0% found this document useful (0 votes)
420 views5 pages

Diesel Storage Hirarc 01

This document identifies hazards and risks associated with construction, use, and handling of diesel storage. It lists specific job activities and hazards for construction of a slab and erection of a skid tank. Controls are identified to lower the likelihood and severity of each hazard.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
420 views5 pages

Diesel Storage Hirarc 01

This document identifies hazards and risks associated with construction, use, and handling of diesel storage. It lists specific job activities and hazards for construction of a slab and erection of a skid tank. Controls are identified to lower the likelihood and severity of each hazard.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Form ref.no.

FC-STCC- HIRARC 004

SMART TECH CITY CONSTRUCTION SDN BHD


HAZARD IDENTIFICATION & RISK ASSESSMENT

Job / Activity Title: Construction, Use and Handling of Diesel Storage


HIRARC Reference No. FC-STCC- HIRARC 004 Prepared by: Reviewed by: Approved by:
Area

Project: P23 GOLF VILLA PHASE 2 Signature:

Company: SMART TECH CITY CONSTRUCTION SDN BHD Name: K. ESWARAN Mr. Du Zhi Qiang Mr. Ye Wen Chang
Name of Supervisor / Manager (Pic): FADLY & TAN Date: 5/30/2020 5/30/2020 5/30/2020
No. Job Sequence / Hazard Identified Classification Current Risk Likelihood Severity Risk Risk Legal & Other Residual Additional Urgency Action
Work Activities of Hazards Control Measures Score Level Requirement Risk Residual Risk Rating Risk Control of Action By

Risk Risk
(L) (S) (LXS) L S
Score Level
1 Construction of i. Hand injury. Physical i. Wear hand gloves. 2 2 4 Medium FMA Inappropriate/ 1 2 2 Low PPE briefing to 1 week Supervisor
slab (BOWEC) Incorrect PPE employees.
1986 used
OHSA
1994
ii. Eye injury due to Chemical ii. Use safety goggles 2 2 4 Medium Inappropriate/ 1 2 2 Low PPE briefing to 1 week Supervisor
splashes of concrete. Incorrect employees.
PPE used

iii. Trapping by concrete Physical iii. Concrete truck to 2 2 4 Medium None None 4 days Supervisor
truck. have audible
reversing alarm or
trucks to be
controlled by
banksman.

iv. Trapping of body parts Physical iv. Only competent 2 2 4 Medium None None 4 days Supervisor
when discharging. person shall control
the discharge device
of the truck.

2 Erection of skid i. Hand injury. Physical i. Wear hand gloves. 2 2 4 Medium FMA Inappropriate/ 1 2 2 Low PPE briefing to 1 week Supervisor
tank. (BOWEC) Incorrect PPE employees.
1986 used
OHSA
1994
ii. Snapping of lifting Physical ii. Inspect lifting sling 2 2 4 Medium Inappropriate 1 2 2 Low Ensure colour 1 week Supervisor
sling. regularly sling being used coded sling are
used &
adequate
supervision.
No. Job Sequence / Hazard Identified Classification Current Risk Likelihood Severity Risk Risk Legal & Other Residual Additional Urgency Action
Work Activities of Hazards Control Measures Score Level Requirement Risk Residual Risk Rating Risk Control of Action By

Risk Risk
(L) (S) (LXS) L S
Score Level
iii. Toppling of crane due Physical iii. Provide stable work 1 3 3 Medium None None 4 days Supervisor
to poor platform. platform or use steel
· Unstable work plates. ·
platform. Adequate rest for
· Lack of operator
concentration by · Ensure operators
operator due to fatigue. have valid
· competency
Incompetent operator certificates.
· Provide the
barricade around rig

iv. Toppling of rig can iv. Guidance of rig 1 3 3 Medium None None 4 days Supervisor
affect employees at movement by
nearby activities in the experienced
site. signalman.
· Alert nearby
employees by
whistle blowing.

v. Fall of person from Physical v. Provide work 2 2 4 Medium Failing to anchor 1 2 2 Low Provide 1 week Supervisor/
height. platform with safety harness induction to the Safety Officer
guardrail employees.
· Use safety
harness.

3 Construction of i. Eye injury due to Physical i. Use safety 2 2 4 Medium FMA Inappropriate/ 1 2 2 Low PPE briefing to 1 week Supervisor
bund wall and roof. splashes of concrete. spectacles. (BOWEC) Incorrect employees.
1986 PPE used
OHSA
1994

ii. Hand injury during Physical ii. Use hand gloves. 2 2 4 Medium Inappropriate/ 1 2 2 Low PPE briefing to 1 week Supervisor
handling of cement Incorrect employees.
bag. PPE used

iii. Fall of person from Physical iii. Provide work 2 2 4 Medium Failing to anchor 1 2 2 Low Provide 1 week Supervisor/
height. platform with safety harness induction to the Safety Officer
guardrail employees.
· Use safety
harness.

iv. Fall of material from Physical iv. Store material at the 2 2 4 Medium None None 4 days Supervisor
height. ground level or
secure it.
No. Job Sequence / Hazard Identified Classification Current Risk Likelihood Severity Risk Risk Legal & Other Residual Additional Urgency Action
Work Activities of Hazards Control Measures Score Level Requirement Risk Residual Risk Rating Risk Control of Action By

Risk Risk
(L) (S) (LXS) L S
Score Level
4 Handling and i. Hand injury. Physical i. Wear hand gloves. 2 2 4 Medium FMA Inappropriate/ 1 2 2 Low PPE briefing to 1 week Supervisor
storage of diesel. (BOWEC) Incorrect PPE employees.
1986 used
OHSA
1994
ii. Snapping of lifting Physical ii. Inspect lifting slings 2 2 4 Medium Inappropriate 1 2 2 Low Ensure colour 1 week Supervisor
slings. regularly. sling being used coded sling are
used &
adequate
supervisor

iii. Oil spillage during Physical iii. Provide dip tray. 2 2 4 Medium None None 4 days Supervisor
handling or storage.

iv. Fire hazards during Physical iv. Provide fire 2 2 4 Medium None 1 2 2 Low None 4 days Supervisor
handling. extinguisher.

· To install safety
signage’s such as
NO SMOKING,
HIGHLY
FLAMMABLE< NO
NAKED LIGHT.

v. Electrocution due to Electrical Elevated all electric 2 2 4 Medium None None 4 days Supervisor
cable lying on the cable above from the
ground. ground.

5 Dismantling of i. Hand injury. Physical i. Wear hand gloves. 2 2 4 Medium FMA Inappropriate/ 1 2 Low PPE briefing to 1 week Supervisor
roof and skid tank. (BOWEC) Incorrect PPE employees.
1986 used
OHSA
1994
ii. Snapping of lifting Physical ii. Inspect lifting sling 2 2 4 Medium Inappropriate 1 2 2 Low Ensure colour 1 week Supervisor
sling. regularly. sling being used coded sling are
used &
adequate
supervisor

iii. Toppling of rig due iii. Provide stable work 1 3 3 Medium None None
to :- platform or use steel
· Unstable work plates. ·
platform. Adequate rest for
· Lack of operator. ·
concentration by Ensure operators
operator due to fatigue. have valid
· competency
Incompetent operator certificates.
· Provide
barricade around rig
No. Job Sequence / Hazard Identified Classification Current Risk Likelihood Severity Risk Risk Legal & Other Residual Additional Urgency Action
Work Activities of Hazards Control Measures Score Level Requirement Risk Residual Risk Rating Risk Control of Action By

Risk Risk
(L) (S) (LXS) L S
Score Level
iv. Toppling of rig can Physical iv. Guidance of rig 1 3 3 Medium None None 4 days Supervisor
affect employees at movement by
nearby activities in the experienced
site. signalman.

v. Fall of person from Physical v. Provide work 2 2 4 Medium Falling to anchor 1 2 2 Low Provide 1 week Supervisor
height. platform with the harness induction to the
guardrail employees
· Use safety
harness.

vi. Fall of material from Physical vi. Store material at the 2 2 4 Medium None None 4 days Supervisor
height. ground level or
secure it.

6 Demolition of i. Eye injury during Physical i. Use safety 2 2 4 Medium FMA Inappropriate/ 1 2 2 Low PPE briefing to 1 week Supervisor
bund wall and slab. hacking. spectacles. (BOWEC) employees.
1986 Incorrect PPE
OHSA used
1994

ii. Dust Physical ii. Spray water to 2 2 4 Medium None None 4 days Supervisor
control dust
emission.

iii. Hand injury iii. Use hand gloves. 2 2 4 Medium Inappropriate/ 1 2 2 Low PPE briefing to 1 week
Incorrect employees.
PPE used

iv. Damage to Physical iv. Identify and relocate 2 2 4 Medium None None 4 days Supervisor
underground utilities. the underground
services.

v. Noise hazard during Physical v. Provide earplug. 2 2 4 Medium Inappropriate/ 1 2 2 Low PPE briefing to 1 week Supervisor
hacking Incorrect PPE employees.
used

7 Other work i. Toppling of rig can Physical i. Alert nearby 1 3 3 Medium FMA None None 4 days Operator/
activities within affect employees at employees by (BOWEC) 1986
the site. nearby activities in the whistle blowing. Supervisor
site. OHSA 1994

ii. Flying object can cause ii. Provide hoarding 1 3 3 Medium None None 4 days Operator/
injury to the public, around the work
employees from nearby area. Supervisor
activities of jobsite.
No. Job Sequence / Hazard Identified Classification Current Risk Likelihood Severity Risk Risk Legal & Other Residual Additional Urgency Action
Work Activities of Hazards Control Measures Score Level Requirement Risk Residual Risk Rating Risk Control of Action By

Risk Risk
(L) (S) (LXS) L S
Score Level
8 Other work i. Toppling of crane/ Fall Physical i. Alert nearby 1 3 3 Medium FMA None None 4 days Supervisor
activities from of crane boom employees by (BOWEC) 1986
neighboring sites. whistle blowing.
OHSA 1994

ii. Hit by flying objects. ii. Erection of hoarding 1 3 3 Medium None None 4 days Supervisor
to separate
neighbouring site
· Brief
our employees on
the potential hazards
of neighbouring site
what could affect us.

iii Flooding due to poor Use of sand bags to 2 2 4 Medium Direct Discharge 1 2 2 Low Briefing to 1 week Supervisor/
drainage prevent surface flow to external drain. employees on Safety Officer
to other environmental
neighbouring site compliance
vice-versa. requirements.