1.1. Description of Test
The method described is a procedure used to determine the asphalt
content of asphalt aggregate mixtures.
2.1. Equipment
Centrifuge extractor with a bowl capable of accepting between 500 g
and 3000 gms. of asphalt mix. The Extractor is capable of rotating
the bowl at controlled variable speeds up to 3500 rpm.
Paper or felt filter rings to be placed on the rim of the bowl and
beneath the bowl lid.
2.2. Materials
Solvents - suggested materials are chlorothene or trichloroethylene.
3. PROCEDURE
3.1. Equipment Preparation
Ensure extractor bowl, hand tools and sample containers are cleaned
of all residual asphalt and aggregate materials and dry before
commencing the test.
Sample Preparation
Collect representative samples as described in section 2.3 above.
Sample size will depend on the extractor bowl size. Larger samples
will give more accurate results. Weigh the asphalt mix and record as
"weight of asphalt mix".
Place two filter rings on the bowl rim and secure the bowl cover
plate on top of the filter papers. Tighten the cover using a
torque wrench up to a maximum torque of 17 N*m. Ensure
that for all subsequent extractions the bowl cover plate is
tightened with the same torque.
4.2. Calculations
Uncorrected Asphalt Content = (wt. of asphalt mix - wt. of dry agg.)
x 100 (Calculated to the nearest .01%) wt. of dry aggregate
Corrected Asphalt Content = Uncorrected Asphalt Content (%) –
Moisture Content (%) + Extractor Error (%)
NOTE:
1) The corrected asphalt content should be rounded to the nearest
0.1%.
2) Refer to STP 204-23 "Extraction and Moisture Corrections" to
determine the proper type of extractor correction to be used.
************************