0% found this document useful (0 votes)
65 views4 pages

NG22 282 QUA PSL 100007 - Revc0

This transmittal sheet provides documentation for the OML58 Upgrade Phase 1 Project. It includes 7 procedures and plans for welding, inspection, and erection of storage tanks. A quality plan is included that outlines the QA/QC organogram and requests that a work schedule be provided in Appendix 4. Comments were provided on the quality plan on August 31, 2010 and the return code of 2 indicates the contractor can proceed with addressing the comments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views4 pages

NG22 282 QUA PSL 100007 - Revc0

This transmittal sheet provides documentation for the OML58 Upgrade Phase 1 Project. It includes 7 procedures and plans for welding, inspection, and erection of storage tanks. A quality plan is included that outlines the QA/QC organogram and requests that a work schedule be provided in Appendix 4. Comments were provided on the quality plan on August 31, 2010 and the return code of 2 indicates the contractor can proceed with addressing the comments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

OML58 Upgrade Phase 1 Project

TRANSMITTAL SHEET

FROM : CPY ~~ Company Contract n° : TO : SPD ~ SAIPEM PONTICELLI DESICON

Name : Transmittal N° : TNO-CPY-SPD-000033 Attn :

Address : Total E&P Nigeria Limited Issue Date : 2-Sep-10 Address : 1/7 Avenue San Fernando
Plein Jour, 12 bis rue Jean Jaurès Montigny le Bretonneux
PUTEAUX 92800 Remarks : 78 884 SAINT QUENTIN EN YVELINES Cedex
Tél. : 01 47 44 84 17 Tél. : 01 61 37 69 36
CD Acknowledgement of receipt :
E-mail Date :
Courier Signature : 03/09/2010
DMZ X

We are pleased to deliver to your Company the following documents. For CPY ~ Company
Prior to be sent, these documents have been checked as per contract requirements.
Information included in this transmittal for each document is in accordance with the document itself.

Name & signature

Approval Class
CONTRACTOR

Return Code

Remarks
DocNber
Document Number Rev Stat. Rev. Date Title Disc. Type

NG22-282-CST-PSL-100017 C0 IFR 9-Jul-10 PROCEDURE FOR VISUAL EXAMINATINO AND WELDING/ NDT CST PRC 2 2
NG22-282-CST-PSL-100018 C0 IFR 13-May-10 WPS / PQR QUALIFICATION PROCEDURE FOR OBITE TC STORAGE TANK CST PRC 2
NG22-282-CST-PSL-100020 C0 IFR 10-Jul-10 PROCEDURE FOR MANAGEMENT OF WELDING CONSUMABLES FOR CST PRC 2 2
NG22-282-CST-PSL-100019 C0 IFR 12-Aug-10 Procedure For Welder Qualification For Obite TC Storage Tanks Erection CST PRC 2 2
NG22-282-CST-PSL-100011 C0 IFR 29-Jun-10 WELDING BOOK FOR OBITE TC TANK ERECTION CST BOK 2
NG22-282-CST-PSL-100014 C0 IFR 7/72010 INSPECTION AND TEST PLAN FOR BASE MATERIAL RECEIVING FOR CST PLN 2 2
NG22-282-CST-PSL-100033 C0 IFR 12-Aug-10 Mobilization Plan For Obite TC Storage Tanks Erection CST PRC 2 2
NG22-282-CST-PSL-100007 C0 IFR 12-Aug-10 Project Quality Plan For Obite TC Storage Tanks Erection QUA PLN 2 2
Comments Summary for document
NG22-282-CST-PSL-100007_revC0 Rev. C0
Date of comments : Aug. 31 2010
Comments performed / validated by: QC Head
Return Code is 2 ~ Proceed with comments

There are 3 annotations following


OML 58 Upgrade Phase 1 Document Number :
PROJECT QUALITY PLAN FOR OBITE TC STORAGE NG22-282-QUA-PSL-100007
TANKS ERECTION Revision : C0 Status : IFR Approval Class : 2
Document Type : PLN System / Subsystem : Zone :00 Rev. Date : 17 July 2010
Page 21 of 6

QA/QC ORGANOGRAM

QA/QC COORDINATOR
IYO. O

QA/QC SUPERVISOR

DOCUMENT CONTROLLER MATERIAL CONTROLLER

WELDING DIMENSIONAL CORROSION NDE CONTRACTOR


INSPECTOR CONTROL INSPECTOR

“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company”.
NG22-282-CST-PSL-100007_C0
OML 58 Upgrade Phase 1 Document Number :
PROJECT QUALITY PLAN FOR OBITE TC STORAGE TANKS NG22-282-CST-PSL-100007
ERECTION Revision : C0 Status : IFR Approval Class : 2
Document Type : PRC System / Subsystem : Zone : 0 Rev. Date : 17-July-2010
Page 22 of 23

APPENDIX 4

PLS PUT WORK SCHEDULE

“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company”.
NG22-282-CST-PSL-100007_C0

You might also like