ITP-MEP-006 Dismantling of MEP

This document outlines an inspection and test plan for dismantling MEP works at the Nakheel Mall East Wing Refurbishment project in Dubai, UAE. It lists 9 key items/activities to be inspected including shop drawing approvals, risk assessment documents, site validation, isolation procedures, stripping electrical supports/cables/fixtures, material storage, and handover documents. For each item, it identifies acceptance criteria, verification activities, inspection frequency, responsible parties, and status. The purpose is to ensure all MEP dismantling works meet project specifications and receive necessary approvals from stakeholders.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
770 views1 page

ITP-MEP-006 Dismantling of MEP

This document outlines an inspection and test plan for dismantling MEP works at the Nakheel Mall East Wing Refurbishment project in Dubai, UAE. It lists 9 key items/activities to be inspected including shop drawing approvals, risk assessment documents, site validation, isolation procedures, stripping electrical supports/cables/fixtures, material storage, and handover documents. For each item, it identifies acceptance criteria, verification activities, inspection frequency, responsible parties, and status. The purpose is to ensure all MEP dismantling works meet project specifications and receive necessary approvals from stakeholders.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

INSPECTION AND TEST PLAN (ITP)

Project Name: NAKHEEL MALL EAST WING REFURBISHMENT, DUBAI, UAE Project No.: UPR377 Ref. No.: UPR377-ITP-MEP-006 Rev No.: 00

Activity : Dismantling of MEP works Location: Nakheel Mall Date: 12-Feb-24

Inspection Points Inspection dates


Project Specification Section /
No. Item/Activity Acceptance Criteria Verification Activity Frequency Verifying Document Status / Comments
Document Reference No.
S/C ISG Consultant Client Planned Actual

Shop Drawing Approvals - Demolition Design / IFC drawings to be used to


1 Elec. Spec / Contract Drawings Drawing Submittal Prior to starting works Drawing Submittal Approval H R A
drawings develop the shop drawings

Risk Assessment Method Statement Elec. Spec Section No, Materials submittal, Relative construction standards and local RAMS and ITP RAMS and ITP document Submittal
2 Every 3 months H W/R A
(RAMS) & Inspection & Test Plan(ITP) method Statement authorities codes document Submittal Approval

Elec. Spec Section No., IFC drawings, design Condiition survey report Inspection
3 Site validation report As built and design drawings Site survey Once H R A
drawings Request (IR) Approval

4 Isolation Elec. Spec Section No,/RAMS/Permits Visual Inspection Material Submittal Once Material Submittal Approval H R R A

Strip out electrical supports and Elec. Spec Section No, Materials submittal,
6 Approved shop drawing and RAMS Site Inspection Once Inspection Request (IR) Approval H R A
containment method Statement

Strip out Cables and wires pulling, and Elec. Spec Section No, Materials submittal,
7 Approved shop drawing and RAMS Site Inspection Once Inspection Request (IR) Approval R R A
final fixtures method Statement, Shop Drawings

Elec. Spec Section No, Materials submittal, (1) 100% by S/C


8 Material Storage Visual Inspection Material Inspection 100% N/A H A W W
method Statement (2) Random by ISG & Client

Handover Documents Specification - Section- Closeout/Handover- Transmittal Approval/Signed copy As per Project Closeout/Handover
9 Visual Inspection Transmittal Once H R R A
SECTION through email Requirements

Inspection / Test Type Witnessing Parties


H = Hold Point (Stop and wait for inspection) Main Contractor = ISG
W = Witness Point (An activity is witnessed by ISG team or informs the client team if they want to attend) Subcontractor = EMKAY GLOBAL ELECTROMECHANICAL WORKS LLC
R = Review (A planned onsite / offsite inspection / audit / Mock up). Consultant = NEB
A = Approval (Inspection, Witness, Review and Approval of the item/activity) Employers Representative = NAKHEEL MALL (PALM JUMEIRAH, DUBAI)

FORM REF: HSQE-ITP-XX1 AUTHORISED BY: Head of HSQE | DEPARTMENT: HSQE | DATE OF ISSUE: February 2019 | ISSUE NUMBER: 02 PAGE NUMBER 1 of 1

FORM REF:  HSQE-ITP-XX1
AUTHORISED BY:  Head of HSQE   |  DEPARTMENT:  HSQE  |  DATE OF ISSUE: February 2019  |  ISSUE NUMBER