Method of Construction and Estimation Estimation
Instructor Abduljaleel 2010-2011
Analysis of Rates and Costs
Before analyzing the rates & costs the prices of all materials, labors fees & equipment fees must be known.
1. Earth Excavation :
2. Building Brick Wall :
A. Materials quantities : B. Materials prices in ( ID ) : C. Materials costs :
Total costs of the materials = 133760 ID D. Fees of worker ( wages of labors ) : Building the wall : Fees of worker : ( Curing : The wall must be cured at 7 days . ) ( )
28
Method of Construction and Estimation Estimation
Instructor Abduljaleel
Final costs = cost of material + working
2010-2011
3. Reinforced Concrete :
Reinforced concrete for column with mix of ( 1:2:4 )
Works fees : Note
*,( ) +
29
Method of Construction and Estimation Estimation
Instructor Abduljaleel 2010-2011
4. Rate of cement plastering :
Materials :
Labors wages :
5. Excavation :
30