Excavation

The document is a checklist for quality control of excavation work. It contains 20 items to check before and during excavation, including confirming approved drawings and soil reports are available, necessary equipment like dewatering pumps and safety measures are on site, proper layout and depth of excavation is achieved, and shoring and barricading are provided where required. The checklist is to be signed off by verifying completion of checks.

Uploaded by

Naiyer Azam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views1 page

Excavation

The document is a checklist for quality control of excavation work. It contains 20 items to check before and during excavation, including confirming approved drawings and soil reports are available, necessary equipment like dewatering pumps and safety measures are on site, proper layout and depth of excavation is achieved, and shoring and barricading are provided where required. The checklist is to be signed off by verifying completion of checks.

Uploaded by

Naiyer Azam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECKLIST FOR QUALITY CONTROL

CHECKLIST OF EXCAVATION WORK


Contractor:
Site:
Location:
Date:

S.No To be checked YES NO REFERENCE OF DOCUMENT RECORD GENERATED Sign off By


PRE - EXECUTION CHECKS
1 Approved Drawings available at site [ ] [ ]
2 soil investigation report [ ] [ ]
3 TBMs established [ ] [ ]
storage or itermediary storage identified for
[ ] [ ]
4 the excavated earth
5 access routes availability [ ] [ ]
possibility to deploy the larger excavating
[ ] [ ]
6 machinery
Requirement of ramp for vehicular
[ ] [ ]
7 movement
8 Grid line markings are adequate [ ] [ ]
Adequate safety measures are taken
[ ] [ ]
9 including the First Aid Kit
10 Dewatering measures ready [ ] [ ]
11 Water pumps are at site [ ] [ ]
12 All tools available [ ] [ ]
Check During Execution [ ] [ ]
13 Book Level Register at site [ ] [ ]
14 Layout and alignments as per Drawing [ ] [ ]
15 Required depth of cut achieved [ ] [ ]

Steps provided for depths beyond 1.2 M [ ] [ ]


16
Proper shoring and shuttering is done in loose
[ ] [ ]
17 soil locations
Barricading at a distance of 1 M from the
[ ] [ ]
18 excavation
19 Point of height indicator installed [ ] [ ]

Marking pillars are free from disturbance [ ] [ ]


20