0% found this document useful (0 votes)
251 views17 pages

Bar Bending Schedule Kerala Overseer PSC

The document provides information on estimation and costing related to bar bending schedules, concrete mix design, plastering, brickwork, random rubble masonry, and floor area ratios. It includes formulas to calculate weights of reinforcement bars of different diameters, hook lengths for bent bars, concrete and cement quantities, plaster and mortar requirements, and defines floor area ratio as the total building floor area divided by the gross plot area. An example calculates the FAR of a single storey building with a 500 sqm floor area on a 1000 sqm plot as being 0.5.

Uploaded by

soorya K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
251 views17 pages

Bar Bending Schedule Kerala Overseer PSC

The document provides information on estimation and costing related to bar bending schedules, concrete mix design, plastering, brickwork, random rubble masonry, and floor area ratios. It includes formulas to calculate weights of reinforcement bars of different diameters, hook lengths for bent bars, concrete and cement quantities, plaster and mortar requirements, and defines floor area ratio as the total building floor area divided by the gross plot area. An example calculates the FAR of a single storey building with a 500 sqm floor area on a 1000 sqm plot as being 0.5.

Uploaded by

soorya K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

ESTIMATION AND

COSTING
BAR BENDING SCHEDULE
Unit weight of bar Genral formula
weight/m of bar =d²/162
Density of reinforcement=7850kg/m³

Diameter of bar Weight/m


6mm 0.22kg
8mm 0.39kg
10mm 0.62kg
12mm 0.89kg
16mm 1.58kg
20mm 2.47kg
22mm 2.98kg
25mm 3.85kg
SL Type ofbar Shape of bar HOOK TOTAL LENGHT
LENGTH
1 2*9d
Straight (both L+18d
bar hook)
2 30⁰bent up 2*9d 0.27D L+18d+0.27D
(both
hook)

3 2*9d 0.42D L+18d+0.42D


45⁰bent up

4 60⁰bent up 2*9d 0.58D L+18d+0.42D

5 Bent up 2*9d
(45⁰ both 2(0.42D) L+18d+0.84D
side)
6 24d 2*(L₁-(2*clear
cover))+2*(L₂-
stirrup (2*clear
cover))+24d
Number of stirrup= (span/spacing)+1
For 1 bag of cement quantity of water required = 22..5L
1 Bag of cement = 50 kg=34.5 L=0.035m³
1m³ cement=30 bag=1440 kg
GRADE OF CONCRETE QUANTITY OF WATER REQUIRED PER
BAG OF CEMENT
M5 60L

M7.5 45L

M10 34L

M15 32L

M20 30L
QUANTITY CALCULATION
 PCC(PLAIN CEMENT CONCTERE 40mm aggregate)

M₅=1:5:10
M₇.₅=1:4:8
M₁₀=1:3:6

Dry volume factor cement concrete


= 1.54
From data book,
Coarse aggregate=0.95m³/m³ item voids
Fine aggregate=0.48 m³/m³
aggregate 34%
Sand 20%
cement negligible
Quantity of cement required for 1m³PCC 1:5:10
Weight of cement= (0.95/10)*1*1440
= 137kg
or
Normal calculation,
Weight of cement = ( 1/(1+5+10))*1440*1.54
= 138.6kg
Quantity of cement required for 1m³PCC 1:4:8
Weight of cement= ( 0.95/8)*1*1440
= 171kg
or
Normal calculation,
Weight of cement = ( 1/(1+4+8))*1440*1.54
= 170.5kg =171kg
Quantity of cement required for 1m³PCC 1:3:6
Weight of cement= ( 0.95/6)*1*1440
= 228kg
or
Normal calculation,
Weight of cement = ( 1/(1+3+6))*1440*1.54
= 221.76kg = 228kg
RCC(REINFORCED CEMENT CONCTERE 20mm aggregate)

M₁₅=1:2:4
M₂ₒ=1:1.5:3
M₂₅=1:1:2

Dry volume factor cement concrete


= 1.54

From data book,


Coarse aggregate=0.90m³/m³
Fine aggregate=0.45 m³/m³
Quantity of cement required for 1m³RCC 1:2:4
Weight of cement= (0.90/4)*1*1440
= 324kg ,But taken as 330 kg
or
Normal calculation,
Weight of cement = ( 1/(1+2+4))*1440*1.54
= 316kg
Quantity of cement required for 1m³RCC 1:1.5:3
Weight of cement= 0.90/3*1*1440
= 432kg
or
Normal calculation,
Weight of cement = ( 1/(1+1.5+3))*1440*1.54
= 403.2kg
Q)Number of cement bag required for the construction of pcc floor
3m*3m*100mm thick using concrete mix of 1:3:6?

An) volume of concrete = L*B*H = 3* 3*0.100


=0.9m ³
cement quantity,
for 1 m ³ 1:3:6 pcc quantity of coarse aggregate required=0.95m ³

so, for 0.9 m ³ pcc need 0.9*0.95= 0.855 m ³ coarse aggregate

hence quantity of cement = ( 0.855/6)*1*1440 =205.2kg

=205.2/50

=4.1 bag
Q)For preparing 10 m ³ of 1:4:8 cement concrete, the required sand would be?

An) quantity of coarse aggregate for 1m ³ 1:4:8 c.c = 0.95 m ³

volume of fine aggregate for 1m ³ = (0.95/8)*4 =0.475 m ³

so , for 10 m ³ =0.475*10 = 4.750 m ³


PLASTERING

1:3 ------------------ 0.14 m ³ sand for 10 m²

1:4
1:5 0.15 m ³ sand for 10 m²
1:6

dry volume factor for cement mortar =1.33


PLASTERING
Sl thickness ratio Quantity of fine Quantity of cement for 10m²
no aggregate for 10m²

1:4 0.15m ³ (0.15/4)=0.0375m ³


0.375*1440=54kg

1 12mm 1:5 0.15m ³ (0.15/5)=0.03m ³


0.03*1440=43.2kg

1:3 0.14m ³ (0.14/3)=0.046m ³


0.046*14=67.2kg

1:4 0.165 (0.165/4) =0.0412m³


0.0412*140=59.2Kg

1:5 0.165 (0.165/5)=0.033m³


2 15 mm 0.033*1440=47.52kg

1:3 0.15 (0.15/3)=0.05m³


0.05*1440=72kg
Q)For plastring with cement mortar 1:4 20 mm thick the cement required for
10m²?
An) Wet volume of cement plaster =10*(20/1000)=0.2m³
dry volume =0.2*1.33=0.266m³
Quantity of cement =(1/1+4)*0.266
= 0.0443m³
=0.0443*1440 =63.84kg
Q)Qunatity of cement and sand for 1 square metre of cement
plaster1:6,1.25cm thick ?
An) Wet volume of cement plaster =1*(1.25/100)=0.0125m³
dry volume =0.0125*1.33=0.0166m³
Quantity of cement =(1/1+6)*0.0166
= 0.002m³
=0.002*1440 =2.88kg
Quantity of sand = ( 6/7)*0.0166=0.014 m³
BRICK WORK RANDOM RUBBLE MASONRY

For 1 m³ brick masonry For 1 m³ RRM

Brick ------------ 0.769m³ Rubble stone -----------1.25m³


Mortar(sand) ------------- 0.23m³ Sand ---------------0.3m³
Q) Quantity of cement required for 1 cubic metre RRM in1:8 cement mortar?

An) for 1 m³ RRM,


Rubble stone =1.25m³
sand(mortar) = 0.3m³

quantity of cement = (0.3/8)*1*1440


= 54 kg
Q) In analysis of rate the quantity of dry mortar for 10m³ brick work is
taken as
An) for 1m³ brick work,
sand=0.23m³
brick= 0.796m³
for 10m³ brick work quantity of mortar = 0.23*10
=2.3 m³
dry volume =2.3*1.33
=3.06 m³
Q) For 5000 brick in cement mortar the sand required in cubic metre?
An) for 1 m³ brick work number of standard brick =500 nos

hence , total quantity of brick work 5000/500 = 10 m³

quantity of fine aggregate for 1 m³ brick work =0.23 m³

therefore total quantity of fine aggregate =10*0.23


=2.3 m³
Floor area ratio(FAR)
FAR = total building floor area /gross plot area
Q) what is the FAR for a single storey building with plot area 1000m² and
floor area 500 m²
FAR = total building floor area /gross plot area
= 500/1000
=0.5