The sector also contributed 37.9% of Ghana’s foreign exchange earnings in 2008. Since
2001, cocoa contributed significantly to the productivity gains although cocoa farmers are not
among the poorest group in society and therefore goes to question the pro-poor nature of the
growth rates recorded. It is also important to highlight that Ghana’s agricultural sector
continued to be dependent on rainfall. A major component of production cost is the cost of
inputs which are very high, making it difficult for smallholders who dominate the sector to
afford them.
The industrial sector contributed 25.9% of GDP in 2008 but declined to 24.9% in 2009.
However, between 2004 and 2008, the sector contributed 27.5% of GDP. The sector‘s growth
rate increased from 7.4% in 2007 to 8.1% in 2008 but declined to 1.6% in 2009. This appears
to have affected growth of the economy in 2009. The decline in construction in 2009 explains
to a large extent the abysmal performance of the industrial sector. The performance of the
manufacturing subsector clearly underlies the strong performance of the sector; from 2007, the
subsector grew from -2.3% to 4.5% in 2008. The service sector facilitates the functioning of
the agricultural and industrial sectors by providing an enabling environment for products and
factor markets to function more efficiently. The service sector contributed 31.8% of GDP in
2008. From 2004 to 2008, the average contribution was 32.6%. The average growth for the
sector between 2003 and 2008 was 6.1%. Between 2007 and 2008, it grew from 8.2% to 9.3%.
The graph indicates that in 2008 the services sector grew by 9.3% compared with growth rate
of 8.1% for industry and 5.1% for agriculture. Agriculture continues to have the largest share
of national output at 33.6% in 2008 to 34.9% in 2009 despite being the slowest growing sector.
15
Figure 1: Sectoral Growth Performance (2000-2008)
It is important to note that the performance of agriculture has usually been driven by cocoa
subsector. Growth in the cocoa production and marketing subsector dropped from 6.5% in
2007 to 5% in 2008. Structural transformation would generally require a greater share of
national output coming from the productive sectors. However, there is no sign of that
happening despite the faster growth in industry and services.
16
Trends in Exports and Imports
In recent past, imports have tended to grow faster than exports. While the total import bill for
2008 rose by about 27% from US$8066.11 million in 2007 to US$10260.97 million, total
exports receipts rose by about 26% from US$4194.71 million in 2007 to US$5275.33 million
in 2008.
The total export value of cocoa rose from US$1103.2 million in 2007, to US$1519.5 million in
2009; representing an increase of 38% over the period. Gold continue to dominate the mineral
subsector in 2008, earning US$ 2257.0 million and taking 96.3% of total earnings from
minerals. While Manganese experienced increased earnings in 2008, both diamond and bauxite
had a drop in 2008. The table below shows mineral exports from 2004 to 2008 in million US
dollars.
17
2.2 The Aid Architecture in Ghana
Ghana currently receives aid in various forms, including general budget support, sector budget
support (mainly health and education), and project aid using parallel systems. Until the mid-
1960s, aid flows were relatively unimportant in Ghana (Harrigan and Younger 2000) because
the Nkrumah government was highly suspicious of the major donors, i.e., Britain and the USA,
which did not help the already poor state of affairs. But more particularly, the economy, as it
emerged from colonial rule (Killick 1978; Brownbridge 1994; Quartey 2002) had inherited
substantial foreign exchange reserves, little debt, and a small public sector. Very little foreign
exchange and budgetary support were needed until the 1961 balance-of-payments crisis
(Killick 1978; Harrigan and Younger 2000; Quartey 2005). Although there was an interest in
attracting aid after 1961, Nkrumah’s criticism of Britain and the USA, the two major western
donors 3 made them less attractive sources of assistance. Eventually, Nkrumah did succeed in
attracting support from the eastern bloc but the relationship deteriorated early in the
programme and this severely limited disbursement (Killick 1978).
Aid to Ghana has been provided by its development partners; bilateral and multilateral donors.
However, some further `informal’ classification exist, namely, traditional donors and non-
traditional donors. The former currently comprise of the 23 multilateral and 24 bilateral
donors 4 . The multilateral donors are: The World Bank, African Development Bank (AfDB),
European Union (EU), Nordic Development Fund, Arab Bank for Economic Development in
Africa, European Investment Bank, OPEC Fund for International Development (OFID), Global
Fund to Fight Aids, Tuberculosis and Malaria (Global Fund), Global Alliance for Vaccines and
Immunization (GAVI), and 12 organs/agencies of the United Nations 5 . The World Bank
remains the largest multilateral donor, providing over 45% of the multilateral annual average.
The bilateral donors is made up of traditional donors like Australia, Austria, Belgium, Canada,
Denmark, Finland, France, Germany, Italy, Japan, Netherlands, Norway, Spain, Sweden,
Switzerland, the UK, and USA. Non-traditional bilateral donors who are increasingly
becoming important in Ghana’s aid architecture include the BRICK countries, the Saudi Fund,
and the Abu Dhabi Fund. These non-traditional donors do not participate actively in current aid
coordination efforts with the traditional donors and the Ghana Aid Policy and Strategy (2011-
2015) seeks to address this issue.
3
Except the Volta River Project, this was partly financed by the World Bank, Britain and the USA.
4
Ghana DP-PAF Baseline Report 2009
5
FAO, IFAD, ILO, IOM, UNAIDS, UNESCO, UNFPA, UNICEF, UNIDO, UNDP, WFP, and WHO.
18
ERP (Aryeetey and Cox 1997). Policy conditionality of programme aid flows ensured that
neither fungibility nor Dutch disease plagued aid inflows (Younger 1992). Harrigan and
Younger (2000) argue that public spending in Ghana had fallen to extremely low levels and
capital spending had almost disappeared, which enabled the government to reduce its
investment spending to finance public consumption in response to aid inflows. Also, the aid
inflow filled the gaps in foreign exchange and capital availability, thus providing support for
reconstruction of basic infrastructure, and the imports of spare parts and capital equipment
The late 1980s and early 1990s marked a new phase in Ghana’s economic situation. During the
period, the government took advantage of the high return public investments; infrastructure
rehabilitation and markets were functioning at a level comparable to the pre-ERP period
(Harrigan and Younger 2000). The foreign exchange market was liberalized during the reform
period which meant that subsequent inflows induced a foreign exchange appreciation, thus
dampening the incentive to export. Second, the government’s attempt to neutralize the
monetary effects of the inflows severely limited credit to the private sector (Younger 1992).
Eventually the continued inflows led to the Dutch disease situation: exports and private
investment were crowded-out due to tight monetary policy.
After the 1996 elections, one constitutional requisition was the drawing up of a development
plan. A medium-term development framework called Vision 2020 was prepared for the period
1997-2000 to provide a plan for the poverty reduction strategies of the country. Similarly, after
the 2000 presidential and parliamentary elections, the (P) NDC, after being in power for over
6
Balance of Payments support
19
20 years, lost to the NPP under the leadership of President Kuffuor. An analysis of ODA
inflows to Ghana shows that aid inflows has increased from US$ 578.96 million in 2001 in
nominal terms to US$1,433.23 million in 2008 and US$1,896.8 million in 2010 (See Table 2).
Aid as a percentage of GDP increased from 13.2 percent in 2003 to 14.6 percent and 12.8
percent respectively in 2009 and 2010. However, the second half of 2008 and first half of 2009
was a difficult period for the country as aid flows were less forthcoming partly due to the
global economic and financial crisis.
Composition
Ghana receives ODA in four categories, namely, (i) Debt Relief funds from the MDRI and the
HIPC Initiative (including exceptional financing from the rescheduling of bilateral debt on
more favourable terms); (ii) project support comprising project loans and grants for supporting
specific projects and activities; (iii) programme aid in the form of loans and grants for general
and sector budget support; and (iv) balance of payments support from the International
Monetary Fund (IMF) which stopped after 2006 but was re-activated in 2009-2012.
Project aid constitutes the bulk (56% in 2008 and 57.4% in 2009) of ODA portfolio in Ghana,
increasing steadily during the period, whereas programme aid has virtually stagnated over the
period 2004 and 2007 (Ghana MDG Report, 2008). General budget support, for instance, has
increased from 27.7% in 2003 to 32.6% in 2010 (Table 2). However, it is worth mentioning
that the relative levels of both types of aid have remained relatively higher than the levels
recorded in the mid-1990s. The improvement in Budget Support from US$277.9 in 2003 to
US$700.4 in 2009 has been largely attributed to the introduction of the Multi-Donor Budget
Support (MDBS) mechanism in 2003 which allows donors to contribute to a common basket to
support the national budget. The MDBS which currently constitute about 30% of donor inflows
in Ghana has improved commitment and predictability of aid inflows.
Programme aid as a percentage of total ODA has remained below 50% between 2003 and
2008, after increasing from 30% in 1999 to 58% in 2002. The average annual programme aid
as a percentage of total ODA was estimated at 38% between 2003 and 2008 but for the period
1999 – 2002 it stood at 42% (Ghana MDG Report, 2008). This implies ODA portfolio in
Ghana continued to be dominated by project aid which is usually off-budget and therefore
subject to non-use of country systems, thereby creating of parallel system for its management
and the associated excessive rigidity in its administration.
7
Extracted from Quartey 2005
8
Mainly, the African Development Bank, Canada, Denmark, European Union, Germany, The Netherlands,
Switzerland, United Kingdom, and the World Bank. Between 1990 and 1994, the World Bank contributed 37.2%
of total ODA to Ghana while the rest contributed the following proportions: Canada (6.5%), Denmark (1.8%), EU
20
package known as the multi-donor budgetary support. Its main goal is to ensure a continuous
flow of aid to enable the government to finance its poverty related expenditures. Unlike direct
budget support, MDBS aims to harmonize policies and procedures of the development partners
(DPs) in order to minimize transaction costs for the recipient country.
The framework memorandum (FM) was signed in March 2003 between the government of
Ghana (GoG) and the DPs. According to the agreement, the FM will be supplemented with
individual arrangements between each DP and the GoG but the contents of each individual
funding arrangement should be compatible with the spirit and provisions of the FM without the
individual agreements, however, constituting an international treaty. The MDBS is open to all
development partners wishing to participate but this does not imply that all participating DPs
are obligated to provide resources in any given year. The spirit of the FM must be respected
(Framework Memorandum 2003).
MDBS main goal is to harmonize the policies and procedures of the DPs in order to minimize
transaction costs for the government. This is to be achieved by (i) agreeing on a common
benchmark against which performance is assessed, (ii) improving dialogue between
government and the development partners, (iii) conditioning funding commitments and
disbursements on the achievements of the agreed targets. The operational framework of the
MDBS is to be in two stages: first, the Ghana Poverty Reduction Strategy (GPRS) is to detail
the poverty reduction strategy of the government of Ghana. Second, the medium-term
expenditure (MTEF) budget process provides the instrument for allocating resources according
to the GPRS priorities and the resource envelope.
Progress assessment of the MDBS is to be based on the goals set by the government within the
GPRS. The FM stipulated that for 2003 the progress assessment framework be based on two
matrices, namely, the MDBS policy matrix (EU and bilaterals) and the World Bank Poverty
Reduction Support Credit. Both matrices are to be subject to separate arrangements, but it is
hoped that all FM participants adopt the use of a single matrix based on the GPRS. There will
be a common review process for all the DPs, and participants will meet according to an agreed
schedule to jointly review the implementation and attainments of the objectives. Under the
MDBS, the government of Ghana, subject to availability of funds, is to ensure the following:
(N/A), Germany (6.1%), Netherlands (2.8%), Switzerland (N/A), and UK (6.99%). Japan was the single largest
contributor (16.4%). Computed from Harrigan and Younger (2000:199)
21
The development partners, on the other hand, would be committed to working in partnership
with the GoG to facilitate the implementation of the GPRS both through direct budgetary
support and complementary support provided through the DPs’ wider development cooperation
programmes.
The FM outlines provisions for settling disputes, and differences arising with regard to the
MDBS are to be settled through dialogue and consultation between the GoG and DPs. The
government and each DP are to consult with other FM participants whenever there is
discussion to suspend or terminate all or partial support to the GPRS. If a DP takes action to
invoke remedial measures or withdraw support, the GoG would, in consultation with other
DPs, make necessary revisions to the programme to ensure that the expenditure framework
matches available resources. Another key feature of the MDBS is the provision of technical
assistance. The DPs have proposed a flexible and responsive technical assistance programme,
which allows the GoG to identify, budget, monitor and evaluate technical assistance. The
unique feature is that all technical assistance would be programmed and budgeted for in a
manner similar to any other resources, regardless of the source of funds.
In July 2008, a new FM was signed between GoG and 11 DPs (including Japan) in support of
the Growth and Poverty Reduction Strategy (GPRS-II). According to the 2009 DP-PAF
Report, the guiding principles of the MDBS process include:
In an attempt to encourage reforms and the predictability of aid flows, the MDBS agreement
with bilateral DPs agreed on a yearly budget support that will be disbursed in two equal
tranches based on a satisfactory annual review of the GoG’s performance. The annual review
entails (i) a holistic assessment of progress in the implementation of the national strategy and
sound macroeconomic management by the IMF; and (ii) an in-depth evaluation of performance
against specific targets. These targets have been jointly agreed on and specified within the
GoG’s Progress Assessment Framework. The second tranche sometimes referred to as
`Performance Payment’, depends on the outcome of a joint progress assessment of key areas of
22
reform including decentralization, public sector reform, PFM, the budget process, governance,
and poverty related expenditures to the social sectors
Since the signing of the FM, the DPs have provided support towards the GPRS. In June 2003,
as part of its contribution under MDBS to Ghana, the World Bank made US$125 million
available for disbursement in one tranche in July to support the implementation of agreed
poverty reduction reform programmes stipulated in the GPRS and the 2003 budget.
Development assistance too Ghana under the MDBS was 32.6% of total aid disbursed in 2003
but declined gradually to 21.22% in 2008. It is important to mention, however, that nearly
100% of funds pledged in support of the budget in 2003, 2005 and 2007 were fully disbursed
while disbursements exceeded pledges in 2004 and 2008 due partly to exchange rate
differences between the US dollar and the original currency of disbursements (DP-PAF Report,
2009).
3.1 Key Factors that shaped & limited PD Implementation & Outcome
Q1 “What are the important factors that have affected the relevance and
implementation of the Paris Declaration and its potential effects on aid effectiveness
and development results?” (The Paris Declaration in context)
3.1.2 Most Important National and International Events that have affected PD
The most important national event that has affected and continues to affect the implemention
of the Paris Declaration and the Accra Agenda for Action priorities can be categorized into pre-
PD events (2000-2004) and post-PD events (2005-2010) and both have had positive disposition
to aid management in Ghana. The former include the HIPC Initiative, the preparation and
operationalization of the GPRS I, the MDRI initial process, MDBS and CG Meetings. The
latter include the full implementation of the MDRI, CG/Annual Partnership Meeting, DP-PAF
and G-JAS. Another key event include the drafting of the Ghana Aid Policy and Strategy 2011-
2015. This policy outlines the roles of the various stakeholders in ensuring that aid is delivered
in line with the PD principles to achieve better results. The holding of the Accra High Level
Forum on Aid Effectiveness in Ghana in 2008 has also affected the implementation of the Paris
Declaration in the country. Also, the setting up of the Multi-Donor Budget Support
Secretariat/Sector Working Group and the operationalization of the MDBS - an aid system
which ensures predictable, accountable and more harmonized processes for aid disbursement
has affected the implementation of the PD principles in ensuring aid effectiveness. It has led to
a common reporting system and reduced the transactions cost of aid. Finally, the preparation
23
and use of the Ghana Shared Growth Development Agenda, a policy document which ensures
that DPs align their support to national priorities have affected PD implementation.
The Paris Declaration essentially formalised the relationship between development partners
and aid recipients by explicitly outlining the roles and responsibilties of both parties and also
by looking at the responsibility of developed and developing countries for delivering and
managing aid in terms of the five principles. The Ghanaian case has been upheld by certain
characteristics that are aligned to the five principles established by the Declaration. From the
Declaration, Ghana's relationship with its development partners has been given a new boost
when the country signed on to the Declaration on Aid Effectiveness. Following the principles
underlying the Declaration, Ghana has worked with its Development Partners (DPs) to improve
Aid effectiveness through the establishement of agencies and capacity building in various
sectors of the economy. The key characteristics of the country in its capacity building initiative
and institutional empowerment could be seen in line with the principles of the declaration as it
provides a coherent analysis and assesses the effectiveness of the Declaration.
Another key factor that has acted as a major influence on the implementation of the Paris
Declaration according to stakeholders interviewed is the role of non-DAC donors. The
entrance of the BRICKs has improved the flow of resources but they have not shown any
commitment to the PD/AAA and these can affect the outcome of the PD/AAA. A related issue
mentioned is the perceived negative attitude to country systems especially in procurement and
the high transactions cost of aid not to mention the changing priorities of key donors. Political
influence was also mentioned and it is believed this prevailed over the AAA. Others include
the lack of political will to implement PD and the lack of resources by MOFEP to implement
PD. Others hold the view that expected revenue from oil and Gas as well as the hoped for
Middle Income status are all factors that may influence the implementation of the PD.
Ghana receives ODA in four categories (see section 2). Project aid constitutes the bulk (56% in
2008 and 57.4% in 2009) of ODA portfolio in Ghana, increasing steadily during the period,
whereas programme aid has virtually stagnated over the period 2004 and 2007 (Ghana MDG
Report, 2008). General budget support, for instance, has increased from 27.7% in 2003 to
32.6% in 2010. However, it is worth mentioning that the relative levels of both types of aid
have remained relatively higher than the levels recorded in the mid-1990s.
Budget support has increased since 2003 and has been subjected to PD principles compared to
project aid. The improvement in Budget Support has largely been attributed to the introduction
of the Multi-Donor Budgetary Support (MDBS) mechanism which allows donors to contribute
to a common basket to support the national budget. The MDBS which currently constitute
about 30% of donor inflows in Ghana has improved commitment and predictability of aid
inflows, one of the cardinal principles of the Paris Declaration.
24
Programme aid as a percentage of total ODA has remained below 50% between 2003 and
2008, after increasing from 30% in 1999 to 58% in 2002. The average annual programme aid
as a percentage of total ODA was estimated at 38% between 2003 and 2008 but for the period
1999 – 2002 it stood at 42% (Ghana MDG Report, 2008). This implies ODA portfolio in
Ghana continued to be dominated by project aid which is usually off-budget and therefore
subject to non-use of country systems, thereby creating of parallel system for its management
and the associated excessive rigidity in its administration. This has been recognized as a major
challenge to the implementation of the PD in Ghana
25
Source: Field Survey, 2010
Development Partners indicated that most major decisions on aid are taken by officers in their
respective agencies and this accounted for 72% major aid decisions among development
partners, civil society organizations and government agencies while the rest of the decision
making were done by individual leaders. Also, among the stakeholders interviewed from the
government sector, all respondents indicated that officers took major decisions in government
sectors (Figure 6). This was followed by civil society organizations (75%) and development
partners (70%).
Major donors are said to take most decisions at the field level and this it is believed, results in
effective management aid in addition to ensuring that Ghanaians are involved in the decision
making process. However, World Bank, UN system, MCC were seen to be headquarter driven
and therefore key decisions on programming and procedures are taken at HQ level. Such HQ
decisions usually take time and can affect the implementation of aid funded projects and
outcomes. I could also add to the project costs. There is general consensus among stakeholders
that while engagement with PD is rather strong, the implementation is rather slow and has
made little or partial progress. Besides, only a few donors such as DFID and Denmark are able
to take significant funding decisions on the field although currently most G-JAS partners make
implementation and policy decisions in the field thus improving coordination and efficiency.
In reference to the aid management system, implementation has been extensive and has had
some influence on aid effectiveness in Ghana according to stakeholders interviewed. This is
because the PD is believed to have increased dialogue and consultative discussions on aid
effectiveness and also because donors are now following and supporting government led
26
agenda. Also, the role of development partners is gradually changing; they are becoming more
of funds administrators and provide technical advice occasionally rather than designing and
managing projects. It also believed that the Paris Declaration has led to increased dialogue and
consultative discussions on aid effectiveness and inspired the development of the Ghana Aid
Policy document (2011-2015). Besides, various sector working groups have been established
through the development of the aid policy groups.
However, others feel there is very little commitment to respond to some of the principles,
particularly, ownership and alignment to country systems. It is further argued that aid is
politically influenced from HQ level and therefore donors pursue varied objectives. Some DPs
also hold the view that they have been able to reorganize the aid architecture through Sector
Working Groups (SWGs), GJAS, the Aid Policy and Strategy (2011-2015). In addition, the
common position and comments from DPs on strategic national documents and the long
meetings to discuss harmonization and coordination are signs of its effects on aid effectiveness
discussions. Both GoG and DPs have significantly credibility in ensuring PD and AAA
principles work in Ghana and have served as primary reference points for aid effectiveness
discussions. Others feel, however, that donors are usually in the driving seat on these issues
and it is hoped that the Aid Policy will change this. Although implementation has been slow
the mode of delivery has improved and firm structures have been established.
27
The PD principles have been significantly interpreted, weighted and implemented in Ghana
with 40.9% of respondents indicating that there has been quite a significant engagement in
terms of weighting and implementation of the Paris Declaration in Ghana. About 27.9% of
respondents indicated a very significant engagement and a similar proportion also indicated
limited engagement. However, whereas 4.5% of the respondents indicated it has very limited
engagement, none of the respondents from the three groups of respondents indicated ‘no
engagement’ (Figure 8).
The PD has also influenced aid effectiveness discussions in Ghana. As indicated in Figure 9,
about 48% of respondents indicated that the Paris declaration has had substantial influence on
aid effectiveness discusions in Ghana with 43.5% of the total respondents also indicating that it
has had some influence.
28
Source: Field Survey, 2010
Harmonization, Ownership and Alignment are three of the five principles that have featured
prominently in discussions and implementation because of the dialogue among stakeholders
(see Figure 10). Also, they have featured prominently because of government’s efforts to
reduce duplication of aid efforts and align them with government priorities. This is because of
the need to ensure that national plans and strategies are based on local analysis of needs and
country systems for implementation. It is further indicated by stakeholders interviewed that
harmonization is the easiest target to achieve since it depends on efforts from DPs than on
government. Some stakeholders argued that the lack of government leadership on PD left
development partners on their own and consequently they focused on harmonization (eg. EU
Code of Conduct, EU Council conclusions etc). Alignment is prominent in discussions but
lagging in implementation hence the lower score compared to the others. This is has been
blamed on weak management systems and discrepancies in budgetary expenditures when
compared with actual. The Aid Policy (2011-2015) is yet to be implemented although it
indicates a strong vision for GoG, thus ownership scored lower than harmonization. Little
progress has been made with mutual accountability although some progress has been made
towards a framework for DP accountability. Meanwhile, some stakeholders interviewed
thought national systems remain weak when it comes to managing for development results.
29
Source: Field Survey, 2010
A significant proportion that there is aid effectiveness fatigue and this affects economic activity
in several ways including: a reduction in the volume of aid and the continuous dependence of
donors on HQ for decisions which leads to uncoordinated development results. It has also
affected accountability to some extent, for example, the DDF concept at the district. Others
feel it has made it more difficult to mobilize partners for advancing in AAA issues and has
limited the harmonization agenda. Activities are affected by the time spent in meetings on
harmonization and related issues. The aid effectiveness fatigue can also be seen in terms of the
slow progress in key reforms (eg. PSR, PFM, M&E etc). It is also due to the perceived lack of
GoG leadership in key areas such as division of labour. Others interviewed hold the view that
there is some harmonization fatigue related to the different approaches used by the various DPs
(eg. IFIs vs. bilateral). There is also some fatigue around the multiple systems for monitoring
and reporting on PD/AAA performance. Nonetheless, most DP remained committed to
PD/AAA. Respondents from government sector hold the view that there is little evidence of
fatigue despite ongoing difficulties in implementation of some of the PD principles. However,
it is not clear whether the new entrants (BRICKS) will be held to the same standard, although
this may simply demonstrate pragmatism, rather than fatigue. CSOs also indicated that there is
a strong and sustained engagement and no evidence of fatigue by the select group of CSOs
who engage in aid effectiveness discussions and related activities. Some however felt there is
some influence since `they are always responding to questionnaires and interviews`.
Government is rather saddled with additional responsibilities without the corresponding
resources to match them. The fatigue can also be seen in terms of the less enthusiasm for
general budget support and joint approaches.
Conclusion: The extent to which each of the five PD principles have been implemented is
varied. Whereas some are easy to achieve and require less effort, others are not. Others have
also seen more donor interest and commitment while government effort in leading some has
not been very strong. Key national or international events such as the drafting of the Ghana Aid
30
Policy and Strategy 2011-2015, the holding of international aid effectiveness forum (Accra
High Level Forum), the operation of the Multi-donor Budgetary Support which has inherent
PD principles to mention but a few has influenced the implementation of the Paris Declaration
principles in Ghana. The implementation of the PD principles has improved dialogue between
donors and the GoG and has led to increased CSO participation in aid discussions. Non-DAC
donors have also provided additional resources but the implementation of the PD has led to
some stakeholders questioning the lack of transparency in non-DAC aid agreements.
Q2 “To what extent and how has the implementation of the Paris Declaration led to an
improvement in the efficiency of aid delivery, the management and use of aid and better
partnerships? (Process and intermediate outcomes)
The implementation of the GPRS has been regularly discussed at ministerial and cabinet levels,
while the Parliamentary Sub-Committee on Poverty, CSOs and DPs provide the oversight
responsibility for the implementation of the GPRS II (UN, 2007). The involvement of the
legislature in the implementation process ensures that all major political interest groups and
Regional Poverty Groups in all regions of the country are involved, thereby reducing potential
strive, dissatisfaction and ensuring the establishment of a sustainable structure for continuing
government-stakeholder dialogue.
In addition to the above, there has also been the establishent of sector working groups within
the framework of the MDBS. These working grioups exist to provide opportunity for further
dialogue on key policy issues. There are currently 18 sector working groups which comprises
of sector ministries and external partners. Some of the sector working groups are well
established (Agriculture, Health, HIV/AIDs, Education, Roads and Public Sector Reform),
while others are more informal and ad hoc in nature. Also, the harmonious collaborattion
between the various stakeholders has permitted the establishment of a joint Government of
Ghana-Donor working group. This group work together to agree on a set of actions to
standardize the functions of sector working groups, increase their effectiveness and strengthen
31
the links with national processes. Furthermore, the increased use of Ghana's procurement
system also underlines the importance of direct budget support as all MDBS funds are subject
to national procurement rules.
Government of Ghana appears to exercise some leadership in developing and implementing its
development strategies through broad consultative process including CSOs but others feel this
is `cosmetic’. The preparation of both the Medium Term Development Policy Framework and
Ghana Aid Policy and Strategy for example, involved consultations with stakeholders.
Respondents interviewed attributed the involvement of civil society organizations in the
consultation process to the return of Ghana to democratic governance since 1992 and the
growing recognition of the importance of all stakeholders as partners of development. Some
respondents observed that national consultative exercises have been more cosmetic because
stakeholders’ inputs, comments, recommendations and refinements are solicited at the very late
in the development of strategic national policy documents. Also, GSGDA, it was explained has
hardly been consulted with sector ministries resulting in incoherencies in policy formulation
and implementation. The MTNDPF specifically addresses gender, rights, disability and
environmental sustainability; the Ghana Aid policy and Strategy, being underpinned by the
tenets of the PD and AAA, also addresses the stated issues.
Since the adoption of the GPRS, donors have gradually learned to shift their support to align
with Government’s priorities. DPs have adjusted their modalities of support and/or responded
to new priorities identified by partner MDAs. For instance, CIDA and WB have changed from
projects identification to sector budget support. Through the MDBS process DPs are also
supporting new Government initiatives and interventions such as the school feeding and the
spraying of cocoa. Respondents explained that some donors have clearly shifted their support
completely from their traditional sectors to new ones, example, Denmark has shifted its support
from rural feeder roads, and water supply and sanitation to decentralization, while Netherlands
have shifted support to Water and Sanitation.
In the recent past years there has been some significant change in the preparation of medium
term national development strategies, greater ownership and leadership by Government; a
modest improvement in consultation and coordination; and a marked improvement in
alignment of projects with Ghana’s development strategies (see Figure 11). Indeed, all sector
specific plans such as FASDEP I & II aligned with national strategic plans. There is
institutionalized sector working groups comprising Government, Development Partners and
Civil Society Organizations to ensure that sections of society are not alienated but rather the
groups’ concerns are mainstreamed in economic and social development. Ghana’s Aid Policy
Strategy, not yet implemented, has laudable initiatives, which when implemented will further
enforce and commit both Government and donors to the PD/AAA.
32
Source: Field Survey, 2010
The 2008 Monitoring Survey on the implementation of the PD on aid effectiveness noted some
notable improvements especially in the areas of Public Financial Management (PFM),
procurement, auditing and M&E systems. Ghana has reached the PD target for improvements
in PFM and from the Joint venture on procurement review, the country’s procurement system
is said to be operating at an `above average‘ level. Using the last (2007) World Bank’s CPIA
scale of measuring the quality of PFM systems, Ghana obtained a `moderately strong‘ rating of
4.0. By this, the country had recorded a half-point increase in the reliability rating of its PFM
and therefore had achieved the PD 2010 target. This can be improved on as users gain
experience with the new systems and as practice at the district level increases. The quality of
the country’s procurement system was assessed in 2007 using the framework developed by the
Joint Venture on Procurement and Ghana received a `C‘ rating similar to those obtained by the
majority of countries engaged in the exercise. Thus, Ghana obtained an `above average‘ level
score. Continued implementation of the Public Procurement Act and the use of the Public
Procurement Model of Excellence for monitoring will enusre that Ghana achieves a B rating by
end 2010.
Under the Ghana Country Systems Initiative, several development partners (including USAID,
the European Union, GTZ and the Netherlands) are supporting the strengthening of the Public
Procurement Authority and the Ghana Audit Service. There has also been some technical
33
capacity support to MOWAC to implement gender issues as well as training of
Parliamentarians and CSOs on issues on regional integration and foreign policy.There is also
an Audit sub-working Group which ensures that all DPs use the same audit processes – a clearl
evidence that DPs will be aligning to government capacities. A Ministry of Finance
Accounting Manual has been prepared to ensure that DPs align their support to the national
budget. DPs have also contributed towards the strengthening of the Sector Working Groups.
Also, DPs interventions in the roads, health and education sectors have capacity building
components in them. However, despite the increasing efforts at strengthening domestic
accountability systems and improved compliance with procurement legislation and systems, a
number of donors are still reluctant to use such country systems 9 .
A major reason why country systems are not used is the lack of confidence (trust) in the
systems. Some DPs also have their reservations about country PFM and M&E capacity.
Administrative procedure, which is considered slow, as well as lack of transparency, are the
other reasons why country systems are not used. There is no strong demand from Government
to improve performance; as a result Government defers to World Bank procurement rules.
Lack of funding to implement these country systems was also cited. There is general
perception that national procurement rules, for example, are too cumbersome. According to
respondents from government, the country systems are not being used because of actions and
inactions of DPs. Some DPs have no confidence in country systems because they are
incompatible with their own systems. Some localization of country systems is seen to be
divergent from DP standards especially if the systems favor local companies. Apart from
political considerations and donor country domestic interests, donor agency priorities/targets
still push DPs to demonstrate results in particular areas identified by HQ including attribution
of systems used. Above all, countries are not using country systems because of conditionalities
attached to aid where procurement of goods and services should be made solely from donor
country. The weak implementation has also been traced to the simmering disagreement
between donors and partners on issues such as value, methodology, indicators and measures in
addition to standards for assessing performance of country systems. It has also been mentioned
that the exclusion of the Parliamentary Committee on Public Accounts and Finance as well as
civil society organizations from the monitoring of commitments and evaluation of their effects
and consequences has also limited the PD principle of mutual accountability.
The extent to which aid is reported in a comprehensive and transparent manner and how it is
used is an important means of ensuring that donors align aid flows with national development
priorities. The proportion of aid disbursed by donors to the government sector and also
included in the annual budgets for the same fiscal year. This measures the degree to which
donors report aid flows comprehensively to partner countries and the degree to which the
country accurately record aid. In terms of aid disbursed and accurately estimated in the budget,
the 2008 monitoring survey reported a slippage of 2.0 percentage points to 94% on aggregate
terms.
9
Nana Siriboe, Draft Report on the Cluster Conference on Shifting into the High-Gear of Results: Proposals for
Accelerated Implementation of the Accra Agenda for Action on Aid Effectiveness 2009-2010, IDEG, Accra
34
3.2.3 Defined Measures and Standards of Performance & Accountability in PFM
Some respondents were however of the view that no substantial improvement has been
observed so far in country’s Public Financial Management. Some of the reasons include
slippages e.g. weak budget control leading to accumulation of arrears, low level of budget
credibility, and the lack of capacity of MOFEP to enforce rules and regulations. There is
virtually no dialogue on procurement with authorities. This means that it is difficult to assess
improvements in such organizations. A delay in selecting successful bidders by the tender
committee after they have met was also highlighted.
It was noted that structural reforms are underway and have not yet translated into significantly
better PFM practices. Large numbers of complex reform processes have been initiated e.g.
introduction of integrated Financial Management Information System, Programme Based
Budgeting. Some improvements were noted though but more capacities needed to be built
across MDAs. Some DPs like AFD, WB and Denmark fully use Country systems, or portions
of procurement systems and some use the approval process of national procurement law. Some
respondents suggested that focus should be put on simple, “home-grown” solutions to improve
budget practices and getting the basics right rather than attempting to adopt international “best-
practice” and state-of-the-art models for which the necessary preconditions are not in place.
The National Procurement Act is fashioned out from international standards of procurement;
but some donors are not using the National Procurement Act because the Act appears not
robust enough. This is because developing countries lack the capacity to meet the standards &
requirements set for international standards. There is also lack capacity of MDAs to comply
with such international regulatory framework. Reasons why internationally recognized
standards of procurement like the Ghana Procurement Act is not being applied is the lack of
transparency in country systems, inadequate capacity of procurement authority and the
dilemma of MMDAs International competitive bidding versus support to local industry. Some
donors also say they do not have HQ approval to use the Act. OECD (2008) Compendium of
Country Examples and Lessons Learned from applying the methodology for assessment of
35
national procurement systems acknowledged that although pilot countries like Philippines and
Ghana used existing tools to evaluate performance at the entity level, for many countries,
national procurement statistics and data on procurement transactions were unavailable.
10
Draft Report on the Cluster Conference on Shifting into the High-Gear of Results: Proposals for Accelerated
Implementation of the Accra Agenda for Action on Aid Effectiveness 2009-2010, IDEG, Accra
36
3.2.4 Building More Inclusive Partnership for Development (Harmonization)
According to GPF (2007) the results of the 2006 Baseline Survey on Monitoring the Paris
Declaration in Ghana recognizes that there has been momentum towards better aid practices in
Ghana as the Declaration places a strong emphasis on in-country ownership of development
agendas (for better aid results) which is evident in Ghana through the development of the
GPRS I & II. Though one may question how far those outside the central government,
including Ghanaians and the civil society as a whole, own or indeed know about the GPRS II
Government is making efforts towards the deepening of its ownership of all the aid processes
that take place in Ghana by developing its own aid policy (in conjunction with civil society,
parliamentarians and other Ghanaian aid actors) and also channeling adequate resources into
the independent monitoring of aid in Ghana (AFRODAD). Also strengthening of country
systems encouraged by the Declaration and the subsequent alignment of donors to these
systems to make for improved country capacity and lower aid transaction costs has seen results
suggesting that the donors in Ghana are increasingly aligning their aid flows to national
priorities, using Ghanaian public financial management systems and a Ghanaian led model of
capacity development.
Using common arrangements to manage and deliver aid in support of partner country priorities
is an important component of aid harmonization through partnerships. The degree to which
donors work together is ascertained by computing the proportion of total ODA disbursed
through Programme-Based Approaches (PBAs). In the 2006 Baseline Survey, 53% of aid to
Ghana was recorded to have used PBAs while the 2008 Monitoring Survey provided an
optimistic figure of 70% thus exceeding the 2010 target of 66%. The extent to which donors
are merging their missions have also been used to measure the degree of harmonization. The
2008 Monitoring Survey (Ghana Report) shows a reduction in the total number of missions
from 366 (in 2006) to 272 in 2008. In addition, there was a 45% increase in the proportion of
missions conducted jointly. Joint analytical work also increased from 40% to 60% over the
same period. These reflect efforts made by a number of donors to conduct more joint missions.
DPs have again made substantial investments in improving the harmonization of aid delivery
through Programme Based Approaches (PBAs), joint projects and common delivery
arrangements. However, there are limits to the level of harmonization that DPs can achieve
without simultaneously aligning to GoG programmes and systems. The 2006 and 2008 Survey
on the Monitoring of the PD indicated that the total amount of aid for Ghana’s PBAs amounted
to a total of 755m USD of which 378m USD was used for budget support and 377m USD for
other PBAs respectively.
The harmonization of government and donor partnership has defined the current Aid
architecture in Ghana with mutual benefits to both parties. For Ghana, the Government and
Donor Partnership have contributed to increased technical and financial support for the
implementation of the GPRS from both bilateral and multilateral donors. In absolute terms, the
MDBS has accounted for an average of about US $300 million on an annual basis (UNESC,
2007). The G-JAS offers a harmonized approach to development away from the tradition of
different development partners possessing different assistance strategies with the GoG. In
Ghana, harmonizing programme-based approaches (PBAs) has provided a platform for actions
to reduce aid fragmentation through specialization and delegation, and improve internal
incentives for collaborative behaviour. The World Bank, European Commission, African
Development Bank, United Kingdom and Netherlands intend to integrate their development
co-operation country strategies fully with the Ghana Joint Assistance Strategy, while Canada,
37
France, Germany, Switzerland, United States and Japan, as well as the UN agencies, with
different programming cycles, expect to be closely associated with it. (UNESC, 2007)
A very important chacteristics which ensures the harmonization of donor funds is the
decoupling of the aid for projects and the consolidated fund. Project funds does not form part
of the national budget execution. Mechanisms have been put in place to differenciate between
the consolidated fund and funds for specific developmental projects. Developmental funds are
not within the budget framework and the are mostly controlled between independent project
management unit and the specific donor supporting the project. Such donors provide technical
support that is aimed at harmonizing Programme-Based Approaches (PBAs) and sharing
missions and analytical work. This has provided a platform for actions to reduce aid
fragmentation through specialization and delegation, and improve internal incentives for
collaborative behavior (UNESC, 2007). The proportion of reported government sector aid
using PBAs and hence employing common arrangements is currently reported as 53%,
reflecting almost equal volumes of direct budget support and support to joint programmes
within particular sectors (UNESC, 2007).
There has been little change in the way the Government of Ghana steers the strength of donors.
Respondents were generally less positive of the changes in the way government steers donors
towards the use of their strength; 41.7% indicated that there has been a little change while 25%
indicated some changes. The responses clearly points to a less optimistic evaluation on the way
government is steering the strength of donors. According to stakeholders (DPs, CSOs and
Government agencies) interviewed the Government of Ghana takes part in the negotiation of
project design and implementation but it lacks the requisite capacity to negotiate and monitor
project management and performance. The two key institutions (MOFEP and NDPC)
responsible for implementation and evaluation of the PD respectively are not resourced enough
to undertake their obligations. The research team was informed that NDPC has been sidelined;
therefore although MMDAs are to report to NDPC only a handful reports on time.
38
Although there has been some improvement in transparency and consultations on aid
conditions, particularly with traditional donors, the same cannot be said of non-traditional
donors especially the BRICKS. In the case of traditional donors, “Targets” and “triggers” in
the MDBS arrangement are jointly agreed between the donor and the respective MDA.
Significantly, these “conditionalities” are derived from the respective sector plans developed
by the MDAs. Conditions associated with budget support are developed through dialogue
between participating DPs and Government of Ghana, with some inputs from other
stakeholders. MDBS/PAF review was cited as quite transparent and consultative. Conditions
associated with certain modalities (e.g. IMF credit) are made transparent once agreed. It was
however mentioned that with project aid, not all conditions are transparently developed. It was
made clear that conditions associated with assistance from BRICKs are not transparent.
Respondents admitted however that there has been some improvement generally in
transparency and consultations on aid conditions in the last few years.
Stakeholders interviewed believe that donors engage in silent partnerships; that is, they channel
their resources directly through other donors’ programs. Examples cited include the
Netherlands channeling their education resource through DFID and the UK also partnering
with the Netherlands in the area of health. There are also partnerships between France and the
EU, Switzerland and the World Bank under the EMCB, as well as Switzerland’s partnership
with GTZ for the tax reform programme. The Ghana Research and Accountability Project (G-
RAP) is administered by DFID with contributions from CIDA, DANIDA, and the Netherlands.
Mention was also made of AFD’s partnership with the EU relating to their involvement in four
sector groups (without delegation of resources). Some recalled that, in 2008, the EU delegation
in Ghana gave funds to UNICEF to support its guinea worm eradication programme with the
Ministry of Health. Also in 2003/2004, USAID provided funds to UNDP to support its
microfinance programme with the Government of Ghana. There were discussions among the
representatives of these donor groups and the Government of Ghana, resulting in the transfer of
funds from one donor to the other. As a way of monitoring for accountability, MoFEP received
regular reports from the UNDP on the utilization of the USAID funds and the progress of the
programme.
The PD principle calls for joint analytical work including analysis and advice to strengthen
policy dialogue and implement country strategies to promote development. This comprises
39
sector studies and strategies, country evaluations, discussion papers etc. This will contribute
towards reducing transactions cost, avoid duplicative efforts and foster common understanding
among donors. The 2008 Monitoring survey reports that how much country analysis is
coordinated has increased from 40% in 2006 to 60% in 2008 and close to meeting the 2010
target of 66%. Thus, assuming these numbers are robust, and with sector working groups active
in initiating the required analytical work and co-ordinating inputs, the target will certainly be
met.
This PD survey reports, however, that according to stakeholders interviewed, there has been
uneven and poor progress in joint analytical work and shared missions among donors because
stakeholders believe that donors have different objectives, interests, and demands from their
parent organizations and funding sources. These different objectives for providing aid make
them want to be identified individually with projects. Others also believe that the timelines on
projects, and poor country systems to steer joint analytical works are some of the reasons for
the poor progress in the area. Again, there is the perception that DPs are still driven by internal
requirements for analytical work, for instance internal time tables for renewal of country
strategies, program level evaluations and internal monitoring cycles. Even though there is
limited coordination, some stakeholders are of the view that some significant progress has been
made in the area of joint work and shared missions and this reflects the shift towards co-
financing and the efforts made by a number of donors to conduct more joint missions. Some of
the areas include the joint mission for the District Development Fund (DDF) in September
2010, the mid-term review in July for NREG, and the joint analytical work of PEFA, CIDA
and DFID to review lessons on capacity development in the public sector. There is also the
joint GoG/DP decentralisation policy and the agriculture and decentralization sector in 2007.
Individual donors are said to have made some changes and simplifications of their policies in
the last five years. As a result of DPs sharing information, analysis, and providing coordinated
policy inputs, there is less duplication of projects. There are efforts towards increasing
harmonization at the sector level, strengthening working group dialogues and CSO
engagement, as well as more joint funding mechanisms. There is more predictable project
commitment notably through District Development Fund (DDF) and Natural Resources and
Environmental Governance (NREG). Generally there has been a more collaborative behaviour
exhibited by the MDBS donors and heads of agencies in adopting simplified joint policies and
procedures in assessing progress. Efforts to strengthen country PFM systems for use by all
donors led to the formation of an Audit Working Group, co-chaired by the Ghana Audit
Service and USAID to harmonize audit language and terminology, audit requirements,
coordinate donor support to the Ghana Audit Service, and to facilitate and coordinate policy
dialogue around audit issues.
Donor performance regarding the predictability and disbursement of aid according to schedule
is made more effective by clear and well spelt out strategies that every donor and agency can
identify with. Budget support as a modality has tended to improve predictability while
centralised funding decisions by donor agencies (still the norm rather than the exception), tends
to work against it. Most DP planning, approval and disbursement cycles remain headquarter
40
driven. Ownership of development program and aid policy determines the rules of engagement,
strong PFM achievement of results in the form of targets and triggers, and economic situations
in donors’ countries. More often than not, administrative constraints on the donors’ side
restrain the timely disbursement of funds. Largely, however, the absorption capacity of the
recipient country and its ability to implement certain projects have been cited as the main
factors in explaining donor performance regarding the predictability and disbursement of aid
according to schedules. In the case of MDBS, the level of disbursement is contingent upon the
achievement of certain targets and triggers. It is recommended that government should
establish predictability scenarios with upper and lower case assumptions rather than expecting
donors to commit for a period of time.
The 2008 Monitoring Survey (Ghana Report, p. 19-15) indicated that there has been a slippage
from 92% in 2006 to 82% in 2008 on in-year predictability of aid; 89% of planned donor
disbursements were actually disbursed. The 2009 G-JAS Mid-Term Review Report indicates
that DPs now routinely provide multi-annual indicative funding commitments and quarterly
information on disbursements. Though disbursement may not always be timely, due mainly to
delays in project implementation and bureaucratic problems on the side of government, the
predictability outcome seems to be on track. In line with Government’s 3-year MTEF, some
Development Partners provide 3-year commitments during the Annual Partnership Meeting.
There is little information to show a delegation of authority from donor headquarters to donor
field staff. However, some donor field staff are adapting to new ways of managing aid
including delegation of authority to field officers. For instance, CIDA in the agriculture sector
has increased its own resources resulting in regular verification of projects. Most DPs are also
undergoing reforms in order to improve the delegation of authority to the field offices and there
is an increase in the use of PBAs. Turnover of DP staff is a problem for continuity; DPs
therefore need to devise strategies to address this. Several global partners do provide technical
assistance which helps to strengthen selected institutions and processes but there still is a
tendency for vertical funds to distort national priority settings.
Stakeholders recall instances where technical staff work for more than one donor.
Examples include DFID sharing an environmental advisor with Netherlands, a HIV/AIDS
advisor with Denmark and an M&E advisor working with the World Bank. Several employees
of AFD have also been hired by other DPs. In general however, donors are likely to agree for
one of them to contract a technical assistant on issues regarding their specific strategic areas.
Respondents also indicated that in terms of harmonization, there is presently less duplication of
projects; about 46.7% respondents indicated that there was a less duplication of projects by the
use of PBA while 40% of respondents indicated that there was a more predictable project
commitment. Also, 33.3% of respondents held the view that there was a more collaborative
behaviour evidenced by participation while 20% and 13.3% indicated that there was simplified
donor policies and procedure and sufficient delegation of authority to donor’s field staff
respectively (Figure 13).
41
Source: Field Survey, 2010
Micro studies of selected educational sector programmes which are donor funded acknowledge
the duplication of donor activities. Athough they finally stated that this has been resolved, they
acknowledged that:
“In the past, duplication of projects existed and different donor funds were
channeled to projects very similar even in the same district. To solve this
anomaly, districts are now asked to prepare a Three-Year District Education
Action Plan, out of which an Annual District Operational Plan was prepared.
These arrangements have ensured that related projects are harmonized to avoid
duplication and waste of efforts” (Field Survey, 2010).
Another area of concern that is affecting the outcome of the harmonization principle is
the partial continuity among donor field office staff and the excessive turnover of staff. In
assessing how Ghana has fared with the harmonization principle, respondent were asked to
assess the level of continuity among donor field office staff or the extent to which there is
excessive staff turnover. It became evident that generally, there is a partial continuity among
donor field office staff and excessive turnover. About 26.1% indicated that there was a
substantial continuity, whiles 47.8% felt there was a partial continuity with 13% each
indicating slightly and insufficient continuity (Figure 14). Most bilaterals serve a 3-year term
while multilaterals have a 4-year rotation and this constitutes a challenge to GoG since it
affects continuity of projects, especially when a new head of mission decides to discontinue
with what his/her predecessor had started.
42
Source: Field Survey, 2010
Global programs are a significant part of the national development landscape. The GPRS I and
II, as well as the GSGDA have included programs financed with resources from the Global
Fund, the GAVI Alliance, the Fast-Track Initiative for Education, the Global Environment
Facility, CGIAR for Agriculture and the Cities Alliance. In Ghana, the Global Fund has
provided two (2) million Insecticide Treated Mosquito Nets (ITNs), completed HIV testing and
counseling for 259,999 pregnant women 11 , contributed to the achievement of the health sector
SWAp which is managed within the Ministry of Health. It has also aligned with the fiscal cycle
and used national budget execution and financial reporting procedures and procured drugs
using national procedures.
Nevertheless, Global Fund’s aid effectiveness scoreboard for 2007 show generally low scores
for (i) the use of national auditing procedures (17%), (ii) joint missions with other donors
(14%), and joint analytical reports (22%).
11
Source: Ghana Health Service 2010 Half Year Performance
43
This PD principle calls for donors and GoG to make joint commitment to managing for
development results. This comprises defining desired results and measuring progress towards
them in addition to using the information arising from the results to feed into decision making
and performance. The MDBS Progress Assessment Framework has served as the catalyst for
both donors and Government to plan, manage and implement policy actions in relation to
managing for results. This practice pre-dates the Paris Declaration. The 2008 Monitoring
Survey utilizes the World Bank’s Results-Based National Development Strategies: Assessment
and Challenges Ahead to assess progress on this indicator. The three aspects of the framework
were: the quality of the information generated; stakeholder access to the information; and the
extent to which such information is utilized within a country level monitoring and evaluation
system. Ghana’s rating in terms of the proportion of countries lacking transparent, results-
based monitoring framework remained at `C’ in 2006 and 2008. Ghana’s low rating is due to
the low utilization of the Annual Progress Reports on the implementation of the national
development strategy, produced by the NDPC. The reports are based on submissions from
MDAs and validated at a stakeholder workshop. Thereafter, they are disseminated to MDAs,
Parliament, DPs and other stakeholder organizations. However, there is no feedback on the
policy recommendations in the Reports.
There has been some level of strengthening in Ghana‘s capacity to manage resources on
the basis of desired results. With regards to the PD goal of establishing a result-oriented aid
reporting and performance framework in Ghana that donors in turn commit to using, the
baseline results suggest that the quality of Ghanaian poverty data is improving. For example,
the formulation of GPRS II was guided by the series of surveys and censuses carried out by the
Ghana Statistical Service and its partners, including a new Demographic and Health Survey,
and a Poverty and Social Impact Analysis. Better data is however required on budget activities
and on intermediate outcomes to avoid inefficiencies that are arising within the central
Government due to the use of different data collection systems by MDAs. These data
limitations are reflected in the timeliness and the quality of the Annual Progress Reports
(APRs) of the implementation of the GPRS, which are widely disseminated by the National
Development Planning Commission (NDPC).
The NDPC has also developed technical guidelines to assist the various agencies in each
sectors and District Assemblies to formulate their respective monotoring and evaluation
(M&E) plans. The M&E plan is expected to help them develop appropriate mechanisms for
monitoring the implementation of their respective plans more effectively through the
development of common indicators. An example is the Cape Coast Metropolitan Assembly’s
generation of its Annual Progress Report (APR) which, among others, includes monitoring and
evaluation activities with indicators. These indicators helps to assess the progress of the
implementation of the objectives of funded projects.
44
backwards. About 43.5% and 52.2% indicated that there was some improvement and little
improvement respectively. It is also important to mention that over half of the respondents felt
that the government’s leadership drive towards greater focus on results has seen little
improvement.
Also, Ghana’s commitment to the implementation of the Paris Declaration has further been
strengthened by hosting the Accra High Level Forum, which came out with the Accra Agenda
for Action (AAA). The AAA reflects the international commitment to support the reforms
needed to accelerate an effective use of development assistance and helps ensure the
achievement of the MDGs by 2015. The AAA, the result of an extensive process of
consultation and negotiations among countries and development partners, focuses the aid
effectiveness agenda on the main technical, institutional, and political challenges to full
implementation of the Paris principles.
High degree of openness have also been demonstrated by both DPs and GoG at the 2010
CG in addition to DPs support and cooperation towards the development of DP-PAF.
Furthermore, constant and open dialogue is seen in the area of sector working groups and
budget support with discussions on triggers and targets done in a collaborative manner at the
45
sector working group level involving both DPs and GoG. Open dialogue via MDBS on
information on aid flows are said to occur enhancing communication to MoFEP. These
information on aid flows is publicly available with other main donors providing these
information yearly to GoG for the preparation of the budget. Regular (quaterly) disbursement
and regular (yearly) projections occurring with the list of DPs and some non-OCDE donors
projects being annex of the budget as well as the availability and accessibility of GoG budget
documents on the MoFEP website are all evidence of increasing trust and mutual respect to the
citizenry.
Other changes in the area of accountability are donors publishing information in the
press each time a financing agreement is signed (they are also obliged to report to their
citizens), regular meetings and regular reviews of the Public Accounts Committee and the
preparation of the budget in an open session. Audits are submitted to parliament for review
and eventually made public via the Ghana Audit Service website though there are some
difficulties associated with assessing actual expenditures against budget projections as
accounting systems are not aligned with budget categories. On the side of donors, their country
program expenditure data is provided to GoG on a quaterly basis (although the procedures and
templates for this exercise could be strengthened) but some donors have channels of assistance
outside the country program that may not be captured in the quarterly reports (e.g. assistance to
DP-country NGOs, universities, etc.)
46
3.2.12 Tackling Corruption
Measures adopted by GoG in tackling corruption include: the enactment and implementation of
the National Procurement Act, supporting the work of the Parliamentary Public Accounts
Committee (public hearings), supporting CSOs advocacy on anti-corruption, strengthening the
national auditing systems, and the enactment of the economic and organised crime law. Other
measures adopted are the use of monitoring indicators and the development of a
comprehensive national anti-corruption action plan. These measures have reinforced actions
against corruption. Donors (e,g, DANIDA, UNDP, etc) have been supportive of anti-
corruption campaigns by CSOs. However, recommendations of the Public Accounts
Committee for the prosecution of public officials who have misappropriated public funds have
not yet been followed through. With support from some DPs (EU, DANIDA, etc), GoG is
undertaking some programmes that could have impact on corruption such as PFM reforms.
Additionally, complementary actions involving the education of public officials on issues of
conflict of interest, assets declaration and the enforcement of ethical standards are being
pursued. For example, two (2) former Minsters of State (in the health and sports sectors) had to
resign their posts to enable investigations into alleged acts of corruption. Despite all these
measures, respondents indicated that they have not seen major changes in tackling corruption.
The transparency international index for 2008 showed only a marginal change in Ghana’s
rating.
In terms of investigations being undertaken on corruption, a number of them were stated by the
stakeholders. Some of these include: CHRAJ and BNI‘s investigation of some officials of the
MDAs, the Presidential Commission on Ghana at 50 celebration, the auditing of the school
feeding programme and the investigations on the FSPO and PAC investigations on MDA
relating to their recommendations. In relation to CHRAJ and BNI‘s investigation of some
officials of the MDAs, a former Minister was in 2009, accused of financial impropriety within
his ministry for taking unauthorised travelling allowances and incurring unauthorised
expenditure of which he was asked by the president to resign though he was not prosecuted.
Another case is seen in the implication of a number of former government officials in a bribery
scandal involving a British construction company. GoG took action on the matter by directing
CHRAJ to investigate into the matter.
Factors that have played key roles in the rising aid related corruption according to
stakeholders interviewed include increase in donor funding increasing the volume of aid,
aid given to the same actors in MMDAs without change in personnel and failure by
donors to monitor aid utilisation. On the other hand, some stakeholders indicated that aid
does not play a direct role towards the absence of change in corruption levels but rather aid
plays a role in diminishing corruption levels through its ability to strengthen and
institutionalise good governance practices in government, through its ability to strengthen
framework conditions including the judiciary and economic governance, through its ability to
support policy dialogue in areas such as transparency. Greater public/civil society awareness
and engagement through the provision of aid allows the availability of (more) funds to CSOs to
actively engage in the fight against corruption to ensure effective change.
Stakeholders interviewed on the evidence of changes in trust, mutual respect, open dialogue
and flexibility between donors and government had varied opinion. About half of the total
respondents indicated that there has been substantial improvement while 27.5% indicated that
there has been some improvement and 18.2% indicating little improvement. Viewed in terms
47
of the various sub-groups, 22.2% of DPs indicated that there was no change in trust, mutual
respect, open dialogue and flexibility between donor’s and government, about 42.9% of
respondents from civil society hold the view that there has been substantial improvement.
However, all respondents from government agencies said there has been substantial
improvement.
About half of stakeholders interviewed also indicated that there have been changes in the
accountability of government toward citizens and parliament. About 45.8% indicated that
there has been some improvement while 29.2% indicated little improvement and 8.3% were of
the view that there has been substantial improvement with none indicating that there has been a
backward movement. It is further explained that there information on flows and the use of aid
in budgets publicly and these are available. This view is shared by government agencies and
development partners but not civil society organizations. The general perception is that there
has been little improvement in the measures to tackle corruption. About 12% of respondents
indicated that there has been substantial improvement in measures to tackle corruption while
40% mentioned some improvement with 44% indicating little improvement but none of the
respondents indicated that that there was no change.
According to stakeholders interviewed, the most significant change noticed over the past
5 years in how government and donors have exercised mutual accountability for
development results can be identified through analytical work to improve policy and
decision making. Further actions of mutual accountability exercised by both government and
donors are in the areas of joint planning and performance monitoring, more demands for
accountability placed on government by CSOs, public accountability measures such as the
Meet the Press series, GPRSIA II, involvement of CSOs in discussions on policies and budget
preparations and government‘s launch of the DP-PAF. Increased improvement to harmonise
both government and donors efforts in aid delivery and management through better sharing of
information on DPs activities and funding in Ghana are some of the changes stated by
respondents. Other significant changes identified were more dialogue with DPs, GoG and civil
society, stakeholder consultations, frequent monitoring of of GoG spending and budget
execution and active media and press engagements. On the side of donors, the mid-term/peer
review of G-JAS undertaken in 2009 is one key change noticed.
12
Contradicts the report on Ghana’s ranking on the Corruption Perception Index which shows and improvement
in 2010
48
3.3 Implementation of the Paris Declaration and Sustainable Development Results
Q3: Has the implementation of Paris Declaration strengthened the contribution of aid to
sustainable development results? How? (Development outcomes)
In following the principles of the PD, further discussions made on how to make aid more
effective led to the formulation of aid policies such as the sector-wide approach (SWAp) and
the multi-donor budgetary support (MDBS). SWAp, the process where donors give significant
funding to a government’s comprehensive sector policy and expenditure is purposed to
establish and implement a sector programming and financing framework that falls in line with
the commitments of the Paris Declaration. SWAp for the education sector saw the formulation
of frameworks such as an Education Strategic Plan (ESP) and the Ghana-Joint Assistant
Strategy (G-JAS) to improve educational outcomes and accelerate the achievement of the
MDGs. ESP is a collaborative approach to education development in Ghana with the setting
up of a Performance Assessment Framework (PAF), a mechanism which provided high level
discussions between DPs and GoG under the leadership of the sector ministry on the
disbursement of donor funds within the sector (Alliance 2015 report, 2007). It also emphasizes
on increasing access, completion and quality in basic education, particularly the six-year cycle
of primary schooling, and specific measures, such as incentive schemes, to increase girls’
enrolment, retention and completion particularly in secondary education (Development
Partners of Government of Ghana (G-JAS, 2007). The development of the ESP was therefore
designed along the framework of the Paris Declaration and was intended to give it a national
ownership status and to allow a national influence and responsibility to render development
cooperation in the sector more efficient. The rearrangement of the education sector planning
programming is based on the requirements of the new paradigm in development cooperation
under the principles of the Paris Declaration.
Donors are said to be generally working to strengthen and use the country’s own frameworks.
DPs provision of strategic support to the development and strengthening of these systems is
purposely to make use of the data they provided for monitoring their own activities and
support. The UNDP’s support for processes involved in producing the Annual Progress
Reports (APR) on the national development framework and capacity building programmes for
M&E offered by the EU/USAID/DFID are examples of PD-like activities aimed at
strengthening the country’s own systems and frameworks by donors. Other examples are: the
implementation of the Domestic Violence Act, responsive skills and community development
projects, CIDA and GIDA’s support to financial management systems as well as the EU’s
support to the agriculture sector are all geared towards strengthening the country‘s framework
and systems. There has been good progress in aligning PAFs and adopting common results
indicators by both DPs and GoG, however most DPs still insist on additional monitoring
arrangements and review missions, in part because of the poor quality of sectoral monitoring
arrangements.
In terms of strengthening the use of these frameworks, there has been comments from DPs on
the Ghana Aid Policy and the medium-term development plan 2011-2013 in this regard. Most
DPs use the national development strategy to select their sectors of concentration and develop
their own strategy. An example is GIFMIS project (information system in the PFM area).
Donors again strengthen the framework through their engagement with the M&E sector
working group to encourage, strengthen and apply the M&E framework. Donors further use
APR for MDBS holistic review and rely on data from sector reviewers. Some donors (AfDB,
WB, EU and DFID) in the act of strengthening country frameworks work with the Ghana
Statistical Service (GSS) on statistical capacity.
50
Stakeholders general feel there have been improvements in the efficiency of aid delivery
over past 5 years. About 20% and 64% of total respondents indicated that there has been some
improvement or little improvements in the efficiency of aid respectively. In terms of
improvements in the management and use of aid over the past years, the three groups of
respondents were generally positive. About 16.7% said that there has been substantial
improvement, while 54.2% said there has been some improvement. Also 20.8% indicated that
there has been little improvement and 8.3 indicated that there is no change. The average rating
was 2.21%.
51
Figure 16: Evidence of productive policy dialogue on exclusion
Social groups are consulted on key issues and evidence of productive/intensive policy
dialogue on exclusion takes place. There is a dedicated working group on gender equality
significant attention in dialogue is the concentration of poverty in the North. The issue of
social exclusion has been recognized as important in the country context. The groups and
issues primarily referred to are the vulnerable such as women, rural people, disabled people,
landless people, HIV/AIDS victims, special needs students, deprived communities girls and
rural poor women and children. In addition, the unequal development between the South and
the North featured strongly in PD discussions. Equally important are disabled, women and
children; their involvement in policy formulation and implementation, Minority groups, aged
and unemployed women. Besides the group that would be primarily referred to are
unemployed people and people living in the North of Ghana. This is because there is the
recognition that significant geographic and gender disparities and some attention to the needs
of disabled citizens. In a nut shell, excluded groups include population in northern region,
rural population, urban poor, Gender, vulnerable especially those with disabilities and children.
But the hope is that, quite a few programmes such as LEAP, take care of the socially excluded
and SADA for instance, address exclusion geographically.
Furthermore, working through the PPP concept, integration to better results (reproductive
health and HIV/AIDS), and more consultation for marginalized groups are seen as different
ways of achieving more effective aid (e.g. in the experience with non-PD donors, ie, those who
53
have not endorsed the Declaration). Also to mention is the fact that, until the recent CG
meeting which brought for first time china, India and South Korea to the table some donors
were missing - Brazil and Russia are still missing. It equally affects future expectations since
China, India, Brazil are more involved in aid delivery yet the level of transparency is very
limited as they are not part of any sector group. China as an unmatched scale with few strings
attached.
Stakeholders added that the PD is effective with regards to economic growth, but not
promoting human rights and good governance. Besides, non-traditional DPs seem to have the
advantage to less bureaucratic, much quicker and less complicated therefore; results can be
seen much earlier and easier.
54
gender issues, at least at some degree. Besides, with the emergence of SADA, the issue of
poverty in the north has been fairly effectively mainstreamed across sectors. In all, the use of
country systems is helping to strengthen institutional capacities at different levels, although
there is still far to go in this regard.
Also, the mix of aid modalities (including general or sector-specific budget support,
projects and programmes) promotes sector coordination. For instance the EU now delivers
between 60-70% of its new assistance to Ghana in the form of budget support, this has been as
a result of donors quest to make an impact in some sectors such that there is sector
coordinating. Another reason for the change towards more holistic budgeting is to improve
sector-wide accountability, reduce duplication and to promote effective and efficient use of
funds that aims to ensure that other areas and sectors that were under national funding also get
attention and that an increase in general and sector budget support has that tendency of
increasing program based aid. Also GBS and SBS now account for a substantial portion of
ODA but the focus is now on sectoral support more than it was formally through the sectors
budget support. Examples are DBS, Project, SWAPS, and CIDA for agriculture sector, just to
mention a few. There is a clear shift towards GBS and SBS, there modalities are the easiest
way to disburse large amounts of funds.
The effects of these shifts have a tremendous change on development results in the sense
that through focusing on sector strategies, M&E capacity has been reinforced. There has
been better coordination and resource utilization for country own priority, though precise
targeting of resources and scarce resource maximization since there is less duplication of
efforts. These enhanced coordination for sustainable development results. Also new sectors
are now supported by aid (agriculture, gender, etc) and Government is able to deal with a better
organized donor community. Delivery improved in sectors where dialogue between donors
and government works (but not so much in sectors where this is not the case). GBS and SBS
have a positive impact on GOG’s ownership over development but in terms development result
delivery, impact remains limited. Also important is the fact that the matrix (PAF) of the
General Budget support (MDBS) states clear targets and triggers for disbursement. Some of
them are clearly result-oriented; some are at least important milestones for development
results. On the other hand, Development agenda is been driven by country’s government
taking into account specific country’s interest. Besides, the idea is better result oriented
although it remains to be documented.
Another key area of progress in terms of development outcomes is the involvement of Civil
Society Organizations in the aid dialogue and other national policy meetings. The space for
CSOs has increased considerably considering their involvement in the formulation of the
medium term development plans such as the GPRS II and the Medium Term National
Development Policy Framework (2010-2013). They have participated in the Consultative
Group Meetings since 2006 and the Review of the Annual Progress Reports of the GPRS II. It
must be pointed out that civil society participation has been more ad-hoc than systematic and
55
institutionalized, has been limited to high level meetings like the CG and less inclusionary with
respect to sector dialogues 13 .
It was noted that apart from meeting specific project objectives, the PD on aid
effectiveness has gone a long way to inspire beneficiaries to be self-reliant and assume
ownership responsibilities, thus encouraging communities to undertake their own
projects for the benefits of their communities. In addition, parents are willing to sacrifice
and contribute to the education and development of their wards. The policy and efforts to
ensure equity in delivery of quality education especially in the deprived regions of Ghana has
brought on board projects such as the provision of free school uniforms for pupils.
Beneficiaries of the Pilot Programmatic Scheme (PPS) were of the view that due to the
PD principles; development aid in recent times also takes into consideration capacity
requirements of project implementers. Project team members have had opportunities to
enhance their capacity by attending workshops both internally and externally in their area of
expertise. In terms of equipment, project management teams have received vehicles, computers
and other tools to facilitate their activities. The capacities of District Assemblies have been
improved to enable them prepare their own district plans, indicating activities, inputs
required, set targets and funding sources making reporting easier. There has been an
overall improvement in the efficiency of aid delivery in recent time past as result of the
PD principles. However, one unintended effect identified was that project staff is over-
burdened because of the need to meet reporting or project guidelines. The problem is
exacerbated with short term projects. It was noted that aid effectiveness to a large extend is not
achieved because of attitudinal challenges. It was therefore advocated that code of ethics
should be promoted among project implementation teams and performance contract be initiated
to improve performance of project implementers.
13
Akwetey (2007), The Paris Declaration and Aid Effectiveness, Effect of Implementation on Civil Society
Funding and Policy Space in Ghana, An Alliance2015 Report
56
An agricultural project evaluated on the development outcome of the PD principles made
very interesting revelations. The evaluation was done at the Zonal Office of IFAD’s Root
and Tuber Improvement and Marketing Programme (RTIMP) in Koforidua. The
RTIMP has worked with a cross section of stakeholders and has achieved significant
economic and social impact at all stages of the commodity chain. The intervention in
particular has impacted positively on small-scale farmers, processors and traders, particularly
women and the youth. A strategy used by government towards achieving development
outcomes which is also the bedrock for this project is the bottom-up approach in developing
policy frameworks. Under RTIMP, consultations are made at all levels - community, district,
regional and national levels. Through this process, the issue of social and gender segregation is
minimized and their concerns are captured in the mainstream of economic and social
development. In the recent past, portion of projects funds are set aside to build capacity of
project staff. The capacity building takes the form of managerial training and workshops. Local
institutions such as Centre for Scientific and Industrial Research (CSIR) have been supported
to undertake research for root and tuber multiplication under the RTIMP. District Assemblies
have also received capacity building support to prepare their own development plans such as
procurement plans. Area councils have also benefitted from capacity building and training to
implement community-based projects.
In 2008, the Ghana Health Service under the malaria control project implemented the malaria
and nutrition project carried out in three districts namely Savelugu-Nanton, Tolon-Kumbungu
and West Mamprusi. The evaluation of the project was carried out in two communities; Gushee
and Nabogu in the Savelugu-Nanton District of the Northern Region. The project has been
effective because of a number of achievements identified. Previously, women felt reluctant
go for a post-natal care. The results of the assessment indicated that there has been an
increase in the number of children weighed in the communities. It was revealed that 150
and 180 children have been weighed in Gushee and Nabogu communities, respectively. In
addition, the project activities (sensitization, education and counseling) have contributed to
improving hospital attendance. There has also been an increase in the number of women
reporting their sick children to the hospital than before. The presence of the group
promoters, a capacity building component of the PD has also helped to fill an important
gap in terms of the availability of health officers in the rural communities. Lastly, group
promoters based on observations explained that there has been a reduction in the number of
malaria cases in the communities with children looking healthy and experiencing improved
nutrition thereby reducing child mortality.
The following project impacts are also reported by stakeholders: Improved child health due to
increased knowledge of child care especially breast feeding and the provision of food and care.
This has e resulted in a reduction in child mortality in the communities because the mothers
through constant weighing are able to detect occurrences of some sickness early enough for
immediate medical attention. Also the education provided by the volunteers helped mothers to
feed their children with balanced meals. It has also led to increases in the incomes of mothers
because they now spend less money on medical expenses. These women have further gained
more man-hours which are being used in promoting their income generating activities.
57
Box 1: Evaluation of three sector specific Projects
Focus Group Discussions for the Evaluation of the Implementation of the Paris Declaration (Phase II) was held
in Elmina, Koforidua and Savelugu-Nanton District. Participants of the meeting were representatives of GES of
the district, schools and RTIMP staff. A third project from the Ghana Health Service under the malaria control
project implemented the malaria and nutrition project carried out in three districts in the North. The evaluation of
the project was carried out in two communities; Gushee and Nabogu in the Savelugu-Nanton District of the
Northern Region.
Context
The concerns of the FGD were mainly the need for more highlights to be placed on projects achieving results
through M&E activities with indicators used in assessing the progress of project objectives. There is again the
need by participants to develop and establish project planning architecture to coordinate efforts towards ensuring
the establishment of a sustainable structure for continuity of projects at the local government level. Participants
hold the view that efforts through consultations, dialogue and suitable reporting systems should be put in place
and geared towards greater focus on results. On the issue of aid effectiveness fatigue, participants clearly
indicated that aid effectiveness fatigue will not exist once the targeted beneficiaries benefit fully from aid.
Participants wondered whether various interventions in the district have achieved their targets based on current
implementation of projects and initiatives especially in the educational sector.
Strategies adopted by some community projects towards the achievement of development results were the use of
community participation, community project facilitators and capacity building trainings for project facilitators.
Some of these projects at the grassroots level provide some incentives to facilitators to smoothen the progress of
their activities. Community participation, one of the adopted strategies deals with the involvement of traditional
authorities (chiefs and elders), opinion leaders, women groups and other community members. Chiefs and elders
are constantly informed about the activities of project facilitators. The participation of traditional authorities and
district assembly members have contributed significantly in project delivery because these authorities are a force
to reckon with in terms of social mobilization. Similarly, the presence of women in the groups is very useful
because of different gender roles in project activities. Finally, in ensuring project sustainability for development
results participants stated that there is the need for social inclusion; community members and facilitators
identifying themselves with these projects. There is also the need to assist in the formulation of
departmental/sectoral M&E plans and the promotion of strategies such as dialogue and consultations to be
adopted by the projects to yield high development results.
58
4. KEY LESSONS AND RECOMMENDATIONS
A key aid effectiveness challenge is off-budget spending 14 which is usually associated with
isolated projects. This usually occurs because of inadequate government-partner planning for
re-current expenditures. Off-budget spending is common in the health and education sectors
where a significant number of projects are financed by donors through sector ministries. This
makes it almost impossible for the government to track these expenditures and they often
distort the national budget. However, due to the PD principles and the associated commitment
to fund government through the MDBS off-budget spending has been minimized. Through the
MDBS, the government has finance development expenditures outlined in the GPRS II and
therefore all aid flows and private flows have been synchronized. Furthermore, it has led to the
setting up of a common mechanism for coordinated delivery of programme aid which in turn
minimizes the off-budget spending and eliminates distortions created within the aid delivery
system.
The PD principles have encouraged the use local systems and capacity and donors are
helping to build local potential. More often than not, governments are faced with an
absorptive capacity constraint for project aid. In Ghana, the administrative capacity of certain
ministries, departments and agencies is weak due to the lack of skilled personnel. Project aid
often worsens the already poor state of affairs, attracting key people as a result of better pay
and other factors not prevalent in the civil service. The MDBS and the PD principle to build
local capacity and systems offers the opportunity to utilize the accounting systems of the GoG
thereby encouraging staff to remain at their posts and strengthening local skills.
14
‘below the line’ expenditures of donor funds given to sector ministries of a country. These
expenditures are not incorporated in the national budget and audited reports are not sent to the
Ministry of Finance.
59
Another aid effectiveness challenge which is being addressed by the PD principles is the issue
of transactions cost. There are currently 23 multilateral and 24 bilateral donors in Ghana and
should each require separate reporting and meetings with GoG, then the cost implications
would have been enormous. One area where this is prevalent is project aid; projects aid is often
hindered by high transaction costs because submitting separate reports on a range of donor-
funded projects is costly. Also, numerous meetings between government officials and donors
can be time-consuming and significantly add to the cost of aid. This shortcoming has been
reduced with MDBS since it applies a unified approach that does not require separate
reporting. With MDBS, individual systems and procedures are simplified and donors agree on
a common format with regard to content and frequency, so that a single periodic report per
project is sufficient to meet the requirements of all partners. Unfortunately, the MDBS
accounts for a third of total aid to Ghana and therefore significant proportions of project aid
funds still exist that require separate reporting.
Project aid is generally made up of different projects funded by different donors. This often
comes with very little country ownership and may not support the government’s priorities.
However, under the PD principles, there is greater opportunity for donor coordination in
supporting government priorities as specified in the GPRS and the Medium Term
Development Framework (2010-2012) thus allowing the government a greater degree of
ownership. However, stakeholders interviewed held the view that there has been little change
in the way the government of Ghana is able to steer the strength of donors.
Aid flows to Ghana has been unpredictable and very volatile which tends to affect
government’s fiscal behaviour and growth. However, under the MDBS which accounts for
about 30% of total ODA to Ghana, nearly all pledged funds are disbursed which ensures that
government is able to plan its activities.
To what extent has each of the five principles of the Paris Declaration been observed
and implemented, and the Accra Agenda priorities reflected? Why? Have there been
conflicts or trade-offs between them?
The extent to which each of the five PD principles have been observed is varied. Whereas
some are easy to achieve and require less effort, others are not. Others have also seen more
donor interest and commitment than others while government effort in leading some has not
been very strong. The level of implementation on each PD is summarized below:
Ownership
Ensuring that aid programmes are aligned to national development plans has been one area of
GoG and DPs concern under the PD principles. GoG has embraced the PD and together
with its DPs made strides in developing the national development policies (GPRS and
GSGDA). The implementation of Ghana’s development policies has been regularly discussed
at Ministerial and Cabinet level and DPs have participated in providing oversight responsibility
in its implementation. Sector Working Groups within the framework of the MDBS have been
very active and they provide opportunity for further dialogue on key policy issues which are of
national interest. Government of Ghana exercises some leadership role in developing and
60
implementing its development strategies through broad consultative processes including civil
society organizations. Development Partners have adjusted their aid modalities and responded
to new priorities identified by partner MDAs. Recently, there have been some significant
changes in the preparation of the MTNDF with government assuming ownership and
leadership. There has been modest improvement in consultations and coordination with
DPs
Alignment
The review finds that there has been a significant improvement in alignment of projects with
Ghana’s development strategies. Nevertheless, off-budget and off-plan activities still remain
indicating lack of alignment with GoG priorities and systems. Whereas MDAs lack capacity to
plan, DPs are also limited by their own institutional arrangements and procedures. Thus
although a new aid landscape is being witnessed, aid effectiveness challenges still remain.
Challenges with country systems and non-use or partial use by donors due to mistrust has
undermined country systems
Harmonization
DPs have made significant efforts to ensure the harmonization of aid delivery through
Programme Based Approaches (PBAs), joint projects and common delivery arrangements. A
major harmonization effort is the decoupling of the aid for projects and the consolidated fund.
Thus, development funds are not within the budget framework and mostly controlled between
independent project management units and the donor supporting the project.
The review acknowledged that harmonization in certain areas has been slow. For
instance, little progress has been recorded in the way the Government of Ghana steers the
strength of donors. In particular, although transparency and consultations between GoG and
traditional donors on aid conditions has improved, little can be said of non-DAC donors, for
example, the BRICKs. It is also reported that division of labour is more donor driven with less
government interest and involvement. Also, there has been uneven progress in joint analytical
work and shared missions among donors because they have different objectives, interest and
demands from their parent organizations and funding sources.
One positive area of harmonization is silent partnerships among donors whereby they
channel their resources directly through other donors’ programmes. Also, individual
donors have been noted for making major changes and simplifications to their policies in the
past five years. Thus, DPs are sharing information, analysis and providing coordinated policy
inputs all geared towards less duplication of projects and a reduction in transactions cost. The
predictability and disbursement of aid according to agreed schedule has been more effective
and clearer. In addition, some donors are adapting to new ways of managing aid including the
delegation of authority to field officers. There has also been instances where technical staff
work for more than one donor. However, concerns were raised about the partial continuity
among donor field office staff, quality issues and the excessive turnover.
61
join in. It is reported that there has been some level of strengthening in Ghana’s capacity to
manage resources to achieve desired results. However, better data is needed on budget
activities and intermediate outcomes to minimize inefficiencies arising from central
government due to the use of different data collection systems by MDAs. Some of the
initiatives to promote better and management for results is the technical guidelines developed
by NDPC to assist various agencies in each sector and District Assembly to formulate M&E
plans. Also, the 2009 G-JAS mid-term review report indicated that DPs are now routinely
providing annual indicative funding commitments and quarterly information on disbursements.
Mutual Accountability
A key PD principle is the level of mutual accountability in resource flow and the achievement
of results. In this regard, GoG has the responsibility of strengthening the accountability
systems of the country. This review notes that there has been evidence of increasing trust,
mutual respect, open dialogue and flexibility between donors and government. It is
unanimously agreed by respondents that the quality of dialogue on public financial
management has increased under the current political regime. Budget hearings and invitations
through the media for input into the national budget were also acknowledged. A high degree of
openness has been demonstrated by both the GoG and its DPs and the recent 2010 CG attest to
this. There has been a renewed commitment from DPs towards the development of the DP-
PAF.
Accountability towards citizens has been demonstrated through activities such as the `Meet the
Press series’, providing information on aid flows to MDAs, budget review meetings attended
by Parliamentary Select Committee in some sectors, the publishing of information by donors
each time a new financing agreement is being signed. Others include Public Account
Committee hearings on the floor of Parliament. Recent parliamentary debates on aid
effectiveness have improved and the STX housing agreement was cited as a typical
example.
Anti-corruption measures such as the work of PAC investigation on the School Feeding
Programme, CHRAJ investigations etc have all served to promote accountability. In
addition, there have been changes in the accountability of government towards citizens and
parliament but a very worrying issue is the perceived level of corruption. The general view is
that there has been little improvement in tackling the issue of corruption despite the
improvement in the corruption perception index provided by Transparency Initiative.
It has been argued that the accountability discussions have been more skewed towards the
partner country but little is said about accountability with respect to donors. There incomplete
information on aid flows to Government including that provided through CSOs which affects
transparency and reduces GoG’s ability to monitor and manage the funds as desired. According
to the Ghana Aid Policy and Strategy 2011-2015, some DPs are unable or unwilling to meet
the GoG’s request for such information. According to Akwetey (2007), there has been very
little accountability of DPs to citizens although under the sector dialogue regime of the MDBS
has seen an improvement in MDAs accountability. Also, accountability to donors by civil
society beneficiaries of recent initiatives like the G-RAP and the RAVI has improved.
Development Results
62
The PD has led to a changing context of aligned and harmonized aid and new modalities.
Ghana has received substantial funding into the health sector; the SWAp and MDBS have all
led to improved funding into the priority sectors. PD has also led to improvements in the
government’s monitoring framework at the sector and programme levels. Also, donors are
increasingly strengthening and using the country’s systems. There is general consensus among
stakeholders that the GoG is leading the agenda to put more focus on results by linking donor
development policies on aid to the national development framework.
Stakeholders were very positive that there have been improvements in the efficiency of
aid delivery between 2005 and 2010. In addition, there is substantial evidence that donor
support for innovative approaches to achieving development objectives in key sectors. Thus,
aid is helping to leverage the country’s own policies and programmes to achieve higher
national objectives. For instance, the funding of agriculture value chain process is geared
towards achieving the national objectives. Others include the provision of aid effectiveness
platform which has promoted dialogue between donors and civil society. It has also helped to
institutionalize good governance practices such as the fight on corruption. PD has also
supported infrastructure development thereby providing an enabling environment for the
private sector.
The PD has had unlimited effects on the effectiveness of aid since it makes a lot of demands on
Ministers, Heads, and other project administrators in the process of ensuring coordination and
harmonization. More time is spent on meeting sector working groups, thus precious time is
lost in meetings rather than focusing on the core business. Progress of PD-style aid to
promoting social exclusion or gender equality looks promising. Some groups are consulted on
key issues and evidence of intensive policy dialogue on exclusion takes place.
The recent CG meeting brought for the first time China, India and South Korea to the Table.
Bedsides, PD-style cooperation has improved the contribution of aid towards strengthening
Ghana’s key institutions and problem solving networks through dialogue. Besides, the mix of
aid modalities including general or sector budget support promotes sector coordination.
Detailed analysis of selected projects from three sectors (agriculture, health, education)
through field visits and focus group discussions point towards improved results due to the
implementation of the PD. For instance, capacity requirements of project implementers have
been taken into consideration. The capacity of district assemblies have been improved to
prepare their own district plans. However, some unintended effects were noted and typical
among them is the over-burdening of staff because of the need to meet reporting deadlines. The
agricultural project evaluated also indicated significant social and economic impact at the
various stages of the commodity chain. The health project also reported of increases in the
number of hospital attendance by mothers, improved child health as a result of improved
information on breastfeeding and child care. These have led to a reduction in maternal
mortality in these areas. Also, less time is spent on medical expenses and more man-hours put
into income generating activities.
63
challenges to full implementation of the Paris principles. Progress with each action is discussed
below:
Predictability – The 2009 G-JAS Mid-Term Review Report indicates that DPs now routinely
provide multi-annual indicative funding commitments and quarterly information on
disbursements.
Country systems – Capacity building support to the country systems has seen some
strengthening lately. Within the context of Ghana’s Country Systems Initiative some donors
are currently working to strengthen the Public Procurement Authority and the Ghana Audit
Service. One main factor identified as the major reasons why country systems are not used,
according to respondents is lack of confidence (trust) in the country systems
Conditionality – The use of policy and process conditionalities by DPs especially those
subject to the interpretation of donors significantly undermines aid delivery. Aid conditionality
has improved over the years especially with major donors like the World Bank. The Bank’s
conditions dropped from 40 conditions per loan in 2005 to 15 per loan in 2009. However, a
large number of conditions (12 out of 57) are not made explicit in loan agreements but they
refer to the Letter of Development Policy according to EURODAD (2010). Aid conditionalities
also affect transactions costs which in turn lowers the real value of assistance. DPs continue to
put significant demands on government in terms of time, reporting needs, and use of other
resources through numerous and uncoordinated missions and meetings 15 . It is believed that this
is as a result of the lack of delegation of authority to local offices of DP organizations which in
turn affects the already challenged capacity systems in MDAs.
Untying – There is significant variations among donors on untying status; four DAC countries
(UK, Ireland, Norway and Luxembourg) report full untying of aid between 2005-2007 while
countries like Austria and Belgium report less than a quarter of their aid as untied. A total of 13
donors report parts of their aid as tied but in value terms, the USA tops the list with 41%
followed by the Netherlands, Belgium and Germany. There is considerable evidence that
confirm the existence of de facto untying. There are wide differences in donor practices in
Ghana and aid delivered as budgetary support or as project aid but through the country’s
procurement system is untied (Geddes, Mensah, Natali and Quartey, 2009). Similarly, newer
forms of pooling such as the use of SWAps, UN Cooperations and Development banks are
untied. However, technical cooperation has remained tied.
4.3 Conclusion
The Phase II evaluation of the implementation of the Paris Declaration noted that moderate
progress has been made in terms of Ownership over the past five years (between Phase I and
15
Ghana Aid Policy and Strategy 2011-2015
64
II). There has been modest improvement in consultations and coordination. There have been
discussions on the implementation of national development policies and priorities at
Ministerial and Cabinet levels and DPs have provided oversight responsibility in its
implementation. Civil society organizations now participate in CG meetings and sector
working groups.
There has been significant improvement in the alignment of projects with Ghana’s
development strategies. Nevertheless, off-budget and off-plan activities still remain indicating
a lack of alignment with GoG priorities and systems. Whereas there is inadequate capacity
within MDAs to plan, DPs are also limited by their own institutional arrangements and
procedures. Thus, although a new aid landscape is emerging aid effectiveness challenges still
remain. Challenges with country systems and non-use or partial use by donors due to mistrust
have undermined country systems.
Aid harmonization is one of the areas which have seen greater improvement particularly the
decoupling of aid for projects from the consolidated fund. Nevertheless, harmonization within
certain areas has been reported to be slow. Little progress is reported on the way GoG steers
the strength of donors and the need for transparency in the way non-DAC donors like the
BRICKs operate. Uneven progress is reported of joint analytical work and shared missions
thereby limiting progress on reducing transactions cost of aid.
In terms of managing for results, it has been reported that between 2006 and 2008 some
modest improvements in the way aid `conditionalities’ have been developed transparently and
in consultation with government and donors. However, the cost of managing aid continues to
be high for partner and donor countries and this is not likely to decline soon in view of the
increase in aid. Some areas of improvement however include the new guidelines on managing
for results developed by the NDPC for MDAs and MMDAs to formulate M&E plans.
Additionally, some donors have been providing multi-year indicative funding and quarterly
information on disbursement
Mutual accountability in terms of resource flow and achievement of results has recorded little
improvement from the previous evaluation period (2008) and goes to confirm Ghana’s recent
position on the Corruption Perception Index. Evidence of improvements can be seen in terms
of mutual trust and respect, open dialogue and flexibility between DPs and government. A high
degree of openness was demonstrated by both parties at the 2010 CG meeting and the renewed
commitment by DPs towards the development of the DP-PAF. Recent debates on the floor of
Parliament especially on the STX Housing Agreement are a typical example of improved
accountability. However, accountability is noted to be skewed towards GoG and less towards
donors. There is incomplete information on donor contributions to CSOs and some donors are
unwilling to provide such information when requested for.
Development Results has been the focus of aid in recent times with the alignment of donor
policies on aid to the national development framework. There has been a partial improvement
in the efficiency of aid delivery over the past five years according to the 2010 PD evaluation
survey. The funding of agricultural value chain as well as other key interventions particularly
in infrastructure development are key areas where aid is helping to leverage the country’s own
policies and programmes to achieve higher national objectives. The provision of aid
effectiveness platform which has promoted dialogue between donors, government and civil
65
society are all clear evidence of improvements in development outcomes. PD has also helped
to institutionalize good governance practices such as press freedom and the fight on corruption.
Project level outcomes have also confirmed the improvement in aid effectiveness. Despite,
these positive outcomes, PD has had unintended effects which have limited its development
outcome. The new complex aid architecture comprising a mixture of programme and project
aid makes a lot of demands on Ministers, Directors and other key administrators of aid
including District Assemblies. Enormous amount of time is spent at meetings and other aid
related activities thus adding to the transactions cost and reducing aid effectiveness.
The Accra Agenda for Action (AAA) whose 4 principal areas of focus aims to build on the PD
principles and accelerate progress with the PD outcomes also noted that the predictability of
aid has improved with DPs routinely providing multi-annual indicative funding commitment
and quarterly reports on disbursements. Capacity building to strengthen country systems are
on-going especially the Public Procurement Authority and the Audit Service. Capacity building
is an integral part of PFM. The use of process and policy conditionality by DPs particularly
those subject to the interpretation of donors is undermining aid delivery. Although there have
been some improvements in aid conditionalities over the past five years, DPs continue to put
significant demands on government in terms of time, reporting needs, uncoordinated missions
and meetings. All these add to the already high levels of transactions costs. This has been
attributed to the lack of delegation of authority of donor HQ to local offices not forgetting the
high staff turnover and in some cases low quality staff used in DPs local offices. Finally,
evidence of de facto untying exists but technical cooperation still remains tied.
Given the key findings above the next section recommends strategies for national stakeholders
and the donor countries.
Government of Ghana
(i) The Government of Ghana should continue to improve its systems and also
encourage donors to use them. Annual budget provisions and regular monitoring of
progress in the use of country systems will build mutual trust and confidence in
their utilization;
(ii) The government should adopt policies and related measures to improve and
regularize consultation with CSOs;
(iii) Transparency with new loans particularly with the non-DAC donors should be
promoted through their participation in the CG/APM;
(iv) Several measures have been taken to strengthen the fight against corruption. This is
yet to significantly reduce public perception of corruption. Prosecution and
conviction of offenders need to be effective;
(v) Government should also invest in promoting the availability of data at the MDAs
and MMDAs to promote the tracking and monitoring of aid funds to the beneficiary
level.
Donors
66
(i) DPs should increase aid to support accelerated development of capacities at all
levels as Ghana continues its transition into a high middle income country. Aid
should also be targeted at building the capacity of institutions and human resources
to effectively manage the transition.
(ii) Donors should ensure that aid is provided in a more coordinated way whether in the
form of projects or budget support. In addition, in as much as they strive to be
responsible to their tax payers, they should together with the Government of Ghana
ensure that there is full information on aid projects to the Ghanaian citizens.
(iii) The review indicated that transparency issues surrounding non-DAC donors are of
concern to DPs and civil society. Thus, non-DAC donors should also be brought on
board the harmonization process in order to ensure that transactions cost is reduced
significantly.
(iv) Donors should also harmonize their aid procedures; the recent pace at
harmonization is very slow (see the Ghana Aid Harmonization Matrix). There
should be a shift from project funding towards pooled or programme funding by
ensuring that the various projects are aligned with the GSGDA to avoid stand-alone
projects.
(v) In line with the AAA, donors should make every effort to use country systems.
(vi) The high turnover of DP project staff and quality issues with field staff were
mentioned as a key challenge to aid effectiveness. Thus, DP HQ should strive to
promote continuity of staff and also address the quality issues that undermine aid
effectiveness.
(vii) With reference to mutual accountability, significant progress has been made in the
development of instruments for partner countries and DPs to strengthen its practice.
Instruments such as the DP-PAF and the MDBS PAF now need to be effectively
implemented.
(viii) Aid conditionalities still remain a challenge and the mixture of project, programme
and pooled funding has led to a complex aid architecture with its associated high
transactions cost. Thus, donors should continually shift from project funding
towards programme or pooled funding
(ix) A major issue with progress on the AAA is the existence of tied aid. Donors
continue to operate tied aid system particularly with procurement of goods and
technical assistance. As country systems are strengthened and their utilization
improves, DPs should progressively untie aid taking into account the improvements
in the system.
(x) DPs and the government should promote accountability of aid funds to civil society
in Ghana by ensuring that aid data in a disaggregated form is made available and
accessible. There should also be a system in place to ensure that funds are tracked
to their recipients.
(xi) Accountability of grants to CSOs should be strengthened. To this end, both DPs and
Government should strengthen the policy and institutional framework for support
and accountability.
Civil Society
(i) Civil Society Organizations should intensify their advocacy and watchdog roles,
and thereby strengthen mutual accountability practices in the country.
(ii) DPs and Government should support capacity building within CSOs to enable them
effectively play their roles in the democratic development of Ghana.
67
(iii) The participation of CSOs in the aid policy/effectiveness dialogues and their
adherence to the PD principles including accountability should be strengthened.
68
References
Aryeetey, E., and A. Cox (1997), ‘Aid Effectiveness in Ghana’, in J. Carlson et al. (eds),
Foreign Aid in Africa: Learning from Country Experiences. Motala Grafiska, Sweden
Aryeetey, E., and A. Cox (1997), ‘Aid Effectiveness in Ghana’, in J. Carlson et al. (eds),
Foreign Aid in Africa: Learning from Country Experiences. Motala Grafiska, Sweden
E. Aryeetey, J. Harrigan and M. Nissanke (eds), Economic Reforms in Ghana: The Miracle and
the Mirage. London: James Currey Ltd.
Aryeetey, Ernest and Augustin Fosu (2005), “Economic Growth in Ghana: 1960—2000.”
Forthcoming in Aryeetey and Kanbur (eds.), The Economy of Ghana: Analytical Perspectives
on Stability, Growth and Poverty. James Currey
E. Aryeetey, J. Harrigan and M. Nissanke (eds), Economic Reforms in Ghana: The Miracle
and the Mirage. London: James Currey Ltd.
Aryeetey, E., O. Baffour, and P. Quartey (2003). ‘Does Tying Aid Make it More Costly? A
Ghanaian Case Study’. Paper presented at the workshop on ‘Quantifying the Impact of
Rich Countries’ Policies on Poor Countries’, 23-24 October. Washington, DC: Center
for Global Development and the Global Development Network.
Addae-Boahene, A (2007) Ghana: Aid Effectiveness And The Education Sector: Implications
For Civil Society. An Alliance2015 report
African Forum and Network on Debt and Development, (AFRODAD). A Critical Assessment
of Aid Management and Donor Harmonisation in Ghana: A Case Study.
Booth, D., Crook, R., Gyimah, B., Killick., T and Robin, L (2004), ‘Drivers of Change in
Ghana : Overview Report’, Accra and London, Center for Democratic Development
and Overseas Development Institute
Johnson, J. H., and S. S. Wasty (1993). ‘Borrower Ownership of Adjustment Programmes and
the Political Economy of Reforms’. WB Discussion Paper No. 199. Washington, DC:
World Bank
OECD (2006), 2006 Survey on Monitoring The Paris Declaration, Ghana Chapter, OECD,
Paris
Osei, R., and P. Quartey (2001). ‘The HIPC Initiative and Poverty Reduction in Ghana: An
Assessment’. WIDER Working Paper No. 2001/119. Helsinki: UNU-WIDER.
69
Quartey, P. (2005). ‘Innovative Ways of Making Aid Effective: Tied Aid versus Direct
Budgetary Support’, Journal of International Development, Vol. 17, pp 1077-1092
Weiss, C., (1998), Evaluation, Prentice Hall, New Jersey, 2nd edition
70
ANNEX
Organizations Interviewed
1. CIDA
2. World Bank
3. DFID
4. Danida
5. KFW
6. GTZ
7. USAID
8. African Development Bank
9. Friedrich Ebert Stiftung, Ghana -
10. Ministry of Finance & Economic Planning
11. Ministry of Water Resources, Works & Housing
12. Ministry of Roads & Highways
13. Ministry of Health -
14. Ministry of Education -
15. Ministry of Food & Agriculture -
16. Ministry of Women & Children Affairs -
17. SEND Foundation
18. ISSER
19. Trade Union Congress
20. Private Enterprise Foundation -
21. Third World Network
22. Royal Netherlands Embassy
23. Italian Embassy
71