MATERIAL REQUISITION FOR A/01 dt.06-11-2019
MAIN LINE - VALVES Total Sheets 14
TABLE OF CONTENTS
1. INTRODUCTION ......................................................................................... 3
2. PURPOSE ................................................................................................. 3
3. DEFINITIONS ............................................................................................. 3
7. NOTES ..................................................................................................... 5
Page 2 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
1. INTRODUCTION
M/s Goa Natural Gas Pvt. Ltd. is a Joint Venture (JV) of Bharat Petroleum Corporation Limited
(BPCL), A Govt. of India Enterprise and GAIL Gas Limited, a fully owned subsidiary company of
GAIL (India) Limited, has been set up to provide PNG (piped Natural Gas) to industrial,
domestic, commercial sectors and CNG to automobile sector in North Goa GA.
VCS Quality Services Pvt. Ltd. (VCS has been appointed as Project Management Consultant for
providing consultancy services for CGD Expansion Project for PNG & CNG in North Goa
(hereinafter referred as Consultant), by GNGPL
2. PURPOSE
This document is for the design, manufacturing and purchase of valves for CONSORTIUM City
gas distribution project in North Goa.
3. DEFINITIONS
Where used in this document, the following terms shall have the meanings indicated below,
unless clearly indicated by the context to this order:
MR Material Requisition
4. DOCUMENT PRECEDENCE
It shall be the responsibility of the MANUFACTURER/ BIDDER to inform the PURCHASER of any
errors, ambiguities, inconsistencies, discrepancies or conflict of information that may be found
to exist in any document, specification or drawing submitted by the PURCHASER.
a. Datasheet
b. MR
c. Basic Documents (Specifications)
d. Codes and Standards
As a general rule in the event of any discrepancy between technical matter and local laws/
regulations (and documents above listed) the most stringent shall be applied.
Page 3 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
MANUFACTURER/ BIDDER shall notify PURCHASER of any apparent conflicts between MR,
specifications, related datasheets, any code and standards and any other specifications noted
herein. (Resolution and/ or interpretation precedence shall be obtained from PURCHASER in
writing before proceeding with the design/ manufacturer or completion of services.)
5. SCOPE OF SUPPLY
Design, procurement of materials and bought out components, manufacture, assembly at
shop, inspection, testing at manufacturer’s works, packing, handling, delivery of various valves
(as per Table below), supply of all pre commissioning & commissioning spares &
documentation as per the enclosed engineering standard, specifications and data sheets etc.
attached or referred.
A. Ball Valves
BODY-ASTM A 216
GR.WCB, TRIM:
1023-000-PL-DS-
01 8” BW SEAT: AISI 30HC Nos 1 *UG/ FB
008A
4140+0.003"
ENP/AISI 410
BODY-ASTM A 216
GR.WCB, TRIM:
1023-000-PL-DS-
02 6” BW SEAT: AISI 30HC Nos 5 *UG/ FB
008A
4140+0.003"
ENP/AISI 410
BODY-ASTM A 216
GR.WCB, TRIM:
1023-000-PL-DS-
03 4” BW SEAT: AISI 30HC Nos 5 *UG/RB
008B
4140+0.003"
ENP/AISI 410
BODY-ASTM A 216
GR.WCB, TRIM:
1023-000-PL-DS-
04 2” BW SEAT: 30HC Nos 10 *UG/ RB
008A
AISI4140+0.003
"ENP/AISI410
B. Globe Valves
Page 4 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
4140+0.003"
ENP/AISI 410,
conforming to BS
1873, ANSI
6. DELIVERY LOCATION
A. Ball Valves
01 8”, (300#) 1
02 6”, (300#) 5
03 4” (300#) 5
04 2” (300#) 10
B. Globe Valves
01 2” (300#) 10
7. NOTES
1. All valves (including all components) shall be designed and suitable for Natural Gas/
RLNG service and are to be in intended to be installed in pipeline.
Page 5 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
3. Bidder shall check, Valve body calculation based on design conditions and
manufacturing requirements and submit necessary to company for approval. All valves
shall have welded both construction.
4. For all valve Charpy V-notch test shall be conducted for each heat treatment lot and for
each heat of steel used. Charpy V-notch test shall be conducted at (-)29°C with the
impact test provisions of ASTM A 370.
6. The quantities indicated above are indicative and are subject to variation up to ± 25 %
(minimum of one number, any fraction shall be taken as next whole number). The price
quoted for the items shall remain valid for any change in quantity within such variation.
7. Bidder shall quote separately spares for 2-year normal operation. List of spares quoted
shall be furnished as per attached formats
8. Bidder to include the startup and commissioning spares in the quoted price. However,
list of spares (start up and commissioning) to be made available without prices as per
attached formats. In case no startup/ commissioning spares are recommended by the
bidder but the same are required at the time of startup/ commissioning, Bidder shall
supply such spares free of cost.
9. Valves shall be delivered at owner’s designated store yard at North GOA as shown in
table Cl. No.6. All transportation, handling, delivery shall be in bidder’s scope.
10. Bidder shall furnish quotation only in case he can supply material strictly as per this MR
and specification/ data sheets forming part of MR.
11. The submission of prices by the bidder shall be construed to mean that he has
confirmed compliance with all technical specifications of the corresponding item(s).
12. If the offer contains any technical deviations or clarifications or stipulates any technical
specifications (even if in line with MR requirements) and does not include complete
scope & Technical/ Performance Data required to be submitted with the offer, the offer
shall be liable for rejection.
13. Bidder must submit all documents/ drawings/ calculations as specified in relevant
specification along with his offer and after award of order.
Page 6 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
14. Purchaser’s inspector reserves the right to perform stage wise inspection and witness
tests, as indicated in specification for valves at manufacture’s works prior to shipment.
Manufacturer shall give reasonable notice of time and shall provide without charge
reasonable access and facilities require for inspection to the purchaser’s inspector.
Inspection and tests performed/witnessed by purchaser’s inspector shall in no way
relieve the manufacturer’s obligation to perform the required inspection and test.
8. LIST OF ATTACHMENTS
1. Data Sheet – Ball Valves; 1023-000-PL-DS-008A
Page 7 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
Page 8 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
VALVE OPERATION
Actuation Type Not Applic able Type of Actuator Not Applic able
DOCUMENT NO.
Page 9 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
1 This Data Sheet shall be read in conjunction with Tender Documents & Specifications.
2 Dimension / Input Data as & where marked "XXX" shall be supplied by Vendor.
Valve body & other pressure containing parts shall be designed as per ASME Sec-VIII Div-I. Minimum thickness shall not be less than
3
ASME B16.34.
4 Manufacturer shall have valid license to use API monogram.
5 Valve design shall ensure repair of stem seals / packing under full line pressure.
Bidder to submit Soft Seal details and type, grade & class selected for R-PTFE from ASTM D4745 with manufacturer's
9
recommendation like Pressure-Temperature Curve/Table for not to damage the soft seal during welding of valve ends at site.
10 The Charpy Impact temperature specified in data sheet shall superceded the Specification (VPC-SS-PL-0004) requirement at 0 oC
A supplementary air seat test as per API 6D (Annex B, Para B.3.3 type II) shall be carried out for all valves. A bubble tight seal is
11
required without the use of any sealant. No leakage is allowed. Test pressure shall be held for at least 15 minutes.
12 All the valves should have full bore/ reduced bore markings as per the API 6D Table 12.
Design of weld end valves shall be such that during field welding operations, the soft seals or plastic compnents of the valve (where
13 ever used) is not liable to be damaged. The manufacture shall furnish necessary field welding instructions and post-weld test
procedure to demonstrate integrity and leak-tightness of valves after field welding operations.
14 Valves of size 8" and above shall have Sealant connection.
LEGEND
Page 10 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
VALVE OPERATION
Diameter / Length Not Applic able Material & Thickness Not Applic able
13% Cr. Steel / SS- 304 / SS- 316 (Solid) /(ASTM A 216
Ball
Gr. WCB) + 0.003" ENP
DOCUMENT NO.
Page 11 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
1 This Data Sheet shall be read in conjunction with Tender Documents & Specifications.
2 Dimension / Input Data as & where marked "XXX" shall be supplied by Vendor.
Valve body & other pressure containing parts shall be designed as per ASME Sec-VIII Div-I. Minimum thickness shall not be less than
3
ASME B16.34.
4 Manufacturer shall have valid license to use API monogram.
5 Valve design shall ensure repair of stem seals / packing under full line pressure.
10 The Charpy Impact temperature specified in data sheet shall superceded the Specification (VPC-SS-PL-0004) requirement at 0 oC
A supplementary air seat test as per API 6D (Annex B, Para B.3.3 type II) shall be carried out for all valves. A bubble tight seal is
11
required without the use of any sealant. No leakage is allowed. Test pressure shall be held for at least 15 minutes.
12 All the valves should have full bore/ reduced bore markings as per the API 6D Table 12.
Design of weld end valves shall be such that during field welding operations, the soft seals or plastic compnents of the valve (where
13 ever used) is not liable to be damaged. The manufacture shall furnish necessary field welding instructions and post-weld test
procedure to demonstrate integrity and leak-tightness of valves after field welding operations.
14 Valves of size 8" and above shall have Sealant connection.
LEGEND
DOCUMENT NO.
Page 12 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
Page 13 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
Face Finish NA
Special Requirement XXX
Locking Arrangement Yes
VALVE OPERATION
Actuation Type Not Applic able Type of Actuator Not Applic able
Diameter / Length Not Applic able Material & Thickness Not Applic able
Seat Ring 13% Cr. Steel Fac ing/ 13% Cr. Steel
13% Cr. Steel / SS-316 (No Casting)/(AISI 4140 +
Stem
0.003" ENP) / AISI 410
Bonnet ASTM A234 GR.WPB
Graphite Asbestos with Sac rific ial Corrosion Inhibitor
Gland/Stem Packing
Inc onel Wire Reinforc ement.
Body Stud ASTM A 193 Gr. B7
DOCUMENT NO.
Page 14 of 15
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
1 This Data Sheet shall be read in conjunction with Tender Documents & Specifications.
2 Dimension / Input Data as & where marked "XXX" shall be supplied by Vendor.
Valve body & other pressure containing parts shall be designed as per ASME Sec-VIII Div-I. Minimum thickness shall not be less than
3
ASME B16.34.
4 Manufacturer shall have valid license to use API monogram.
5 Valve design shall ensure repair of stem seals / packing under full line pressure.
Bidder to submit Soft Seal details and type, grade & class selected for R-PTFE from ASTM D4745 with manufacturer's
9
recommendation like Pressure-Temperature Curve/Table for not to damage the soft seal during welding of valve ends at site.
10 The Charpy Impact temperature specified in data sheet shall superceded the Specification (VPC-SS-PL-0004) requirement at 0 oC
A supplementary air seat test as per API 6D (Annex B, Para B.3.3 type II) shall be carried out for all valves. A bubble tight seal is
11
required without the use of any sealant. No leakage is allowed. Test pressure shall be held for at least 15 minutes.
12 All the valves should have full bore/ reduced bore markings as per the API 6D Table 12.
Design of weld end valves shall be such that during field welding operations, the soft seals or plastic compnents of the valve (where
13 ever used) is not liable to be damaged. The manufacture shall furnish necessary field welding instructions and post-weld test
procedure to demonstrate integrity and leak-tightness of valves after field welding operations.
14 Valves of size 8" and above shall have Sealant connection.
LEGEND
DOCUMENT NO.
Page 15 of 15
VCS PROJECT CONSULTANTS PVT. LTD.
STANDARD SPECIFICATION
FOR
PIPELINE BALL VALES
VPC – SS – PL - 0004
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 1 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
ABBREVIATIONS:
DN Nominal Size
DP Dye Penetrant
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 2 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
CONTENTS
1 SCOPE ........................................................................................................................ 4
2 REFERENCE DOCUMENTS .............................................................................................. 4
3 MATERIALS .................................................................................................................. 5
4 DESIGN AND CONSTRUCTION REQUIREMENTS ................................................................ 6
5 INSPECTION & TESTS ................................................................................................. 10
6 TEST CERTIFICATES ................................................................................................... 13
7 PAINTING .................................................................................................................. 13
8 MARKING & SHIPMENT ................................................................................................ 13
9 SPARES & ACCESSORIES ............................................................................................ 14
10 DOCUMENTATION ..................................................................................................... 14
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 3 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
1 SCOPE
This specification covers the minimum requirements for design, manufacture, testing and
supply of carbon steel ball valves of size DN 50 mm (2") and above and ANSI pressure rating
Class 150# thru 900# for use in onshore pipeline systems handling non-sour hydrocarbons in
liquid or gaseous phase including Liquefied Petroleum Gas (LPG).
2 REFERENCE DOCUMENTS
All valves shall be manufactured and supplied in accordance with the American Petroleum
Institute (API) Specification 6D, Twenty Third Edition, April 2008/ ISO 14313:2007,
Petroleum and Natural Gas Industries - Pipeline Transportation Systems - Pipeline Valves,
with additions and modifications as indicated in the following sections of this specification.
Reference has also been made in this specification to the latest edition (edition enforce at the
time of issue of enquiry) of the following Codes, Standards and Specifications.
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 4 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
2.6 In case of conflict between the requirements of this specification, API 6D and the Codes,
Standards and Specifications referred in clause 2.2 above, the requirements of this
specification shall govern.
3 MATERIALS
3.1 The material of major components of the ball valves shall be as indicated in Valve Data
Sheet. Remaining components shall be as per Manufacturer's standard (suitable for the
service indicated in the data Sheet) and as approval by Company.
All process-wetted parts, metallic and non-metallic, and lubricants shall be suitable for the
service specified by the Company. Manufacturer shall confirm that all wetted parts are
suitable for treated water/ seawater environment, which may be used during field testing.
Non-metallic parts of the valves (including O-rings, soft seals etc.) intended for
hydrocarbon gas service shall be resistant to explosive decompression.
3.2 Carbon steel used for the manufacture of valves shall be fully killed.
3.3 The carbon equivalent (CE) of valve end connections which are subject to further field
welding by Company shall not exceed 0.45 on check analysis for each heat of steel used,
as calculated by the following formula:
Mn Cr Mo V Cu Ni
CE C
6 5 15
For valves specified to be used for Gas service or LPG service, Charpy V-notch test, on
each heat of base material shall be conducted as per API 6D-Clause 8.5, for all pressure
containing parts such as body, end flanges and welding ends as well as bolting material
for pressure containing parts. Unless specified otherwise, the Charpy V-notch test shall be
conducted at 0°C. Test procedure shall conform to ASTM A 370. The average absorbed
energy value of three full sized specimens shall be 27 J. The minimum impact energy
value of any one specimen of the three specimens analyzed as above shall not be less
than 22 J.
When Low Temperature Carbon Steel (LTCS) materials are specified in Valve Data Sheet
or offered by Manufacturer, the Charpy V-notch test requirements of applicable material
standard shall be complied with.
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 5 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
For valves specified to be used for Gas service or LPG service, Hardness test shall be
carried out as per ASTM A370 for each method of manufacture and each heat of steel
used in the manufacture of valves. A full thickness cross section shall be taken for this
purpose and the maximum hardness of the materials of valve components shall not
exceed 248 HV10.
For all such valves where Carbon Steel is used as ball material, the ball shall have 75
micrometers (0.003 inches) thick Electro less Nickel Plating (ENP) as per ASTM B 733 with
following classification:
4.1 GENERAL
Valve design shall meet the requirements of API Specification 6D and shall be suitable for
the service conditions indicated in the Valve Data Sheet. The valve body and other
pressure containing parts shall be designed in compliance with ASME Boiler & Pressure
Vessel Code, Section VIII, Div 1. Allowable stress requirements shall comply the
provisions of ASME B31.3. Also corrosion allowance indicated in Valve Data Sheet shall be
considered in valve design; however, the minimum wall thickness shall not be less than
the minimum requirement of ASME B16.34. The manufacturer shall have valid license to
use API monogram on valves manufactured as per API 6D.
Valves shall be suitable for either buried or above ground installation as indicated in Valve
Data Sheet.
4.3.1 Valve body design shall be either fully welded or bolted type. Valve body joints with
threads are not permitted.
4.3.2 The Ball of valve shall be trunnion mounted. Valve design shall minimize the possibility of
debris ingress into the trunnion as far as practicable.
4.4 BALL
Valves shall be Full bore (FB) or Reduced bore (RB) as indicated in the Valve Data Sheet.
Full bore valves shall be suitable for the passage of all types of pipeline pigs including
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 6 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
instrumented intelligent pigs and regular cleaning, batching and scraper pigs on regular
basis without causing damage to either the valve component or the pig. The full bore,
valve shall provide an unobstructed profile for pigging operations in either direction. Full
bore valves shall be designed to minimize accumulation of debris in the seat ring region to
ensure that valve movement is not impeded. The bore size of a full bore-valve shall be as
per API 6D.
The bore size of reduced bore valve shall be as indicated in Table- 4.5 below:
TABLE – 4.5
Valve seat shall comprise of a hard metallic seat ring energized with bellville or helical
spring and shall provide bubble tight shutoff at high pressure. ‘O’ ring or other seals if
used for drip tight sealing shall be encased in a suitable groove in such a manner that it
cannot be removed from seat ring and there is no extrusion during opening or closing
operation of valve, at maximum differential pressure corresponding to valve class rating.
4.7 Valves shall be designed to withstand a sustained internal vacuum of at least 1 (one)
mille-bar in both open and closed positions.
Valves shall have double block and bleed feature to facilitate complete flush, drain and
venting of the valve body cavity. Cavity relief pressure shall be as per API 6D.
Full bore valves of nominal valve size DN 200 mm (8") & above and Reduced Bore valves
of nominal valve size DN 250 mm (10") & above, shall have provision for secondary
sealant injection under full line pressure for seat and stem seals. All sealant injection
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 7 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
connections shall be provided with an internal non-return valve. Valve design shall have a
provision to replace the sealant injection fitting under full line pressure. Valves shall be
provided with vent and drain connections. Drain sizes shall be in accordance with API 6D
or MSS-SP-45. Drain sizes shall be as specified in MSS-SP-45 for valve size NPS 2 to NPS
24. For sizes larger than NPS 24, manufacturer shall specify suitable drain size for
purchaser approval.
Valves shall be provided with vent and drain connections. Location and arrangement of
vents and drains shall be as per Fig. 4.9. Body vent and drain shall be provided with
valves (Ball or Plug type). Number and size shall be as per Fig. 4.9.
4.10 Valve design shall ensure repair of stem seals/ packing under full line pressure.
Full bore valves of nominal valve size DN 200 mm (8") & above and Reduced bore valves
of nominal valve size DN 250 mm (10") & above, shall be equipped with support foot and
lifting lugs unless specified otherwise. Tapped holes and eyebolts shall not be used for
lifting lugs. Height of support foot shall be kept minimum. The location and size of support
foot/ lifting lugs shall ensure unrestrictive operation of vent/ drain valves.
4.12 Valve design shall be such as to avoid bimetallic. Corrosion between carbon steel and high
alloy steel components. Suitable insulation shall be provided as required.
4.13 For valves to be used in liquid service, the body cavity over-pressure shall be prevented
by self- relieving seat rings/ assemblies. Self-relieving seat rings shall relieve at a body
cavity differential pressure not exceeding 50% of the valve class rating pressure.
Valve ends shall be either flanged/ or butt welded or one end flanged and one end butt
welded as indicated in the Valve Data Sheet. Flanges of the flanged end cast/ forged body
valves shall be integrally cast/ forged with the body of the valve. Face to face/ end to end
dimensions shall conform to API 6D. Face-to-face and end-to-end dimensions for valve
sizes not specified in API 6D shall be in accordance with ASME B 16.10. Face-to-face and
end-to-end dimensions not shown in API 6D or in ASME B 16.10 shall be as per
Manufacturer Standard and shall be subject to approval by Company.
Flanged ends, if specified, shall have flanges as per ASME B16.5 for valve sizes up to DN
600 mm (24") excluding DN 550 mm (22") and as per MSS-SP-44/ ASME B 16.47 Series A
for valve sizes DN 550 mm (22") and for DN 650 mm (26 inches) and above. Flange face
shall be either raised face or ring joint type (RTJ) as indicated in Valve Data Sheet. Flange
face finish shall be serrated or smooth as indicated in Valve Data Sheet. In case of RTJ
flanges, the groove hardness shall be minimum 140 BHN.
Butt weld end preparation shall be as per ASME B 16.25. The thickness of the pipe to
which the valve has to be welded shall be as indicated in the Valve Data Sheet. Valves
shall be without transition pups. In case difference exists between thickness of welding
ends of valve and connecting pipe, the welding ends of valve shall have bevel preparation
as per ASME B31.4 or ASME B31.8 as applicable.
4.15 Design of weld end valves shall be such that during field welding operations, the soft seals
or plastic components of the valve (where ever used) is not liable to be damaged. The
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 8 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
manufacturer shall furnish necessary field welding instructions and post-weld test
procedure to demonstrate integrity and leak-tightness of valves after field welding
operations.
Valve shall be provided with ball position indicator and stops of rugged construction at the
fully open and fully closed positions.
When stem extension requirement is indicated in Valve Data Sheet, the valves shall have
the following provisions.
a. Valves provided with stem extension shall have water proof outer casing. Length of
stem extension shall be as indicated in Valve Data Sheet. The length indicated
corresponds to the distance between centerline of the valve opening and the top of
mounting flange for valve operating device (gear operator/ power actuator as
applicable).
b. Vent and drain connections and sealant injection lines shall be terminated adjacent to
the valve operator by means of suitable piping anchored to the valve body. The pipe
used shall be API 5L Gr. B/ ASTM A 106 Gr. B, with Sch 160. Fittings shall be ASTM
A105/ ASTM A234 Gr. WPB, Socket welded ANSI class 600.
c. Stem extension and stem housing design shall be such that the complete assembly will
form a rigid unit giving positive drive under all conditions with no-possibility of free
movement between valve body, stem extension or its operator.
d. Outer casing of stem extension shall have 3/8” or 1/2" NPT plugs at the top and
bottom, for draining and filling with oil to prevent internal corrosion.
e. The Stem Extension shall be self-relieving.
a. Valves shall have a power actuator or manual operator as indicated in the Valve Data
Sheet. In case of manual operator, valve sizes, DN ≤ 100 mm (4") shall be wrench
operated and valve sizes, DN ≥ 150 mm (6") shall be gear operated. Each wrench
operated valve shall be supplied with wrench. Valve design shall be such that damage
due to malfunctioning of the operator or its controls will only occur in the operator
gear train or power cylinder and that damaged parts can be replaced without the
valve cover being removed.
b. The power actuator shall be in accordance with the Company Specification issued for
the purpose and as indicated in the Valve and Actuator Data Sheet. Operating time
shall be as indicated in Valve Data Sheet. Valve operating time shall correspond to full
close to full open/ full open to full close under maximum differential pressure
corresponding to the valve rating. For actuated valves, the actuator's rated torque
output shall be 1.25 times the break torque required to operate the ball valve under
the maximum differential pressure corresponding to the Valve Class Rating.
c. For the manual operator of all valves, the diameter of the hand wheel or the length of
operating wrench shall be such that under the maximum differential pressure, the
total force required to operate the valve does not exceed 350N. Manufacturer shall
also indicate the number of turns of hand wheel (In case of gear operators) required
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 9 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
for Operating the valve from full open to full close position.
d. Direction of operation of hand wheel or wrench shall be in clock-wise direction while
closing the valve. Hand wheels shall not have protruding spokes.
e. Gear operators, when provided, shall have a self-locking provision and shall be fully
encased in water proof/ splash proof enclosure and shall be filled with suitable grease.
4.19 The tolerance on internal diameter and out of roundness at the ends for welded ends
valves shall be as per connected pipe specification as indicated in the Valve Data Sheet.
When indicated in Material Requisition, valves shall have locking devices to lock the valve
either in full open (LO) or full close (LC) positions. Locking devices shall be permanently
attached to the valve operator and shall not interfere with operation of the valve.
4.21 WELDING
All welds shall be made by welders and welding procedures qualified in accordance with
the provisions of ASME Section IX, except that only positions 5G and 2G shall qualify all-
positional welding. The procedure qualification shall also include impact test and hardness
test when required as per Clause 3.4 to 3.5 of this specification and shall meet the
requirements as specified therein.
Repair by welding is not permitted for fabricated and forged body valves. However repair
by welding as per ASME B16.34 is permitted for cast body valves. Such repairs shall be
carried out at casting supplier's care only. Repair shall be carried out before any heat
treatment of casting is done. Repair welding procedure qualification shall also include
impact test and hardness test when required as per Clause 3.4 to 3.5 of this specification
and shall meet the requirements as specified therein.
4.23 Valve stem shall be capable of withstanding the maximum operating torque required to
operate the valve against the maximum differential pressure corresponding to applicable
class rating. The combined stress shall not exceed the maximum allowable stresses
specified in ASME section VIII, Division 1. For power actuated valves, the valve stem shall
be designed for maximum output torque of the selected power actuator (including gear
box, if any) at valve stem.
5.1 The Manufacturer shall perform all inspection and tests as per the requirements of this
specification and the relevant codes, prior to shipment, at his works. Such inspection and
tests shall be, but not limited to, the following:
5.2 All valves shall be visually inspected. The internal and external surfaces of the valves shall
be free from any strikes, gouges and other detrimental defects. The surfaces shall be
thoroughly cleaned and free from dirt, rust and scales.
5.3 Dimensional check on all valves shall be carried out as per the Company approved
drawings.
5.4 Chemical composition and mechanical properties shall be checked as per this specification
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 10 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
5.5 Non-destructive examination of individual valve material and component consisting of but
not limited to castings, forgings, plates and assembly welds shall be carried out by the
Manufacturer.
a. Body castings of all valves shall be radio graphically examined as per ASME B16.34.
Procedure and acceptance criteria shall be as per ASME B 16.34. The extent of the
radiography shall be as under:
All castings shall be wet magnetic particle inspected 100% of the internal surfaces.
Method and acceptance shall, comply with ASME B 16.34.
b. All valves, with body fabricated from plates or made by, forgings, shall be
ultrasonically examined in accordance with the procedure and acceptance standard as
per ASME B16.34.
All forgings shall be Wet magnetic particle inspected 100% of the internal surfaces.
Method and acceptance shall comply with ASME B16.34.
c. Bodies and bonnets made by welded assembly of segments of castings, forgings,
plates or combinations thereof shall be examined, as applicable, by methods of 5.5 (a)
for cast components or 5.5 (b) for forged components and plates.
5.6 Full inspection by radiography shall be carried out on all welds of pressure containing
parts. Acceptance criteria shall be as per ASME B 31.4 or ASME B31.8 as applicable and
API 1104.
5.7 Welds, which in Company's opinion cannot be inspected, by radiographic methods, shall
be checked by ultrasonic or magnetic particle methods and acceptance criteria shall be as
per ASME Sec. VIII (2007 edition), Division 1, Appendix 12 and, Appendix 6 respectively.
5.8 All finished wrought weld ends subject to welding in field shall be 100% ultrasonically
tested for lamination type defects for a distance of 50 mm from the end. Laminations shall
not be acceptable.
a. Weld ends of all cast valves subject to welding in field shall be 100% radio graphically
examined and acceptance criteria shall be as per ASME B16.34.
b. After final machining, all bevel surfaces shall be inspected by dye penetrant or wet
magnetic particle methods All defects longer than 6.35 mm are rejected, as are the
defects between 6.35 mm and 1.59 mm that are separated by a distance less than 50
times their greatest length. Rejectable defects must be removed. Weld repair of bevel
surface is not permitted.
5.9 All valves shall be tested in compliance with the requirements of API 6D. During pressure
testing, valves shall not have sealant lines and other cavities filled with sealant, grease or
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 11 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
other foreign material: The drain, vent and sealant lines shall be either included in the
hydrostatic shell test or tested independently. Test pressure shall be held for at least 30
minutes. No leakage is permissible during hydrostatic testing. The body cavity self-
relieving feature meeting the requirements of clause 4.13 of this specification shall also be
checked.
5.10 A supplementary air seat test as per API 6D (Annex B, Para B.3.3 Type II) shall be carried
out for all valves. A bubble tight seal is required without the use of any sealant. No
leakage is allowed. Test pressure shall be held for at least 15 minutes.
5.11 Valves shall be subjected to Operational Torque Test as per API 6D (Annex B, Para B.6)
under hydraulic pressure equal to maximum differential pressure corresponding to the
applicable ANSI class rating of valve. It shall be established that the force required to
operate the valve does not exceed the requirements stated in section 4.18 (C) of this
specification.
5.12 Power actuated valves shall be tested after assembly of the valve and actuator, at the
valve Manufacturer's works. At least five Open-Close-Open cycles without internal
pressure and five Open-Close-Open cycles with maximum differential pressure
corresponding to the valve rating shall be performed on the valve actuator assembly. The
time for Full Open to Full Close shall be recorded during testing. If required, the actuator
shall be adjusted to ensure that the opening and closing time is within the limits stated in
Valve Data Sheet.
Hand operator provided on the actuator shall also be checked after above testing, for
satisfactory manual over-ride performance.
These tests shall be conducted on minimum one valve out of a lot of five (5) valves of the
same size, rating and the actuator model/ type. In case, the tests do not meet the
requirements, retesting/ rejection of the lot shall be decided by the Company's Inspector.
5.13 Subsequent to successful testing as specified in clause 5.11 and 5.12 above, one (1) valve
out of the total ordered quantity shall be randomly selected by the Company
Representative for cyclic testing as mentioned below:
a. The valve shall be subjected to at least 100 Open-Close-Open cycles with maximum
differential pressure corresponding to the valve rating.
b. Subsequent to the above, the valve shall be subjected to hydrostatic test and
supplementary air seat test in accordance with clause 5.9 and 5.10.
In case this valve fails to pass these tests, the valve shall be rejected and two more
valves shall be selected randomly and subjected to testing as indicated above. If both
valves pass these tests, all valves manufactured for the order (except the valve that
failed) shall be deemed acceptable. If either of the two valves fails to pass these tests, all
valves shall be rejected or each valve shall be tested at the option of manufacturer.
Previously carried out test of similar nature shall be considered acceptable if the same has
been carried out by Manufacturer in last two years. Valves of two sizes below and two
sizes above the size of valve previously tested, and rating similar or one rating lower of
valve tested previously, shall be qualified.
5.14 Checks shall be carried out to demonstrate that the dissimilar metals used in the valves
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 12 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
are successfully insulated as per the requirement of clause 4.12 of this specification.
5.15 Company reserves the right to perform stage wise inspection and witness tests as
indicated in clause 5.1 above at Manufacturer's works prior to shipment. Manufacturer
shall give reasonable access and facilities required for inspection to the Company's
Inspector. Company reserves the right to require additional testing at any time to confirm
or further investigate a suspected fault. The cost incurred shall be to Manufacturer's
account.
In no case shall any action of Company or his inspector shall relieve the Manufacturer of
his responsibility for material, design, quality or operation of valves.
Inspection and tests performed/ witnessed by the Company's Inspector shall in no way
relieve the Manufacturer's obligation to perform the required inspection and tests.
6 TEST CERTIFICATES
Manufacturer shall submit the following certificates in accordance with EN 10204 3.2.
a. Mill test certificates relevant to the chemical analysis and mechanical properties of the
materials used for the valve construction as per the relevant standards.
b. Report on heat treatment carried out.
c. Test certificates of hydrostatic and pneumatic tests complete with records of timing
and pressure of each test.
d. Test reports of radiograph and ultrasonic inspection, MPI and DP Inspection
e. Test report on operation of valves conforming to clause 5.11, 5.12 and 5.13 of this
specification.
f. All other test reports and certificates as required by API 6D and this specification.
The certificates shall be considered valid only when signed by Company's Inspector. Only
those valves which have been certified by Company's Inspector shall be dispatched from
Manufacturer's works.
7 PAINTING
Valve surface shall be thoroughly cleaned, freed from rust and grease and applied with
sufficient coats of corrosion resistant paint. Surface preparation shall be carried out by
shot blasting to SP-6 in accordance with "Steel Structures Painting Council - Visual
Standard SSPC-VIS-1". For the valves to be installed underground, when indicated in
Valve Data Sheet, the external surfaces of buried portion of the valve shall be painted with
three coats of suitable coal tar epoxy resin with a minimum dry film thickness of 300
microns.
8.1 All valves shall be marked as per API 6D. The units of marking shall be metric except
nominal diameter, which shall be in inches.
8.2 Valve ends shall be suitably protected to avoid any damage during transit. All threaded
and machined surfaces subject to corrosion shall be well protected by a coat of grease or
other suitable material. All valves shall be provided with suitable protectors for flange
faces, securely attached to the valves. Bevel ends shall be protected with metallic or high
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 13 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
8.3 All sealant lines and other cavities of the valve shall be filled with sealant before shipment.
8.5 The serial number of each valve indicated on its nameplate shall appear on all required
documentation in accordance with EN 10204 3.2.
8.6 All valves shall be transported with ball in fully opened condition
8.7 On packages, following shall be marked legibly with suitable marking ink:
a. Order Number
b. Manufacturer's Name
c. Valve size and rating
d. Tag Number
e. Serial Number
9.1 Manufacturer shall furnish list of recommended spares and accessories for valves required
during start-up and commissioning and supply of such spares shall be included in the price
quoted by Manufacturer.
9.2 Manufacturer shall furnish list of recommended spares and accessories required for two
years of normal operation and maintenance of valves and price for such spares shall be
quoted separately.
10 DOCUMENTATION
The Manufacturer shall supply documentation in accordance with the Vendor Data
Requirements List (VDRL) as attached with Purchase Order.
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 14 of 15
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0004
FOR PIPELINE BALL VALVES Rev No : 00
FORMAT NO. VPC-SS-PL-0004 R0 Copyright VCS Project – All rights reserved Page 15 of 15
VCS PROJECT CONSULTANTS PVT. LTD.
STANDARD SPECIFICATION
FOR
PIPELINE GLOBE VALVES
VPC – SS – PL - 0030
FORMAT NO. VPC-SS-PL-0030 R0 Copyright VCS Project – All rights reserved Page 1 of 10
STANDARD SPECIFICATION DOCNO: VPC-SS-PL-0030
FOR PIPELINE GLOBE VALVES Rev No : 00
ABBREVIATIONS:
DN Nominal Size
DP Dye Penetrant
CONTENTS
1 SCOPE ........................................................................................................................ 4
2 REFERENCE DOCUMENTS .............................................................................................. 4
3 MATERIALS .................................................................................................................. 5
4 DESIGN AND CONSTRUCTION REQUIREMENTS ................................................................ 6
5 INSPECTION & TESTS ................................................................................................... 7
6 TEST CERTIFICATES ..................................................................................................... 7
7 PAINTING .................................................................................................................... 9
8 MARKING & SHIPMENT .................................................................................................. 9
9 SPARES & ACCESSORIES ............................................................................................ 10
10 DOCUMENTATION ..................................................................................................... 10
1 SCOPE
This specification covers the minimum requirements for design, manufacture, testing and
supply of carbon steel globe valves of size DN 50 mm (2") and above and ANSI pressure
rating Class 150# thru 900# for use in onshore pipeline systems handling non-sour
hydrocarbons in liquid or gaseous phase including Liquefied Petroleum Gas (LPG).
2 REFERENCE DOCUMENTS
All valves shall be manufactured and supplied in accordance with the Design Code BS
1873, with additions and modifications as indicated in the following sections of this
specification.
Reference has also been made in this specification to the latest edition (edition enforce at
the time of issue of enquiry) of the following Codes, Standards and Specifications.
2.6 In case of conflict between the requirements of this specification, BS-1873 and the Codes,
Standards and Specifications referred in clause 2.0 above, the requirements of this
specification shall govern.
3 MATERIALS
The material of major components of the valves shall be as indicated in Valve Data Sheet.
Remaining components shall be as per Manufacturer's standard (suitable for the service
indicated in the data Sheet) and as approval by Company.
All process-wetted parts, metallic and non-metallic, and lubricants shall be suitable for the
service specified by the Company. Manufacturer shall confirm that all wetted parts are
suitable for treated water/ seawater environment, which may be used during field testing.
Non-metallic parts of the valves intended for hydrocarbon gas service shall be resistant to
explosive decompression.
Carbon steel used for the manufacture of valves shall be fully killed.
The carbon equivalent (CE) of valve end connections which are subject to further field
welding by Company shall not exceed 0.45 on check analysis for each heat of steel used,
as calculated by the following formula:
Mn Cr Mo V Cu Ni
CE C
6 5 15
For valves specified to be used for Gas service or LPG service, Charpy V-notch test, on
each heat of base material shall be conducted as per standard, for all pressure containing
parts such as body, end flanges and welding ends as well as bolting material for pressure
containing parts. Unless specified otherwise, the Charpy V-notch test shall be conducted
at 0°C. Test procedure shall conform to ASTM A 370. The average absorbed energy value
of three full sized specimens shall be 27 J. The minimum impact energy value of any one
specimen of the three specimens analyzed as above shall not be less than 22 J.
When Low Temperature Carbon Steel (LTCS) materials are specified in Valve Data Sheet
or offered by Manufacturer, the Charpy V-notch test requirements of applicable material
standard shall be complied with.
For valves specified to be used for Gas service or LPG service, Hardness test shall be
carried out as per ASTM A370 for each method of manufacture and each heat of steel
used in the manufacture of valves. A full thickness cross section shall be taken for this
purpose and the maximum hardness of the materials of valve components shall not
exceed 248 HV10.
For all such valves where Carbon Steel is used as ball material, the ball shall have 75
micrometers (0.003 inches) thick Electroless Nickel Plating (ENP) as per ASTM B 733 with
following classification:
GENERAL
Valve design shall meet the requirements of BS 1873 and shall be suitable for the service
conditions indicated in the Valve Data Sheet. The valve body and other pressure
containing parts shall be designed in compliance with ASME Boiler & Pressure Vessel Code,
Section VIII, Div 1. The Corrosion allowance indicated in the Valve Data Sheet shall be
considered in the design. However the minimum wall thickness shall not be less than the
minimum requirement of ASME B16.34
The Cover shall be bolted to the body. Screwed connections are not acceptable.
Valve design shall provide for the repair of gland packing under full line pressure.
Valve ends:
Valve ends shall be of the flanged type or butt welded as indicated in the Valve Data
Sheet. Flanges shall be integrally cast with the body of the Valve. Face to face/end to
end dimensions shall conform to the design codes.
Flanged ends, if specified, shall have flanges as per ASME B16.5 for valve sizes up to
DN 600 mm (24") excluding DN 550 mm (22") and as per MSS-SP-44/ ASME B 16.47
Series A for valve sizes DN 550 mm (22") and for DN 650 mm (26 inches) and above.
Flange face shall be either raised face or ring joint type (RTJ) as indicated in Valve
Data Sheet. Flange face finish shall be serrated or smooth as indicated in Valve Data
Sheet. In case of RTJ flanges, the groove hardness shall be minimum 140 BHN.
Butt weld end preparation shall be as per ASME B 16.25. The thickness of the pipe to
which the valve has to be welded shall be as indicated in the Valve Data Sheet. In
case difference exists between thickness of welding ends of valve and connecting pipe,
the welding ends of valve shall have bevel preparation as per ASME B31.4 or ASME
B31.8 as applicable.
Design of weld end valves shall be such that during field welding operations, the soft
seals or plastic components of the valve (where ever used) is not liable to be
damaged. The manufacturer shall furnish necessary field welding instructions and
post-weld test procedure to demonstrate integrity and leak-tightness of valves after
field welding operations.
The Valve stem shall be capable of withstanding the maximum operating torque
requirement to operate the Valve against the maximum differential pressure as per the
appropriate class. The combined stress shall not exceed the maximum allowable stresses
specified in ASME Section VIII, Division 1. The design shall take into account a safety
factor of 1.5 based on the maximum output torque of the operating mechanism.
OPERATING DEVICES
Valves of 4” (DN100), and below shall be manually operated. Valves of 6" N.B (DN
150), and above, shall be gear operated. Gear operators shall be sized such that their
output torque is at least 1.5 times the maximum operating torque of the Valve. The
Valve design shall be such, that damage due to malfunctioning of the Operator, or its
controls, will only occur in the gear train or power cylinder. Damaged parts should be
able to be replaced without the Valve cover being removed.
The diameter of the hand wheel for manually operated Valves, shall be such that
under the maximum differential pressure, the torque required to operate the Valve
does not exceed 350 Nm. The Manufacturer shall also indicate the number of turns of
the hand wheel required for operating the Valve from the fully open to fully closed
position.
The Direction of operation of the hand wheel, shall be in a clock-wise direction for
closing the Valves. Hand wheels shall not have protruding spokes.
Gear operators, where provided, shall have a self-locking provision and shall be fully
encased in a water proof/ splash proof enclosure (IP65) and shall be filled with
suitable grease.
The tolerance on internal diameter and out of roundness at the ends for welded ends
valves shall be as per connected pipe specification as indicated in the Valve Data Sheet.
Repair by welding is not permitted for forged Valves. However repair by welding as per
ASME B 16.34 is permitted for cast Valves. Repairs shall be carried out before any heat
treatment of the casting is done. Repair welding procedure qualifications shall include
hardness tests and shall meet the requirements of Clause 3.2 of this Specification.
When specified in the Valve Data Sheet, Valves shall have locking devices to lock the
Valve either in a fully open (LO) or fully closed (LC) position.
When specified in the Valve Data Sheet, Globe Valves shall be “fire safe” in accordance
with API RP6FA, for which qualifying certificates, covering the range of items offered, shall
be supplied by the Manufacturer
All Valves and Gear Operators shall have a stainless steel Nameplate permanently affixed
with stainless steel pan head screws. Each Nameplate shall have, as a minimum, the
following information stamped thereon:
Manufacturer
Year of Manufacture
Serial No.
Tag no
Size
Where called for in the Procurement Documents, the Manufacturer shall appoint a
reputable Third Party Inspection Agency, to carry out all inspection and tests as per the
requirements of this Specification and the relevant codes, at his Works, prior to shipment.
The cost of such Third Party Inspection shall be included in the Tendered Sum; also, the
Third Party Inspection Agency shall be approved by the Purchaser prior to his
appointment. Such inspection and tests shall be as a minimum, but not be limited to, the
following:
Visual inspection
A Dimensional checks on all Valves shall be carried out as per the drawings approved
by the Purchaser.
Cast Valves subject to field welding shall be 100% radiographically examined on their
welding ends and acceptance criteria shall be as per ANSI B16.34.
All finished wrought welding ends subject to field welding shall be ultrasonically tested
on 100% of the welded area for lamination type defects for a distance of 50 mm from
the end. Laminations more than 50mm shall not be acceptable.
All the Valves shall be Hydrostatically tested in compliance with the requirements of
BS 1873.
A supplementary Air Seat Test shall be carried out for all Valves with leakage criteria
in accordance with the Data Sheets.
The Purchaser also reserves the right to witness tests as indicated above at the
Manufacturer’s works, prior to shipment. The Manufacturer shall give reasonable
access and facilities required for inspection to the Purchaser’s Inspector. The
Purchaser reserves the right to require additional testing, at any time, to conform or
further investigate, a suspected fault. The cost incurred shall be to the Manufacturer’s
account. In no case shall any action of the Purchaser, or his Inspector, relieve the
Manufacturer of his responsibility for material, design, quality or operation of the
Valves. Inspection and tests performed/witnessed by the Purchaser’s Inspector shall
in no way relieve the Manufacturer of his obligation to perform the required inspection
and tests.
The Purchaser may, at his discretion appoint a Third Party Inspection Agency to carry
out inspection on behalf of, or together with, the Purchaser’s Inspector
6 TEST CERTIFICATES
Manufacturer shall submit the following certificates in accordance with EN 10204 3.2.
a. Mill test certificates relevant to the chemical analysis and mechanical properties of the
materials used for the valve construction as per the relevant standards.
b. Report on heat treatment carried out.
c. Test certificates of hydrostatic and pneumatic tests complete with records of timing
and pressure of each test.
d. Test reports of radiograph and ultrasonic inspection, MPI and DP Inspection
e. Test report on operation of valves conforming to clause 5.11, 5.12 and 5.13 of this
specification.
f. All other test reports and certificates as required by BS 1873 and this specification.
The certificates shall be considered valid only when signed by Company's Inspector. Only
those valves which have been certified by Company's Inspector shall be dispatched from
Manufacturer's works.
7 PAINTING
Valve surface shall be thoroughly cleaned, freed from rust and grease and applied with
sufficient coats of corrosion resistant paint. Surface preparation shall be carried out by
shot blasting to SP-6 in accordance with "Steel Structures Painting Council - Visual
Standard SSPC-VIS-1". For the valves to be installed underground, when indicated in
Valve Data Sheet, the external surfaces of buried portion of the valve shall be painted with
three coats of suitable coal tar epoxy resin with a minimum dry film thickness of 300
microns.
All valves shall be marked as per BS 1873. The units of marking shall be metric except
nominal diameter, which shall be in inches.
Valve ends shall be suitably protected to avoid any damage during transit. All threaded
and machined surfaces subject to corrosion shall be well protected by a coat of grease or
other suitable material. All valves shall be provided with suitable protectors for flange
faces, securely attached to the valves. Bevel ends shall be protected with metallic or high
impact plastic bevel protectors.
All sealant lines and other cavities of the valve shall be filled with sealant before shipment.
The serial number of each valve indicated on its nameplate shall appear on all required
documentation in accordance with EN 10204 3.2.
a. Order Number
b. Manufacturer's Name
Manufacturer shall furnish list of recommended spares and accessories for valves required
during start-up and commissioning and supply of such spares shall be included in the price
quoted by Manufacturer.
Manufacturer shall furnish list of recommended spares and accessories required for two
years of normal operation and maintenance of valves and price for such spares shall be
quoted separately.
10 DOCUMENTATION
The Manufacturer shall supply documentation in accordance with the Vendor Data
Requirements List (VDRL) as attached with Purchase Order.
STANDARD SPECIFICATION
FOR PAINTING
VPC – SS – PI - 0008
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 1 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
CONTENTS
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 2 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
1.0 GENERAL
1.1 These standard specifications shall be applicable for the work covered by the contract,
and without prejudice to the provisions of various codes of practice, standard
specifications etc. It is understood that contractor shall carry out the work in all respects
with the best quality of materials and workmanship and in accordance with the best
engineering practice and instructions of Engineer-In-Charge.
1.2 SCOPE
1.2.1 Scope of work covered in the specification shall include, without being limited to the
following.
1.2.2 This specification defines the requirements for surface preparation, selection and
application of primers and paints on external surfaces of equipment, vessels, machinery,
piping, ducts, steel structures, external & internal protection of storage tanks for all
services, MS Chimney without Refractory lining and Flare lines etc. The items listed in the
heading of tables of paint systems is indicative only, however, the contractor is fully
responsible for carrying out all the necessary painting, coating and lining on external and
internal surfaces as per the tender requirement.
1.2.3.1 The following surfaces and materials shall require shop, pre-erection and field
painting:
a. All un-insulated C.S. & A.S. equipment like columns, vessels, drums, storage tanks
(both external & internal surfaces), heat exchangers, pumps, compressors, electrical
panels and motors etc.
b. All un-insulated carbon and low alloy piping, fittings and valves (including painting of
identification marks), furnace ducts and stacks.
d. All structural steel work, pipe, structural steel supports, walkways, handrails, ladders,
platforms etc.
e. Flare lines, external surfaces of MS chimney with or without refractory lining and
internal surfaces of MS chimney without refractory lining.
i. Supply of all primers, paints and all other materials required for painting (other than
Owner supplied materials)
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 3 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
k. Painting under insulation for carbon steel, alloy steel and stainless steel as specified.
m. Repair work of damaged pre-erection/fabrication and shop primer and weld joints in
the field/site before and after erection as required.
n. All CS Piping, equipments, storage tanks and internal surfaces of RCC tanks in ETP
plant.
1.2.3.2 The following surfaces and materials shall not require painting in general. However, if
there is any specific requirement by the owner, the same shall be painted as per the
relevant specifications:
1.2.4 Documents
1.2.4.1 The contractor shall perform the work in accordance with the following documents
issued to him for execution of work.
1.2.5 Unless otherwise instructed, final painting on pre-erection/ shop primed pipes and
equipments shall be painted in the field, only after the mechanical completion, testing on
systems are completed as well as after completion of steam purging wherever required.
1.2.6 Changes and deviations required for any specific job due to clients requirement or
otherwise shall be referred to VCS for deviation permit.
Without prejudice to the specifications of the contract, the following codes and standards
shall be followed for the work covered by this contract.
IS: 101 Methods of test for ready mixed paints and enamels,
IS: 2074 Specifications for ready mixed paint, red oxide zinc chrome priming.
IS: 2932 Specification for enamel, synthetic, exterior (a) undercoating. (b) Finishing.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 4 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Packaging
Every recipient will be fitted with a hermetically-sealed lid with an opening that is
sufficiently large to allow the contents to be stirred: the outside and inside are protected
against oxidation, and, the lid, are marked with a strip of color identical to the contents.
a) Quality
The composition and quality of the products may not differ from batch to batch. A
batch is all of the products of a specified manufacture. If the analyses of products
bring to light that the composition does not conform to the specifications of the
paint manufacturer, the OWNER may refuse to use this batch of products. The
paint products must comply with the following conditions
They must have the viscosity necessary for the described use and the
established condition: use of the brush - paint roller (spray gun only for special
cases and in the workshop)
While the works are in progress on the construction site, the OWNER may carry
out sampling on the paint being used for the purpose of checking conformity. The
paint products must be made available free of charge to the laboratory or the
approved supervisory body in sufficient quantities so that all the tests can be
carried out on the same batch.
Before proceeding the work, a product that does conform will be required. The
only Purpose of the analysis is to reveal any nonconformity of the composition of
the products. Their purpose is therefore not to assess the quality of the different
components. The analyses concerned are not acceptance tests of the products
supplied and in no way affect the obligations of the contractor specified in the
contract towards the OWNER.
5.0 IDENTIFICATION
Batch no
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 5 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
At the time of delivery, this packaging must bear labels in conformity with the legal
stipulations in force.
After completion of a job a general clean-up shall be carried out by the Contractor to
remove all debris, materials or irregularities that his work has brought to the site so that
it is left tidy:
The Contractor will make the required repairs to any damage after refitting the
supports.
a) The contractor shall arrange, at his own cost to keep a set of latest edition
of above standards and codes at site.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 6 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
The cases that occur in practice on building sites, with regard to painted surfaces, can be
broken down as follows:
Good preparation oldie surface is the best guarantee for good anti-corrosion protection.
Paintwork may never begin until the surface to be treated is dry and is independent of the
base coat and cleared of dirt, dust, rust, scale, grease, salt attack, cement powder,
cement mud-scale, sand, oil, etc.
Based on the environmental conditions of coastal and saline nature, the Painting
specification for station pipes defines the complete requirements like:
The pipeline passes through the coastal and marine environment, the Table-4 of this
specification to be followed for the painting works.
The method of preparation of the surface will be implemented in accordance with the
preparation methods described below:
The Contractor should have the required material at his disposal to clean the surfaces to
be coated thoroughly in accordance with the preparation methods regardless of the form
or the condition of such surfaces. The cleaning devices that might be damaged during the
surface preparation shall be screened off by the Contractor.
7.2 Sandblasting
Before beginning cleaning by blasting, the person carrying out the work will take the
following measures:
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 7 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
The OWNER reserves the right to carry out part or all of these works himself.
To prevent rust forming quickly as the result of humidity on the blasted surface, cleaning
by blasting may only be carried out when the temperature of the steel surface is at least
3°C higher than the dew-point of the ambient air.
Blasting may not be carried out if the relative degree of humidity exceeds 80%. The
choice of the type of blasting medium used depends on local circumstances such as the
possible presence of gas and the material to be blasted.
The abrasive to be used must conform to the local low i.e. it may contain no carbon and
less than 1% free silicon dioxide. The Sa 3 will always be requested and must at least
reach Sa 2½ during the initial stage of the paintwork. For blasting followed by
metallization, the surface preparation degree to be achieved is always Sa 3. The degree
of cleanliness to be obtained will be inspected in accordance with the Swedish standard
SVENSK STANDARD ISO 8501-1-1988 SS 05.5900.
Sa 3: surface blasted down to the bare metal; when the surface is inspected with
a magnifying glass, scale, rust and foreign bodies must be completely removed
and it should be possible to raise a metallic -shine on the treated surface.
Sa 2 1/2: blasted very carefully. Scale, rust and foreign bodies must be removed
in such a way that anything left behind will only be visible as nuances (shading) or
strips.
The blast-cleaning will be carried out by means of compressed air free of water and oil.
After the blasting and before painting, the surface should be completely cleaned of
blasting material and so forth with a soft brush, a dry cloth or dry compressed air.
If sandblasting is not permitted or if the metal structures are not easily accessible for
blasting or blasting for one reason or another is technically unfeasible, mechanical
derusting can be used instead. With mechanical cleaning by means of chipping, rotating
steel brushes and sanding discs, a degree of cleanliness St. 3 should be reached.
St 3 : removal of the old paint layers of which the adhesion leaves something to be
desired and/or of which the paint layer no longer fulfills the requirements.
If parts are present that are so corroded that St 3 is difficult to achieve, this should be
notified to the OWNER representative prior to the start of the works.
N.B:
St. 3 : means removal of every old paint layer. Retouching means local polishing with St.
3 or Sa 3 followed by application of the desired painting system.
After mechanical cleaning, the surface should be made dust-flee with a cloth or a so
brush, washed with an organic solvent and thoroughly dried off with a dry cloth (e.g. with
1.1.1. Trichoroethane such as Solvethane, Chloroethene).
Manual derusting with the aid of scrapers. steel brushes, sandpaper etc. shall only be
permitted in exceptional cases for local repairs. Any deviation there from must be
requested from the OWNER/ OWNER 's Representative.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 8 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
With manual derusting, a surface preparation degree St 3 must be obtained. The length
of the handles of the equipment used may not exceed 50 cm.
This layer is in general applied by the manufacturer, for example, on valves, regulators
etc. Layers of this kind will be checked for their proper adhesion in accordance with ASTM
D 3359, method A (Standard Test Method for measuring adhesion by tape test). The
adhesion should be at least.
If the paint layer shows less adhesion or is incompatible with the rest of the system it
should be completely removed. If the paint layer is not removed, the Contractor accepts
it in the state in which the coating is found and the guarantee remains in force. The
adhesion does not have to be examined if system 63 has already been applied in the
workshop on behalf of the OWNER.
The Contractor, who must provide for the protection on the construction site, must
therefore obtain the information regarding the treatment of the surface and the quality of
the paint that was used and must, moreover, examine the adhesion of the layer on the
construction site, the percentage of damage and weathering as well as the value of the
preparation of the surface in the workshop together with the thickness thereof that must
be supplemented if necessary.
a) Galvanized surface
Galvanized surfaces, both old and new will be carefully roughened up. Every
foreign body (concrete splatters, chalk marks, grease and oil stains, etc.) will be
removed. Thereafter, rub the surfaces with abundant water and, if necessary, with
cleaning products.
To this end, nylon brushes will be used for every kind of dirt as well as for
removing zinc salt residue. Thereafter, the surfaces will be treated in accordance
with system 21. Where the zinc layer is lacking, it will be derusted manually to a
degree of cleanliness St 3, after which a primer coat will be applied in accordance
with system 22.
If on the other hand, the percentage of damage does exceed 5 %/m or if the layer
applied in the workshop comes loose the Contractor must draw the attention of the
OWNER to this and carry out the complete application system.
7.6 Preparation of surfaces covered with earlier paint layers that show different
degrees of weathering.
If the surfaces do not show deep weathering limited to the spread of rust by small pitted
areas or non-penetrative rust in spots, it will very often be sufficient to clean the surfaces
with abrasives or with an abrasive disc, then to rub them down with steel wool, remove
the dust and wash off. If thick rust appears, in spots, scale rust and active rust canker,
this should be removed with needle hammers or stripped away directly by blasting,
removing the dust and washing oft.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 9 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Remove unsound paint layers and loose components with scrapers, blades or rotating
steel brushes. Thoroughly clean the entire surface with water containing ammonia.
Thoroughly remove moss, algae and fungal growths. Where these growths have been
removed, treat the area with a fungicide in accordance with the instructions for use.
Once the entire area is completely dry, brush off the dead residue of moss, algae and
fungus with a hard brush. In the case of reinforcement steel that has been laid bare,
remove as rust, dust and grease as possible and treat with a printer coat. When painting
concrete surfaces, they must first be checked for cracks. Cracks larger than 0.3 mm must
be repaired with an appropriate system in accordance with the type and extent of the
repairs (e.g. injection with epoxy mortar). Repair damage such as cracks and bursts to
concrete parts with a two-component mortar or preferably with micro-mortars. Finally
check the alkalinity of the surface with the aid of litmus paper and neutralize it if
necessary.
It is sometimes necessary to use solvents when the surfaces to be painted are streaked
with grease or oil. In this case a suitable organic solvent should be applied. The operation
should be carried out with the aid of clean brushes or rags and clean solvent.
All the legal specifications in connection with solvents etc. must be adhered to. The
OWNER/OWNER's Representative will be informed in advance of any toxicity or
flammability. All measures must be taken to prevent any risk of fire and to nick out any
possibility of poisoning (ventilation). The Contractor will provide drip collectors to keep
the environment free of pollution.
The Contractor must have the equipment necessary for the removal of asphalt from the
pipe without damaging the latter (scratching, impact, etc,). The Contractor undertakes to
carry out the work in accordance with an approved procedure.
8.0 METALLISATION
Metallization is carried out as rapidly as possible after blasting in order to limit corrosion
of the pipes (max. 3 hours later). With metallization, a surface preparation degree Sa 3 is
compulsory. The roughness of the blasted surfaces should be from 25 to 50µ R Max.
The metallizing is always carried out on dry parts in good weather conditions
(maximum
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 10 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
The sealant must be thinned and applied as per the present specifications. A visual
inspection whereby the sealant completely covers the metallization will suffice here.
When evaluating the metallization, a negative deviation from the minimum coating
thickness, to 80 µ for 20% of the measurements will be permitted.
All preparatory work and painting may only he carried out in dry weather and at a
minimum temperature of 10C, except for special eases requested by the OWNER's
Representative.
Unless otherwise stipulated in the specifications of the paint supplier, application of the
paint is forbidden if it is forecast that the temperature will fall to below 0C before the
paint is dry. The temperature of-the surface to be painted must be at least 3°C higher
than the dew point of the ambient air. Application of the paint is also not permitted if
there is a danger that the coat of paint will not be dry before dew or condensation sets in.
If the temperature of the surface to be painted is higher than that described by the
supplier.
In rain, snow, mist or fog or when the relative humidity is higher than 80 %.
Coats that have not yet dried and have been exposed to frost, mist, snow or rain and
might thereby be damaged must be removed after drying and the surfaces must be
repainted at the expense of the Contractor.
The first coat of paint must be applied maximum 3 hours after the preparation of the
surface of the relative humidity of the air is between 50% and 80%. This time span may
be increased to 6 hours if the relative humidity is less than 50%. In all cases, the
preparation of the surface must exhibit degree Sa 3 and at the very least the appearance
of degree Sa 2 ½ at the time of painting.
The coats of paint may only be applied on carefully cleaned surfaces that must be dry and
free of grease and dust.
Painting may be carried out when the Contractor can be sure that the instructions of the
paint supplier have been scrupulously followed with regard to the parameters in the
following (non-exhaustive) list:
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 11 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Ambient temperature.
Surface temperature.
Relative humidity.
Dew point.
Drying times.
The Contractor must in this respect be able to produce the instructions for the paint on
the site. The OWNER/CONSULTANT will guarantee 100% supervision in this regard during
the execution of the work.
In addition, the paintwork may only be carried out to a minimum ambient temperature of
5°C and/or to a maximum relative degree of humidity of 85 %. Application of the paint is
also not permitted if there is a danger that the coat of paint will not be dry before dew or
condensation sets in.
Manufacturers shall furnish the characteristics of all paints indicating the suitability for the
required service conditions. Primer and finish coats shall be of class-I quality and shall
conform to the following:
a) Primer (P-1)
b) Primer (P-2)
c) Primer (P-3)
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 12 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Type and Composition Single Pack, Synthetic medium, pigmented with zinc
phosphate.
d) Primer (P-4)
Type and Composition Two pack Poly vinyl butyral resin medium cured with
phosphoric acid solution pigmented with zinc tetroxy
chromate.
e) Primer (P-5)
Type and Composition Two packs, Polyamide cured epoxy resin medium
pigmented with zinc chromate.
f) Primer (P-6)
Type and Composition Two packs, Polyamide cured Epoxy resin medium
pigmented with zinc phosphate.
g) Primer (P-7)
Type and composition two pack Poly Polyamide cured epoxy resin medium
pigmented with micaceous iron oxide. Volume solids
7- 8%
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 13 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
h) Primer (P-8)
Type and Composition two pack. Polyamine cured epoxy resin pigmented
with Red oxide and Zinc phosphate.
i) Primer (P-9)
Epoxy based tie coat (suitable for conventional alkyd based coating prior to
application of acrylic polyurethane epoxy finishing coat)
Synthetic Enamel
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 14 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Type and Composition Single pack Chlorinated rubber based high build
pigmented with micaceous iron oxide.
Type and Composition Two pack. Polyamide cured epoxy resin medium
suitably pigmented.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 15 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Type and Composition Two pack, Polyamine cured epoxy resin blended with
Coal Tar.
Type and Composition Two packs, self-cured Ethyl silicate solvent based
Inorganic Zinc coating.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 16 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Type and Composition Duel container (paste & medium). Heat resistant spec
varnish medium combined with aluminium flakes.
Type and Composition Single pack Silicone resin based with aluminium flakes.
DFT 25 microns/coat
Notes:
4 All primers and finish coats should be cold cured and air-drying unless otherwise
specified.
5. Technical data sheets for all paints shall be supplied at the time of submission of
quotations.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 17 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
6. In case of use of epoxy tie coat, manufacturer should demonstrate satisfactory test
for inter coat adhesion. In case of limited availability of epoxy tie coat (P-9)
alternate system may be used taking into the service requirement of the system.
7. In case of F-6, F-9, F-1 1 & F-1 2 Finish Coats, No Primer are required.
MANUFACTURERS
The paints shall conform to the specifications given above and Class-I quality in their
products range of any of the-following manufacturers:
STORAGE
All paints and painting material shall be stored only in rooms to be provided by contractor
and approved by OWNER/ OWNER 's Representative for the purpose. AlI necessary
precautions shall be taken to prevent fire. The storage building shall preferably be
separate from adjacent, building.
A signboard bearing the words given below shall be clearly displayed outside:
PAINT STORAGE No NAKED LIGHT highly -inflammable
i) For identification of pipelines, the color code as per Table -1 shall be used.
ii) The color code scheme is intended for identification of the individual group of the pipeline.
The system of color coding consists of a ground color and color bands superimposed on it.
iii) Colors (Ground) as given in Table-2 shall be applied throughout the entire length of
uninsulated pipes, on the metal cladding & on surfaces. Ground color coating of minimum
2m length or of adequate length not to be mistaken as color band shall be applied at
places requiring color bands. Color bands shall be applied as per approved procedure.
V) Line coating shall meet DIN 30670 standard for external coating and API 5L RP – 2
for internal coating.
VI) The thickness for the epoxy should be 180 microns, adhesive 200 microns and
balance should be PE
VII) The minimum coating thickness on weld seam shall be 3.2 mm and minimum
coating thickness on body should be 3.2.
VIII) Minimum thickness for liquid epoxy for internal coating should be 100 ± 20
microns.
Max design temperature for coating should be considered +80 ºC
COLOR CODE:
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 18 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
IDENTIFICATION SIGN
i) Colors of arrows shall be black or white and in contrast to the color on which they
are superimposed.
ii) Product names shall be marked at pump inlet, outlet and battery limit in a suitable
size as approved by OWNER.
a) Color Bands
IDENTIFICATION OF EQUIPMENT
All equipment shall be stenciled in black or white on each vessels, column, equipment,
and painting as per approved procedure.
In addition to above. record should include type of shop primer already applied on
equipment e.g. Red oxide zinc chromate or zinc chromate or Red lead primer etc.
Any defect noticed during the various stages of inspection shall be rectified by the
contractor to the entire satisfaction of OWNER/ OWNER's Representative before
proceeding further. Irrespective of the inspection, repair and approval at intermediate
stages of work. Contractor shall be responsible for making good any defects found during
final inspection/guarantee period/defect liability period as defined in general condition of
contract. Dry film thickness (DFT) shall be checked and recorded after application of each
coat and extra coat of paint should be applied to make-up the DFT specified without any
extra cost to OWNER.
PRIMER APPLICATION
Dry film thickness of each coat, surface profile gauge for checking of surface
profile in case of sand blasting. Holiday detectors and pinhole detector and
protector whenever required for checking in case of immerse conditions.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 19 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
iii. Final Inspection shall include measurement of paint dry film thickness, check of
finish and workmanship. The thickness should be measured at as many points/
locations as decided by OWNER/ OWNER's Representative and shall be within
+10% of the dry film thickness.
iv. The contractor shall produce test reports from manufacturer regarding the quality
of the particular batch of paint supplied. The OWNER shall have the right to test
wet samples of paint at random for quality of same. Batch test reports of the
manufacturer's for each batch of paints supplied shall be made available by the
contractor.
PAINT SYSTEMS
The paint system should vary, with type of environment envisaged in and around the
plants. The types of environment as given below are considered for selection of paint
system. The paint system is also given for specific requirements.
Notes 1. Primers and finish coats for any particular paint systems shall be from
same manufacturer in order to ensure compatibility.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 20 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Table – 1
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 21 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Table 2
1.1 -Do- -10 to SSPC-SP-3 One One coat F-4 175 Primer
20 coat P-2 65 microns/ and Finish
50 coat (min) coat can
microns Two coats F- be applied
/ coat 3, 30 at
(min) Microns/coat ambient
(min) temp.
1.2 -Do- 21 to SSPC-SP-6 Two Two coats of 90 -
60 coats P- F-1, 20
1, 25 microns/coat
microns/ (min)
coat
(min.)
1.3 -Do- 61 to SSPC-SP-6 Two Two coats of 150 -
80 coats P- F-13, 25
3, 50 microns/coat
microns/ (min)
coat
(min)
1.4 -Do- 81 to SSPC-SP-6 Covered Three coats 60 Paint
250 in Finish of F-11, 20 application
coat microns/ at
coat (min) ambient
temp.
curing at
elevated
temp.
during
start-up.
1.5 -Do- 251 to SSPC-SP-10 Covered Three coats 60 -do-
400 in Finish of F-12, 20
coat. microns/
coat (min)
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 22 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Table- 3
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 23 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Table – 4
1.1 -do- -10 to SSPC-SP-3 Two coats Two coats 160 Primer
60 P-2, 50 F- and Finish
micron/ 3, 30 coat
coat Microns/coa applicatio
(min) t n
(min.) at
Ambient
temp.
1.2 do - 61 to SSPC-SP-10 Two coats Two coats of 270 -do-
80 P-5. 35 F-6, 100
Microns. Microns/Coa
coat t
(Min.) (min.)
1.3 - do - 81 to SSPC-SP-I0 One coat - 85 Paint
400 F-9, 83 applicatio
Microns/ n
Coat(Min. at
) Ambient
temp.
Primer is
acting
as primer
cum finish
coat.
1.4 - do - i) SSPC-SP- One coat One coat of 95 Paint
Upto 10 F-9, 6.5 F-2. 30 applicatio
80 microns / Microns/coa n
coat (Min) t at
(min.) ambient
temp.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 24 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
Neither the environment of the site nor the marking labels of devices may be covered
with paint and they must be kept free of paint splashes. To this end, it is advisable to use
removable masking tape.
Paint splashes, leaks, etc. on any adjacent installations such as measuring apparatus,
valves, pipes. Sources of light, insulation, heat insulators, walls, concrete, etc, must
immediately be wiped up and the damage repaired before the paint is dry.
Otherwise, the OWNER will be obliged to have the cleaning carried out at the expense of
the Contractor. The paint recipient will only be opened at the time of use (unless
otherwise specified by the manufacturer).
The product will be mixed in the recipient with the aid of suitable tools and thus
homogenized.
Normally, three methods of application will be used on the construction site for the paint
products. i.e. with a brush, with a roller or with a spray gun.
The brush method makes it possible to obtain good penetration of the paint over
irregularities in the metal.
Only this method will be used for application of the base coats, for retouching and for
protrusions, welded areas, riveted joints or bolted joints:
The roller method may be used on large flat surfaces for the intermediate and topcoats.
The spray gun method must be used in accordance with the instructions of the
manufacturer and carried out by qualified personnel.
The Contractor must guarantee that all safety measures have been taken for such work.
The spray gun method may only he used on site for places that arc difficult to reach with
the brush. In this case, a request must be made to the OWNER/ OWNER's Representative
for a deviation.
All paintwork will be carried out with good brushes or rollers that are suitable for the type
of paint being used and for the form of the material to be painted and fitted with short
handles. The maximum length of the brush and roller handles will be 50 cm; longer
handles may only be used for places that are absolutely inaccessible. The maximum width
of a brush will be 13 cm.
Application of the paint will be carried out in accordance with best practice in order to
obtain a homogeneous and continuous layer. The OWNER or the Approved Supervisory
body demands that painting of a layer will only be started after acceptance by them of
the surface preparation or of the previous layer of paint.
The layers of paint must have a uniform thickness. They must he spread in such a way
that all concave parts are dried out and that the surface is completely covered and has a
glossy appearance without leaving brush marks and without exhibiting bubbles, foam,
wrinkles, drips, craters, skins or gums that arise from weathered paint,
Each layer must have the color stipulated in the tables of the present specifications, which
clearly differs from the previous layer, taking account of the Color of the top layer, all of
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 25 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
which for the purpose of being able to identify the number of coats and their order of
sequence. If the color of the coats is not mentioned in the tables the color difference in
consecutive coats must, if possible, he at least 100 RAL. The color of the top layer is
given in the table.
The coating power should be such that the underlying layer is not visible. Only 1 layer per
day may be applied, unless otherwise specified by the OWNER or the Approved
Supervisory Body.
The drying times prescribed by the paint manufacturer must be strictly observed in
relation to the environmental conditions before proceeding with the application of the
next layer.
The dry coating thickness indicated in the description of the paint systems are minimum
thickness. In this connection, the Contractor is obliged to contact the paint manufacturer
and conform to his guidelines. The Contractor must respect the thickness specified by the
supplier.
In the case of works being carried out in a workshop, the metal structures will be
surrounded by ventilated contraction film that prevents damage during transportation.
This film may only be applied after complete polymerization of the paint.
The Contractor will provide system 02 over the entire length of the pipes above ground
and below ground and up to a height of 20 cm and a depth of 40 cm. perpendicular to the
ground level mark. In each case, he must ensure that the jointing below the asphalt is in
good condition and assures' faultless adhesion. He will apply the following products over
the entire surface area, prepared in accordance with is Sa 3:
3) He will then apply the other coats of system 01a to the surface section and thus
cover the reinforced polyester with about 5 cm.
4) For new constructions, the polygon primer will be applied to PE and then
subsequently processed as described under point 2.
Mounting, maintenance and dismantling of scaffolding for carrying out adaptation and/or
paintwork to surface gas pipes or gas transport installations in use;
The Contractor will specify the cost of scaffolding in the price list.
The supplementary rental price for delays attributable to the Contractor will be
charged to him:
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 26 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
In his price quotation the Contractor should present the OWNER with diagrams of the
scaffolding that he intends to install for carrying out the works of the OWNER.
1.12.1 The Contractor is responsible for checking the weather conditions to ascertain whether
the paintwork can be carried out within the standard specifications.
The Contractor should have the required calibrated monitoring apparatus for this purpose
on site (with calibration certificates). The personnel who will have to use this apparatus
should have the training for this purpose.
The OWNER or his representative and possibly the approved supervisory body indicated
by the OWNER will maintain supervision during the works and inspect the works with
random checks. A daily report will be drawn up in relation to the department that
maintains supervision of these works.
The supplementary inspection and the supervision by the OWNER or the approved
supervisory body do not diminish in any way the liability of the Contractor. The proper
execution of the work and the materials used may be checked at any time.
At the start of the works. The OWNER or the approved supervisory body will indicate a
few surfaces that the Contractor will prepare and cover in accordance with the recognized
method of operation under the inspection and to the satisfaction of all parties; the
OWNER or his representative, the approved supervisory body, the contractor and possibly
the paint manufacturer. These reference surfaces will serve as a point of comparison for
the good adhesion of the paint on the installations as a whole. The parties will together
work out a system for the identification of these surfaces in order to be able to monitor
the conditions of the coatings over time. If the paintwork on a section of the installations
is in a worse condition than the reference surfaces, the Contractor may be obliged to
treat these parts again.
If on delivery of the works no agreement can be reached between the Contractor and the
OWNER regarding the conformity of the works to the requirements of these specifications,
an Approved Supervisory Body will he Called in. The Approved Supervisory Body will then
carry out inspections' on site whereby the following assessment criteria wilt be used:
The Swedish standards ISO 8501-1 1988 SS 05.5900 concerning the degree of
cleanliness of the areas derusted by blasting, by machine or by hand.
The wet film thickness of the paint will be measured in accordance with ISO 2808 or
ASTM DI 212;
The dry layer thickness of the film will be measured electronically, will complete
statistical information. in accordance will, ISO 2808 or ASTM D 1186.
The thickness of each layer will be measured in accordance with ISO 2808. ASTM 4138
or DIN 50986.
Adhesion tests will be carried out in accordance with ISO 2409. ASTM 3359 or DIN
53151.
Traction tests will he carried out in conformity with ISO 4624 or ASTM D 4541.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 27 of 28
STANDARD SPECIFICATION DOCNO: VPC-SS-PI-0008
FOR PAINTING Rev No : 00
The non-porosity will be measured with a test tension depending on the type of coating,
the layer thickness and after consultation with the Paint manufacturer.
Any defects in the paint film may be inspected visually by means of a magnifying glass
or microscope. If necessary a photographic report may be drawn up in accordance with
ASTM Standard D 4121-82.
The final judgment of the Approved Supervisory Body is irrevocable and binding for the
Contractor and the OWNER. In the event of non-conformity of the works with the criteria
of these specifications, all costs arising from the inspection by the Approved Supervisory
Body shall be borne by the Contractor.
1.12.4 Guarantee
a) General Principles
The Contractor will carry out the requested repair work as promptly as possible.
FORMAT NO. VPC-SS-PI-0008 R0 Copyright VCS Project – All rights reserved Page 28 of 28
INSPECTION AND TEST PLAN – BALL VALVE VPC-PL-ITP-007
P - Perform,
RW - Random Witness [As specified or 10% (min.1 no. of each size and type of Bulk items)],
R - Review,
W - Witness (Give due notice, work may proceed after scheduled date).
2. This document describes the generic test requirements. Any additional test or Inspection scope if specified/required in contract documents shall also be
Applicable (unless otherwise agreed upon).
3. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred there in /Job Specification /Approved Documents.
4. For orders placed on stockist, items shall be accepted based on manufacturer's TC with EN310204 type 3.2 certification from approved suppliers.
INSPECTION AND TEST PLAN – CHECK, GATE & GLOBE VALVES
VCS-PL-ITP-008
UT Ultrasonic Testing
1.0 SCOPE:
This Inspection and Test Plan covers the minimum testing requirements of Valves
SCOPE OF INSPECTION
QUANTUM OF
SL.NO. STAGE/ACTIVITY CHARACTERISTICS RECORD
CHECK
SUB
SUPPLIER VCS/TPIA
SUPPLIER
1.0 Procedure
As per PR /
Body and Bonnet Radiography Films and
2.3 Purchase H R R
Castings Examination report
Specification
Test
2.4 Bars for Trim material Chemical Analysis Each Heat Certificates& H R -
Lab Report
Performance , Test
2.6 Actuators as applicable Statutory Certificates as 100% Certificates& H H R
applicable Lab Report
Machining of Inspection
3.2 Visual / Dimension 100% - H -
components Reports
SCOPE OF INSPECTION
QUANTUM OF
SL.NO. STAGE/ACTIVITY CHARACTERISTICS RECORD
CHECK
SUB
SUPPLIER VCS/TPIA
SUPPLIER
Inspection RW
4.4 PMI Check Chemical As per Spec. - H
Report
Stamping of
Valves H
Stamping Of Accepted Inspection
4.6 Final Stamping which are - H (Note -1)
Valves witnessed Report
by VCS/TPIA.
SCOPE OF INSPECTION
QUANTUM OF
SL.NO. STAGE/ACTIVITY CHARACTERISTICS RECORD
CHECK
SUB
SUPPLIER VCS/TPIA
SUPPLIER
5.0 Painting
P - Perform,
RW - Random Witness [As specified or 10% (min.1 no. of each size and type of Bulk items)],
R - Review,
W - Witness (Give due notice, work may proceed after scheduled date).
1. For Non NACE & Non Hydrogen service Carbon Steel Valves up to size 12" will be accepted on review of Supplier Test Certificates. Supplier Test
Certificate to be reviewed by VCS /TPIA.
2. This document describes the generic test requirements. Any additional test or Inspection scope if specified/required in contract documents shall also be
Applicable (unless otherwise agreed upon).
3. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred there in /Job Specification /Approved Documents.
CITY GAS DISTRIBUTION PROJECT AT NORTH
PROJECT:
GOA
CLIENT: GOA NATURAL GAS PRIVATE LIMITED
CONSULTANT: VCS QUALITY SERVICES PVT. LTD.
22,Sarvodaya
1 Tata Projects Ltd. 0265-2392863 0265-2785952
Society,Nizampura,Baroda-390002
CHECKLIST – TECHNICAL
Compiled by
S.NO. Requirements
Bidder(Tick)
COMPLIANCE STATEMENT
Bidder’s
S.No Requirement
Confirmation
NOTES
1- Bidder confirms that apart of from the deviations/exceptions/clarifications listed above, the bid is in full
compliance with Inquiry requisition.
2- Bidder shall submit this sheet duly filled up and signed by him along with his bid. In case there is no
deviation, then also supplier shall submit this sheet along with his bid indicating NIL deviation.
Successful Bidder shall submit four copies unless noted otherwise, each of the following:
1. Inspection & test reports for all mandatory tests as per the applicable code as well as test reports for any
supplementary tests, in nicely bound volumes.
2. Filled in Quality Assurance Plan (QAP) & GAD for Purchaser's/ Consultant's approval. These QAPs shall be submitted
in two copies within 05 days from LOI/ FOI.
3. Detailed completion schedule activity wise (Bar Chart), within one week of placement of order.
Note : All drawings, instructions, catalogues, etc., shall be in English language and all dimensions shall be metric
U U
units.
INSTRUCTION TO BIDDERS
1. Bidder to note that no correspondence shall be entered into or entertained after the bid submission.
2. Bidder shall furnish quotation only in case he can supply material strictly as per this Material
Requisition and specification/data sheet forming part of Material Requisition.
3. If the offer contains any technical deviations or clarifications or stipulates any technical specifications (even
if in line with MR requirements) and does not include complete scope & technical / performance data
required to be submitted with the offer, the offer shall be liable for rejection.
4. Bidder must submit all documents as listed in checklist with his offer.
5. Supplier must note that stage wise inspection for complete fabrication, testing including the raw material
inspected to be carried out.
6. Vendors for bought out items to be restricted to the approved vendor list attached with bid document.
Approval of additional vendor if required, for all critical bought out items shall be obtained by the supplier
from the purchaser before placement of order. Credentials/PTR of the additional vendor proposed to be
submitted by supplier for review and approval of Purchaser/ Purchaser’s representative
LIST OF SPARES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
REV
REFERENCE LIST
DATE
Contact No. thk
16.10.2020
DESCRIPTION
ISSUED AS STANDARDS
REFERENCE LIST
JR
PREP
Bidder’s Signature with stamp
GS
CHK
HK
APPR
VCS-SD-RL-001
PROJECT NUMBER: 1023
ABBREVIATION
BS British Standards
[Xx] [Description]
[Xx] [Description]
[Xx] [Description]
Page 2 of 37
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
TABLE OF CONTENTS
1. INTRODUCTION........................................................................................4
2. CODES AND STANDARDS ..........................................................................4
3. MATERIAL SPECIFICATIONS.......................................................................4
4. CLASS DESIGNATION CODE.......................................................................4
5. PIPELINE .................................................................................................5
6. PIPES......................................................................................................5
7. FITTINGS ................................................................................................5
8. BENDS ....................................................................................................6
9. FLANGES .................................................................................................6
10. GASKETS.................................................................................................7
11. BOLTING & THREADS................................................................................7
12. THREAD SEALANT.....................................................................................7
13. VALVES ...................................................................................................7
14. QUICK OPENING END CLOSURE .................................................................9
15. HYDROTESTING VENTS AND DRAINS ..........................................................9
16. PIPELINE SPECIATLITY ITEMS ....................................................................9
17. INSULATING GASKET, SLEEVE AND WASHER ...............................................9
18. CHARPY V-NOTCH TEST .......................................................................... 11
Page 3 of 37
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
1. INTRODUCTION
This specification cover minimum requirements for the material specification for pipe,
fittings, flanges, line blinds, bolts, gaskets, and valves that shall be used for natural gas
pipeline and associated facilities in accordance with ASME B31.8, OISD-226 and PNGRB
guideline
This specification also defines, by piping class for each listed service, and defines the
pressure/temperature limitations within which they may be used.
This specification shall be read in conjunction with various codes and standards as
applicable.
2.1 Pipeline and pipeline terminal facilities envisaged as part of this project shall be designed
and engineered primarily in accordance with the provisions of the latest edition of the
following codes:
2.2 All codes, standards and specifications referred herein shall be the latest edition of such
documents.
2.3 For sake of brevity the initials of the society to which the codes are referred may be
omitted in the specifications, for example, B16.5 is a code referring to ASME A106 is a code
referring to ASTM.
2.4 In addition to this PMS, various piping and pipeline materials shall also be applicable.
3. MATERIAL SPECIFICATIONS
Individual piping class has been generally designed to cover a set of service operating
within pressure-temperature consideration as per ASME B16.5/ B16.34 or part of it.
Deviations of material from class specifications may occur due to specific design conditions
and/or availability. These deviations are permissible if they equal or better the individual
class requirements and shall be subjected to approval on case-to-case basis.
The piping class designation shall generally consist of three digits made up of a letter,
number & letter e.g. 15HC, 15HLT, 30HC, 30 HLT, 60HC etc. as follows:
Document No. Rev
Page 4 of 37
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
15 - 150 Class
30 - 300 Class
60 - 600 Class
The first alphabet indicates differences in the specifications within the same class rating
and material, e.g. H stands for Hydrocarbon, etc.
5. PIPELINE
5.1 Line pipe material grade and wall thickness details are indicated in PMS.
6. PIPES
6.1 Carbon steel pipe shall be made by open hearth, electric furnace or basic oxygen process
only. The steel used shall be fully killed and made with fine grain structure. The grade and
wall thickness of various sizes of pipes shall be as per piping material specification for the
applicable class.
6.2 Pipe dimensions shall be in accordance with ASME B 36.10 for carbon steel ASTM standard
pipes & API 5L for carbon steel API 5L grade pipes.
6.3 All pipe threads shall conform to American Standard taper as per ASME B 1.20.1 NPT,
unless otherwise specified.
6.4 For butt weld end, bevel shall be in accordance with API specification 5L or ASME B16.25 as
applicable.
7. FITTINGS
7.1 Fully killed carbon steel shall be used in the manufacture of fittings. The fitting shall have
carbon equivalent not exceeding 0.45, based on check analysis.
7.2 Threaded joints, if used, shall conform to American Standard taper as per ASME B1.20.1
NPT.
7.3 Dimensions of socket welded/screwed fittings shall conform to ASME B 16.11. Swage shall
be as per BS 3799.
Page 5 of 37
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
7.5 Bore of socket welded fittings shall suit outside diameter (OD) of pipe and its thickness.
7.6 Butt welding ends shall conform to API specification 5L or ASME B 16.25 as applicable. In
case of difference in thickness of matching ends, requirements of ASME B 31.4 shall apply.
7.7 Integrally reinforced forged branch fittings such as Sockolet, Weldolet etc. shall be as per
MSS-SP-97. Fittings not covered in ASME B16.9 and MSS-SP-97 shall conform to
manufacturer’s standard.
8. BENDS
8.1 Unless otherwise specified for process piping, elbow of radius R = 1.5 D shall only be used.
8.2 In order to accommodate changes in vertical and horizontal alignment in piggable section
of pipeline, Elastic bends/ Cold field bends/ Hot formed long radius bends shall be used.
D = Specified Outside Diameter
Long Radius Bend shall be used only when indicated in AFC drawing.
9. FLANGES
9.1 Pressure Temperature rating of flanges shall conform to B16.5/ MSS-SP44/ B16.47 Series
A, as applicable.
9.2 Dimensions of flanges shall be in accordance with B16.5/ MSS-SP44/ B16.47 Series A, as
applicable.
9.3 Neck of weld neck (WN) flanges shall suit pipe bore and thickness.
9.4 Bore of socket welded (SW) flanges shall suit pipe O.D. and its thickness.
9.5 Threads for screwed flanges, if used, shall conform to American Standard taper as per
ASME B 1.20.1 NPT.
9.6 Sizes for blind flanges shall be indicated by nominal pipe size.
9.7 Unless specified otherwise in Piping Material Specification the flange face finish shall be as
per ASME B16.5.
9.8 Butt welding ends of WN flanges shall conform to ASME B 16.25.
9.9 Spectacle blind/spacer & blinds shall be in accordance with ASME B 16.48/ manufacturer’s
standard.
Page 6 of 37
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
10. GASKETS
10.1 Spiral wound metallic gasket with Graphite filled winding with SS304 inner ring and CS
outer ring and shall conform to ASME B 16.20/ API 601.
11.1 Nuts for stud bolts shall be American Standard Hexagon Heavy Series and double
chamfered.
11.2 Dimension and tolerances for stud bolts and nuts shall be as per ASME B 18.2.1 and 18.2.2
with full threading to ASME B 1.1 Class 2A thread for bolts and Class 2B for nuts. Diameter
and length of stud bolts shall be as per ASME B 16.5/ASME B16.47 with full threading.
11.3 Threads for nuts shall be as per ASME B 1.1 as follows,
11.4 Threads for stud bolts shall be as per ASME B 1.1, as follows:
11.5 Threads for threaded pipe, fitting, flanges and valve shall be in accordance with B 1.20.1
taper threads, unless specified otherwise.
11.6 Heads of jack screws shall be heavy hexagonal type. Jack screw end shall be rounded. Stud
bolts shall be fully threaded with two hexagonal nuts.
12.1 Threaded joints shall be made with 1" wide PTFE jointing tape.
13. VALVES
13.1 Valve ends shall be as per valve data sheets for various piping class.
13.2 Sectionalizing valves, Block valves and other isolation valves installed on the main pipeline
shall be ball valves with butt welding ends. All inline isolation valves on the mainline
(pipeline) shall be full bore valves to allow smooth passage of cleaning as well as intelligent
pigs.
13.3 All buried valves shall be provided with stem extension, sealant, vent/drain and shall have
butt welded ends as per relevant specification/ data sheet.
Document No. Rev
Page 7 of 37
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
13.4 Flange dimensions and face finish of flanged end valves shall conform to clause 9.0 of this
specification.
13.5 Butt welding ends of Butt Welded valves shall conform to ASME B 16.25.
13.6 Face to face and end to end dimensions shall conform to applicable standards.
13.7 Valves shall conform to following standards unless specified otherwise in piping material
specification for various piping class.
Flanged/Socket Welded end valves (1½" and below)
For ANSI class 150 and 300 -Hand wheel operated for size ≤ 12" NB.
Gear operated for size ≥ 14" NB.
For ANSI class 600 -Hand wheel operated for size ≤ 10" NB.
Gear operated for size ≥ 12" NB.
For ANSI class 150, 300, 600 and 900 -Hand Wheel operated for all size
For all ANSI class - Wrench operated for size ≤ 4" NB.
Gear operated for size ≥ 6" NB.
Page 8 of 37
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
Actuated valves shall be as per P & IDs. The actuator shall have provision for remote
operation as per P & IDs. All Actuated valves shall have additional provision of hand wheel
operation.
Quick opening end closure to be installed on scraper traps shall be designed in accordance
with Section VIII of ASME Boiler and Pressure Vessel Code and equipped with safety locking
devices in compliance with Section VIII, division 1, UG-35.2 of ASME Boiler and Pressure
Vessel Code.
In terminal piping, high point vents and low point drains required for the purpose of hydro
testing shall be of size 0.75". These vents & drains shall consist of gate valves with blind
flange assembly.
Pipeline specialty items viz. scraper traps, flow tees, insulating joints; LR bends etc. shall
be as per data sheets and specification.
For Mainline Items, corrosion allowance shall be as per data sheet
The insulating gasket shall consist of a PTFE (Teflon) spring-energized face seal, or an
elastomeric O-ring, seated in an isolating laminate, which shall be permanently bonded to a
high strength metal gasket core. Due to this unique pressure activated sealing mechanism,
the gasket requires far less bolt stress to seal than any other gasket. The gasket inner
diameter shall be exactly matched to the flange bore to eliminate turbulent flow and flange
face erosion/ corrosion. The seal elements shall be replaceable in the reusable gasket
retainer. The core of gasket shall be made of annealed 316 stainless steel or other metals
including duplex and Inconel etc.
Page 9 of 37
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
The sealing elements shall intended to provide an impervious barrier through which no
contained media or other substance can penetrate. The composite retainer backing
material behind the seal remains uncontaminated and thus permanently holds the seal in
place in a static, fully encapsulated manner.
Isolating Sleeve
Spiral wound Mylar is a general purpose material recommended for bolting application
with flange temperatures below 250°F.
Material shall be fair resistance to crushing, cracking, breaking and thread pinch.
Butt weld (BW) ends of the insulating assembly shall be protected by metallic or high
impact plastic bevel protectors.
Page 10 of 37
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
compressive strength to permit proper tightening of flange bolts for leak proof joint.
The insulating material shall be suitable for pressure and temperature indicated in Data
Sheet under connecting pipeline details and shall be resistant to the fluid to be handled
through the pipeline.
I.D. and O.D. of insulating washers shall be designed to fit over insulating sleeves and
within spot faces on flanges.
After the hydrostatic test, insulating flange assembly shall be tested with air at 5 kg/cm 2
for 10 minutes. The tightness shall be checked by immersion or with a frothing agent. No
leakage shall be accepted.
Insulating gasket, sleeve and washer after the field hydrostatic test shall be tested for
dielectric integrity at 5000 V A.C., 50 Hz for one minute and the leakage current before
and after shall be equal. Testing time, voltage and leakage shall be recorded and certified.
The test shall be carried out in dry conditions.
All piping material like valves, fittings, flanges bolting etc. shall be Charpy impact tested.
Charpy V-notch impact tests are required for the base metal weld metal and heat-affected
zone (HAZ)
Page 11 of 37
CITY GAS DISTRIBUTION PROJECT OF
NORTH GOA
NON-CORROSIVE
CARBON PROCESS-FLAMMABLE Page 14 of
1 15HC 150 1.5 NON IBR
STEEL /NONFLAMMABLE, NON 38
LETHAL- HYDROCARBONS
LOW NON-CORROSIVE
TEMPER CARBON PROCESS-FLAMMABLE Page 19 of
2 15HLT 150 1.5
ATURE STEEL /NON-FLAMMABLE, NON 38
SERVICE LETHAL- HYDROCARBONS
NON-CORROSIVE
CARBON PROCESS-FLAMMABLE / Page 24
3 30HC 300 1.5 NON IBR
STEEL NONFLAMMABLE, NON of 38
LETHAL- HYDROCARBONS
LOW
FIRE WATER (ABOVE
TEMPER CARBON Page 30
4 30HLT 300 1.5 GROUND / UNDER
ATURE STEEL of 38
GROUND)
SERVICE
Page 12 of 37
PIPING MATERIAL SPECIFICATION (15HC)
16.1
PRESS 20.03 20.03 18.28 14.06 11.95 9.84 8.78 7.73
7
SERVICE
Natural Gas, Utilities (water, inst. air, plant air, nitrogen, carbon dioxide)
NOTES
1. All vents and drains shall be provided with gate valve with blind flange assembly
unless otherwise indicated in P&ID.
2. NDT of welds shall be as follows:
Radiography : All butt welds 100%
MPI : Socket welds 100%
3. Piping design as per ASME B 31.8, OISD 226 & PNGRB Guidelines
4. Charpy V notch test and hardness test shall be conducted for pipes, fittings and flanges at (-)
29°C.
5. All branch connections including vent, drain, pressure and temperature connection shall be
as per branch connection table.
6. For valves, refer valve data sheets.
Page 13 of 37
PIPING MATERIAL SPECIFICATION (15HC)
BRANCH TABLE
T 24
T T 20
T T T 18 B
T T T T 16 R
T T T T T 14 A
T T T T T T 12 N
T T T T T T T 10 C
T T T T T T T W 8 H
T T T T T T W W W 6
T T T W W W W W W W 4 P
T T T W W W W W W W W 3 I
T T T W W W W W W W W W 2 P
T T T T S S S S S S S S S 1.5 E
T T T S S S S S S S S S S S 1
T T T T S S S S S S S S S S S 0.75
T T T T S S S S S S S S S S S S 0.50
R U N P I P E
CODE DESCRIPTION
T TEES
W WELDOLETS
S SOCKOLETS
Page 14 of 37
PIPING MATERIAL SPECIFICATION (15HC)
PIPE GROUP
PIPE 00.500 00.750 S160 B-36.10 ASTM A 106 GR.B PE, SEAMLESS
FLANGE GROUP
150,
FLNG.SW 00.500 01.500 M B-16.5 ASTM A 105
RF/125AARH
ASTM A 105 150, RF/
FLNG.WN 2.000 24.000 M B-16.5
(Charpy) 125AARH
150, RF/
FLNG.BLIND 00.500 01.500 B-16.5 ASTM A 105
125AARH
ASTM A 105 150, RF/
FLNG.BLIND 00.500 24.000 B-16.5
(Charpy) 125AARH
ASME ASTM A 105 150, FF/
FLNG.FIG.8 00.500 08.000
B16.48 (Charpy) 125AARH
ASME ASTM A 105 150, FF/
SPCR&BLND 10.000 24.000
B16.48 (Charpy) 125AARH
FITTING GROUP
ASTM A 234
ELBOW.90 02.000 26.000 M B-16.9 BW, 1.5D
GR.WPB (Charpy)
Page 15 of 37
PIPING MATERIAL SPECIFICATION (15HC)
O'let
VALVES GROUP
Page 16 of 37
PIPING MATERIAL SPECIFICATION (15HC)
BOLT GROUP
BOLT:A193 GR.B7,
BOLT.STUD 00.500 48.000 B-18.2
NUT:A194 GR.2H
GASKET GROUP
B-16.20- SP.WND
GASKET 00.500 24.000 ANSI METTALIC WITH SPIRAL, 150
B16.5 GRAPHITE FILLER
B-16.20- SP.WND
GASKET 26.000 48.000 ANSI METTALIC WITH SPIRAL, 150
B16.47A GRAPHITE FILLER
Page 17 of 37
PIPING MATERIAL SPECIFICATION (15HLT)
TEMP -45 38 93
SERVICE
Natural Gas, Utilities (water, inst. air, plant air, nitrogen, carbon dioxide)
NOTES
1. All vents and drains shall be provided with gate valve with blind flange assembly unless
otherwise indicated in P&ID.
2. NDT of welds shall be as follows:
Radiography : All butt welds 100%
MPI : Socket welds 100%
3. Piping design as per ASME B 31.8 , OISD 226 & PNGRB Guidelines
4. Charpy V notch test and hardness test shall be conducted for pipes, fittings and flanges at (-)
45°C.
5. All branch connections including vent, drain, pressure and temperature connection shall be
as per branch connection table.
6. For valves, refer valve data sheets.
Page 18 of 37
PIPING MATERIAL SPECIFICATION (15HLT)
BRANCH TABLE
T 6
BRANCH PIPE
T T 4
T T T 3
T T T W 2
T T T T S 1.5
T T T S S S 1
T T T T S S S 0.75
T T T T S S S S 0.50
RUN PIPE
CODE DESCRIPTION
T TEES
W WELDOLETS
S SOCKOLETS
Page 19 of 37
PIPING MATERIAL SPECIFICATION (15HLT)
PIPE GROUP
PIPE 00.500 00.750 S160 B-36.10 ASTM A 333 GR.6 PE, SEAMLESS
PIPE 03.000 06.000 STD B-36.10 ASTM A 333 GR.6 BE, SEAMLESS
FLANGE GROUP
FITTING GROUP
ASTM A 350
ELBOW.90 00.500 00.75 B-16.11 SW, 6000
GR.LF2
ASTM A 350
ELBOW.90 01.000 01.500 B-16.11 SW, 3000
GR.LF2
ASTM A 420
ELBOW.90 02.000 6.000 M B-16.9 BW, 1.5D
GR.WPL6
ASTM A 350
ELBOW.45 00.500 00.75 B-16.11 SW, 6000
GR.LF2
ASTM A 350
ELBOW.45 01.000 01.500 B-16.11 SW, 3000
GR.LF2
ASTM A 420
ELBOW.45 02.000 6.000 M B-16.9 BW, 1.5D
GR.WPL6
ASTM A 350
T.EQUAL 00.500 00.75 B-16.11 SW, 6000
GR.LF2
ASTM A 350
T.EQUAL 01.000 01.500 B-16.11 SW, 3000
GR.LF2
ASTM A 420
T.EQUAL 02.000 6.000 M B-16.9 BW
GR.WPL6
Page 20 of 37
PIPING MATERIAL SPECIFICATION (15HLT)
ASTM A 350
T.RED 01.000 01.500 B-16.11 SW, 3000
GR.LF2
ASTM A 420
T.RED 02.000 6.000 M, M B-16.9 BW
GR.WPL6
REDUC.
ASTM A 420
CONC 02.000 6.000 M, M B-16.9 BW
GR.WPL6
O'let
VALVES GROUP
Page 21 of 37
PIPING MATERIAL SPECIFICATION (15HLT)
BOLT GROUP
BOLT:A320 GR.L7,
BOLT.STUD 00.500 6.000 B-18.2
NUT:A194 GR.4
GASKET GROUP
Page 22 of 37
PIPING MATERIAL SPECIFICATION (30HC)
SERVICE
Natural Gas, Utilities (water, inst. air, plant air, nitrogen, carbon dioxide)
NOTES
1. All vents and drains shall be provided with gate valve with blind flange
assembly unless otherwise indicated in P&ID
2. NDT of welds shall be as follows:
Radiography : All butt welds 100%
MPI : Socket welds 100%
3. Piping design as per ASME B 31.8 , OISD 226 & PNGRB Guidelines
4. Charpy V notch test and hardness test shall be conducted for pipes, fittings and flanges at
(-) 29°C.
5. Corrosion allowance of 1.5 mm has been considered for terminal piping.
6. All branch connections including vent, drain, pressure and temperature connection shall
be as per branch connection table.
7. For valves, refer valve data sheets as enclosed.
8. Design factor 0.5.
9. Ball Valve to be used in main pipeline shall have butt welded ends.
Page 23 of 37
PIPING MATERIAL SPECIFICATION (30HC)
BRANCH TABLE
T 42
T T 36
T T T 32
T T T T 30
T T T T T 24
T T T T T T 20
T T T T T T T 18 B
T T T T T T T T 16 R
T T T T T T T T T 14 A
T T T T T T T T T T 12 N
T T T T T T T T T T T 10 C
T T T T T T T W W W W W 8 H
T T T WT T T W W W W W W 6
T T T T W W W W W W W W W W 4 P
T T T W W W W W W W W W W W W 3 I
T T T W W W W W W W W W W W W W 2 P
T T T T S S S S S S S S S S S S S 1.5 E
T T T S S S S S S S S S S S S S S S 1
T T T T S S S S S S S S S S S S S S S 0.75
T T T T S S S S S S S S S S S S S S S S 0.50
R U N P I P E
CODE DESCRIPTION
T TEES
W WELDOLETS
S SOCKOLETS
Page 24 of 37
PIPING MATERIAL SPECIFICATION (30HC)
Upper Sch
Lower Dmn.
Size ./ Material (Charpy) Description
Item Size STD
(Inch Thk
(Inch)
) .
PIPE GROUP
PIPE 00.500 00.750 S160 B-36.10 ASTM A 106 GR.B PE, SEAMLESS
FLANGE GROUP
Page 25 of 37
PIPING MATERIAL SPECIFICATION (30HC)
Upper Sch
Lower Dmn.
Size ./ Material (Charpy) Description
Item Size STD
(Inch Thk
(Inch)
) .
FITTING GROUP
Page 26 of 37
PIPING MATERIAL SPECIFICATION (30HC)
Upper Sch
Lower Dmn.
Size ./ Material (Charpy) Description
Item Size STD
(Inch Thk
(Inch)
)
.
CAP 00.500 00.750 B-16.11 ASTM A 105 SCRF, 6000
O'let
MSS-
SOCKOLET 00.500 00.750 ASTM A 105 SW, 6000
SP97
MSS-
SOCKOLET 01.000 01.500 ASTM A 105 SW, 3000
SP97
M, MSS-
WELDOLET 02.000 08.000 ASTM A 105 (CHARPY) BW
XX SP97
VALVE GROUP
BODY-ASTM A
SW, 600, 3000,
VLV.GATE 00.500 01.500 API-602 105,TRIM-
STELLITED,STEM- 13% B-16.11
BS EN BODY-ASTM A
SW, 600, 3000,
VLV.GLOBE 00.500 01.500 1SO 105,TRIM-
STELLITED,STEM- 13% B-16.11
15761
BODY-ASTM A 216 FLGD, 300, B-
VLV.GLOBE 02.000 12.000 BS 1873 GR.WCB, TRIM- 16.5,
13% CR.STEEL RF/125AARH
BS EN SW, 600, 3000,
BODY-ASTM A 105,
VLV.CHECK 00.500 01.500 1SO
TRIM- STELLITED B-16.11
15761
Page 27 of 37
PIPING MATERIAL SPECIFICATION (30HC)
Upper Sch
Lower Dmn.
Size ./ Material (Charpy) Description
Item Size STD
(Inch Thk
(Inch)
)
.
BS EN BODY-ASTM A 105, SW, 600, B-
VLV.BALL 00.500 01.500 1SO TRIM-BODY SEAT - 16.5,
17292 RPTFE RF/125AARH
BODY-ASTM A 216
GR.WCC/A234 FLGD, 300,
VLV.BALL 02.000 24.000 API-6D GR.WPC,TRIM:SEAT: B-16.5,
AISI4140+0.003 RF/125AARH
"ENP/AISI410
BODY-ASTM A 216
GR.WCC/A234 GR. FLGD, 300,
VLV.BALL 26.000 30.000 API-6D WPC,TRIM: SEAT: B-16.47 A,
AISI4140 + 0.003"ENP/
RF/125AARH
AISI
4140
BODY-ASTM A 216
GR.WCC/A234 GR.
BW, 300, B-
VLV.BALL 02.000 30.000 M API-6D WPC,TRIM: SEAT : AISI
16.25
4140+0.003"ENP/AISI
410
BODY-ASTM A 216
BW, 300, B-
VLV.PLUG 02.000 02.000 M API-6D GR.WCB,PLUG: A216
16.25
GR.WCB + 0.003"ENP
BOLT GROUP
BOLT:A193 GR.B7,
BOLT.STUD 00.500 30.000 B-18.2
NUT:A194 GR.2H
GASKET
B-16.20- SP.WND
GASKET 00.500 24.000 ANSI METTALIC WITH SPIRAL, 300
B16.5 GRAPHITEFILLER
B-16.20- SP.WND
GASKET 26.000 30.000 ANSI METTALIC WITH SPIRAL, 300
B16.47A GRAPHITEFILLER
Page 28 of 37
PIPING MATERIAL SPECIFICATION (30HLT)
SERVICE
Natural Gas, Utilities (water, inst. air, plant air, nitrogen, carbon dioxide)
NOTES
a. All vents and drains shall be provided with gate valve with blind flange assembly unless
otherwise indicated in P&ID.
b. Piping design as per ASME B 31.8 , OISD 226 & PNGRB Guidelines
c. Flanged end shall be as per ASME B 16.5 for valve up to 24" (excluding 22"), for 22" as
per MSS-SP-44.
d. Impact testing is required at (-45) Deg C.
e. NDT of welds within terminal shall be as follows:
Radiography : All Butt welds 100%
MPI : Socket welds 100%
Page 29 of 37
PIPING MATERIAL SPECIFICATION (30HLT)
BRANCH TABLE
T 16
T T 14 B
T T T 12 R
T T T T 10 A
T T T T T 8 N
T T T T T T 6 C
T T T W W W
T 4 H
T T T W W W W W 3
T T T W W W W W W 2 P
T T T T S S S S S S 1.5 I
T T T S S S S S S S S 1 P
T T T T S S S S S S S S 0.75 E
T T T T S S S S S S S S S 0.50
R U N P I P E
CODE DESCRIPTION
T TEES
W WELDOLETS
S SOCKOLETS
Page 30 of 37
PIPING MATERIAL SPECIFICATION (30HLT)
Upper
Lower Sch.
Size Dmn. STD Material (Charpy) Description
Item Size /
(Inch
(Inch) Thk.
)
PIPE GROUP
PIPE 00.500 00.750 S160 B-36.10 ASTM A 333 GR.6 PE, SEAMLESS
PIPE 03.000 03.000 STD B-36.10 ASTM A 333 GR.6 BE, SEAMLESS
FLANGE GROUP
FLNG.BLIN
00.500 10.000 B-16.5 ASTM A 350 GR.LF2 300, RF/125AARH
D
ASME- B
FLNG.FIG.8 00.500 08.000 ASTM A 350 GR.LF2 300, FF/125AARH
16.48
SPCR&BLN ASME-
10.000 10.000 ASTM A 350 GR.LF2 300, FF/125AARH
D B16.48
FITTINGS
Page 31 of 37
PIPING MATERIAL SPECIFICATION (30HLT)
VALVE GROUP
BODY-ASTM A 350
GR.LF2,TRIM- SW, 600, 3000, B-
VLV.GATE 00.500 01.500 API-602
16.11
STELLITED,STEM- SS
BODY-ASTM A 350
BS EN ISO SW, 600, 3000, B-
VLV.GLOBE 00.500 01.500 GR.LF2,TRIM-
15761 16.11
STELLITED,STEM- SS304
BS EN ISO BODY-ASTM A 350 SW, 600, 3000, B-
VLV.CHECK 00.500 01.500
15761 GR.LF2,TRIM- STELLITED 16.11
BODY-ASTM A 350
SW, 600, 3000, B-
VLV.PLUG 00.500 01.500 BS-5353 GR.LF2,PLUG: A350
16.11
GR.LF2 + 0.003" ENP
BODY-ASTM A 352
FLGD, 300, B-
GR.LCB / A350
VLV.PLUG 02.000 10.000 API-6D 16.5,
GR.LF2,STEM-SS
RF/125AARH
304/SS316
BODY-ASTM A 352
GR.LCB/ ASTM
VLV.PLUG 02.000 10.000 API-6D BW, 300, B-16.25
A350GR.LF2,TRIM- SS
304/ SS316
BOLT & GASKET
BOLT:A320 GR.L7,
BOLT.STUD 00.500 10.000 B-18.2
NUT:A194 GR.4
B-16.20-
SP.WND METTALIC WITH
GASKET 00.500 10.000 ANSI SPIRAL, 300
GRAPHITEFILLER
B16.5
Page 32 of 37
PIPING MATERIAL SPECIFICATION (15FW)
TEMP 0 38 50 65
PRESS 18.9 18.9 18.9 18.9
NOTES
1.0 All vents and drains shall be provided with gate valve with blind flange assembly unless
otherwise indicated in P&ID.
2.0 Forgings are acceptable in Lieu of Plate material.
3.0 Sizes given in PMS are nominal bore for O.D. of IS 3589 pipes refer ANSI B36.10.
4.0 Butterfly Valves shall be lugged wafer type up to 24" and double flanged body for sizes
beyond 24".
5.0 Pipe thicknesses are job specific based on the soil properties of job site and depth of top of
pipe of 1.5m. No live load has been considered for calculation of pipe thickness. Live loads
wherever expected shall be suitably taken care of.
6.0 NDT of welds shall be as follows:
Radiography : All Butt welds 10%
MPI : Socket welds 10%
SPECIAL NOTES
Page 33 of 37
PIPING MATERIAL SPECIFICATION (15FW)
CODE DESCRIPTION
BRANCH TABLE
B
R
T 14 A
T R 12 N
T R R 10 C
T R R R 8 H
T P R R R 6
T R P R R R 4 P
T P R P R R R 3 I
T P P R P R R R 2 P
T T H H H H H H H 1.5 E
T T H H H H H H H H 1
T T T H H H H H H H H 0.75
T T T T H H H H H H H H 0.50
R U N P I P E
Page 34 of 37
PIPING MATERIAL SPECIFICATION (15FW)
Lower Upper
Item Sch/
Size Size Dmn. STD Material Description
Type Thk
(Inch) (Inch)
PIPE GROUP
NIPPLE 00.500 01.500 HVY VCS 'STD IS-1239 (BLACK) PBE, C.WELDED
FLANGE GROUP
FITTING GROUP
Page 35 of 37
PIPING MATERIAL SPECIFICATION (15FW)
Lower Upper
Item Sch/ Dmn.
Size Size Material Description
Type Thk STD
(Inch) (Inch)
FITTING GROUP
VALVES GROUP
BODY-ASTM A 105,TRIM-
SW, 800, 3000, B-
VLV.GATE 00.500 01.500 API-602 STELLITED,STEM-
16.11.
13%CR.STEEL
BODY-ASTM A 216
FLGD, 150, B-16.5,
VLV.GATE 02.000 24.000 API-600 GR.WCB,TRIM-
RF/125AARH.
13% CR.STEEL
BODY-ASTM A SW, 800, 3000, B-
VLV.GLOBE 00.500 01.500 BS-5352 105,TRIM- 16.11.
STELLITED,STEM-
BODY-ASTM A 216
FLGD, 150, B-16.5,
VLV.GLOBE 02.000 16.000 BS-1873 GR.WCB,TRIM-
RF/125AARH.
13% CR.STEEL
BODY-ASTM A SW, 800, 3000, B-
VLV.CHECK 00.500 01.500 BS-5352
105,TRIM- STELLITED 16.11.
BODY-ASTM A 216
FLGD, 150, B-16.5,
VLV.CHECK 02.000 24.000 BS 1868 GR.WCB,TRIM-
RF/125AARH.
13% CR.STEEL
Page 36 of 37
PIPING MATERIAL SPECIFICATION (15FW)
Lower Upper
Item Sch/
Size Size Dmn. STD Material Description
Type Thk
(Inch) (Inch)
VALVES GROUP
BOLT GROUP
BOLT:A193 GR.B7,
BOLT.STUD 00.500 14.000 B-18.2
NUT:A194 GR.2H
GASKET GROUP
B-16.21-
GASKET 00.500 14.000 IS-2712-GR.W/3 RING, 150, 2 MM
ANSI B16.5
TRAP/STRAINER GROUP
Page 37 of 37