1. Purpose:
The purpose of this method statement is to outline the procedures and safety measures to be
followed during the installation of the Stage Light System at the specified location.
2. Scope:
This method statement covers the installation of the Stage Light System according to the project
specifications and drawings.
3. Responsibilities:
Health and Safety Officer: Ensures all safety measures are followed.
List the equipment, tools, and materials that will be used during the installation, including personal
protective equipment (PPE).
5. Pre-Installation Preparations:
Review project specifications, drawings, and Stage Light System manufacturer's guidelines.
6. Installation Procedures:
Detail the step-by-step procedures for the installation of the Stage Light System. Include information
such as:
Site survey and planning for the location of lighting fixtures, rigging points, and control
equipment.
7. Quality Control:
Inspect the installed Stage Light System components for quality and compliance with project
specifications.
Follow safety guidelines and procedures, especially when working at heights or with
electrical equipment.
9. Environmental Considerations:
Handover the completed Stage Light System to the client or project manager.