29, Chi Overs balig
Reference : CSCB/FRL/98/504/249 139 Heaney ond, Hoe Kons
eso as 2s roe
Date 15 December 1998 bidedeichitil
‘The Engineer's Representative
Binnie Black & Veatch Hong Kong Ltd.
Junction J/O Ting Cheung Road / Tin Pak Road
Tin Shui Wai Site Office
New Territories
Attn: Mr, Ho Pak Hoi
Chief Resident Engineer
Dear Sir,
Contract No. YL 39/98 A Ba
Tin Shui Wai Further Development
Tin Ying/Hung Tin Road and Tin Ts2/Long Tin Road External Links '
M fate for Drivil eel H. Pile
We would like to inform you that our driving steel H. pile sub-contractor is Yuen Chak
Construction Lid.
We are submit the following material and method statement of steel H. pile for your
comments and approval
1) Welding rad. $-9016.G.
2) Welding procedure test report.
3) Welder certificate
4) Method statement for driving steel H. pile.
5) BSP Hydraulic hammer 357 technical data
6) Detail of loading testing platform and calibration report of Jack 1000 7.
7) Constiuction Noise Permit for carry out of percussive pile, 3 sets.
Thank you for your attention -
Yours faithfully,
For and on behalf of CSCEC
“EE
K®. Cheung
Project Manager
Enel,
cc. Head Office
KCCMYT/jcMethod Statement for Driving Steel H-Piles
»
2a
3)
4)
5)
8)
Setting out the point for each pile.
Driving the Steel H-piles to the point of setting out until the required level by Hydraulic
Hammer,
Extract the piles by Vibration Hammer if the driven
obstruction.
encountered any underground
Removal of encountered obstruction, backfill and compaction.
Re-drive the piles to the required level by Hydraulic Hammer.
Final set all driven piles by Drop Hammer. :
fi.ae
s-9016-G % Be
reagent lek tna ts
ms ay
Talalaal ts
hound hy ato
Benue
Sj elastt
Diy the electrodes at 350-4000
= ‘dep back nap sathad oa
Fre aa bane er of Inlitan eta.
Beep ni sth a eile
Preheat at 60-90 Bele
‘The tamperstute to be npelod
plate thickness and Roel Ki
@ flencs paan wrigp hevomer hcker Show acceptable level b
sy arrordnner wth
Wes phan aris erence malposion he impel
MILNE Rnd jetta Gero
i ype canta eompeten of nad saa (8)
Teper feel]
‘aor [ous | 1.08 [o.011 [o.000 | 0.28 | 0.60
2 Type mechs prpaioe of wo metal
ve ws | w
twat ans meena] Gb | tna mi -208)
e sein | ean | | ore
av avalos and ewmmanvd covena(AO of DO?
¢ os Din, (mm) 26 32 4.0 5.0 6.0
umm | aso | 350 | 400 | ao | ato
Teas oie a ne
Te aie | som‘0 [ao-1e0 [ie=v70[ =e]
™: Material.
AR tener
fla? HR. TER tle. FRorta Gok AA
WELDING PROCEDURE TES] REPORT Aoport No: _961962NT80961
te Data: 811296 ‘sheet
Lene = Lwietoves — sacatiaea hin) kt
|Sterdned Wed: 88 4970: Part 1: 198)
Welding Procedure in: LLICL/TKOIWPOAIG! ___Logatlonal fewt .
'oNewne:_Choung Men FakWiyhig Hon ChunglW¥2) H.KLO. Me.: Hozpeee zy £6797
WELDING PROCESS = «O.M.AWAA.C) [PARENT MATERIALS)
jolt Tree: Single Bavel Butl Wold Jopceliicetion(e}: 89 4960, inde SSC
(Gack Gouging)
poking Povtlr(e: Horizontal Vorial(20) [Mato roupts) 69 4870: Part; 1981 Grows AZ
[ree Picco Poon: Fld to Vestal lLimeneane of Tow pos: H-Beamt
($e x 208m x 240 TH
ee eee eee os 2
WED PREPARATION (nm) BUN SEQUENGE AND COMPLETED WELD
Fame Cultng and Mechanteal Grioding ty?
WEL Deid ConpUMART ES” “TBize(ay em Bolseleo| so}
Fier Materia AWS AB.SIASME SFAS.S, E7018. [Currani: Amp 160- fat0- |a10-|260-| |
ie ae 190 | 210 | 220 | 220
Jidaka are Typo: Hyunuel Wokting ~ $-9010 a \Voltage: V jae |$0- [92- |90~
[Composition: Ax per Manufacturer Spec.
Baking Treatment: Hod one hour at 950%
af on Aeendeoin),
Second side Tr
Preheat Treaiment Min, 126°C
|menveae Temporaivo: Max. 250°C, [AM Are Gauging and Olea Qrnding
[EXTENT OF APPROVAL:- Rlomarks (it any)
ange of Natorake Quon ALAR
'
JAange of Thickneertcel: — 4.fenm + 50mm Joint Type: Glagle Baval Bult Weld (Beck ouging:
[Ranga of Olmetee =. NIA Waldir Poaition ; Horlzontal - Verneal
ee
atess 0 erett ater eeeso*4 WLOL
AHA LIMAL AL cee ee
wen i x
WELDING PROCEDURE TEST REPORT
RESULTS
LOCATION OF HARONESS MEASUREMENT:
(SKETCH)
Vicker (H¥10)
b_1okg
‘ndich ota "| Feet
gague | —[L.. Temperate _| :
Franevors to mett|Batcen of Noich Pewandcutr a
Axle. sord 10mm x ito the surlace and at ine oro J2}180 Avorage: |
tonimx 88mm feast woe fauswo
[ADLITIONAL TESTS) NIA. - ae
Ramvark : Tho tavt weid wae prepared, wakied and tested In accordance with BS 4870: Payt | 1981,
Welding Procedure Test : PASS
{Asoeeaed By : Pitta Poaltion; Supervisor = NOTA
[Authorized By: Aatlatant Manager owe: Z- [1-47
NOT Waldiog
EE apy ceae etre BESTE REETZTENN-1998 945
YUEN CHEK CONSTRUCTION CO
2838 6275 P87
Lees
Far East Technical Services ca
gin 1a cHEONG NING STREET HAPPY VALLEY TONG KONG
708 207877:
Ref. + FE/981206/waT. 06th November, 19g,
Client Yuen Chak Construction Co,, Ltd.
Bubject 1 Welder Qualification Cortificate.
Date of Welding Inspection + 30th October, 1998
Date of Test 03rd November, 1998
This 18 to certify that 13 welders from the above mentioned
company have undergone welder approval testing in ordance
e with B.S. 4872 : Part 2 = 1982 with the following results t~
Le
Welding process
7 ; Manual metal arc welding, AC
Parent material
; B.S, 4360 grade 503.
Thickness
: 16,0 mm, steel plate.
Joint type
: 45° 45° single bevel butt
weld with back gauging.
Welding position
: Horizontal-vetical.
Test piece position
1 Fixed vertically.
as
Holdina_consuneb}a,
Filler material (make & type)
e KoBe steel B-52.
specification
t BiS, 639 1 1986 BS154B26(H).
sizes
: 94,0mm and #5. Oinin,
Qualification Test Besulte .
code Name of welder
1. Cheung, Kam tung
Visual examination
Destructive tes:
a. Side bend tost
b. Fracture test
qa)
ding proc
+ MMA, “AC.
Material range
TAL & AZ (C & C-Hn stood
Thickness range
+ 4,8 mm to 32.0mm.
Joint type
1 45° £5" single bevel, but
weld with back ‘gauging.
Welding position
? Flat and hordzontal.
Consumables
{ agic and rutile covere
electrode.
Weld preparation
(sketch)
Root
face
2intinm = —b
dap 7 4p't!
3inmt2me
Lt 6m
1.D. Card No.
B822017 (A)
: Good surface condition:
No surface fracture.
No defects. :
ronack «The above test ali acceptable ~ Ranged.27-NOU-1988 @9:45 YUEN CHAK CONSTRUCTION CO
Far East Technical Services
(GIR, 1A CHEONG MING STREET HAPPY VALLEY HONG KOND.
Yet 267877;
06th November, 1998 i
Client + Yuen Chak Construction Co., Lid.
Bubject : Welder Qualification Certificate.
2. Poon, Kwok Chu 8314436 (8)
Visual examination : Good surface conditions
Destructive tests
a, Side bend test 1 No surface fracture.
e b. Fracture test 1 No defects.
Remark : The above tests all acceptable - Passed,
hen 3. Cheung, Kim bung §244490 (2)
Vigual examination 1 Good surface conditions
Destructive teste :
a. Side 1 No surface fracture.
b. Fracture * cost No defects,
Remark : The above tests ali acceptable - Ragsed.
4, Tang, So Kit A296156 (6)
Vieual examination : Good surface conditions
Destructive tests
a, side test 1 No surface fracture,
b. Fracture test : No defects.
Remark : The above tests all acceptable - Passed.
5. Lai, Fu Yip 4989368 (6)
Visual examination Good surface conditions
Destructive tests
e@ a. Side test 1 No surface fracture.
b. Fracture test : No defects.
cy Remark ; The above tests al .acceptable - Passed.
6. Lam, Pui Ho 4860283 (3)
Visual examination : Good surface conditions
Destructive tests
a. Side test
b. Fracture test
Remark : The above tests all acceptabl
: No surface fracture:
No defects.
2. Sin, King Keung 038472 (4)
Visual examination 1 Good surface conditions
Destructive tests
a, Bide test 1 No surface fracture.
b. Fracture test 1 No defects.
Remark : The above tests all acceptable ~ Papsed,
8. Yeung, Choi Yau 485556 (1)
Vieval examination : Good surface conditions
Destructive tests
a. Side No surface fracture.
b. Fractur : No defects.
Remark : The above tests all acceptable - Passed.
(2)-P7-NOU-1998 a9t46 ‘YUEN CHAK CONSTRUCTION cc 2a38 6275 B63
Far East Technical Services BR
GIf., TA CHEONG MIG STREET HAPPY VALLEY HONG KONG
Tek 2675 77
T octn November, 1998
Client : Yuen Chak Construction Co., Ltd.
Subject : Welder Qualification Certificate.
9. Ng, Wad Kong 8226317 (7)
Visual examination : Good surface conditions
Destructive tests
Side test 1 No surface fracture,
b. Fracture test 1 No defects.
Remark ; The above tests ail acceptable ~ Passed,
5
20, Chan, Kwong Ming AT59187 (2)
Visual examination 1 Good surface conditions
Destructive tests
a. Side test 1 No surface fracture.
b, Fracture teat : No defects,
Remark : The above tests all acceptable - Passed.
21. Wong, Kwai Choung B548645 (2)
Visual examination + Good surface conditions.
Destructive teste
a. Side test : No surface fracture,
t : No defects.
The above tests all acceptable ~ Pagged,
The statement in this certificate are correct. The test weld wa
Prepared, welded and tested in accordance with the requirements o
B.S. 4872 : Part 1: 1982.
Rxpiring date of certificate : 03rd may, 1999.
Sun +K. Che.
Manager
(3)Method Statement for Driving Steel H-Piles
)
2»
3)
4)
5)
8)
Setting out the point for each pile.
Driving the Stee! H-ples to the point of setting out until the required level by Hydraulic
Hammer
Extract the piles by Vibration Hammer if the driven pile encountered any underground
obstruction
Removal of encountered obstruction, backfill and compaction
Re-drive the piles to the requited level by Hydraulic Hanumer.
Final set all driven piles by Drop Hammer.BSP HYDRAULIC HAMMER 357>
g have always set new standards [nt pile
Since thelr Inception BSP Hydraulle Hammer:
installation, The 357 Mk 5 serles now Incorporates 5, 7, 9
‘and 11 tonne ram weights.
PT
‘e« standard in all BSP Hydraulic
a aS ee Mk 5 SERIES
ABOVE: HX dog
26-NV-1988 15443
ECONOMY OF OPERATION: Tu ensure lower canacity requirements
ronan cost the paced hy
Oe
ayatem, from « comparatively small hydraulic
PERFORMANCE MONITORED: With the
increasing di
the operation of quality assurance systems,
the optional BSP Energy Menivur fea
worthwhile addition. It produces an instant
and dieget read-out of performanes. aud this
information may be stored for
eventual down loading to 4 PC.
POWER SOURCE: BSP offers a Hydropack
+ qucteus of every BSP Hydraulic
Hammer, This high efficiency is
achieved by the actustor design which
allows the hammer drop weight to fall
under effece of gravity with virtually no
sesistance from the hydraulic circuit.
“The simplicley of design of the eetuator
enhances the operating efficiency,
baving few moving parts, and with all
hydraulic components closely coupled
to the lifting cylinder. These features
Hammers, providing the contractor
with a high outpet performance
together with above average fuel
efficiency from the power source
[EAR LEFT: M5 ene sperated, delving 390380
Betas, eaten
’
CENTRE: crave warded
ity gee set omar
pies #93 6, Ur
Sovnsonessn 7c, 300
irom asing ne,
usa.
BELOW: HAY with sort
Teclonre diving Larsen 6
Mpa crane scene
ule actuator
Mow rate
ENVIRONMENTAL RESPONSIBILITY:
Aethe driving force of BSP hammers ts
hydraulic, there are no hammer exhaust
‘coinsions, and by optimising the impact
velaciny 3 reduction in noise output eam be
ver source.
Jemand feom piling comteactart for hiained.
QUALITY ASSURED: BSI has thorough
and cxacting standards and all products
facrured to the highest
quality and apecifiention
Tus 1988 BSS7S0 wat
olvained for quality
asaurance, and now
SP conforms to the
Ioceat internationally
rn external poser source isto revised 1S
itiey and the etandsed.
power source providing hydraulic flow and
presmice compatible to the hammer output
Altcenativel
be used, BSP can advise on wulzenou-1998 13844 YUEN Cho LORD IRLL
PoWER SOURCE ~
DIESEL POWERED ‘OPEN CIRCUIT’ HYDRAULIC HIYDROPACK with aurhacharged diese! ‘engine, and
ent axis punsp, is edivated to the oe BSD 987 Mle § Hammers.
“the engine snanagement systebs on the i
qontol panels allows the hammer to be HIyOROPACK - NH3S7 Mk 5 SERIES t
‘operated in manual morte, ENGINE IYPE PERKINS Jone! | HYDRAYLIC OF
Yann capactty 300 He
qe ucine rower 102 2W
Filtration is provided by a tank sean ie | ouensions: +
tnounted filter with rentor providing e Tenant eats
engin the event of blockage ne annius wwinnn 1300 en :
ecesiine 00 br x
OSes sansamune FLOW 195 an netour 2140 ne
radiator fan, and hydraulic oil PetHaN f ‘WeIgit! DRY 2280 ka
perature contol by a tacit 70 me wren rut, 774045
independent air blac cooler.
“The bate and frame are
of welded construction.
Lockable doors, lined
with sound dampening
inaterial, give security
aid service ances,
‘The conteol panel is
and at one eu
pack.
pe
of theza-nov-igsa 13444 YUEN Chis, CONSTRUCT ACN ww
HHSHD HH7HD-HHQHD —-HHILHD
11000
1670
rasa
1e
a8
vase
100
wn
1837 07 eer er
90 100 1100 2700
DIMENSIONS: HH357 Mk 5
(GRANE SUSPENDED LEGS AND LEaben ovenarion
INSERTS FOR SHEET PILING NELMET AND BAGKGUIDES
—
6 ia
|
LERCTH OF MAMMIER WITH LECS AND INSERTS (12)
Hl
4
LENGTH OF WAIMMER WITH HELMET (0.2)
ax PILE 813 |
DIA
ae edeb
ss a :2e-nounigse 13:45 YUEN ChAR CLD IRA batt oe
ne
. FOUNDATION TECHNIQUES LIMITED
Speclalit In Testing , Monitoring, Instrumentation & Caltoration”
03 Shai Hing Centre, 13 Sheung ‘Yuet Road, Kowloon Bay
Tel.: 2758 4861 Fax; 2758 8962
CALIBRATION REPORT
RefNo: 811749-37 Paget of 2
Client + ‘Yuen Chak Construction Co. Lic. L
Jack i ‘Serial No. 113663
: Capacity 1000 Tonnes t
Presure cauce : Serial No; + 028108 '
; Range : 0-600 kglon*
Calibration Instruments. : strain Gauge System Traceable to Recognised National Standards: i
Granted by NAMAS, Cert. No. 46147, * ke
Calibration Conditions: ‘Temperature 27 °C, Relative Humidity 76% i
Basis of Calibration z To calibrate at the above conditions using traceable calibrated
equipment
Calibration Date t November 17, 1998
Regul
Pressure Gauge Strain Gauge System Reading (Tenne)
Reding
Qxgler) Test Fea 2 Toot 5 Ayerage. i
ee eee re tere o a 7 o .
100. 198 197 il 798.0 1
200 396. 3o7 ‘400 7
300, 5 594 596. 595.0
400 B00 798 799.0 i
480, 393. 985 994 994.0 x
salibrated By : Certified By ¢
Name +: K.M. Chow Name 2 WeG.Yue 8
%. Position: Principal Technician Position fl jetations er
Foundation Techniques
“This report shall not be reproduced other than in Fl ‘except with prior written appr
‘ignoture : dip Signature k
Wwpat No, 81174037 -@ eo
Page 2 of 2°
Calibration of Hydraulic System : 3
6
Jockos 206) peau Gnge acta h
1200 + 7
=
= 1000 é
o 2
eE o
> §
= 300 g
a
3 ;
« .
§ 600 ‘
ao
>
Q
& 400
s
s
o
200
a :
5 ;
0 100 200 300 400 500 600
fester nito Pressure Gauge Reading (kg/em”)
~
2-@
= oe
COT
Le | ff 4 = CONCRETE BLOCK
BO5RHSAzzBiginTBEAM fot,
TTT t=
‘STSEL PLATE Arr ‘t900T
GAUGES fee REFERENCE BEAM FOR GALES MATNTING
a i
oN
_ ELEVATION
I
‘ J
4 N— STEEL" H“PILE.
,___me___j__ ae __
FTE STIOLE
[-— DRIVEN POST OR PILE.
rroheee
pret 966:
rok 00, NOLLOMSESNUD RHO NEMAamet Hong Keng Government an URGRIEAE
SRPE,.(4) in BP942INOGTWO08E-MBy vironmental Protection Depertwent i ‘3 Rene
gaat. Local Control Office/Territory West (a)
a 6 ‘7f,, Chinechem Tsuen Wen Plaza, SANUaR
Fe, Noe 2411 9619 455-457 Caste Peak Road, TN
iT. ment
Fax NO: 2611 9149 — ni
By Bepistered Post 10 Decenber, 1998
‘Yuen Chak Construction Company Limited
384-388 Lockhart Road,
Uf. Flat B, i
Wanchal.
Hong Kong
e Dear Sirs,
( Notice of Issue of Construction Noise Permit Pursuant
to Section 8 (6) of the Noii
se Control Ordinance, the
Lite to inform you that, under section 8 (6) of the Noi
y has decided to issue a Constrvction Noise Permit in respect ‘of your application,
‘was received by the Authority for carrying out percussive piling
Author
“The Construction Noise Permit No. PP-TWO08E-98 is enclosed,
“The conditions imposed in the above Consttuction Noise Permit are based on an
assessment nade in accordance with the Technical Memorandum on Noise from Percussive
Piling,
e iryou are aggrieved by the decision ofthe Authority in respect fou" application, ‘
you may, porsuant to Section 18 of the Noise Control Ordinance, appeal to the Appeal Board
T this notice in such manner and form prescribed under the
within 21 days afler the service of
Noise Control (Appeal Board) Regulations.
‘Yours faithfully,
oo
(CHAN Pin-lin, Louis)
for Authority
Encl
Salina Serving the community for a better environment
UR AER AOLSSRARLEF
1986 to 1998,: FORM 4
NOISE CONTROL ORDINANCE
(Chapter 400)
SECTION 89)
CONSTRUCTION NOISE PERMIT FOR THE
CARRYING OUT OF PERCUSSIVE PILING
this congtvetton noi permits issued in accordance with section & of the Noise Control Ordinance. Pension
ns gnatrucon nein Perr corcusaive pling, subject o te conditions set out below. The carrying out of percsse
etter tha iv ccordance aay econalitigns may result in the permit being cancelled and in a prosecution for
nee,
CONDITIONS
@_ | Construction site where percussive piling may be carried out:
i ung Tin Road External Links, Tin Shul Wai, Yuen Long. N,
Full stroct address:
7
‘The piling zone, that Is, the area within ‘which percussive piling may take place js delineated on the attached plan
which forms part of this construction nolsc permit.
2. Percussive piling method and pile type which may be used in the piling zone:
Piling method and pile type No. of units
iH Drop hammer driving ste! ple Two
Hydaulie hammer (single acting) driving steet pile Two
© 5. vatsiy orth construction uot permit:
Date of commencement: ..L4 Paembsr 12
Days and hours:
This permit expires oF
‘be displayed on the construction site at AL YSHISULEE ers
4. This construction nofse permit or copy thereof must
ive piling covered. by.thls pesmi.
valle entrances/enits For pubis
is being carried out.
19s when pet
wom4
“ eae
(98 400 8)
9 809) He
: TE
TRL
3 SOR aT OT
ARERR RET REIN EA AN I 8 LE TS BERETA LE BART
PERN » SER RCMB MRT LE + APPT OPS RE ARI» Tn A SEAS
sett
7 e 1. TTR ORE ER OR ©
; smn... SILEMPRABUAIAR RUBIES
“FT RSV IRATE AR HT) ASTD + RF HE»
2. MESTARR RO TRA EMSC ST He De A +
7 ITA ERE MMA
: Fase x :
TORBEN FARE x :
@ 3. aeneraamn:
Asbo ee eRe IURIRRSRAUAIRN ... AA ROARS,» HARTER...
zi PRATT HF LALOY HAIGH + TFA
i sieht \
HM: 19...28,48
foEnvfconmental Protection Department 54VESIPEFR
Local Coatrel Office/Tersitory West (FS) .
Plan attached to Construction Hoise Permit No. +
08 BF FD BE Mit Bot recnwoosessayene
Bras
(ANE)
7 Hong Keng Governme!
f2(4) in EP942/NO6/TW0089-53, vironmental Protection Department
Local Control Offise/Territory West
7/F., Chinachem Tsuen Wen Pisce,
2411 9619 1455-457 Castle Peak Roed,
2641 9149 Touen Wan, NT.
SUES
‘escs7 it
By Registered Post 10 Decenber, 1998
Chek Construction Company Limited
3§4-388 Lockhart Road,
e Dear Sirs,
Permit Pursuant
dinance (Cep. 400)
8 (6) of the Noise Control Ordinance, the
in respect of your application,
for carrying out percussive piling
Notice ef Issue of Construction Ni
sect
ty hes struction Noise Permi
which wes received Authority on 20 November 1998,
at Tin Ying Rood / Hung Tin Road Extzmal Links, Tin Shui
The Construction Noise Permit No. PP-TW0089-98 is enclosed.
L write to you that,
bove Construction Noise Permit are based on an
‘The conditions imposed in
rechnical Memorandum on Noise from Percussive
assessment made in accordance with the
Piling.
e Ifyou are aggrieved by the decision of the Authority in respect of your application,
you mey, pursuant to Section 18 of the Noise Control Ordinance, appeel to the Appe#l Board
yethin 21 days afer the service of this notice in such manner and form preseribed under the
Noise Contro! (Appeal Board) Regulations
‘Yours faithfully,
(CHAN Pi
for Authority
Encl,
ata” Serving the community for a better environment
180 o 188 RAR AANA EEL ARLE byFORM 4
z NOISE CONTROL ORDINANCE
(Chapter 400)
SECTION 80)
CONSTRUCTION NOISE PERMIT FOR THE
CARRYING QUT OF PERCUSSIVE PILING 7
PP-TW0089-98
CONSTRUCTION NOISE PERMIT NO.
To: eaten Cs .ctlon Corapaay Li
this conateution nol permit is isued i acenedance with eaton # ofthe NOs Contzol Ordinance, Perrassion is
it is isuad fo, accu nee To the eanalsfons sat out below. Ths carT Ing OM ot Po
ane ik a prosecution for
the permit being
nied foe the earring ost of pe
fet Mies tush in accordance with the conditions may res
fs
Enolfence.
CONDITIONS
e 1, Construction site where percussive piling may be carried out:
‘Tit Road / Tin Shui Wal External Links, Yus _
may be used in the piling zone:
2. Persassive piling method and pile bre
Piling raethod rad ple Ware Wo. of unite
a Drop hammer driving stecl pile One
One
Hydraulic hammer (single acting) driving steel pile
e@
<
3
3
\ Date of commencement
Days and hours:
‘This permit expices on:
4, Thisconstruction nolse permitora copy thereof must be displayed onthe construction site
site ontranceslexits
: is being carried out
eon)UR TAF +
Be
4
waar
(5400 8)
35809)
nEAnrTe
eRe
SES
sm RRR » EE
SRIHNARATE LE + BRET
pS ORT SSI ROR ES ALRTLS 2 EEL
Fem ERIE MATS PORE BLE + RUSTERSAY ATSB AIER) + PTB.ASERIRES ©
4 SRS PRE FFT AE ICT BUR ARABS AEE
fhe
Cig RTM RITES +
PHONE AEF
HEA
EARP AGEL | UTIL
FIRE EO RTRRSTA TRS
LOE ERAT
a
EFT RA BS *
BSS TTTANT
: RGAE)
aE
SRSEBR HERERO &
RATTLE
penal Oo yA LRBOSETIN * AS
Hg: 19.98.98 228eR eS PES
BU an
RRR AE ATF IRA ROR RRL 8 RE
fFFRa + EETRERELBS BaP TILT
HRA ROLE TS A
aah
PT
(8540051)
809) He
ARG
RTT
oo ET EAREE,
EME « BERATSGRBRTATS + CHR TAE
1 TREAT RERLALIA WOE PRUE +
BE
RUSH IPRAT MTR RRES
weenie Reh +
SANFL: 6 REPORT ATA? +
1a (BT PLR)
CET ROR PU UT PRIISR SCAT HD DEG
TRDUARR EA AE
Reni x
REECE) TM =
ASABE
CAR FD
PRETORIA
RRR: a FTA RCT A BURR SR AE
ATL REE ATDRAY
Fim: 19.98.04722
ii
la
g
il
Hi
1 PP+THO0S9-98
ioise Permit No.
Xl
Plan attached to Construction
fy Bit
it eP-TH0089-98
2 0 ST MMaT (4) i : Hong Kong Govern
ZENE.) in EP242/NO6TW0090-S5, ronmental Protection Depart
RAM Loca! Control Office/Terrltory West
8, 7/F., Chinschem Tsuen Wan Pl2z3,
NOs 2411 9619 455-287 Castle Peak Road,
‘Fever Wan, NT.
BERS, 26119149
By Rexistered Last
‘Yuen Chak Constriction Company Limited
384-388 Lockhart Road,
7F., Flat B,
Wenehai,
Hong Kong
@ Dear Sirs,
Notice of Issue of Construction Noise Permit Pursuait
{e Section £ ©) of the Noise Contr ro} Ordinance (Cap. 400)
Control Ordinance, the
espact of your application,
emive: 1828, fo: carrying out percussive piling
‘in Shui Wal, Yuet aN.
Lwalte to inform
fas decided to
Permit No, PP-TW0099-98 is enclosed.
‘The Construction Noi:
The conditions Imposed in the above Construction Noise Permit are based on an
assessment made in accordance with the Technical Memorandum on Noise from Percussive
Piling.
oe Ifyou are aggrieved by the deciston of the Authority in respect of your application,
: you may, pursuant to Section 18 of the Noise Control Ozdinanee, appeel to the Appeal Board
Z within 21 days after the service of this notice in such manner end form prescribed under the
Noise Control (Appeal Board) Regulations.
5 faithfully,
, o
(CHAN Pi 1, Louis)
for Authority
E
Serving the community for 6 better environment
SU PARDEE RPTLFORM 4
CONTROL ORDINANCE
(Chapter 400)
SECTION 89)
nots!
CONSTRUCTION NOISE PERMIT FOR THE
CONSNING OUT OF PERCUSSIVE FILING :
pp-rwot
CONSTRUCTION NOISE PERMIT NO-
Chak Construction Compeny Li
va with section 8 of the Noite Control Ordinance, Permission»
Fo in idisn Toeexriagout gf peuslye
“Tals cangzustion neise rests is issued In accord
2 ee St being canceled abd ina prosecution for
Tals cae pecans out of paces PINNE SHER
genie Se than accordance wih fe eondtions may =F
fan offence.
CONDITIONS
1. Gonsruetion ste where percutive piling may be carieg out
: Fullstectaderese THD Tse Rens
plan
‘and pile type which may be used in the
2, Percussive pling mathod
“Filing method ane pile WE No, of wntts «
“ i
si Drop hammer driving steel pile One
One
Hydraulic hammer (single ating) driving st! ple
‘Validity of the construction noise permit:
11 December 1998
{ 3
5 Date
f commencement:
don theconstraction stat fi shicl,
14. Thisconstrustion aoe pemitora cops thereof must be dep
i e pling covered by ths pet
aieances/exits for public information at all tin
rousean = .
re Pal zane
1P~THOOSO-98 a
Plan attached to Construction Noise Permit io. :
oe oH
oan a
Hong Kong Government 73
Environmental Protection Department 7FRYRMAL ER
decal Control Odfice/Teeritory West alia