EnMS Module Refrence Manual
EnMS Module Refrence Manual
Company LOGO
Company Name,
Address,
Contact Details,
E-mail: ___________________
Website: _________________
COPY NO:-……………
Approved By : CEO/Director
Signature:
6.0 Planning 00
7.2 Competence 00
7.3 Awareness 00
7.4 Communication 00
8.3 Procurement 00
Abbreviations
3.1.1
organization
Person or group of people that has its own functions with responsibilities, authorities and
relationships to achieve its objectives
3.1.2
Top management
Person or group of people who directs and controls an organization at the highest level.
3.1.3
Boundary
Physical or organizational limits
3.1.4
Energy management system scope
EnMS scope
Set of activities, which an organization addresses through an energy management system
3.1.5
Interested party (preferred term)
Stakeholder (admitted term)
Person or organization that can affect, be affected by, or perceive itself to be
affected by a decision or activity
3.2.1
Management system
Set of interrelated or interacting elements of an organization to establish policies and
objectives and processes to achieve those objectives
3.2.2
Energy management system
EnMS
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 4 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
Management system to establish an energy policy, objectives, energy targets, action plans
and process(es) to achieve the objectives and energy targets.
3.2.3
Policy
Intentions and direction of an organization, as formally expressed by its top
management
3.2.4
Energy policy
Statement by the organization of its overall intention(s), direction(s), and commitment(s)
related to its energy performance, as formally expressed by top management
3.2.5
Energy management team
Person(s) with responsibility and authority for effective implementation of an energy
management system and for delivering energy performance improvement.
3.3.1
Requirement
Need or expectation that is stated, generally implied or obligatory.
3.3.2
Conformity
Fulfilment of a requirement
3.3.3
Nonconformity
Non-fulfilment of a requirement
3.3.4
Corrective action
Action to eliminate the cause of a nonconformity and to prevent recurrence
3.3.5
Documented information
Information required to be controlled and maintained by an organization and the medium
on which it is contained.
3.3.6
Process
Set of interrelated or interacting activities which transform inputs into outputs
3.3.7
Monitoring
Determining the status of a system, a process or an activity.
3.3.8
Audit
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 5 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
Systematic, independent and documented process for obtaining audit evidence and
evaluating it objectively to determine the extent to which the audit criteria are fulfilled
3.3.9
Outsource (verb)
Make an arrangement where an external organization performs part of an organization’s
function or process
3.4.1
Measurement
Process to determine a value
3.4.2
Performance
Measurable result
3.4.3
Energy performance
Measurable result(s) related to energy efficiency, energy use and energy consumption
3.4.4
Energy performance indicator
EnPI
Measure or unit of energy performance, as defined by the organization
3.4.5
Energy performance indicator value
EnPI value
Quantification of the EnPI at a point in or over a specified period of time
3.4.6
Energy performance improvement
Improvement in measurable results of energy efficiency, or energy consumption related to
energy use, compared to the energy baseline
3.4.7
Energy baseline
EnB
Quantitative reference(s) providing a basis for comparison of energy performance
3.4.8
Static factor
Identified factor that significantly impacts energy performance and does not routinely
change.
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 6 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
EXAMPLE Facility size; design of installed equipment; number of weekly shifts; range of
products.
3.4.9
Relevant variable
Quantifiable factor that significantly impacts energy performance and routinely changes
3.4.10
Normalization
Modification of data to account for changes to enable comparison of energy performance
under equivalent conditions
3.4.11
Risk
Effect of uncertainty
3.4.12
Competence
Ability to apply knowledge and skills to achieve intended results
3.4.13
Objective
Results to be achieved
3.4.14
Effectiveness
Extent to which planned activities are realized and planned results achieved
3.4.15
Energy target
Quantifiable objective of energy performance improvement
3.4.16
Continual improvement
Recurring activity to enhance performance
3.5.1
Energy
Electricity, fuels, steam, heat, compressed air and other similar media
3.5.2
Energy consumption
Quantity of energy applied
3.5.3
Energy efficiency
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 7 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
3.5.4
Energy use
Application of energy
3.5.5
Energy review
Analysis of energy efficiency , energy use and energy consumption based on data and other
information, leading to identification of SEUs and opportunities for energy performance
improvement
3.5.6
Significant energy use
SEU
Energy use accounting for substantial energy consumption and/or offering considerable
potential for energy performance improvement
XYZ Limited has grown to become one of the major manufacturer and supplier of automotive
components to Original Equipment Manufacturer and their Tier 1 suppliers in India and
abroad. We are also supplying parts for home appliances and white goods.
Our obsession with the driving force which is why our esteemed customers keep on coming
back to us with repeat orders. We are proud to share that none of our customers have ever
left us. Quality improvement and Quality Assurance is an ongoing process at the company.
There is a continual process of improvement of product, process and quality system. The
focus is on defect prevention rather than defect detection and correction.
One of our strength is the wide range of machine. Our production facilities include a wide
variety of machines which are a combination of CNC, Conventional and special purpose
machines. This helps the company in developing different range of products. It is continuous
endeavour to upgrade the technology involved in production and development of
components.
Our commitment towards achieving customer delight is shown by the fact that today we
are associated with top companies in our wheelers and home appliance industry. Besides
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 8 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
OEM Customers in India, we also export to leading automotive parts manufacturer and OEM
vendors in Europe.
Human Resources are also among our strength. The company has enjoyed excellent
industrial relation with it’s associates and has never faced any instances like strikes or lock
out.
We continually invest in development of manpower and increase skills. It is ensured that all
people get related training all through the year.
We have been regularly invested in getting new technology which has helped us to stay
competitive in the market and first choice for our customers. Besides this, we practice lot
of cost saving and productivity exercise like Gemba Kaizen, 5S, Poke Yoke, SMED etc. to
remain competitive and give best value to our esteemed customers. We have good
experience in efficient methods of manufacturing like single piece flow and TQM
The organization has determined external and internal issues as per Annex A-01 which
affect the intended outcome and energy performance.
The organization has also understood the needs and expectations of the interested parties
which are relevant to energy performance and the EnMS.
The needs and expectations are reviewed in the Energy Review committee meetings for
changes, if any.
The interested parties are organization, Employees, customers and suppliers and their
basic need is energy cost.
The legal bodies are also the interested party and the need is legal compliance.
The organization has also identified the applicable legal requirements.
There is no other requirement at present and as and when is applicable the same shall be
identified and complied with.
Scope of EnMS:
Manufacturing of XYZ using Power from State Electricity Board, DG Sets as Power Backup,
and Compressed Air from Air Compressors.
The scope shall be confined to the physical boundaries of site <Plant Name and Address.>
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 9 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
The top management has the authority to control its energy efficiency, energy use and
energy consumption within the scope and boundaries. The organization has included all
energy type within the scope and boundaries.
The organization has defined the Scope, boundaries, objectives and targets, has
approved the action plans to achieve the identified objectives. The objectives has
been aligned with the business processes.
To achieve the intended results, the Top Management has assured the resources to
be provided, which are needed for the EnMS. The communication of the EnMS, its
requirements, effectiveness and performance is done through the displays, Digital
media and meetings.
The Top Management has formed the cross functional energy management team as per
Annex A-03
The management
- directs and support the team to work for effectiveness of the EnMS and to review
energy performance improvement.
- ensures that processes are established and implemented to identify and address
changes affecting the EnMS and energy performance.
Sign
Executive Director
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 10 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
The Energy Policy has been defined by top management (Executive Director – MAPL)
considering the energy aspects associated with the location’s activities, products and
services, and the requirements of ISO 50001:2018. The Energy Policy is a framework for
the location’s “energy efficiency” initiatives, objectives & targets along with the
compliance to legal and for continually improving its energy performance.
This policy supports the procurement of energy efficient product and services impacting
energy performance, support design activities that considers energy performance
improvement.
Energy team ensures that the Energy Policy is communicated and understood by all
personnel at the location. The Policy is also made available to the stakeholders and public
on request.
The Energy Policy is reviewed by the Executive Director in conjunction with Energy Team in
the Energy Review Committee Meetings and revised, if necessary.
Energy Policy
(XYZ Limited)
We at XYZ Limited, are committed to improve our energy performance in all our activities,
products Purchase and services, having Energy sustainable for future generations. We also
committed to reduce our specific energy consumption on a continual basis.
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 11 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
04.02.20
Mr……….
Executive Director
Top management has assigned the responsibility and authority to the energy team for
establishing, implementing , maintaining and continually improve EnMS as per the
requirements of the standard.
Executive Director`
Energy Coordinator
Executive Director has appointed one competent person as the Energy Coordinator from
Engineering for EnMS and is a member of energy team. The responsibilities of EC, in addition
to his other responsibilities, are:
Energy Team
9. Collating performance data against Objectives and targets and reporting to the
location management.
10. Ensure that EnMS training is imparted to all employees.
Functional HOD
Department HOD’s are responsible for overall operational control in various areas of EnMS
as follows:
1. Ensure that relevant EnMS requirements with respect to the function are
established, implemented and maintained.
2. Implementation of EnMS for achievement of Objectives and targets and
periodically review the implementation status and effectiveness of energy
management
3. Identification of resources essential to implement and control the EnMS.
4. Reporting the performance of EnMS to Energy Team/EC for review.
5. Ensure communication of Energy Policy and Significant Energy aspects relevant to
the employees.
6. In conjunction with EC/ Energy Team, identify training needs of personnel whose
works have a significant impact on energy, and imparting EnMS training to all their
personnel.
6.0 PLANNING
The organization has identified risks & opportunities with respect to internal and external
issues on bases of Significant or Nonsignificant and has taken appropriate actions to achieve
continual improvement.
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 14 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
The Organization has established Energy Objectives and targets at the location / functional
level considering the Energy Policy, internal/external energy audit, legal requirements, risk
analysis and views of interested parties. Availability of technological options for increasing
energy efficiency, financial, operational and business requirements has also be considered
while defining the objectives and corresponding targets.
Energy saving objective, action items and targets has been identified as per Annex A-04
while defining the Energy Objectives, the following has been considered:
The performance status against set Objectives and Targets are monitored and reported by
the Energy Coordinator once in a month as per Annex A-05 Or minimum in the Energy
Review Committee (ERC) Meeting. Energy Review Committee (ERC) meetings is decided to
held at least once in six months. The Energy Review committee has members of energy
team and workers to review and to give/take suggestion for energy performance
improvement. Once a target has achieved, the same is reviewed for possibility of further
performance improvement. In case, it is be not feasible for the location to revise the target
for improvement, the same is maintained as a performance standard on an on-going basis.
Objective and targets are revised/amended in Energy Review committee meetings where
relevant to ensure that Energy management also applies to projects related to new
developments and new or modified activities, technology, products, equipment or services
as per Annex A-06
The organization is using following methodology and criteria for energy review
The organization has determined EnPIs for each action items which are:
The organization has establish EnB for each action items using the information from the
energy review(s) taking into account a suitable period of time.
The organization has ensured that key parameters affecting energy performance are
identified, measured, monitored and analyzed at planned intervals. Measurement and
monitoring plan as per Annex A-07 .
7.0 Support
Recourses
The resources required for implementation and control of the EnMS is included in Annual
Operating budget. Additional requirement, if identified during the plan period shall be
provided by the location head.
Awareness training is provided to all employees on Energy Policy, Energy Objectives &
targets, energy review associated with their work and their roles and responsibilities within
EnMS.
EnMS Training plan has been prepared by the Energy team in consultation with EC/ Area
In-charges every year as per Annex A-08. Training is conducted on the job and / or formally
in the classroom. Training attendance records has been maintained as per Annex A-09. The
effectiveness of training is evaluated by asking questions to the trainees during the training.
Energy team is a cross functional team having members from Top management,
Engineering, Purchase and Production. All the members must be competitive enough to
drive, to take decision, have skills with respect to energy management and have ability to
present report to higher management.
The team members and their competency is approved by top management as per Annex A-
10
COMMUNICATION
Internal Communication
The location has institute Energy Review Committee Meetings (frequency – half
Yearly) under the EnMS to.
These are communicated in the form of Minutes of meetings by Energy coordinator to all
those within the location who are responsible for Energy performance actions decisions.
The Energy Policy is communicated to all employees through displays / handouts by Energy
Team etc.
The energy policy shall be communicated to the external parties like the contractors working
on the location, suppliers, legal authorities if applicable through verbal communication or
distribution of policy pamphlets, as far as practicable.
DOCUMENTED REQUIREMENT
To ensure that the activities, products and services conform to the specified EnMS
requirements, the EnMS has been documented in the following 3 levels.
Level 1:
EnMS MANUAL as an apex manual describes the commitment of the Management towards
energy performance. The sections of this Manual has been aligned to the structure of ISO
50001:2018 Standard. It addresses how the requirements of various clauses of ISO
50001:2018 has been fulfilled by the location.
Level 2:
OCPs provide guidance for carrying out specific activities that are associated with the
identified significant energy saving action items for the objectives and targets.
Level 3:
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 19 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
RECORDS for providing evidence that the EnMS is working effectively and are generated
concurrently as the procedures are performed. Forms and Formats used to maintain records
are also be a part of Level 3.
Cross References to the relevant documents is provided at the end of the Manual and
procedures.
Energy performance records and the persons responsible for maintaining them is identified
in the EnMS Manual.
Records are identified by their title and/or their number. All files / registers containing
records are labeled. All records are legible and maintained in an orderly manner.
For easy retrieval and protection against deterioration and loss, records are stored at
specified location. Locations shall be allocated keeping in mind the convenience of access
to the relevant users. Retention period, is the minimum period for which each record is to
be maintained.
List of records is maintained containing title of the record, retention period, storage location
and custodian as per Annex: A-11 Records are disposed off after retention period, but for
each disposal an approval of disposition is taken from the Location Head
Identification of Documents
The documents generated by the location as part of EnMS are identified by their unique
title/ the Unique Numbering System as per Annex: A-12
The documents are reviewed & approved for adequacy prior to issue. The personnel
authorized for document approval and issue of documents is as per Annex: A-13
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 20 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
Document Changes
To carry out amendment in any document, the change initiator shall make the necessary
changes in the document, reviews the adequacy as well as changes in revision number,
date etc. and forwards the amendment to the approving authority, highlighting the changes
made. The reasons for change shall be explained to the approving authority by the change
initiator. The approving authority shall review the amendments for its adequacy and
effectiveness. On confirming the amendment is complete and adequate, the approving
authority shall approve the amended document. In case of amendment in the EnMS Manual,
the revision number shall be changed page wise wherever changes have been made, and
the amendments shall be recorded in the Revision History of the EnMS Manual. However,
in case of amendment of any other EnMS document, the revision number of the entire
document shall be changed. The amendments shall be recorded in the Revision History
maintained for the document.
Master Copy of the obsolete documents related to EnMS shall be retained by Location Energy
Coordinator at least for the last change for reference purpose and shall be suitably identified
as “SUPERSEDED”. All the Controlled Copies of the documents shall be collected back by
the issuer and destroyed.
REVISION HISTORY
Status of Document
The original copy of the document is a Master Copy. The Master Copy is signed by approving
authority in original. The Controlled copy of the document is obtained by taking the
photocopy of the Master Copy.
In every level of document, the status of the document is indicated. The following is the
identification for indicating status:
1. Master Copy
Green colour seal bearing "MASTER COPY" on the back side of every page.
2. Controlled Copy
Red Color Seal bearing "CONTROLLED COPY" on the front side of every page.
3. Obsolete Copy
blue Colour seal bearing "OBSOLETE COPY" on the front side of every page.
1. The documents of external origin received by the location includes acts / rules issued
by statutory bodies etc.
The EnMS Manual is circulated to the personnel shown hereunder. The holders of the Manual
is responsible for maintenance and sharing amongst personnel in their respective area of
work.
MASTER COPY
Executive Director
Functional Head
This Manual can be made available to all Line Managers in soft form as a ‘pdf’ file. In
addition the manual can also be made available in digital form with in the company
if feasible.
8 OPERATION
DOC: ENM-EC-01
ENERGY MANAGEMENT SYSTEM PAGE: 23 of 77
Company Name / Logo
MANUAL ISSUE: 0
REVISION No.: 0
DATE:
Location has instituted operational controls for its processes and operations in line with its
Energy Policy, significant energy objective, action items and targets, legal requirements,
and views of interested parties including customers. These include:
The organization monitors, measures, evaluates the Energy Performance and the
EnMS: through monitoring and measurement covering
1. key parameters.
2. EnPI(s);
3. Energy performance of action items for SEUs; actual versus expected energy
consumption
8.3 Procurement
The organization has establish guidelines for evaluating energy performance over the
planned or expected operating lifetime, when procuring energy using products, equipment
and services which are expected to have a significant impact on the organization's energy
performance.
When procuring energy using products, equipment and services that have, or can have, an
impact on energy performance, the organization shall inform suppliers that energy
performance is one of the evaluation criteria for procurement.
Where applicable, the organization has define and communicate specifications as per
guidelines for:
Design
Measurement and monitoring requirement of key performance indicators has been identified
and included in the Measurement and Monitoring Plan. The Plan has define the Energy
parameters to be measured / monitored, frequency of monitoring, allowable limits and
calibration/verification of instruments used for measurement and monitoring.
The measured Key Performance Indicators has been used to track effectiveness of
operational controls and also conformance with the location’s energy performance
objectives and targets. The performance against objectives/ action items is tracked and
reviewed as per defined frequency.
The significant energy monitoring instruments has been calibrated either internally or
through external agency. Required energy monitoring instruments has been mentioned in
monitoring and measurement plan. The calibration records is maintained by Engineering.
Where energy monitoring is outsourced, the concerned function has ensured that the
instruments used are having valid calibration status and maintains record of the same.
The organization has identified & documented for legal requirement related to energy in
Annex A-16 compliance is documented and reviewed during energy review committee
meetings for any noncompliance and required action to mitigate the risk.
1. Determine whether or not the EnMS conforms to planned arrangements for energy
management including the requirements of ISO 50001: 2018 and also to determine
whether the EnMS has been properly implemented and maintained.
Internal Audits is conducted at least once in 6 months. Annual Internal Audit Plan is
prepared by ER taking into consideration the Energy Performance importance of the activity
concerned and the results of previous audits as per Annex: A-17
The internal audit schedule is prepared by the EC which defines the activities / functions to
be audited, scope of audit, date and time of audit and also the name of the auditor(s) as
per Annex: A-18 The audit schedule is circulated to the auditees and the auditors concerned
in advance. The auditors used for the purpose are trained in internal auditing. The audit
schedule takes care that the auditors are not auditing their own function(s).
Auditing
The audit observations are recorded by the auditor in the “Audit Checklist & Observation
Sheet”. Both the areas of conformance and non-conformance observed by the auditor are
recorded in the Audit Checklist & Observation Sheet. The observations clearly identifies as
“Conforming” and “Non-conforming” by the auditor in the Audit Checklist & Observation
Sheet as per Annex: A-19 Potential non-conformities is identified and recorded in the Audit
Observation Sheet. The non-conformities identified during audit is recorded in NCR forms
as per Annex: A-20 Auditors submit the Audit Checklist & Observation Sheet and Non
Conformance Reports to the Executive Director.
The NCRs are closed by internal auditors after reviewing the corrective actions taken. The
concerned person is committed to take immediate corrective actions without undue delay
and report the status of corrective actions against the NCRs in Energy Review meetings.
10.0 Improvement
Corrective Actions
In case of major or repetitive non-conformance as identified and /or by any other source as
mentioned above, the cause of the non-conformance is determined and the corrective
actions is planned. Corrective Actions is taken in a planned manner considering the
technological options and severity of the non-conformance. Record of corrective actions is
maintained in Corrective Action Report.
The non-conformances and corrective actions are reviewed in the Energy Review meetings.
The corrective / preventive actions may necessitate changes in the documented procedures.
The same is carried out as per the procedure for control of documents.
Continual Improvement
The organization continually improves the suitability, adequacy and effectiveness of the
EnMS. The organization demonstrates continual energy performance improvement
through the case studies or suggestions or energy saving results. If the results are not
achieved, the causes are identified and subsequent actions are taken. Documented
information is kept.
List of Annexure
Annexure
Sr. No Title
Number
Significant /Non
Control Measure/
S.No External & Internal Issues Significant ( If Legal Remarks
Action Plan
always Significant)
Adverse impact of
weather/climate change on
availability of power/Fuel/Gases
Emissions of exhausts/flue gases
during power
generation/Steam/Gases
generation impacting adversely
on Environment
No or Inadequate contingency
Plans to counter interruptions in
energy supply
Usage of Outdated/Inefficient
technology
Furnace
Electricity
Compressed Air
Steam
Fuel
Gases
Significant Use
Normal Use
Minor Use
A03 - Scope
Manufacturing of Sheet Metal. Machined, Fabricated Components and Sub-Assemblies for Automotive Application & General Engineering
using Power from State Electricity Board, DG Sets as Power Backup , LPG in the coating process,CO2 in the welding process and Compressed
Air from Air Compressors.
Energy Policy
(XYZ Ltd.)
We at XYZ Ltd. are committed to improve our energy performance in all our activities, products, Purchase and services, having Energy
sustainable for future generations. We are also committed to reduce our specific energy consumption on a continual basis.
To achieve this we shall ensure, in particular,
• Impart awareness to all employees, contractors and vendors on energy efficiency aspects and their contribution to the Energy
Management System.
• Comply with applicable legal and organizational requirements pertinent to the energy management aspects.
• Encourage and promote waste minimization, energy efficiency and resource conservation.
• Evaluate effectiveness of the Energy Management System through periodic audits and management reviews.
CEO/Director
EnergyTeam Structure
Plant Head
(……………………….)
EnergyCo-coordinator
( …………………………. )
Control
Baseline
S.N Objective to be Achieved by taking Identified Energy Performance Targe Measur
SEU with
o Actions Indicators (EnPI) t e (
Justification
EnMP)
To reduce
Electrical Check Monthly and maintain Power Factor, Max demand
6 distribution
System record of PF, MDI Indicator (KVA)
losses.
Check Monthly and maintain Capacitor performance
record of Capacitor test & (kVAR)
voltage drop Voltage drop (Volts)
Fuel consumption / day or
Monitor & maintain record
/week or /Month
Boiler / To improve
Evaporation ratio,kg of
Thermic performance
steam/per unit of fuel
fluid generation of
7 Monitor & maintain record consumption for Coal fired ( 4
heater/ steam / hot
- 5.5), oil fired (13.5-14.5) ,
Hot water water/ thermic
gas fired (11 to 13)
generator fluid.
Fuel Quality ( Like Calorific
Monitor & maintain record
Value, Moisture, Ash% etc)
Generation pressure(kg/cm2)
Monitor & control
& temp (deg C)
Periodic monitoring & Percentage of (O2, CO2, SOx,
optimization NOx etc)
Optimize blow down frequency Blow down frequency as per
based on TDS TDS,TDS Level <5000ppm
Identification the opportunities Waste heat recovery in
to utilize waste heat identified processes
For Month
______________________
___
Targ
Energy et % Reaso
Baseline Actio
S.N Objective to be Achieved by Performance Targ Achi Var n of Rema
SEU with n
o taking Identified Actions Indicators et eved iati Deviat rks
Justification Plan
(EnPI) Till on ion
Date
Free air delivery
Capacity test
test, kW/CFM
1.Pressure
setting of
generation
compressor to
pressure
be optimized
To (kg/cm2), bar
2. Installation of
improve
VFD's
performa
1. Record it/
Compres nce of
1 Energy Meters energy
sors compress
2. Control on Consumption /
ed air
running hrs day or /week
generatio
(Lunch time/ or/ Month
n.
shift change etc)
1.Record &
optimize unload Running hours,
hrs Load hours &
2. Scheduling unload hours
Cleanliness of
air Filter/ Any
other activities
Pressure loss
To
1.Minimize from Receiver
improve
losses. to Farthest
performa
2.Reciver size end,0.3 bar in
nce of
and location mains header at
compress
analysis the farthest
ed air
3.Drain valve of point & 0.5 bar
distributi
receiver check in distribution
on
system.
1.Scheduled
compressed air
leakage test &
Leakage (%)
maintain record
of arrested
points
1. Check the Moisture Free
To
dew point after air,dew point of
improve
the dryer for the air should
performa
moisture free air be less - 40 *c
nce of
1. Check the Minimum
compress
capacity and fluctuation of
ed air
location of air compressed air
use
receiver to avoid at receiving
fluctuation in air end, Air
pressure receiver
capacity (
Generation
capacity X 4.6
liters)
Compressed air
consumption
Reduce use of
(cfm/ kWh/day
compressed air
or /week
or/month)
1.Segregating
compressed air
Air pressure at
pressure user
application
based
point- pressure
on pressure
setting at user
requirement,
end (kg/cm2)
Use of blower,
Trivector gun
1. Compare with
designed pump
efficiency &
replace with
available high
efficient pumps Pump efficiency
2. Installation of test (%),
To VFD's and Designed pump
improve optimize efficiency (%)
performa pressure & flow
2 Pumps nce of 3.Right size
performa pump selection
nce of based on your
pumps requirement
1. Record it &
control on energy
running hrs Consumption
2. ground water kWh/ day or
charging for /week or/
borewell pumps Month
3.Spillage/
leakages to be
monitored and
controlled
1.Monitor &
reduce its
running hrs. Performance
2. Temp setting check of Chilling
of air/water system (kW/TR)
3. Installation of
VFD's
1. Check to what
To temp. of chilled
improve water/ Air could
performa be
Chilled water
nce of increased
temperature
chiller without
(deg C)
system affecting
Chiller
3 process
System
requirement
and maintain it
energy
1. maintain Consumption
record of it/ kWh/ day or
Energy meters /week or/
Month
Performance of
To 1.Installation of
air handling
improve VFD on AHU
unit kW/CFM
performa
Monitoring of
nce of
Insulation over
chilled
chilled water
water/Air
line/ Ducting
distributi
on
To
improve
Increasing
performa
temperature of User temp
nce of
water/air to setting (deg C)
chilled
save power
water/Air
use
Recording of
Rewinded
rewinded
motors, no load
motors and no
To current should
load current
Reduce be < 30 %
after rewinding
Electricit
Batch time
Major y
reduction / idle
Motors Consump
time control kWh/no of
tion with
/ maximum components or
4 optimal
capcity kWh/Ton of
utiliztion
utilization/ production etc
production
planning
Batch time
kWh/ton,
reduction / idle
To kwh/day or
time control
reduce /week
/ maximum
5 Electrical electrical or/month,Fuel
capacity
/ Fuel /Fuel consumption/p
utilization/
fired consump er tonne molten
production
tion/Ton metal
planning
Furnaces of
Perform flue gas Flue gas
producti
analysis in case analysis for O2
on
of fuel fired (gas -1-
furnaces 2%Liquid3-4%-
soild-5-6%), For
CO,(gas -
<50PPm
Liquid<100PPm-
solid <200PPM)
Maintain the
To maintain the
draft ,slightly
draft in side the
positive than
furnace
atm
Radiation loss,
Insulate heated
Power loss in
surfaces to
crucible=18-
Reduce heat
25%,Radiation
losses.
loss =7-9%)
Monitor the Cycle time
6
cycle time (minutes/hours)
Electricity bill
7 Electricity Bill
analysis
Check Monthly
To Power Factor,
and maintain
8 reduce Max demand
Electrical record of PF,
distributi Indicator (KVA)
System MDI
on
Check Monthly Capacitor
losses.
and maintain performance
9 record of (kVAR)
Capacitor test & Voltage drop
voltage drop (Volts)
Boiler / To Fuel
Thermic improve Monitor & consumption /
8
fluid performa maintain record day or /week or
heater/ nce /Month
Hot generatio Evaporation
water n of ratio,kg of
generato steam / steam/per unit
r hot of fuel
Monitor &
water/ consumption
maintain record
thermic for Coal fired ( 4
fluid. - 5.5), oil fired
(13.5-14.5) , gas
fired (11 to 13)
Fuel Quality (
Like Calorific
Monitor &
Value,
maintain record
Moisture, Ash%
etc)
Generation
Monitor & pressure(kg/cm
control 2) & temp (deg
C)
Periodic Percentage of
monitoring & (O2, CO2, SOx,
optimization NOx etc)
Blow down
Optimize blow frequency as
down frequency per TDS,TDS
based on TDS Level
<5000ppm
Identification
Waste heat
the
recovery in
opportunities to
identified
utilize waste
processes
heat
Increase Feed water
condensate temp (deg C)
recovery (%) & and Condensate
feed water recovery (%)
temp. / make up
water
consumption
(lit/day)
Automation and FD/ID fan
control of FD/ ID power
fans consumption
Pressure &
Steam trap /
temp drop from
insulation
generation to
maintenance
user end
Measure fuel
Avoid steam
loss because of
leakages
steam leakages
Insulation
losses,skin tem
of insulated line
To
should not
improve
more ambient +
performa
20*c
nce of
Batch time
steam
reduction / idle
distributi
time control
on & use
/ maximum Cycle time
capacity (minutes/hours)
utilization/
production
planning
Maintain record Steam traps
of Steam selection/opera
Leakages tion/maintenan
identification & ce, inlet and
arresting it outlet tem diff
along the steam
trap should be
>50*c
Improve Lux
Monitor and
level ( Maintain
To measure lux
lux level as per
reduce level
IS)
power
9 Lighting Energy efficient
consump
lighting system,
tion in kWh/day or
Control on
lighting month
running hrs &
idle running
Any
Monitor and
Other To
reduce specific
thermal reduce
power kWh/productio
10 Equipme energy
consumption of n
nt / consump
energy intensive
process tion
machines.
system
SEU
Exis
ting Re
Ne Ne
Targ New as
Exis w/R New/R w/R
S. Existing Objectives & Existing Energy Existing et /Revised on Justi
ting evis evised evis
N already Identified Performance Indicators Baselin Acie Objectiv of ficat
Tar ed Baselin ed
o Actions (EnPI) e ved e& Ch ion
get EnP e Tar
Till Action an
I get
Dat ge
e
Free air delivery test,
Capacity test
kW/CFM
1.Pressure
setting of
compressor to generation pressure
be optimized (kg/cm2), bar
2. Installation
To of VFD's
improve 1. Record it/
perform Energy Meters
ance of 2. Control on
energy Consumption /
compre running hrs
Compr day or /week or/ Month
1 ssed air (Lunch time/
essors
generati shift change
on. etc)
1.Record &
optimize
unload hrs
Running hours, Load
2. Scheduling
hours & unload hours
Cleanliness of
air Filter/ Any
other activities
To 1.Minimize Pressure loss from
improve losses. Receiver to Farthest
perform 2.Reciver size end,0.3 bar in mains
ance of and location header at the farthest
compre analysis point & 0.5 bar in
ssed air 3.Drain valve distribution system.
distribu of receiver
tion check
1.Scheduled
compressed air
leakage test &
Leakage (%)
maintain
record of
arrested points
1. Check the
dew point after Moisture Free air,dew
the dryer for point of the air should be
moisture free less - 40 *c
air
To
1. Check the
improve Minimum fluctuation of
capacity and
perform compressed air at
location of air
ance of receiving end, Air
receiver to
compre receiver capacity (
avoid
ssed air Generation capacity X 4.6
fluctuation in
use liters)
air pressure
Compressed air
Reduce use of consumption
compressed air (cfm/ kWh/day or /week
or/month)
1.Segregating
compressed air Air pressure at
pressure user application point-
based pressure setting at user
on pressure end (kg/cm2)
requirement,
Use of blower,
Trivector gun
1. Compare
with designed
pump
efficiency &
replace with
available high
efficient pumps
Pump efficiency test (%),
2. Installation
Designed pump
of VFD's and
efficiency (%)
optimize
To pressure &
improve flow
perform 3.Right size
2 Pumps ance of pump selection
perform based on your
ance of requirement
pumps 1. Record it &
control on
running hrs
2. ground
water charging energy Consumption
for borewell kWh/ day or /week or/
pumps Month
3.Spillage/
leakages to be
monitored and
controlled
To 1.Monitor &
Chiller
improve reduce its Performance check of
3 Syste
perform running hrs. Chilling system (kW/TR)
m
ance of 2. Temp setting
chiller of air/water
system 3. Installation
of VFD's
1. Check to
what temp. of
chilled water/
Air could be
increased Chilled water
without temperature (deg C)
affecting
process
requirement
and maintain it
1. maintain energy Consumption
record of it/ kWh/ day or /week or/
Energy meters Month
To 1.Installation Performance of air
improve of VFD on AHU handling unit kW/CFM
perform
ance of
Monitoring of
chilled
Insulation over
water/A
chilled water
ir
line/ Ducting
distribu
tion
To
improve
Increasing
perform
temperature of
ance of User temp setting (deg C)
water/air to
chilled
save power
water/A
ir use
Recording of
rewinded Rewinded motors, no
To
motors and no load current should be <
Reduce
load current 30 %
Electrici
after rewinding
ty
Major Batch time
Consum
Motor reduction / idle
ption
s time control
with kWh/no of components
/ maximum
4 optimal or kWh/Ton of
capcity
utilizati production etc
utilization/
on
production
planning
Batch time
reduction / idle
time control kWh/ton, kwh/day or
/ maximum /week or/month,Fuel
5
capacity consumption/per tonne
To utilization/ molten metal
Electri reduce production
cal/ electric planning
Fuel al /Fuel Perform flue Flue gas analysis for O2
fired consum gas analysis in (gas -1-2%Liquid3-4%-
ption/T case of fuel soild-5-6%), For CO,(gas -
Furnac on of fired furnaces <50PPm Liquid<100PPm-
es product solid <200PPM)
ion To maintain
the draft in Maintain the draft
side the ,slighty positive thn atm
furnace
Insulate heated Radiation loss,Power loss
surfaces to in crucible=18-
Reduce heat 25%,Radiation loss =7-
losses. 9%)
Monitor the Cycle time
6
cycle time (minutes/hours)
Electricity bill
7 Electricity Bill
analysis
Check Monthly
Electri To
and maintain Power Factor, Max
8 cal reduce
record of PF, demand Indicator (KVA)
distribu
MDI
Syste tion
Check Monthly
m losses.
and maintain Capacitor performance
9 record of (kVAR)
Capacitor test Voltage drop (Volts)
& voltage drop
Monitor &
Fuel consumption / day
maintain
or /week or /Month
To record
Boiler
improve Evaporation ratio,kg of
/
perform steam/per unit of fuel
Therm Monitor &
ance consumption for Coal
ic fluid maintain
generati fired ( 4 - 5.5), oil fired
heater record
8 on of (13.5-14.5) , gas fired (11
/
steam / to 13)
Hot
hot Monitor & Fuel Quality ( Like
water
water/ maintain Calorific Value, Moisture,
gener
thermic record Ash% etc)
ator
fluid. Generation
Monitor &
pressure(kg/cm2) &
control
temp (deg C)
Periodic
Percentage of (O2, CO2,
monitoring &
SOx, NOx etc)
optimization
Optimize blow
Blow down frequency as
down
per TDS,TDS Level
frequency
<5000ppm
based on TDS
Identification
the
Waste heat recovery in
opertunities to
identified processes
utilize waste
heat
Increase Feed water temp (deg C)
condensate and Condensate recovery
recovery (%) & (%)
feed water / make up water
temp. consumption (lit/day)
Automation
FD/ID fan power
and control of
consumption
FD/ ID fans
Steam trap / Pressure & temp drop
insulation from generation to user
maintenance end
To Measure fuel loss
Avoid steam
improve because of steam
leakages
perform leakages
ance of Insulation losses,skin tem
steam of insulated line should
distribu not more ambient + 20*c
tion & Batch time
use reduction / idle
Cycle time
time control
(minutes/hours)
/ maximum
capcity
utilization/
production
planning
Maintain
Steam traps
record of
selection/operation/mai
Steam
ntenance, inlet and oulte
Leakages
tem diff along the steam
identification &
trap should be >50*c
arresting it
Monitor and Improve Lux level (
measure lux Maintain lux level as per
To level IS)
reduce Energy
Lightin power efficient
9
g consum lighting
ption in system, kWh/day or month
lighting Control on
running hrs &
idle running
Any
Other
Monitor and
therm
To reduce specific
al
reduce power
1 Equip
energy consumption kWh/production
0 ment /
consum of energy
proces
ption intensive
s
machines.
syste
m
Training Title Participant Group Trainer Duration Tentative Time Frame Actual Training
(Month) Date(s)
(Hrs.)
Venue: Trainer :
TOPIC :
Training Contents
(In brief)
Document Code
ET Energy Team
Department Code
Activities EnMS Manual Energy Management Objective & Targets / OCPs Formats
Change Review & Approval Executive Director Departmental Head Departmental Head / ER
Reviewed on Dated____________
*Compliance Status (
Reasons of Non
S.No Legal Requirement Compliance/Non Control Measure Remarks
Compliance
Compliance)
Compiance to Energy
1 Conservation act 2001, if
applicable
Approval of Electrical
2 Installation from approval
authority
Monitoring of stack
6
Emmissions
* Enter Not Applicable, if mentioned legal requirement is not applicable on the Industry
Prepaired By Approved BY
Function/ Department/ Area Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Date: ______________
Energy Coordinator
Name of the Internal Auditor:……………………. Guidelines: Please mark the clause audited by internal auditor.
Date:
Claus Remarks
S.N e Objective
Requirements Findings (NC/No
o Cove Evidence, if any
NC)
red (Observation / NC)
22 9.2.2 Has the Internal Audit Plan, Audit Schedule has been
developed, Audit Checklist & Audit result sheet prepared.
Department: Date:
Audit Observations:
Attribute: Clause No. ___________ of ISO 50001:2018
Auditor’s Signatures:
Root Cause(s):