GM 1927-01 Project Plan

This document outlines the key tasks and timeline for an APQP project plan on a global scale. It includes milestones for supplier assessments, design reviews, process development, and validation from pre-sourcing through production part approval and run at rate. Major milestones include supplier eligibility -110 days out, APQP kickoff -98 days, design reviews from -92 to -32 days, process validation plans at -36 days, production part approval at -15 days, and run at rate at 0 days. Key deliverables are required for supplier readiness reviews at -76, -36, and -25 days.

Uploaded by

강민구
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
437 views1 page

GM 1927-01 Project Plan

This document outlines the key tasks and timeline for an APQP project plan on a global scale. It includes milestones for supplier assessments, design reviews, process development, and validation from pre-sourcing through production part approval and run at rate. Major milestones include supplier eligibility -110 days out, APQP kickoff -98 days, design reviews from -92 to -32 days, process validation plans at -36 days, production part approval at -15 days, and run at rate at 0 days. Key deliverables are required for supplier readiness reviews at -76, -36, and -25 days.

Uploaded by

강민구
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Global APQP Project Plan = Repeat previous activity

CVER SVER IVER BIW MRD CVER / SVER / IVER PPV BIW MVBns BIW MVBs BIW SORP
P Release P P -54 / -48 / -45 MRD -39 MRD -25 MRD -15 0
-110 Release Release
GM GVDP 6.0 33/20 -98 -83 M2 & PPV GA M3 & MVBns M4 & MVBs
M1 GA MRD -42 MRD -32 GA MRD -21 GA MRD -14
Global APQP Tasks PPAP -42 PPAP -35 PPAP -15
Matching Non-Saleable VTC -21 Gate R@R -8

-165 -104 -100 -96 -92 -88 -84 -80 -76 -72 -68 -64 -60 -56 -52 -48 -44 -40 -36 -32 -28 -24 -20 -16 -12 -8 -4 0 +4
Commodity Key Pre-Sourcing
1
Stakeholders Mtg
Tiered Supplier APQP
2 Technical Reviews Pre-Sourcing Assessment GM1927-7

3 Supplier Eligibility Pre-Sourcing

Supplier Readiness APQP Kick Off SRV 1 SRV 2 SRV 3 PPAP Run@Rate
Within 30 days of nomination (deadline -76) (deadline -36) (deadline -25) (deadline -15) (deadline -8)
Valves
SRV APQP Supplier Status Workbook GM1927-34
Key Deliverables Validation Plan - A/D/V
(must be available to Audit draftGM1927-14
Kick-off Checklist Subcontractor Status Update GM1927-25 P&R GM1829
& uploaded to GQTS)
4 Warranty Data / Reduction Plan

GM & Supplier Program Available Process Capability


Contacts GM1927-17 Data GM1927-20
SRV Deliverables
(information must be available draft
Tiered Supplier Management Plan draft Tiered Supplier Management Plan Review
to Audit)
 Tired-Components info
Tiered-Components info GM1927-23 / 25 draft
Tiered-Components info GM1927-23 / 26 GM1927-25 / 26

Initial -TR Timing Plan GM1927-2 GM1927-2 Update


Timing Charts /
5
Open Issues Initial-CKSM Open Issues List GM1927-5 draftUpdate
GM1927-5

draft (Gap Analysis) or


QSB Audit GM1927-30 draft
QSB or Greenfield Facility QSB Audit GM1927-30 (Compliance)
6 QSB Greenfield Assessment Checklist implementation Follow Up or Greenfield Assessment Checklist
GM1927-31
GM1927-31

Initial Flow Chart Review Flow Chart


7 Flow Chart Initial -TR Flow Chart Follow Up Flow Chart
Updates

Initial -TR DRBFM for any DFMEA Update


8 DFMEA Initial DFMEA Review DFMEA Follow Up
design change
draft
KCDS GMW15049
KCDS Schedule & Workshop
9 Design Reviews Initial-CKSM GD&T Mark Up Design Review Status
GD&T Workshop
Initial Tooling & Equipment Review Tooling & Equipment Follow Up
Tooling & Equipment Initial -TR
10
Reviews Tooling Window - refer GM Engineer for Component Plan timing including TKO

Gage Concept Gage Design Approval GM1927-29


Gage Development Initial -TR
Gage Request
11 GM1927-29 Approval GM1927-29
Process Gage Building, Certification &
GR&R GM1927-29
RPN Reduction Summary GM1927-21 RPN Reduction Follow
12 PFMEA Initial-TR Initial PFMEA Review PFMEA GM1927-37 Up GM1927-21

Initial Control Plan GP12 & Production Control Plans


Control Plan
13 Control Plan Initial-TR Review Follow Up GP12 & Production Control
Plans Updates
GP12 Audit GM1927-33 (Compliance) GP12 Exit EOA
Initial-TR (agreed Exit
14 GP-12 GP12 Audit GM1927-33 Criteria achieved)
GP12 Plan
(I-chart review)
Dimensional Report GM1927-32
15 PPAP
PPAP Promise GM1411 (if PPAP
Date in GQTS not full) Approval
R@R GM1927-35
Preliminary (Executed)
16 Run @ Rate Initial-TR R@R Plan Capacity Analysis
GM1927-35 PCPA Audit GM1927-16

17 Lessons Learned Initial-TR LL Overview LL Review

June 24, 2009 1 of 1 GM1927-01