0% found this document useful (0 votes)
23 views22 pages

Hydro Test

This document summarizes a review of procedures for testing storage tanks being constructed at the New Gathering Centre GC-30 in North Kuwait. It includes procedures for fabricating, erecting and testing field storage tanks, testing tank roofs by air pressure, hydrostatic testing of storage tanks, and radiographic examination. The contractor had no comments on the referenced procedures. The document was prepared by the welding inspection engineer, reviewed by the lead QA/QC engineer, and approved.

Uploaded by

Pramod Gr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views22 pages

Hydro Test

This document summarizes a review of procedures for testing storage tanks being constructed at the New Gathering Centre GC-30 in North Kuwait. It includes procedures for fabricating, erecting and testing field storage tanks, testing tank roofs by air pressure, hydrostatic testing of storage tanks, and radiographic examination. The contractor had no comments on the referenced procedures. The document was prepared by the welding inspection engineer, reviewed by the lead QA/QC engineer, and approved.

Uploaded by

Pramod Gr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 22

PROJECT: EF-1902

PROJECT DOCUMENT CONTRACT NO: 14050489

REVIEW I COMMENT SHEET NEW GATHERING CENTRE, GC-30 IN


NORTH KUWAIT
EF1902/GC30/LNT- Date Date
Transmittal No.: 12-Aug-15 13-Aug-15
KOC/D-2264 I Issued: I Received:
Return
Document No.: See Below I Revision: B See Below
I Code:
Subject: See Below

Reference Company Response


50489-530-450- Procedure For Fabrication, Erection, and Testing of field storage Tanks
PR0-2105 Company has no further comments.
Return Code -A

50489-530-450- Procedure For Testing of Storage Tanks roof weld by Air Pressure
PR0-2108 Company has no further comments.
Return Code -A

50489-530-450- Procedure For Hydrostatic Test of storage Tanks


PR0-2109 Company has no further comments.
Return Code -A

50489-530-450- Procedure For Radiographic Examination.


PR0-2110 Company has no further comments .
Return Code -A

50489-530-450=--
PR0-2130 Preliminary Welding Procedure Specifications-
50489-530-450- General Comments
PR0-2131 Weld Procedure shall be submitted for approval together with supporting procedure
50489-530-450- qualification records.
PR0-2132 >- Impact test results of plates after heat treatment (if any) shall be submitted to KOC
50489-530-450- for evaluation . Welding procedure qualification shall include such results .
PR0-2133
50489-530-450- Return Code A. (Contractor can do next submission after completing the actual
PR0-2134 welding qualification test with new WPS and Procedure Qualification Records with
50489-530-450- test results-Document title need to be changed accordingly)
PR0-2135 -

Name Discipline Date: Signature


Prepared by: Soma nathan
Welding Inspection
Engineer
01-Sep-15 y
Reviewed by: Nazir Hajar Lead QA/QC Engineer 01-Sep-15 (~ tJj!~
Approved by: ;_~> L j?t::::- .~

-~·

050426-0000-DAOO-FRM-0001 Rev A 1 Paae 1 of 1


I. /:~~>~--'-:'\:\_
{
I
KUWAIT OIL COMPANY (K.S.C.}
PageNo:1of14 J 9
2~~c;3· A Subsidiary of Kuwait Petroleum Corporation f--D-at_e_:-0-4-.0-8-.2-0-15------+1 ~.:,,- s;·, ,·."':i, T:>u t.t(.'
KOC Contract No Company Doc No : Rev

14050489 Project Title


NEW GATHERING CENTRE GC 30, IN NORTH KUWAIT
Contr. Doc No.: Rev
KOC Project No.:

EF1902 Document Title : 50489-530-450-PR0-2109 B

Contr. Job No.: ! PROCEDURE FOR HYDROSTATIC TESTING OF FIELD


KOC Doc No :. Rev

ERECTED STORAGE TANKS


5026
Fa cility No. 1 Equipment Description : Equipment Tag No
GC-30 NA NA
I

KUWAIT OIL COMPANY (K.S.C.)


LARSEN & TOUBRO

~ cz(
D 0
D 0 C. P.~;;ac: ~:J - r c' su::·\c: t
D 0. " " ,:. . . · ;::... ... ... . -.: fJ D. •:· 'cu:·,:.: ·:·1 ?2 ·:-=s ~<!

Approval conveyed herein shall in no way relieves


Vendor of his contractual obligations and his
responsibilities for correc tness of dimensions.
material of construction. weights. quantities, design,
Approval by the Company related to the Works
detail assembly fits. system performance shall in no way relieve the Contractorfrom its
requirem e nts with all the contractual requirements obligation to comply with the requirements of
of the Purchaser. \ the Contract'.
I [c7/ zo ~5
I ~· ~ / , >-. I
C- j
~A l"t:{ _ RE:_·--I
1 -- - - - - : ---......_,!-:S,-tC_N_A_nJ
'R C VII;.\Nt;O BY
(f@I/Jh
. By
c)

' Date

C~t::ED !C

LARSEN & TOUBRO LIMITED


Lar scr"J &· To ubro

Heavy Engineering Industries and Shipbuilding Co.K.S.C.(?ublic)


I P.O Box 10155,

~I
Shuaiba 65452,
Kuwait
HEISCO

B I Issued "Incorporated Client Comments" PM I QCM I\ \ OM 04.August.2015


A I Issued for Review/Comments PM j QCM 09-June-2015

REV. I ISSUE DESCRIPTION PREPARED CHECKED I' \ APPROVED DATE

50489-530-45 0-PR0-2 109(TWI I 0 I 0-6 53 0 12) Rev. B 04-08-2015

You might also like