1, Background
The Seal of Good Local Govemance (SGLG) Incentive Fund, a Performance
Challenge Fund, was institutionalized by virtue of RA 11282 otherwise known as
the Seal of Good Local Govemance Act of 2019, and is a Local Goverment
Development Program managed by the Council of Good Local Governance
(hereinafter as the Council), composed of various National Government Agencies
(NGAs),
The SGLG Incentive Fund evolved from one of the long-standing flagship
programs of the Department which is the Performance Challenge Fund (PCF).
Originally established in 2010, the program serves as a performance-based reform
program of the DILG that seeks to rationalize intergovernmental transfers of the
ational government to local government units (LGUs) and encourage the
convergence of local development initiatives with national development agenda
and priorities.
The SGLG Incentive Fund shall be provided to LGUs which passed the Seal of
Good Local Governance (SGLG) assessment criteria for the current year.
“Matino, Mahusay at Masasahan”
“Trunkline No," 8876-34-54
01
18-06%
OFFICIAL 4,
mrcone raurmans SRELEA2. Purpose
This Memorandum Circular is issued to prescribe the general policies and
procedures in the implementation of the SGLG Incentive Fund/PCF. It will serve
‘as a guide to the 1.) SGLG Incentive Fund LGU beneficiaries to be able to
effectively and efficiently implement their respective program-funded projects; 2.)
DILG on the management of SGLG Incentive Fund which includes release of
financial subsidy, monitoring and reporting; and 3.) other concerned stakeholders.
3. Scope/Coverage
All DILG Regional/Provincial/City Directors, Cluster Leaders, City and Municipal
Local Government Operations Officers (C/MLGOOs), Bangsamoro Autonomous
Region in Muslim Mindanao (BARMM) Chief Minister, Governors and Mayors of
‘SGLG Incentive Fund Recipient LGUs, and others concemed.
4. Legal Bases/References
Section 28, Chapter 4, Book VI of Executive Order No. 292, s. 1987,
Instituting the “Administrative Code of 1987”
Republic Act 7160 - Local Government Code of 1991
© Administrative Order No. 15 s.2011, amending Administrative Order No. 233,
S. 2008 entitled “Reiterating the Prohibition on the Acquisition and Use of
Luxury Vehicles and Directing Revisions of Guidelines on Government Motor
Vehicles Acquisition”
¢ COA Circular No. 2016-003 dated August 16, 2016, amending COA Circular
No. 2013-004 dated January 30, 2013 Re: Information and Publicity on
Programs/Projects/Activities of the Government Agencies
DBM Budget Circular No. 2016-5 dated August 22, 2016 Re: Revised
Guidelines on the Acquisition and Use of Government Motor Vehicles
¢ DBM-DILG Joint Memorandum Circular 2017-1 dated February 22, 2017 Re:
Updated Guidelines on the Appropriation and Utilization of the Twenty
Percent (20%) of the Annual Internal Revenue Allotment (IRA) for
Development Projects
DBM Budget Circular No. 2019-2 dated March 4, 2019 Re: Guidelines
Implementing Certain Provisions of Administrative Order No. 14, s. 2018
DBM Budget Circular No. 2019-3 dated May 16, 2019 Re: Guidelines to
Implement the Centralized Procurement of Government Motor Vehicles
Pursuant to Administrative Order No. 14, s. 2018
@ RA 11292 - SGLG Act of 2019
RA 9184 — Government Procurement Reform Act and its Implementing Rules
and Regulations (IRR)
© General Appropriations Act of the Current Year under the Local Government
Performance Oversight and Recognition and Incentives Program of the
Department of the Interior and Local Government
Page 2 of 175. Guiding Principles
© Support the current Philippine Development Pian (PDP) as the governing
medium-term plan, anchored on the Ambisyon Natin 2040 that articulates the
ipino people's collective vision of a MATATAG, MAGINHAWA, AT
PANATAG NA BUHAY PARA SA LAHAT.
© Support the government's advocacy of improving overall LGU performance in
governance and delivery of basic services;
© Expand opportunities for performing LGUs to accelerate local inclusive
development, giving constituencies better access to education, health care,
and tourism development among others;
© Sustain the provision of incentives to LGUs commensurate to their
performance level;
© Foster and sustain cooperation among government stakeholders,
development partners. NGOs, and CSOs to influence greater LGU
performance;
© Enhance the LGU's programiproject conceptualization, implementation,
monitoring and evaluation;
© Ensure that project processes are inclusive of and are responsive to concerns
such as, but not limited to: gender-sensitivity, disability and social inclusivity,
diversity, human development index, and other thematic concems that
promote the welfare of the most vulnerable sectors in the community.
6. Policy Content and Guidelines
6.1. Eligibility Requirements
6.1.4, Eligible LGUs
LGUs that passed the Seal of Good Local Governance (SGLG),
according to the assessment of the DILG, for the current year with no
pending (on-going and not-yet-started) PCF/SGLGIF project/s later
than the year 2019 and their proposed project are included in their
existing latest approved LDIP/PDIP, shall be eligible to avail the SGLG
Incentive Fund.
6.1.2, Eligible Projects
‘The SGLG Incentive Fund subsidy shall be used to finance high-impact
local development projects supportive of the following:
© Good Fiscal or Financial Administration or Fiscal
Sustainability (e.g. Real Property Tax Computerization,
and Administration Technology, Procurement of equipment,
Procurement of IT Infrastructure and Servers, etc.)
© Disaster Preparedness (e.g. Flood control, Storm
Drainage, Dikes, Seawall, Flood Gates and other Flood
Protection Infrastructure, Slope Protection, Evacuation
Centers, Rainwater Collection Facility, Early Waring
Page 3 of 17,System/Devices, Rescue Equipment, and Rescue Vehicle,
Construction of Emergency Operation Center, etc.)
Social Protection and Sensitivity Program (e.g.
Rehabilitation Center, Bahay Pag-asa/Child Development
Center, Halfway Houses, Livelihood Training Center, All
Gender Public Comfort Room, Water Projects/Systems,
Pathways, Hanging Bridges, etc.)
Health Compliance and Responsiveness (eg Rural
Health Units/Health Centers, Birthing or Lying-in Facilities,
COVID-19 Infrastructure/Equipment, TB - DOTS Facilities,
X-RAY Machines, Emergency Ambulance, etc)
Sustainable Education (e.g. School Buildings, ICT
Equipment,and Daycare Centers, etc.)
Business Friendliness and Competitiveness (e.g.
Business One-stop Shop (under EODB program), Hardware
and Software Infrastructure for modernization of business
processes, Farm-to-market Roads, Core Local Roads and
Bridges, Access Roads, Irrigation Systems, Post-harvest
Facilities, Cold Storage Facilities, Public Markets, Ports and
Wharves and other economic structures and growth
enhancement projects, etc.)
Safety, Peace and Order (e.g. Closed-Circuit Television
(CCTV) compliant with NPC advisory 2020-04), Street lights,
Traffic Signages, Patrol Vehicle, Early Warning Devices,
etc.)
Environmental Management (e.g. Garbage truck, Material
Recovery Facility, Retaining Wall, Sanitary Landfill,
Pumping station, Sewerage Treatment Plant, Green
infrastructure, etc.)
Tourism, Heritage Development, Culture and Arts (e.g
Pasalubong Center, Museum, Parks, Tourist Information
Center, etc.)
Youth Development (e.g. Youth Center, Multi-purpose
Building, Gymnasium, Library, Foundling Safe Haven
Facility, etc.)
The abovementioned eligible projects shall likewise be compliant with all
applicable National Government Standards and Policies governing and
regulating the said projects.
6.2. Prohibitions on the Use of SGLG Incentive Fund
The SGLG Incentive Fund shall not be utilized for the following:
Projects exclusively on training or capacity development;
Financing of micro credits and loans;
Administrative expenses such as cash gifts, bonuses, food
allowance, medical assistance, uniforms, supplies,
Page 4 of 17meetings, communication, water and light, petroleum
products and the like;
© Salaries, wages or overtime pay;
© Travelling expenses, whether domestic or foreign;
Registration or participation fees on training, seminars,
conferences or convention;
© Construction, repair or refurbishing of administrative offices;
Renovation, maintenance, repair, or refurbishing of
currenvexisting vertical projects;
@ Road reblocking, road opening, and graveling of
current/existing horizontal road projects;
© Purchase of administrative office fumiture, fixtures,
equipment or appliances;
© Purchase of Lot;
© Purchase, maintenance or repair of any motor vehicle or
motorcycles not directly used for the SGLG undertaking,
pursuant to Section 12 (d) of Republic Act No. 11292; and
Loan Guarantee.
Note: The proposed project to be funded by the SGLG Incentive Fund must
be a new, whole, and single project and not a component of other
projects. LGU counterpart for SGLG Incentive Fund Projects is allowed for
not more than 80% of the total subsidy received.
6.3. Validity of SGLG Incentive Fund
The SGLG Incentive Fund will be valid for utilization by recipient LGUs for
a whole year from the date of issuance of the Notice To Implement (NTI).
Any unutilized funds must be reverted to the National Treasury per the
© For Cancelled Funds
a) No Notice to Implement Secured - If in case 12 months
after the release of the SGLG Incentive Fund check, an LGU
recipient determines that the funds can no longer be utilized
(i.e. when the project cannot be implemented for any reason
or when the same has been funded from other sources or
when the LGU failed to secure their Notice to Implement
[6.4.4.]), the whole amount received by the said LGU shall
be immediately reverted to the National Treasury.
b) Notice to Implement has been Secured with no
Implementation - If in case within nine (9) months after
receipt of Notice to Implement, an LGU fails to begin the
implementation of the project, the whole amount received by
the said LGU shall be immediately reverted to the National
Treasury,
Page 5 of 17© For Unexpended Funds - Any unutilized funds for completed
projects upon payment of the final billing, including liquidated
damages, shall be reverted to the National Treasury.
6.4. Implementation Procedures
6.4.1. Issuance of Notice of Eligibility
The DILG Regional Director shall issue the Notice of Eligibility (Annex
A) to qualified LGUs within three (3) working days upon receipt of the
final list of awardees of the Seal of Good Local Governance (SGLG)
and the amount of subsidy from the DILG-Central Office.
6.4.1.1. Release of SGLG Incentive Fund Subsidy to Recipient
LGUs
The DILG Central Office shall immediately sub-allot SGLG Incentive
Fund subsidy to DILG Regional Office upon receipt of Special
Allotment Release Order (SARO) and Notice of Cash Allocation (NCA)
from DBM; on the other hand, the DILG Regional Office will obligate
and prepare payment to recipient LGU by issuing the SGLG Incentive
Fund check or the List of Due and Demandable Accounts Payable —
‘Advice to Debit Account (LDDAP-ADA) upon receipt of the following
documentary requirements:
‘© Accomplished Menu/Checklist of Projects indicating the
proposed high-impact development project duly approved by the
Local Chief Executive and attached a certified true copy of the
existing approved Local Development Investment Program
(LDIP) or Provincial Development Investment Program (PDIP)
{page indicating the proposed project) by the Secretary to the
‘Sanggunian.
The LGU should issue an Official Receipt (OR) to the Regional Office
for subsidy received via SGLG Incentive Fund check. In case of fund
transfer to LGU through LDDAP-ADA, the issuance of Official Receipt
is no longer required. However, the LGU must submit a copy of Journal
Entry Voucher (JEV) as proof of receipt of the subsidy thru LDDAP-
ADA.
The SGLG Incentive Fund Subsidy amount received should not be
utilized by the recipient LGU prior to the receipt of Notice to
Implement (NTI) from the DILG Regional Office.
‘The date of issuance of NTI to recipient LGUs shall be considered the
day one (1) of the project implementations.
6.4.2, Conduct of Regional Orientation
Page 6 of 17After the issuance of the notices of eligibility to the recipient LGUs, the
DILG-CO shall download funds to the Regional Offices for the conduct
of the Regional SGLG Incentive Fund Orientation on this
Memorandum Circular. The orientation can be conducted via face-to-
face or via any online platform whichever is preferred by the regional
office.
The following officials shall attend the Regional Orientation, or his/her
representative who should provide a coaching or re-echoing of the
orientation on the SGLG Incentive Fund Guidelines whenever
necessary:
© Concemed LCEs, Engineers or Budget Officer, Planning
Officers or Accountants
© Concemed DILG Provincial/City Directors;
© Concemed DILG Cluster Leaders;
© Concerned City/Municipal Local Government Operations
Officers (CIMLGOOs); and
© Concerned Provincial Focal Persons.
6.4.3. Submission of Complete Administrative Documents
by the LGU for the issuance of NTI.
The LGUs shall submit for review all of the following documentary
requirements to the DILG Regional Office thru channels upon receipt
of the SGLG Incentive Fund check/LDDAP-ADA not exceeding 90
calendar days.
The Project Proposal (Annex C) and all its pertinent administrative
requirements based on their submitted LDIP/PDIP.
The physical and digitized copy of the Project Proposal, Certified true
copy of LDIP/PDIP (page indicating the project) and high-resolution
picture of the proposed project site or the site of the proposed
deployment/exact location in case of motor vehicle/equipment must be
submitted by the LGU for uploading to the SGLG Incentive Fund Web
Application.
LGU's Project Proposal shall include the following documents:
© Administrative/Executive Order creating the LGU SGLG
Incentive Fund Project Implementation Unit/Team;
¢ One (1) Picture of the proposed site (in high-resolution
geotagged photos taken).
a) For Infrastructure Projects
(must be consistent with existing National Standards)
Project Subtype General Requirements
Page 7 of 17Vertical Projects Project Permits
Detailed Engineering Design
(DED)
Detailed Estimates
Program of Work
Bar Chart/S-curve
Billboards and Safety signages
(drafsample design)
Horizontal Projects
Water Projects
“All Infrastructure projects under SGLG Incentive Fund shall
comply with existing laws on Accessibility, Gender
Responsiveness, etc. LGUs shalll have the sole responsibility
in securing necessary documents related to these standards
and policies.
b) For Non-infrastructure Projects
Project Subtype General Requirements
Procurement of Brand- © All Procurement and
New Motor Vehicle Bidding Documents prior
to the posting of Invitation
Procurement of ICT to Bid (ITB)
Equipment © Technical
Specification
Others (Medical Supplies, o Purpose of
etc.) Vehicle/Equipment
2 Number of units
and unit cost
For Procurement of Brand-New Motor Vehicles
The project proposal of the LGU must include the following
requirements for the approval of the Authority to Purchase
Brand New Molor Vehicles (APMV) and other requirements
pursuant to Administrative Order No. 233 s. 2008 as amended
by AO No. 15 s. 2011, DBM-Budget Circular Nos. 2022-1,
2019-02, 2019-03, 2017-01, 2016-05, 2010-02, National
Budget Circular (NBC) No. 446 s. 1995, as amended by NBC.
No. 446-A s. 1998, and BC No. 2017-1 amending BC 2016-5,
DILG MC 2021-004 as amended by DILG 2021-102 and DILG
MC 2022-105.
© Technical Specifications of the Vehic!
Unit Cost of the proposed Motor Vehicle; and
© Report of the physical count of vehicle and heavy
equipment
Page 8 of 17The process owner of the APMV shall review the technical
specifications and documentary requirements of the motor
vehicle and submit recommendations to the SGLG Incentive
Fund Regional Focal Person/Unit.
Unless otherwise in cases of extreme necessity and
emergencies, and/or in exigency of public service amid
disasters, calamities, and pandemics, the procured motor
vehicles shall strictly be used only for its intended purpose,
pursuant to Administrative Order No. 239, s. 2008. Use of said
motor vehicles for the above-cited special purposes shall only
be permitted when supported by a document signed by the
Local Chief Executive, or if used amid an extremely urgent
concer, supported by a justification from the LCE issued
immediately after the emergency has been addressed.
Further, the markers for the vehicles must be compliant with
the provisions of the governing General Appropriations Act
(GAA) related to the Prohibition on the Attachment of the
Name, Image, and Likeness of Public Officials on Government
Projects.
Note: DILG Regional Offices shall ensure the transfer of
registration of acquired motor vehicles in the name of the LGU
as Asset Account to protect the interest of the government.
The Appraisal Review and Approval Form (ARAF) (Annex D) shall
serve as checklist in the review of the LGU's compliance to the SGLG
Incentive Fund administrative requirements.
Whenever practicable, the DILG Provincial Office/HUC Office shall be
responsible for the appraisal of the projects and the completeness of
documents, while the DILG Regional Office shall be responsible for the
Approval of the Project Proposal.
The DILG Regional Office shall issue regular advisories or updates on
the status of submission of documentary requirements to the
concerned LGU beneficiaries.
6.4.4, Notice to Implement
Within five (5) working days upon approval of the project proposal,
the Regional Office shall issue a Notice to Implement (NTI) (Annex
E) authorizing the LGU's start of the fund utilization given that the
following have been conformed with:
LGUs with previous PCF/SGLG Incentive Fund project(s) of the LGU
have complied with all of the following requirements:
Page 9 of 17Those that have completed the project and submitted all
administrative documentary requirements and pertinent
Annexes to DILG Regional Office;
© Certification, with pictures of corrected or built items that
were recommended during the final inspection or
monitoring by the joint DILG and LGU team of the previous
PCFISGLG incentive Fund projects
© Those that have submitted to DILG Regional Office the
following:
© Project Completion Report;
© Cettificate of Completion;
© Final Statement of Work Accomplishment (SWA)
with high resolution pictures; and
© Copy of the Final Report of Disbursement duly-
received by COA assigned in the LGU at the time of
application if the ‘verified correct” Report of
Disbursement is not yet available.
In case the proposed project is Purchase of Motor Vehicle, LGU
recipients should secure first the NTI issued by the DILG Regional
Office before requesting the Authority to Purchase Motor Vehicle
(APMV).
Concerned Regional Office shall secure a receiving copy of the said
NTI and upload it in the SGLG Incentive Fund Web Application.
6.45. Project Timeline
All projects must be completed and liquidated wit
the date of issuance of the Notice to Implement from the DILG
Regional Office. The date of issuance of Notice to Implement (NT!)
from the DILG regional office shall be considered the project's start-up
date. All LGU recipients are expected to implement the project based
on the approved Project Proposal and Program of Works.
In case of change location of their project/s, recipient LGUs _ shall
secure DILG Regional Office approval. In case of change order or
deviation order, recipient LGU shall submit the revised Project
Proposal for approval of the DILG Regional Office and furnish copies
of the change order or deviation order. Variation order is not allowed
in the last quarter of the implementation period or at its 85% nearby
completion.
‘The LGU may request for an extension on the implementation of the
SGLG Incentive Fund project, to be approved by the DILG Regional
Office, as long as the following documents have been complied:
a. Justification for the delayed implementation of the project
(eg attachment document for Force Majeure, changes in
project scope, delayed delivery of equipment, etc.); and
Page 10 of 17
|b. Proposed/programmed Catch-up Plan/Schedule within the
allowable leeway period (3 months) to complete the
project
“Total change of the approved project proposal is not allowed once the
Notice to Implement was received.
6.5. Fund Management
6.6.
6.5.1. Entry to Regional Books of Account
SGLG Incentive Fund Subsidy shall be taken up as an outright
expense in the Book of Accounts of the Regional Offices. Upon release
of the subsidy to LGUs, the entry should be Financial Assistance to
Local Government Units.
6.5.2. Entry to LGU Books of Account
Upon receipt of the subsidy, the entry in the LGU Books of Account
shall be “Due to other Government Agencies” or its equivalent
account used by the LGUs. Completed projects and procured motor
vehicles/equipment shall be recognized in the LGU Books of Account
as “Asset Account” which is debited and the Income Account
(Subsidy from Other Gov't Agencies) is credited.
6.5.3. Refund of Unexpended Balance After Project Completion
Unexpended balances shall be returned directly to the National
Treasury within the implementation period (one full year from the date
of receipt of NTI from the DILG Regional Office), following existing
guidelines on the transfer of funds. Proof of such remittance/refund
shall be submitted to the concerned DILG regional office (LGU to
secure a copy), the same should be retained by the Regional Office
copy furnished the Bureau of Local Government Development (BLGD).
*Once retumed to the national treasury or claimed as “reverted”,
requests for the use of said funds will no longer be allowed.
Failure to revert unutilzed funds for projects that cannot be
implemented (i.e. overlapping of funds, peace and order situations,
legal concerns, and among others) within the recommended period
shall be considered non-compliance to these Guidelines.
Monitoring and Reporting
6.6.1. Progress Monitoring
The LGU shall submit a Monthly Progress Accomplishment Report not
later than the 25" day of the ensuing month using the Statement of
Work Accomplished (SWA) (Annex F) to the Regional Office thru
Page 11 of 17appropriate channels. Whereas, the Statement of Receipts and
Disbursement (SORD) (Annex G) shall be submitted by the LGU as
deemed necessary, whenever a progress billing is issued by the
Contractor/Administration. LGUs shall use the prescribed SWA and
ORD template to ensure uniformity and uploading/encoding
purposes.
6.6.2. Conduct of Monitoring Visits
The DILG Regional Team shall conduct regular quarterly monitoring
visits to SGLGIF-subsidized projects or as offen as necessary.
Whereas, SGLGIF Project Monitoring/Assessment Tool (Annex N)
shall be used while conducting the visit. Upon notification of the DILG
monitoring team of its findings, the concerned LGUs shall make the
necessary corrections during the project implementation.
The National SGLGIF Management Team shall also conduct
monitoring and evaluation (M&E) through field validation and spot-
checking on ongoing and/or completed projects, as deemed
appropriate.
6.6.3. Data Uploading on the SGLG Incentive Fund Web
Application
To fast-track submission of SGLG Incentive Fund Project
Accomplishment Reports, recipient LGUs shall submit electronic
copies of pertinent documentary requirements to the concerned
Cluster Leaders, SGLG Incentive Fund Provincial Focal Persons, and
Regional Offices through channels. The concemed DILG
Office/Personnel shall upload the said documents directly in the SGLG
Incentive Fund Web Application on a monthly basis (not later than the
5th day of the ensuing month) in order to regularly update the status of
LGU project implementation.
Cluster Leaders shall encode the accomplishment reports of recipient
component Cities/Municipalities under their coverage. Provincial Focal
person shall encode the accomplishment report of recipients Provinces
as well as oversee the reports encoded by their Cluster Leaders.
Regional Office shall encode data for Highly-Urbanized Cities or LGUs
that are not under the coverage of Cluster leader or Provincial Focal
Person. It shall also oversee all the encoded data/reports within their
respective regions.
For ready reference of the concemed LGUs, below is a list of
documentary requirements for submission to the concerned DILG
Office/Personnel per project implementation phase:
Start-up Phase
© Project Proposal,
Page 12 of 17Existing approved LDIP or PDIP (certified true copy by the
Secretary to the Sanggunian of the page indicating the
project);
Project Fund (Proof of Fund Receipt — OR/JEV);
Project Implementing Team (Executive Order);
Detailed Engineering Design;
Program of Works; and
One (1) High-resolution geo-tagged Joint Photographic
Experts Group (,jpeg) photos of the project site.
Implementation Phase
Copy of LGU stamped-received NTI;
Project Permits or Certificates;
Monthly Accomplishment Reports through Statement of
Work Accomplished (SWA) vis-a-vis Program of Work
(POW);
Statements of Receipts and Disbursements (SORD),
whenever necessary
Procurement and Bidding Documents (Purchase Order,
ITB, NOA, Contracts and NTP);
Authority to Purchase Motor Vehicle from DILG or DBM;
and
One (1) High-resolution geo-tagged jpeg photos of the on-
going project.
Project Completion Phase
List of corrective measures conducted based on the
monitoring report of the DILG monitoring inspection team;
Final Statement of Receipts and Disbursement (SORD)
with proof of Refund (for unexpended balances);
Final Statement of Work Accomplishment (SWA);
Project Completion Report;
Certificate of Completion;
Certificate of Occupancy;
Certificate of Turnover and Acceptance (if by Contractor);
12 months warranty certificate signed by the Contractor;
One (1) High-resolution geo-tagged jpeg photos of the
completed project (visible SGLG Incentive Fund marker);
and
Copy of OR/CR under the name of LGU for purchase of
Brand-New Motor Vehicle
Copy of Official Receipt of the Heavy Equipment
(Backhoe, Bulldozer, Loader, and Graders)
The Regional Focal Person shall conduct regular monitoring of SGLG
Incentive Fund Web Application, updating by the Cluster Leader/
SGLG Incentive Fund Provincial Focal Persons and provide technical
assistance as necessary.
Page 13 of 17Regional Focal Persons/Cluster Leaders/Provincial Focal Persons are
the only authorized personnel to upload and encode data in the
SGLG Incentive Fund Web Application. LGU recipients shall not be
given access to the said Web Application as it may create conflict of
interest and affect the integrity of data.
6.6.4. Reporting of Completed Projects
Within 10 calendar days of project completion, the LGUs sirall submit
the copy of their Project Completion Reports (PCRs) (Annex H) to the
DILG Regional Office thru channels. The PCRs to be submitted by
LGUs shall include the following attachments:
© Certificate of Project Completion by the Local Chief
Executive;
12 months warranty certificate signed by the contractor;
© Copy of Statement of Receipts and Disbursement
(SORD); and
‘© One (1) High-resolution geo-tagged jpeg photos of the
completed project;
For projects involving acquisition of motor vehicles, the LGU shall
accomplish and submit the Motor Vehicle Report Form (Annex J) within
15 calendar days upon delivery or completion of the procurement
process.
66.5. Inauguration of Completed Projects
In continuance of the Department in the implementation of LGU SGLG-
IF/PCF supported projects, the Local Chief Executive shall submit a
letter of invitation hereto referred as “Annex L” to the DILG Regional
Office copy furnished to the BLGD, 15 days after completion of the
project, a schedule of inauguration ceremony of completed projects
and shalll ensure that the DILG Director/Provincial/ MLGOO/CLGOO is
represented in these activities. Also, a picture of the said event shall
be submitted by the recipient Local Government Unit to the DILG
Regional Office
6.6.6. Permanent Markers
‘A Permanent Marker shall be installed in a noticeable, exposed place
within the area for completed projects. Markers can be funded through
the SGLG Incentive Fund by indicating said marker as part of the items
in the Program of Works.
© For horizontal projects, permanent markers must be
placed or displayed at the beginning of the completed
infrastructure on post signage (single or dauble mounted).
Page 14 of 17
|Whereas for vertical projects, markers shalll be installed
‘on the wall near the entrance or main door, preferably
within eye level. ifthe said installation is not applicable due
to the materials/characteristics/appearance of the project,
the permanent marker for the horizontal projects may be
used instead. Material used for the marker of both
horizontal and vertical projects should be weather-
resistant, may be non-corrosive metal (brass, aluminum,
etc.) or plastic (acrylic, fiberglass, corrugated, etc.)
Please refer to Annex J for Sample Marker with
corresponding specifications.
* For vehicles, goods and IT equipmentisystems,
permanent markers to be used are stickers. For vehicles,
stickers shall be installed at the driver's side (left front
door) of the vehicle whereas tor Goods/T Equipment,
stickers shall be installed to the visible area where the
equipment is placed and/or on the CPU of the main
computer used. Scaling of the sticker may be considered
depending on the size and type of equipment/vehicles (e.g.
for vehicles - 8.5°x11”, for system/equipment/computers —
4°x4”, for birthing facilities — 3x3"). Please refer to Annex
K for Sample Marker with corresponding specifications.
For ready reference and ease of access, editable templates of the
aforementioned markers may be downloaded through the following
Google Drive: bit.ly/3PufxqK
of the’ governing GAA particularly under Prohibition on the
Attachment of the Name, Image, and Likeness of Public Officials
on Government Projects. Generally, subject to the guidelines issued
by the Department of Budget and Management, itis prohibited to affix,
or cause to affix, the name, visage, appearance, logo, signature, or
other analogous image of any public official, whether elected or
appointed, on all Programs, Activities, Projects (PAPs) or its
corresponding signage.
6.6.7. Reportorial Requirements under the General
Appropriations Act (GAA)
Based on the GAA, the DILG shall update the following: Department
of Budget and Management (DBM) through the unified reporting
system, House of Representatives, Senate of the Philippines, and the
Commission on Audit (COA) with quarterly and annual reports that
note financial and physical accomplishments of the SGLG Incentive
Fund. The same report shall also be posted on the DILG website in
compliance to such reportorial requirements; hence, submission of
reports by the recipient LGUs through channels and up-to-date
Page 15 of 17
aencoding of DILG Field Officers in the SGLG Incentive Fund Web
Application ie necessary.
6.6.8. CSO Participation
The DILG Regional Office, through channels, must ensure the regular
monitoring of the implementation of SGLG Incentive Fund projects with
the local CSOs such as faith-based organizations and other sectoral
groups on a voluntary basis. CSO participation in field monitoring and
evaluation is highly encouraged.
6.7. Transparency in the Implementation of Projects
All recipient LGUs shall strictly follow the provisions of COA Circular No.
2013-004 dated January 30, 2013 entitled “Information and Publicity on
Programs/Projects/Activities of Government Agencies’, as amended by
COA Circular No. 2016-003 dated August 16, 2016.
7. Penal Provisions
Non-compliance to the provisions of this Memorandum Circular shall be dealt with
in accordance with pertinent laws, rules and regulations.
8. Dissemination
All DILG Regional Directors and the BARMM Minister of Local Government are
hereby directed to cause the immediate and widest dissemination of this
Memorandum Circular within their respective areas of jurisdiction.
9. Effectivity
This Memorandum Circular shall take effect immediately and shall remain in force
unless otherwise superseded or modified by subsequent policies and other
issuances
10. Separability Clause
If any clause, part or provision of this MC is declared unconstitutional or invalid,
the remaining parts or provisions not affected shall remain in full force and effect.
41, Amendments and/or Modifications
All amendments to the provision of this MC shall be done separately by the DILG
through the issuance of appropriate supplemental guidelines.
Page 16 of 17,12.Feedback
For related queries, kindly contact the Bureau of Local Government Development
(BLGD) at Tel. Nos. (02) 8 876 3454, or e-mail address at
[email protected].
13. Approving Authority
eee yg 2
arry oun C/ABALOS, JR.
Septétary
14.Annexes
Annex A: Notice of Eligibility
Annex B: Checklist of Projects
Annex C: SGLG Incentive Fund Project Proposal Format
Annex D: Appraisal Review and Approval Form (ARAF)
Annex E: Notice to Implement
Annex F: ‘Statement of Work Accomplished (SWA)
Annex G: Statement of Receipts and Disbursements (SORD)
‘Annex H: LGU Project Completion Report
Annex |: Motor Vehicle Report Form
Annex J Permanent Markers
Annex K: Motor Vehicle and Equipment Sticker
Annex L: Certificate of Completion and Acceptance
Annex M: Implementing Rules and Regulation for Project Implementing
and Monitoring Team
Annex N: SGLG Incentive Fund Project Monitoring/Assessment Tool
ELGOAFSIAAMLADOIGRMUSMJLENaM
Page 17 of 17Annex A: Notice of Eligibility
(DILG REGION LETTERHEAD)
Date:
Hon.
Province/City/Mun
Dear Hon.
We are pleased to inform you that the LGU of , being a Seal of
Good Local Governance (SGLG) recipient for CY __(Year) _ can now access the Seal of Good Local
Governance Incentive Fund subsidy in the amount of. Pesos (Php. .
Kindly prepare the following documentary requirements to start the project implementation, to
wit.
1. Accomplished Menu/Checklist of Projects indicating the proposed high-impact
development project duly approved by the Local Chief Executive and attached a certified
true copy of the existing approved Local Development Investment Program (LDIP) or
Provincial Development Investment Program (PDIP) (page indicating the proposed
project) by the Secretary to the Sanggunian.
Please submit the said requirements within five (5) working days upon receipt of this notice.
‘Our warmest regards.
Very truly yours,
Regional DirectorB. MENU/CHECKLIST OF PROJECTS
Region:
SGLG Incentive Fund Recipient LGU:
Province:,
Income Class of LGU:
This is to certify that the SGLG Incentive Fund _(Year)_ amounting to Php __M shal be utilized for the
implementation ofthe following project/s with corresponding project cost
Project Category
Proposed Project Title
Project Cost
jal Administration or
‘= Real Property Tax Computerization and
‘Administration Technology
1G Procurement of Equipment
‘GIT Infrastructure and Servers
1 Others, specify
Disaster Preparedness
© Fleod control
‘2 Storm drainage
5 Dikes
Seawall
Flood Gates
1 Slope protection
= Evacuation Centers
‘© Rainwater Collection
‘o Rescue Vehicle
Early warning system/device
1 Others, specify
Social Protection and Sensitivity Proaram
‘5 Rehabilitation center
© Ghild development center! Bahay Pag-6sa
‘Halfway houses:
Livelihood program
1 Alk-gender public comfort room
1 Water projects/systems
Water tanker
a Pathways:
je Hanging Bridges
Others, specify
Health Compliance and Responsiveness
t Rural Health Units/Health Centers
1 Birthing or Lying-in Facilities
1 COVID-19 Infrastructure/Equipment
1 Emergency Ambulance:
0 TB DOTS Facilities
7 Xray Machines
Others, specify
Prouram at A
‘3 School buildings
OTCT Equipment
Daycare Centers
1 Others, specify
sm, Her velopment, Culture, and
Arts‘5 Pasalubong Center
Museum
Parks
12 Tourist Information Center
a Others, specify
Business Friendlini iv
1a Business one-stop shop (Under EODB:
program)
a Hardware and Software infrastructure for the
modernization of business processes
‘a Access Roads, Core local roads, and Bridges
10 Public market
a Irrigation Systems
1a Cold Storage Facilities
1 Ports and Wharves
1 Post Harvest Facilities
15 Slaughternouse
‘a Automation of Permits and Licenses (hardware
& software)
1a Others, specify
Safety, Peace and Order
13 Closed-Circuit Television (CCTV) compliant with
NPC Advisory 2020-04)
13 Street lights
a Traffic Signages_
1 Patrol vehicle
a Early waming device
Environmental Management
15 Material Recovery Facility
Solid waste management equipment
1 Sewerage System
13 Garbage truck
1 Retaining wall
13 Sanitary land
‘3 Pumping stalion
10 Green infrastructure
1 Others, specify
‘Youth Development
‘a website development and equipment
a Youth center
13 Multi-purpose building
1 Gymnasium
a Librery
1 Foundling safe haven facility
a Others, specify
Confirmed/Certified by:
Local Chief Executive
Disclaimer: The above-stated projects are recommendatory, thus, LGUs have the option to propose other
eligible projects which are not included in the menu.Annex C: SGLG Ine: fe Fund Project Proposal Format
Project Code
(ie., SDGs)
Schoo! Building
Seal of Good Local Governance Incentive Fund
Project Proposal Format
1. Identifying Information
Project tile:
LGU: (Mun, Province)
(Region/Cong.
District)
Project Location:
Proposed start date: Proposed completion date:
No. of Beneficiaries:
Direct: Women :
Men:
Indirect:
Men:
Type of Beneficiary:
(e.g.,Fisherfolk)
LGU Income Class:
(CE/Contact Person:
Il. Project Description
A. Brief Summary of the Project
A description of what the project intends to do based on the problems it wants to
address and Its immediate impacts.
B. Problem Statement
A description/statement of the problem it wants to address, substantiating the problem/s
‘or opportunityries. For example, the project wants to rehabilitate a 1-kilometer Access
Road destroyed by flooding. To substantiate, state the number of families affected, theirsource of income, level of income, hectares planted to agricultural crops, etc., that
‘would warrant the approval of the project.
C. Project Goal and Objectives
Since the SGLG Incentive Fund projects are implementable only over a period of 12
months or less
+ Only one(1) goal should be stated; and,
+ Limit the statement of objectives to 2-3. These objectives should be SMART
(Specific, measurable, attainable, realistic, and time bound).
D. Project Components / Expected Output/s / Timetable
= It is recommended that one(1) objective correspond to one(1) component. For
example:
OBJECTIVES
‘COMPONENT
1. Construction of Two-
Classroom School Building
‘A. Construction of 2 Classrooms
2
‘A Timetable or Project Implementation Plan is presented using the following table. For
‘example:
COMPONENT | ACTIVITIES | EXPECTED | IMPLEMENTAT | PERSON
OUTPUTS |IONPERIOD | RESPONSIB
Le
Construcio |1. Finalization | Final January 20___| Project
nof2 of Surveying Engineer
Classroom | Surveying | Work
School ‘Work
Building
2 Finalization | Final POWs | January =do-
of Engineering
Plans and
Pows
3 Contract Feb BAC
Procurement | signed
4. Construction | 2 ‘April Contractor
Classrooms
Constructed
8
cBudget
Line Items | SGLG incentive Fund Subsidy | __ TOTAL PROJECT COST
/ Grant Amount Requested
Total
Project Management / Monitoring and Evaluation
Name the key officers and staff (LGU Project Management Team) that will be directly
accountable for the project and their tasks. Describe the monitoring and evaluation
‘schemes to be utilized in accordance with SGLG Incentive Fund guidelines.
Project Sustainability
Describe how the project will be sustained after SGLG Incentive Fund assistance in terms
of policy, user's fees and charges (i.e., water tariff) and related resolutions/ordinances;
office/unit responsible for the operation and maintenance.
Risk Management
Describe under what conditions the project will go wrong. Indicate what preventive and
mitigation mechanisms need to be installedAnnex D: Appraisal Review and Approval Form
Region:*
Province:
City/Municipality:
Congressional District:
Name of LCE:
Income Class:
Project Title:
Appraised Project Cost:
Contact Details:
Civil Society Organization (CSO), f any
‘Subproject Stages and Requirements ‘Remarks
PRE — QUALIFICATION
1. Seal of Good Local Governance Fund
RA. 11292 Project Proposal
2. Certification that the project is included
in the current Local Devel
Investment Program (LDIP) or
Provincial Development Investment
Program (PDIP)
3. Program of Work (POW)
with Detailed Estimates and Quantity
Take-Off
Institutional ee eke ened
1.1 Proof of tand ownership (Deed of
Donation/Sale, Tax Deciaration,
Transfer Cert. of Title, Certificate of
Land Ownership under CARP,
Certiticate/Title of Ancestral Domain)
1.2 Land Use/Zoning (agricultural,
residential, commercial, institutional,
public land)
1.3, Right of waylownership
1.3.1 Deed of Donation/Sale ~for
roads/water supply
4.3.2 Waiver! consent letter of land
‘owners-for water supply system1.3.2 Waiver! consent letter of land
‘owners-for water supply system
1.4No non-compensable negative effects
on affected indigenous peoples
(IPs)imarginalized sectoris
1.5 Peace and order situation (proposed
subproject site)
4.6 GEDSI Responsiveness
‘2. Technical
24. Infrastructure
2.1.1 The proposed site is not susceptible
to excessive surface run-off or
flooding except for small water
impounding projects and inland
fishery projects.
2.1.2 The proposed site is not located on a
slope that is prone to landslide or
erosion,
2.1.3 The proposed site is not located
within oF near a faultiine.
2.14 The proposed site will not disturb
historical and monumental markers.
2.1.5 Completeness of detailed
engineering design (drawing
plans)
2.1.6 Priced bill of quantities and
detailed estimates
2.1.7 Construction schedule, bar
chart/S-curve
2.1.8 Technical specifications
2.1.9 Pictures of the proposed project
site
2.1.10 Installation of Permanent
Marker
2.2 Goods/Equipment
2.2.1 Availability of Goods! Equipment
to support the operation of the
project
2.2.2 Specifications and quantities,2.2.3 Cost estimates based on the
canvass made by the LGU and
Validated by the RPCFT
2.2.4 Delivery schedule
2.3 Motor Vehicle/Equipment
2.3.1 Technical Specifications
2.3.2 Unit cost of the proposed Motor
Vehicle
2.3.3 Report of the Physical Count of
Vehicle/ Equipment
2.3.4. Proof of Ownership / Transfer of
Registration
IEE/ECCICNC/HNCINGIP Application,
Tree cutting permit, if applicable
3.2 Water permits (water projects)
3.3 iWaSH - Integrated Safe Water,
Sanitation and Hygiene
4.1 Unit/Personnel identified for the
‘operation and maintenance of the facility
4.2. Annual budget for operation and
maintenance
4.3, Proposed users’ fees and charges
for income-generating projects, if
required (funding requirement)
Imposed Resolutions/Ordinances
5.1 ADM
6.2 Salintubig
5.3 ete (epecily)
Other Comments for consideration:
Reviewed and Appraised By:
PDMU Staf/RSGLGIF Team Member/Focal PersonAnnex E : Sample Notice to Implement
(Date)
Hon,
Province/City/Municipality of
Thru:
Provincial Director
Attention:
MUGOOIKLGOO
Dear Governor/Mayor i
Pursuant to the completion of documents submitted to this level, you are hereby NOTIFIED
TO IMPLEMENT the (Project Tile)_at (Project Location} to be charged against the Seal of
Good Lacal Governance Incentive Fund in the amount of Php . Please be advised
that the project must be completed and liquidated on or before (12 moni nr
this Notice to Implement (NTI) from the DILG regional office). Failure to implement the
proposed project within the prescribed timeline can be used as a ground for disqualification
of your LGU in the next SGLG assessment.
Moreover, kindly submit to this level, thru appropriate channels, the reports and other
pertinent documents using the prescribed forms as stipulated in the DILG Memorandum
Circular No. ted
For your compliance.
Very truly yours,
Regional Director —eg 20
‘enjewesaidey pazuouinyoreyiowenog Je0uj6u3 WOId
panouddy ig pasedaig
WIOL
puna ep wy Te
enqueouy 7 (4) eve g¢)uqUOW @U4 405 wicooy uo |
Geen ps0 02" MeN OOS | oy aulusicuiosay | weuysiduioooy shud Auend | duoseapuon | “ON
(dyg)swerl pied leoisfud BOL reorsfud Ssno|Aald 40 sue}]
| al
uoneuewejduy |eMoy ‘SHON JO wreIBOIE
‘eQueueA
:uone|dwog jo seq
___vonequawia/du| o Weis enjoy Jo 12
— turnotty 92ND
uno feo pelold
junowy pun4 enyuscu] 9198
484 PuN4 AUBOL] OTS
“UNIAN NOS
“20h elOdd
yo yUoU eWy 404
44Od3Y LNSWHSITdNOD9V SSIYOOUd ATHLNOW
NN SALLNSONI SONVNYSAOD 1V901 GOOD 40 vas
(WMS) Pousidulodoy YOM JO juaUIo}e}G 4 xouUy‘angeqaseidey pezioysny | oe WHOWBACD W/DId Joinseas WiOld quewunosoy IW/DId
(uewesungsiq 0} sy) (uodey 04 sy)
‘hq penouddy PELOD PaylHeED J9210D payed
sPeuod pue eng ave sjuawajeys BujoSe10} ay) yeyy Auped Aqevey |
od OK SoURIER TeIOL
HK HONK sjuolussingsic [eI
KX KK syijeoay je}0)
rel = oti :Aewwing anyenuing
00% xx Jose eouereg
00 10% 20K sjuawasingsig [2101
ON
Jeyonon qu
qunowy sieinomegjeekey — awasingsig ‘ON 994 area
sjuewasingsig :ss27
2K KK 200K sydieoey IO.
nowy Seno, «ON -PSUDTON UIBIESY aiea
‘spun, Jo ydiao0y
2X 2K seouejeg Buluuibag
Aynb3
rol Sia
"L809 LOSrOud
‘FULIL LOBPOUd
40 YyuoYy <4) 04
(GuOS) SLNSWASYNESIC GNV SidI303Y 30 LNSWS_W1S
AD CNN SAILNSONI SONVNYSAOD 1¥907 GOOO JO Tvas- 911d
40 sound
Jo Awediouny/Ay
(aYOS) s}ueWesingsig pue s}disDey Jo JUOWA}e}g 15 XoUUYAnnex H: LGU Project Completion Report
SEAL OF GOOD LOCAL GOVERNANCE INCENTIVE FUND-SUPPORTED PROJECT
LGU Project Completion Report
Identifying information
Project Title
LGU: (Province/Gity/Miun.)
(RegioniGong, District)
Project Location
No. of Beneficiaries:
Direct Women
‘Men :
Indirect Women:
Men
‘Sector/s Involved:
(@.9..Fisherfolk)
TSU Income Class:
TCE/Contact Person
Assessment of Accomplishments
Stated
Objectives
Activities
Conducted
Achievement of
Objectives
‘Outcomels (Contribution to Good fiscal,
DRR, Social Protection, Health
Compliance, Sustainable Education,
Business friendliness, Peace and Order,
Environmental Management, Tourism,
Youth Development)
vin.
Difficulties Encountered and Measures Taken
Unanticipated Benefits of the Project, if any
Finances (Actual Expenditure vs. Budget)
Sustainability (Funding Requirements to sustain the project, Resolutione/Ordinances, ote.)
Recommendations
Attachments (Pictorials (Projects, Permanent Markers, Stickers), 12 months warranty
Certificate, Certificate of Completion, Certificate of Turnover and Acceptance if by
Contractor, etc.)
1X. Propared by:
(Sgd.)LGU-SGLG Incentive Fund Team Leader
Date:
Approved By:
(Sgd)Local Chief Executive
Date:sea saqea
{uoneubisoq] Quewunosoy Ap/Ayedouunyy/fepuivoid]
[owen paquiig 4000 aunyeusis] [owen pazuiid Jeno eumeubis]
‘Ag panouedy :he pauedaud
unowy ajiyen eseyaing | uowhoideq vequny ees pue oaks jon wousoedsia | gy
reo,” | 3293" | ONYORIO | orhuoMny | joe2yjo | esoding | subug TepoHy puesg ‘apHeA 0IGN 0 Sch) | OO
jo.eyeq eouenss} | 4048) ‘Suopeoyjoods jeouyre|, 30 0N
wos Hoday s1a142A 1010~
Pun eAgusdUl aUEUIeAOD [2907 Pood jo [eas
[ssaippy AoueBy/eou0]
{NOIDSY 40 3WNI
[LAona9WA1440 4O AINWN]
Souda @UN Jo SyGNdeR,Annex J: Permanent Marker for Completed Projects
SIZE: 8.5 inches width x 11 inches height
Material: Brass/Steel/Aluminum / Galvanized Iron
This Project Title
was constructed thru |
| SEAL OF GOOD LOCAL GOVERNANCE |
INCENTIVE FUND (SGLG IF,
availed by the
Province / City / Municipality of |
for having passed the DILG-
Seal of Good Local Governance
in Year awarded |
Project Completed on:Annex K: Motor Vehicle / Equipment Sticker
LGU LOGO
‘SPECIFICATION:
Size: Motor Vehicie:
8.5 inches width x 11 inches height (Minimum ~ Scalable per desired
size)
Equipment:
As applicable (Scalable per desired size)
Font Style: Century Gothic
Color: Primary Color: Yellow (#FFDE13) — Red (##BF1C2D) - Blue
(#2149CD)
Other shades as necessary.NOILWAS13 YV3Y NOILWAS 13 LNOUS
worossavont = —- 9¢0-— vorossaonL = —- 00 -~G—
1331S avMNANL HHL
WNEXWAOSXWHCOT
1p e2ujoid /Ao /Auodorunw
yA Petsno wosbelg
-O11d 84} Muy Peyonysuo> SDMAnnex L: Certificate of Completion and Turnover/Acceptance
Republic of the Philippines
Province/City/Municipality of
OFFICE OF THE
Date)
CERTIFICATE OF ACCEPTANCE
‘hereby certify that the project described below has been found satisfactorily completed
in accordance with approved plans and specifications as certified by the Municipal Engineer or
Authorized Representatives. Final payment is therefore recommended.
Name of Project:
NOTE: BY _(ADMINISTRATION/CONTRACTOR) _
Recommended by:
Name of P/C/M Engineer
POSITION
Accepted by:
(Name of Local Chief Executive)
POSITIONRepublic of the Philippines
ProvinceiCity/Municipality of
OFFICE OF THE
CERTIFICATE OF PROJECT COMPLETION
This is to certify that the. (Title of the Project has been duly completed as of (Date
of Completion) by __(this administration _/(Name of Coniractor) _ and that all works
incorporated therein as to quantity and quality of materials were done in accordance with the
approved plans, specifications and other requirements.
Issued this _day of (Month, Year) in__(Location)_
Prepared by:
Name of Contractor)
Name of Authorized Representative)
‘CONTRACTOR
Inspected by:
Name of P/C/M En
POSITION
Recommended by
(Name of Local Chief Executive)
POSITION(DILG REGION/PROVINCIAL
LETTERHEAD)
(Date)
CERTIFICATE OF TURNOVER AND ACCEPTANCE
By way of the issuance of the Certificate of Completion for the:
Project Title:
Location:
Source of Fund:
Project Cost
Date Started:
Date Completed:
The Department of the Interior and Local Government (DILG) is hereby formally turning over to
the Local Government Unit (LGU) of _Province/City/Municipality _ the completed facility as,
described above.
Regional/Provincial Director
ACCEPTANCE
By virtue of this certificate, through the undersigned, hereby accepts the completed project ac
above described and confirms assumption of responsibility with regard to custody, security, care
‘and maintenance of the structure and its facilities,
NAME
‘Governor/City/Municipal Mayor
Issued this __ day of (Month, Year).Republic of the Philippines
Province/City/Municipality of
OFFICE OF THE
WARRANTY CERTIFICATE
‘We hereby warrant and guarantee all work performed to the (Title of the Project) for
a period of 12 months from the _(Date of Completion). _(Name of Contractor) _ will repair or
replace any defective work which we performed at no additional charge to the owner.
Issued this___day of (Month, Year) in__(Location)_.
Prepared by:
(Name of Contractor
Name of,
CONTRACTOR
Noted by:
(Name of P: ineer)
POSITION
Recommended by:
POSITIONRepublic of the Philippines
Province/City/Municipality of
OFFICE OF THE
INVITATION LETTER
Date:
To:
Name of DILG Official
Designation
‘Organization,
Office Address.
Subject: Invitation to the Inauguration/Turn-over Ceremony
Dear Sir/Madam,
‘We would like to cordially invite you to the Inauguration/Turnover of our new__Name of
Project at the Location of the project, (Brief Summary of the Project).
The said project was completed on __Date completion of the project
Please note on the following details about the Inauguration/Turnover ceremony:
Date:
Place:
Time:
Prepared by:
(Name of P/C/M Engineer)
POSITION
Noted by:
(Name of Local Chief Execut
POSITIONAnnex M: Project Implementing Unit
(LGU LETTERHEAD)
IMPLEMENTING RULES AND REGULATIONS OF RA. NO. 11202
(THE SEAL OF GOOD LOCAL GOVERNANCE ACT)
AN ORDER CREATING THE SEAL OF GOOD LOCAL GOVERNANCE INCENTIVE FUND.
(SGLGIF) PROJECT IMPLEMENTATION TEAM AND ITS TECHNICAL WORKING GROUP
(TWG) OF THE (Name of LGU)
WHEREAS, The Seal of Good Local Governance Incentive Fund (SGLG Incentive Fund), a
Performance Challenge Fund, was institutionalized by virtue of Republic Act No. 11292
otherwise known as the Seal of Good Local Governance Act of 2019, and is a Local
Government Development Program managed by the Seal of Good Local Governance Council
(hereinafter as the Council), composed of various National Government Agencies (NGAS).
WHEREAS, the SGLG Incentive Fund is a progressive incentive system given to an eligible
LGU in the form of a counterpart fund to finance high-impact local development projects
prioritized by the LGU, and to further influence and encourage the LGU to deliver public service
more effectively;
WHFRFAS, through the SGLG Incentive Fund, the LGU is encouraged to promote effective and
honest governance through an intensive campaign on full disclosure policy, as the Seal of Good
Local Governance is one of the criteria in order for the LGU to be eligible for the SGLG.
Incentive Fund;
WHEREAS, the __(Name of LGU) _ received a Notice of Eligibility dated from the
(Name of Regional Director). DILG Region _ informing that this office passed the
Seal of Good Local Governance (SGLG) FY and eligible to avail the SGLG Incentive
Fund _(Year)_ subsidy in the amount of
WHEREAS, one of the requirements in availing of the SGLG Incentive Fund is the creation of a
Project Implementation Team to facilitate and monitor the implementation of the projects
Prioritized by the LGU.
NOW THEREFORE, |, _ (Name of Local Chief Executive) __ of __(Name of LGU)__ by
virtue of power vested in me by law and the Constitution do hereby create the SGLGIF Project
Implementation Team (SGLGIF-PIT) in the _(Name of LGU) _.Section 1. CREATION. There shall be created a SGLG Incentive Fund Project implementing
Team tothe ___ (Name of LGU)
Section 2. COMPOSITION. The SGLG Incentive Fund Project Implementing Team of the
(Name of LGU) __ ehall be composed of the following membere:
Chairman (Name of LCE) __
Co-Chairman (Name of Vice-Mayor/Governor)
Members (Name of LGU Planning and Development Officer)
yf ngineer
Name of Budget Officer)
Name of LGU Accountant
—iName of LGU Administrator) _
(Name of M/ICLGOO)
(Others, if applicable
‘Section 3. FUNCTION, DUTIES AND RESPONSIBILITIES. The SGLG Incentive Fund Project
Implementation Team (SGLGIF-PIT) shall have the following function. duties and
responsibilities
1. Ensure that the project implementation abides the provisions on the DILG MC 2022-
dated
2. Facilitate the preparation and submission of all documentary requirements for the
release of the SGLG Incentive Fund Subsidy;
3. Assist in the preparation of the project proposal to be submitted to the Chairman of the
SGLGIF-PIT for review and approval;
4. Assist in the preparation of the Program of Works, Detailed Cost Estimate and Detailed
Engineering Design in case of Infrastructure project;
5. Prepare the project action plan and budget, subject to the approval of the LCE;
6. Determine and approve propose project to be funded by the SGLG Incentive Fund;
7. Monitor the progress and oversee the implementation of the SGLG Incentive fund
project;
8. Facilitate the preparation and submission to the DILG Regional Office progress reports
of the following:
‘a. Monthly Submission of the Statement of Work Accomplished (SWA) every 5th
day of the ensuing monthb. Submission of Statement of Report and Disbursement (SORD, as deemed
necessary, when the contractor/administrator issues a progress billing
cc. Reports on projects involving procurement of goods and services.
9. Submit Project Completion Report once project is completed supported with pictorials
accompanied by the following:
a. Cerlification of Completion
b. Certificate of Turnover and Acceptance (if project is by contract)
¢. 12 months warranty certificate signed by the Contractor
d. Final Report of Disbursements duly received and verified by the Local COA;
410. Performs such other functions related to the SGLG Incentive Fund Implementation and
‘management as may be prescribed by competent authorities.
Section 4. MEETINGS. The SGLGIF-PIT shall have its meeting as it may deemed necessary, to
discuss, assess, review, and evaluate any matters relative to its function as mentioned hereof.
Section 5, REPEALING CLAUSE. Previous issuance or any portion thereof, which are
inconsistent with the provision of this Act are hereby amended, modified, suspended or
repealed accordingly.
Section. 6. SEPARABILITY CLAUSE. If any section or provision of this Implementing Rules and
Regulation is declared void, ineffective or invalid by a court of competent jurisdiction, the holding
of such section or provision to be void or invalid for any cause whatsoever shall in no way affect
the validity of the remaining sections and provisions, which shall remain in full force and effect.
Section 7. EFFECTIVITY CLAUSE. This Implementing Rules and Regulation shall take effect
immediately upon the date hereof and shall remain in effect until rescinded, repealed or
amended.
SO ORDERED.
Done this __ th day of (Month, Year) at the Office of the __(Name of LGU) ___, Philippines.
(Name of.
Governor/Gity/Municipal MayorDEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
SGLGIF PROJECT MONITORING /
ASSESSMENT TOOL ET
PROJECT OBSERVATIONS AND ASSESSMENT TOOL (For Vertical Projects]
[PROJECT LOCATION: |
PROJECT START
DATE:
VERTICAL PROJECTS
[Evacuation Center _ | Medical ‘School TMulti-
Center/Hospital | Building purpose
Butlding
TAs per plan. Twith variation
Description Location
Concrete Test Result Availability Elevation Check
Yes 1 As per plan
Description Location
RSB Test Result Availability Mill Certificate Availability
Yes Yes 1No
Description LocationDEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
SGLGIF PROJECT MONITORING /
“Architectural TNot Applicable
‘Scope of work Description Location
Floor finishes
Ceiling/Roofing works
Metal works
Painting works
Electrical TNot Applicable
‘Scope of work Description Location
Lighting Layout
Power Layout
Electrical Fixtures
2 Panel Boards/EE room
Plumbing TNot Applicable
‘Scope of work Description Location
Waterlines
Sewer lines
Plumbing Fixtures
Septic Tank
ther Findings:
Attached Photo HereDEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
SGLGIF PROJECT MONITORING /
ASSESSMENT TOOL encore ere]
Validator’s Signature over
printed name
Office/Designation:
‘Attached Photo Here
Regional Focal Person Regional Director | TEU Representative |DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
SGLGIF PROJECT MONITORING /
ASSESSMENT TOOL
| PROJECT OBSERVATIONS AND ASSESSMENT TOOL (For Horizontal P1
PROJECT TITLE:
[PROJECT LOCATION: |
PROJECT START
DATE:
HORIZONTAL PROJECTS
7 Gore Local Access Road
1 Farm-to-Market-Road
‘Type of Material
(Flood Control
Drainage Canal
Concrete
Asphalt
Bridges
0 Seawall
Gravel
"Type of Construction
Road Shoulders
(Reference: POW/DED)
Rehabilitation
(Parallel to the Traffic
Dincluded
[iNew Construction
TPerpendicular to Road
Center
‘Weakened Plane Joint
Cutting
‘Asphalt sealant
application
Proper
Present
TU Discrepancy in PCCP Length:
Discrepancy in PCCP Thickness:
improper
‘Uneven
“Discrepancy in PCCP Width:
1 Other Findings:
Description
Does the SGLGIF Project have an incoming
Variation Order UYes (NoDEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
SGLGIF PROJECT MONITORING /
ASSESSMENT TOOL ST
‘Attached Photo Here
Validator’s Signature —_ _—
over printed name
Sierra ES
Regional Focal Person Regional Director LGU RepresentativeDEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
SGLGIF PROJECT MONITORING /
ASSN TL —
PROJECT OBSERVATIONS AND ASSESSMENT TOOL (For Water Project]
aT
PROJECT START
DATE:
Water Supply. TD Sewage and Sanitation _[ Oi trrigation
Level | (10-20 Iped) Level Il (60-80 Iped) | Ci Level Ill (100-120 Iped)
liters/capita/day or lped)
Ground [GElevated
"Type of Material Reinforced Concrete | O Steel
“Type of Starage TDReservair | Water Tanks ) Ferrocement Tank
(Gistern Tank
Ti faproper foundation aligamant 1 Poor welding connections
i Painting of Steel Water Tank (If included in Ti Potable Water Quality Certificate
POW)
Does the SGLGIF Project have an incoming Variation Order (Yes No
(1D Other Findings:
Description Location
'SGLGIF Permanent Marker Installed_U Yes _11NoDEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
A SGLGIF PROJECT MONITORING /
2,
Photo Documentation:
Attached Photo Here
Remarks:
Office Designation:
Regional Focal Person
Regional Director _ LGU Representative