The document is a test report for a current transformer. It provides details of the equipment tested, testing equipment used, and results of insulation resistance testing, polarity testing, winding resistance testing, secondary current injection testing, and ratio testing. All test results were found to be satisfactory and the current transformer was determined to be fit for service.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views2 pages

Electrotest: Pvt. LTD

The document is a test report for a current transformer. It provides details of the equipment tested, testing equipment used, and results of insulation resistance testing, polarity testing, winding resistance testing, secondary current injection testing, and ratio testing. All test results were found to be satisfactory and the current transformer was determined to be fit for service.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

TEST REPORT FOR CURRENT TRASFORMER

ELECTROTEST DOC. NO. : 01/ETEST/TPSSL/04/2023-24


DATE :- 25/06/23
PVT. LTD. TESTING DATE : 26/06/23
FEEDER : ………
CLIENT : TATA POWER SOLAR PANEL: ACDB Sheet No:-
LOCATION : COKE PLANT UPC FEEDER NO. : ……. 1 of 2

01. EQUIPMENT DETAILS :-


MAKE :- Automatic Electric Ltd.
SL NO. :- RPH :- 03/22/054245/06 YPH :- 03/22/054245/05 BPH :- 03/22/054245/04
INSTALLATION : Indoor
MFG. YEAR :- 2022
CT DESGN. CLASS RATIO BURDEN Type PURPOSE
CAST RESIN 0.5 100/5 Amp 5 VA RC METERING

02.TESTING EQUIPMENT DETAILS:-


CALIBRATION
INSTRUMENT MAKE SL. NO. RANGE
DUE DATE
Digital Insulation tester Motwane A02747J21 0 – 5 KV 12-01-2024
Secondary Current Injection
Metravi MIPL/43/21-22 0-200 Amp 12-01-2024
Kit
Digital Multimeter Fluke 55030407 0-1000 V 12-01-2024
Milli Clamp Meter Multi B02850 30 mA – 300 Amp 12-01-2024

03. INSULATION RESISTANCE TEST :-

APPLIED
REFERENCE R ph Y ph B ph
VOLTAGE
Primary to Earth 500 V DC 745 MΩ 542 MΩ 651 MΩ
Primary to Sec. 500 V DC 2.45 GΩ 968 MΩ 1.05 GΩ
Sec to Earth 500 V DC 742 MΩ 845 MΩ 645 MΩ

04. POLARITY TEST :-

CORE No. TERMINAL R – ph Y – ph B – ph


Core – 1 1S1 – 1S2 Polarity ok Polarity ok Polarity ok

05. WINDING RESISTANCE TEST :-

Core No TERMINAL MEASURED RESISTANCE ( in Ω )


R – ph Y – ph B – ph
Core – 1 1S1 – 1S2 0.2 Ω 0.2 Ω 0.2 Ω
TEST REPORT FOR CURRENT TRASFORMER

ELECTROTEST DOC. NO. : 01/ETEST/TPSSL/04/2023-24


DATE :- 25/06/23
PVT. LTD. TESTING DATE : 26/06/23
FEEDER : ………
CLIENT : TATA POWER SOLAR PANEL: ACDB Sheet No:-
LOCATION : COKE PLANT UPC FEEDER NO. : ……. 2 of 2

06. Secondary Current Injection Test:-

Phase Injected Measured Current in SWBD T.B. MFM ( A )


Reference Current (A) Rph Yph Bph N R Y B
R–N 5.0 A 4.98 A --- --- 4.97 A 101 --- ---
Y–N 5.0 A --- 5.01 A --- 5.01 A --- 100.3 ---
B–N 5.0 A --- --- 5.02A 4.99 A --- --- 102
R–Y 5.0 A 5.01 A 5.02 A --- --- 101 100 ---
Y–B 5.0 A --- 4.99 A 5.01 A --- --- 102 103
B–R 5.0 A 5.01 A --- 4.99 A --- 101.4 --- 102

07. RATIO TEST:-

Phase Injected Measured Current in SWBD T.B. MFM ( A )


Reference Current (A) Rph Yph Bph R Y B
Y – Y’ 101 A 4.98A 5.02 A 5.01 A 101 100.1 102.1

Remarks : Test Results found satisfactory, CTs are FIT for service.

Name : Vishal & Mukesh Name : Arijit Basu


Organization : Electrotest Pvt. Ltd. Organization : TPSSL
Checked by/
ELECTROTEST TPSSL TSL (E&P)
Approved By
Name: PRADIP KARMAKAR
Designation: Sr. Engg
Signature.
Date: