INCIDENT REPORT
PROJECT : Congressional Town Center Tower 2
LOCATION : 23 Congressional Ave. Brgy. Toro, Quezon City
DATE : September 25, 2023
Details of the Incident:
During the physical and visual inspection conducted last September 23, 2023. It is
found that the Electrical conduit PVC at roof deck of machine room was damaged and
cut by unknown people and finished the floor with water proofing; it is the cause of
water leakage at the machine room.
Actions taken:
1. The incident was reported immediately to the Electrical Contractor.
2. Inspected the area and traced the water leakage.
3. Connect another PVC for extension to block the water leakage.
(See attached pictured for review and reference)
Prepared By: Inspected By: Inspected By:
RACHEL A. BETINOL GIRLY MANIKAN RONALD CALIXTO
ELECTRICAL ENGINEER PROJECT MANAGER SCHINDLER
MCS-Sub. Contractor MCS-Sub. Contractor
Witnessed By: Witnessed By:
FOREMAN ADRIAN KING JESS
FOREMAN MCS-Sub. Contractor
MCS-Sub. Contractor