ELECTRICAL SYSTEMS & ENGINEERING CENTER ABTS/ES&EC/FMT/31:B
TEST REPORT FOR BUS BAR Date: 01/11/2013
CUSTOMER :
SHEET OF
PROJECT :
TEST REPORT FOR BUS BAR
Weather Condition: Temperature: Humidity:
1. Date of Testing :
2. Equipment Details
Make & Type :
Size & Rating :
Mfg Year :
3. Location & Feeder Name:
4. Insulation Resistance Test:
Used Megger : 5000V Duration: 60Sec
Before Hi-pot After Hi-pot
Reference Phases
Values in GΩ Values in GΩ
R–E
Y–E
B–E
R–Y
Y–B
B–R
5. High Pot Test :
Injected Voltage Leakage Current
Phases Time Result
(VDC) (mA)
18KV R – E (Y & B Short to Earth)
18KV Y – E (R & B Short to Earth)
18KV B – E (R & Y Short to Earth)
6. Visual inspection:
Check the bus bar for any insulation damage
Check for any damages
Tested by Verified by Witnessed by
ELECTRICAL SYSTEMS & ENGINEERING CENTER ABTS/ES&EC/FMT/31:B
TEST REPORT FOR BUS BAR Date: 01/11/2013
CUSTOMER :
SHEET OF
PROJECT :
7. PHASE CHECKS (BY CROSS-REFERENCE)
FROM TO
PHASE R PHASE Y PHASE B PHASE R PHASE Y PHASE B
PHASE R
PHASE Y
PHASE B
RESULT
8. Applicable Standards
IS 613 (P-3) Aluminium Bus bar
9. Testing instruments
Calibration
Instrument Type Serial no Specification Manufacture
due date
Hi-pot test Kit
AC/DC LEAKAGE TESTER
DIGITAL MEGGER
10. Remarks :
CRITERIA FOR BUSBAR
Application Test Item Acceptance criteria Reference Standard/
(Panel/Area /component ) Reference document
Insulation 2 X Rated Voltage+1 Indian Electricity rules,
resistance test i.e. 2 X 11+1 ≥23Mohms Act 1956
11kV RMU Panel –
Withstood
Busbars
2.5 X Rated Voltage/1 Min
Hi-pot IS 7098 Rec-xx 1993
i.e. 2.5*11 ≥27.5kV/1min
Tested by Verified by Witnessed by