Bp-22005-E-p-202 - t1 - Electrical Services Power Data Security & Fire First and Second Floors
Bp-22005-E-p-202 - t1 - Electrical Services Power Data Security & Fire First and Second Floors
VALVE
Terrace lighting to be
ROOFLIGHT / BLIND switched from both
SD POSITION TBC office and gym
VALVE RM 304
2 C RM 306
C V Gym 3rd Floor Terrace
C
F
C 5A
V KEY
V 2 SD
USB Combined telephone
5A CO Carbon monoxide detector
Ref Point 1 Ref Point 3 and data outlet (Double
M/L M/L
USB USB
RJ45)
2 2 Combined smoke detector
2 SD 2
1 2 3 4 5 6 7 with sounder 13A Twin switched socket outlet
2 FCU UFH FCU 2 2 5A
POE
IAP WAP 3 PV Inv KNX KNX IP
D gsm Joinery
SD Combined smoke detector with
SPACE BELOW FCU FOR PV integral sounder & strobe light LED Flex outlet
INVERTER - 500w X 700h X
230d INC AC + DC
ISOLATIONS BELOW
INVERTER HD Combined heat detector with Fused Connection Unit
sounder
A Permanent live from lighting circuit for joinery
2 lighting (i.e. PIR or door activated)
MIRROR MIRROR HD Combined heat detector with Joinery
IAP KNX
Power & Panel for Roof M
Vent within this Point / BT Master Telephone
C cupboard to include Socket
C RM 104
rain sensing
RM 105 auto-close C
Ref Point 2
DB3 K Keypad Ref Point 4
Environmental Keypad with remote Room (Tr) /
1 2 3 +
Linen Cupboard
4 5 6 -
Master Bathroom SD C EK
7 8 9 *
V Tf SD
V
FCU (CV)
RM 101 C Contact sensor EK Environmental Keypad with integral room sensor
Tf
Tr FCU (CV) UFH EK Tf 1st Floor Stair Hall VALVE
KNX POE
WAP
Tr
DE 2 V Vibration sensor
Joinery KNX
Tf
s
s
B Joinery
PA
FAN
TV
TV TV outlet comprising 2 x Satellite + 1 x
K Tr
5A 2 2 5A
FCU PA Personal attack button Terrestrial with 2 x Shotgun cables (One spare)
2 EUFH WC USB USB 5A
WC EK SD
FCU
Shower Floor EK EUFH
Tf RM 105
KNX Wall mounted dual technology
Ensuite EK
EUFH Tr In Cupboard passive infra red / microwave
Dressing EK on Half Landing
Tr Tf
Landing Storage Cupboard (below) detector
Bedroom EK
WC
F Floor box
2 CCTV
USB 3 THREE PHASE ISOLATOR
C
V 5A
From
C DB1
SD Way: 1.L1
C
CO SD
100A/33kA
Fuse 3P
SWA/PVC70/Cu
L/N 2Cx25mm²
CPC armour
Isolator
Isolator
100A
C
63A
SAFE POE
5A 2 2 5A
WAP
TV DB1-LG Entrance DB2-LG Flat
D Joinery Joinery TBC 1.L1 1.L2 1.L3 2.L1 2.L2 2.L3 3.L1 3.L2 3.L3 4.L1 4.L2 4.L3 5.L1 5.L2 5.L3 6.L1 6.L2 6.L3 7.L1 7.L2 7.L3 1.L1 2.L1 3.L1 4.L1 5.L1 6.L1 7.L1 8.L1 9.L1 10.L1 11.L1 12.L1 13.L1 14.L1 15.L1 16.L1
30mA Class AC
30mA Class AC
30mA Class A
RCBO B 3P
RCBO B 3P
RCBO B 3P
RCBO B 1P
RCBO B 1P
MCB B 1P
MCB B 1P
30mA 16A
30mA 16A
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
30mA 6A
30mA 6A
100A/10kA
30mA 32A
30mA 32A
30mA 32A
30mA 32A
30mA 32A
30mA 32A
30mA 32A
100A/10kA
6A/15kA
6A/15kA
30mA 6A
80A/6kA
30mA 6A
30mA 6A
30mA 6A
CPC 1.5mm² cable core
Ring FlatTwin+E/PVC70
FlatTwin+E/XLPE90
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
L/N 2C+E 2.5mm²
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
L/N 2C+E 16mm²
SWA/PVC70/Cu
SWA/PVC70/Cu
L/N 4Cx2.5mm²
L/N 5Cx2.5mm²
CPC cable core
L/N 2Cx25mm²
CPC armour
CPC armour
1 - First Floor
1
Ref Point 2
1 : 50
Ref Point 4
LG Flat Hob
1 2 3 4 5 6 7 8.L1 8.L2 8.L3 9.L1 9.L2 9.L3 10.L1 10.L2 10.L3 11.L1 11.L2 11.L3 12.L1 12.L2 12.L3 13.L1 13.L2 13.L3 14.L1 14.L2 14.L3
30mA Class A
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 3P
30mA 16A
30mA 16A
30mA 16A
RCBO B 3P
30mA 16A
32A/6kA
SPD/T1+T2/Up:2.5kV/Iimp:12.5kA
From
DB1
L/N 2x1Cx2.5mm²
In:20kA/Connection: 3+1
SWA/PVC70/Cu
SWA/PVC70/Cu
Way: 1.L1,L2,L3
L/N 2Cx2.5mm²
L/N 2Cx2.5mm²
CPC 1x1mm²
Joinery
CPC armour
CPC armour
Pvc70/S/Cu
A
Solar Inverter
TV
5A 2 5A Washer
M/L Washer RM 207 Dryer
Dryer
M M
Under Stair Cupboard
FC7-Immersion 1
FC9-Foul Drainage Pump
RM 201 V
Solar Inverter
SD
RMSD206 2nd Floor Stair Hall
VALVE
Play Room Tf Tr
Tf
UFH From
B Tr KNX POE
5A WAP DB1
Way: 1.L2
Joinery
From
DB1
EK EK Way: 1.L3
s
EK 2
Ensuite
SWA/PVC70/Cu
POE
L/N 2Cx25mm²
KNX WAP 5A
CPC armour
Joinery
Tf
SWA/PVC70/Cu
RM 203
L/N 2Cx25mm²
Tr Tf
CPC armour
5A 2 5A Ensuite 02 Tr
USB RM 202
100A/10kA
MCB B 1P
C
Bedroom 01 (Isobel)
VALVE In Ceiling
RM 204
Isolator
Isolator
KNX
100A
100A
Bedroom 02 (Seba) FCU SD
DB4-1st to 3rd Floor Distribution
DB3-LG & UG Distribution Board
1.L3 2.L3 3.L3 4.L3 5.L3 6.L3 7.L3 8.L3 9.L3 10.L3 11.L3 12.L3 13.L3 14.L3 15.L3 16.L3 17.L3 18.L3 19.L3 20.L3
1.L2 2.L2 3.L2 4.L2 5.L2 6.L2 7.L2 8.L2 9.L2 10.L2 11.L2 12.L2 13.L2 14.L2 15.L2 16.L2 17.L2 18.L2
EK
EUFH s
Ensuite EK
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
30mA 32A
30mA 32A
30mA 32A
30mA 32A
30mA 32A
30mA 16A
30mA 16A
30mA 16A
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
RCBO B 1P
30mA 32A
30mA 16A
30mA 32A
30mA 32A
30mA 32A
30mA 32A
30mA 45A
30mA 16A
30mA 16A
30mA 16A
30mA 16A
30mA 6A
30mA 6A
30mA 6A
30mA 6A
30mA 6A
30mA 6A
30mA 6A
2
30mA 6A
30mA 6A
30mA 6A
30mA 6A
2 EUFH
SD 5A
F
Ring FlatTwin+E/PVC70
Ring FlatTwin+E/PVC70
Ring FlatTwin+E/PVC70
Ring FlatTwin+E/PVC70
Ring FlatTwin+E/PVC70
L/N 2x2x1Cx50mm²
L/N 2x2C+E 2.5mm²
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
FlatTwin+E/PVC70
L/N 2C+E 10mm²
CPC armour
KNX Tr
Ensuite 01 VALVE
Ref Point 1 Ref Point 3
FCU
FAN M
Laundry Washer
Laundry Dryer
Refrigeration (x2)
Dishwasher
D Joinery
PRELIMINARY
A
FD SUBJECT TO APPLIANCE SPECIFICATIONS
OM
Tr BLIND
RM 001 RM 002
2 2 5A POSITION TBC
USB
2 - Second Floor Vestibule
Ground Floor Stair Hall
M/L
VALVE C Power Schematic
2
Ref Point 2
1 : 50
SD
SD
RM 003
Study
V
BLIND
3 1:1
Ref Point 4
Tr 2
2 DE BLIND status drawing
IMPORTANT: All materials and workmanship shall conform with the NOTES: KNX The installing electrical professional shall consider and A 3 Phase PV installation shall be designed and installed EK
POSITION TBC
B
This drawing is the copyright © of Built Physics Limited
relevant British & European Standards, Specifications and
Codes of Practice
This VALVE
installation is notifyable (Part P) and shall be installed to impliment the requiremetns of 411.3.1.2 of BS by an MCS qualified contractor. C
TENDER
title
ELECTRICAL SERVICES
the 18th
5A 2edition (with amendments) of the IET wiring 7671:20185A amendment 2 in respect of equipotential
POWER DATA SECURITY & FIRE
Tf Tr
and shall not be copied or reproduced without permission. 2 5A 5A
Built Physics Limited shall be credited on any redraw or Any deviation from this drawing is to be discussed with Built regulations. bonding including any existing extraneous conductive Drawings must be read in conjunction with Architectural,
RM 004 2 V
client
FIRST AND SECOND FLOORS
USB 2
re-production. Physics Limited on 01233 885737. Any installer deviating structure that may be found on site. Any uncertainties - Structural and Interior Design layouts WC
2 M/L
BLIND
MR MAGALHAES
Tf POSITION TBC
from the design without consent shall indemnify Build C
This drawing shall not be scaled. Unless stated Physics of design responsibility where it is not rectified.
This drawing demonstrates the intent. All final sizing, please
Tr ask. Tf F C
5A 5A Drawn Engineer Date created
otherwise, all dimensions are in millimetres. Where C 5A selections and full certification of the electrical systems shall This drawing is for FIRST FIX ONLY - Refer to
applicable all dimensions shall be checked by the Equipotential bonding requirements will be the responisbility be the responsibility of the NICEIC or equivalent qualified An addressable fire alarm system shall be installed to Haydon Finch elevations for setting out.
POE
WAP project
DC DC Mar '22
5A C V C
contractor onsite, prior to commencement of any works. V
of the installing electrical engineer to determine and provide. installation professional for domestic systems. LD2 Grade A. Smoke detectors shall be positioned in 2
C Tr T1 29/01/2023 Updated to latest GA's
Specialist Engineering Design Scale
39 UPPER ADDISON
USB
POSITION TBC
BLIND
POSITION TBC
BLIND
This drawing shall be read inconjunction with all other Nothing on this drawing or within the documentation removes accordance with BS5839 pt6 and at least 1m from any KNX
T0 18/01/2023 Updated and Issued for Tender As indicated @ A1
drawings and the services specification document(s). the installers responsibility to provide a fully certifiedCand A security system to Grade 3 shall be designed, installed and ventilation / air conditioning grille. The design, P0 IP 21/12/2022 Updated to latest GA's & comments received
GARDENS LONDON W14
T: 01233 808000 Drawing number Revision
compliant installation in respect of Building Regulations, Gas
C certified by a suitably experienced contractor. The contractor installation and certification of the fire alarm system F: 01233 808001
This drawing MUST be read in conjunction with the Safe certification and NICEIC or equivalent testing and Rev Date RM 007
Description
shall identify as part of their tender, their 2current ongoing shall be via a suitably qualified and experienced fire
BP/22005/E/P/202 T1
RM 006 RM 005
E: [email protected]
specifications and schedules. certification.
V maintenance costs including police response.
Library alarm contractor. CO Room
Sitting SD Ground Floor Terrace
F 2
Revisions
5A
F C
C 5A
C
C 5A
CO SD