Weekly HSE Walkthrough Report
MISK, DAR AL RIYADH & ADVACON
Reference:
Subject: Weekly HSE Walkthrough Report
Walk No.: (04)
Date:
Venue: MiSK – South and secondary Road Project
Time: 8:30 AM – 11:00 AM
Attendees: MiSK HSE Engineer
DAR Al Riyadh (Consultant):
Ata Ul Mohsin
HSE MANAGER
ADVACON CONTRACTING COMPANY (Contractor):
Sikandar - HSE Lead
Imran - HSE Supervisor
Younus - HSE Officer
Tayeb – HSE Officer
Umair - HSE Officer
Waqas – Site Engineer
Umair – Site Engineer
Shah Zaib – HSE Coordinator
Kice: Site Incharge
Ali – Site Supervisor
Rajesh-Site Engineer
Raja-Construction Manager
Page 1 of 6
Sr. No Description Date Raised Action Date Status
Weekly HSE walkthrough conducted Jointly by
DAR HSE representatives with ADVACON
construction, Logistic and Site HSE teams at MiSK
South Road Project PHASE 1,2 3 4
01 07 SEP 2023 Info
Discussed Site issues related to the observations
noted during the walkthrough regarding daily
housekeeping, hard barriers and signage
installation at appropriate areas fire extinguisher
conditions ,electrical cable and cable management
practice, drinking water condition, welfare facilities,
site HSE Communication hazards, risks and
control measures and best practices as per the
MiSK HSE Standards have been discussed and
highlighted to make the work safe and improve
safety performance at the workplace with initiatives
actions and proactive measures.
02 19 OCT 2023 19 OCT 2023 Open
Page 2 of 6
Route to equipment was not barricade also not
assigned the flagman with the equipment to control
the neay by traffic in Phase 03.
22 OCT 2023 22 OCT 2023 Closed
Area around the equipment barrication done and
signages installed.
Page 3 of 6
19 OCT 2023 19 OCT 2023 Open
Observed a smoking shelter without a fire extinguisher in
Phase 01.
22 OCT 2023 22 OCT 2023 Closed
Fire extinguisher provided.
Page 4 of 6
19 OCT 2023 19 OCT 2023 Open
Jerry can used to store the fuel kept close to the rest
shelter in the phase 01 also fuel stored in the cold drink
bottle in phase 4.
22 OCT 2023 22 OCT 2023 Closed
All flammable materials removed from the rest shelter.
(Note: Risk and control measures of All the above observations were discussed and agreed with
Contractor’s HSE and Site Representatives during the Site Walkthrough).
Report Prepared By:
ATA UL MOHSIN
DAR Al Riyadh- HSE Manager
Page 5 of 6
Page 6 of 6