100% found this document useful (1 vote)
333 views2 pages

Incident Report Roof Deck

During a routine inspection of Tower 2 of the Congressional Town Center project, it was discovered that an electrical conduit at the machine room roof deck had been damaged, likely by unknown individuals. This was causing water leakage into the machine room. To address the issue, the electrical contractor was notified and another PVC conduit was connected to block the water leakage and repair the problem. Pictures were taken to document the incident and repairs.

Uploaded by

betinolrachel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
333 views2 pages

Incident Report Roof Deck

During a routine inspection of Tower 2 of the Congressional Town Center project, it was discovered that an electrical conduit at the machine room roof deck had been damaged, likely by unknown individuals. This was causing water leakage into the machine room. To address the issue, the electrical contractor was notified and another PVC conduit was connected to block the water leakage and repair the problem. Pictures were taken to document the incident and repairs.

Uploaded by

betinolrachel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

INCIDENT REPORT

PROJECT : Congressional Town Center Tower 2


LOCATION : 23 Congressional Ave. Brgy. Toro, Quezon City
DATE : September 25, 2023

Details of the Incident:

During the physical and visual inspection conducted last September 23, 2023. It is
found that the Electrical conduit PVC at roof deck of machine room was damaged and
cut by unknown people and finished the floor with water proofing; it is the cause of
water leakage at the machine room.

Actions taken:

1. The incident was reported immediately to the Electrical Contractor.


2. Inspected the area and traced the water leakage.
3. Connect another PVC for extension to block the water leakage.

(See attached pictured for review and reference)

Prepared By: Inspected By: Inspected By:

RACHEL A. BETINOL GIRLY MANIKAN RONALD CALIXTO


ELECTRICAL ENGINEER PROJECT MANAGER SCHINDLER
MCS-Sub. Contractor MCS-Sub. Contractor

Witnessed By: Witnessed By:

FOREMAN ADRIAN KING JESS


FOREMAN MCS-Sub. Contractor
MCS-Sub. Contractor
BEFORE

AFTER