CLIENT : CONCESSIONAIRE :
HYDERABAD METRO RAIL
L&T METRO RAIL (HYDERABAD) LTD
CONTENTS
A SPAN DETAILS
C DESIGN STANDARDS
D MATERIAL PROPERTIES
G LOADINGS
H LOAD COMBINATIONS
I LOADS, MOMENTS AND SHEAR CALCULATIONS AT MID SPAN FOR SERVICE STAGE
A SPAN DETAILS
C DESIGN STANDARDS
D MATERIAL PROPERTIES
G LOADINGS
H LOAD COMBINATIONS
M DESIGN OF WEB
INTRODUCTION
General Philosophy:
c) All the tendons are proposed to stress with multi strands jack
from one end only.
SECTION - I
LONGITUDINAL ANALYSIS
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.007
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
A.5 Cantilever projection of deck slab from girder at the ends 275.00 mm
B.7 Moment of Inertia about X axis at mid span (Annex-1) 5.15E+12 mm4
B.8 Moment of Inertia about Y axis at mid span (Annex-1) 2.17E+13 mm4
B.10 Centre of gravity of girder from bottom at mid span (Annex-1) 1530.86 mm
C DESIGN STANDARDS
D MATERIAL PROPERTIES
F.02 Permissible compressive stress during service stage (0.40 fck ) 18.00 N/mm2
F.04 Permissible tensile stress at the time of prestress transfer 0.00 N/mm2
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.010
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
G LOADINGS
G.03 Cable trough cell (Super imposed dead loads-variable) 7.40 kN/m
Wheel configuration;
H LOAD COMBINATIONS
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.013
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.014
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
I LOADS, MOMENTS AND SHEAR CALCULATIONS AT MID SPAN FOR SERVICE STAGE
Loads from self weight of the structure 5% extra considered for 127.89 kN/m
I.01
support thickening and misc. items like future stress blocks etc.)
I.02 Sum of all super imposed dead loads (variable) with factor 1.20 51.84 kN/m
I.03 Sum of all super imposed dead loads (fixed) 22.00 kN/m
I.04 Total Dead Load (self wt+SIDL variable & fixed) 201.73 kN/m
MOVING LOAD ANALYSIS IS DONE USING THE SPREAD SHEET (ANNEX-2) AND RESULTS
ARE COMPARED WITH A SIMPLE BEAM ANALYSIS OF WHEEL LOADS FOR MAXIMUM
BENDING MOMENT CASE (ANNEX-3). (For moving loads; the maximum bending moment in
simple beam analysis is arrived by keeping the C.G of span equidistant from the C.G of loading
and nearest wheel load). The analysis results converted into the units required for further calcs
DERAILMENT LOADS
15.0KN
15.0KN
1.40
1.510
2.08
I.19
eed at 10m above ground level for basic wind speed of 33m/s Vz 27.80 m/s
I.20
Basic wind speed for Hyderabad as per wind map of India 44.00 m/s
I.21 Mean wind speed at 10m above ground level for basic wind m/s
speed of 44m/s Vz 37.07
I.22
Wind pressure at 10m above ground level=Pz 0.82 KN/m2
I.30
Where T=torsional moment 939.54 KN-M
I.31
D= depth of the section 2610.00 mm
I.32
b=average breadth of the section 4250.00 mm
I.33
Upward/Downward Wind force at support-1=Fv=Pz *A3*G*CL 10.88 KN/m
I.34
Upward/Downward Wind force at support-2=Fv=Pz *A3*G*CL 10.88 KN/m
I.35
where G=Gust factor 2.00
I.36
CL =lift coefficient 0.75
I.37
A3=Plan area at support -1 per m run 8.80 m2
I.38
A3=Plan area at support -2 per m run 8.80 m2
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.017
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
I.39
Moment due to upward/downward wind at mid span (Annex-3) 2549.00 KN-m
The stresses and moments due to temperature difference and is calculated based on sec.5.13 of
DBR, Fig-10 of IRC-6-2000, Fig 9 and Table 24 of BD-37/01- Appendix-A
Positive temperature difference values (T1 to T3) for Group-4 structures with wearing coat
thickness of 150mm as per Table-24 of BD-37/01-Appendix-A are as below (refer Annex-4)
J.03 T1 10.00 0C
J.04 T2 2.50 0C
J.05 T3 2.00 0C
J.09 Modulus of elasticity for Temperature stress calculations (50%) 16250.00 N/mm2
J.16 Distance from C.G of box section to C.G of h2 portion (Annex-4) 895.24 mm
J.20 Distance from C.G of box section to C.G of h3 portion (Annex-4) 1460.81 mm
J.27 Distance from C.G of box section to C.G of h1 portion (Anx-4) 1171.32 mm
J.31 Distance from C.G of box section to C.G of h2 portion (Annex-4) 1015.26 mm
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.021
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
J.35 Distance from C.G of box section to C.G of h3 portion (Anx-4) 2348.42 mm
Reverse temperature difference values (T1 to T4) for Group-4 structures with wearing coat
thickness of 150mm as per Table-24 of BD-37/01-Appendix-A are as below (refer Annex-4)
J.41 T1 6.50 0C
J.42 T2 0.40 0C
J.43 T3 1.10 0C
J.44 T4 6.20 0C
J.47 Modulus of elasticity for Temperature stress calculations (50%) 16250.00 N/mm2
J.50 Distance from C.G of box section to C.G of h1 portion (Anx-4) 1008.29 mm
J.54 Distance from C.G of box section to C.G of h2 portion (Anx-4) 826.47 mm
J.58 Distance from C.G of box section to C.G of h3 portion (Anx-4) 1182.24 mm
J.62 Distance from C.G of box section to C.G of h4 portion (Annex-4) 1410.43 mm
J.69 Distance from C.G of box section to C.G of h1 portion (Annex-4) 1134.90 mm
J.73 Distance from C.G of box section to C.G of h2 portion (Anx-4) 892.96 mm
J.77 Distance from C.G of box section to C.G of h3 portion (Anx-4) 1032.71 mm
J.88 Area of box section contributing to inner half portion (Annex-4) 2284641.00 mm2
Distance from C.G of box section to C.G of inner half portion area
J.89 109.69 mm
(Annex-4)
J.92 Area of box section contributing to outer half portion (Annex-4) 4415470.00 mm2
Distance from C.G of box section to C.G of outer half portion area
J.93 56.76 mm
(Annex-4)
J.97 Area of box section contributing to inner half portion (Annex-4) 1736869.00 mm2
Distance from C.G of box section to C.G of inner half portion area
J.98 199.43 mm
(Annex-4)
J.101 Area of box section contributing to outer half portion (Annex-4) 3378809.00 mm2
Distance from C.G of box section to C.G of outer half portion area
J.102 102.52 mm
(Annex-4)
0.00
K.02 Permitted stress at bottom fibre of box section at service stage N/mm2
P/A (axial compressive stress) + M1/Z (internal stress due to prestress) + M2/Z ( stresses
due to external moments/forces) = Permissible stress
Considering % loss in prestress and no tensile force at bottom fibre of the box section
L.06 Tendons T5, T6, T11& T12 at support (Refer Annex-1) 290.00 mm
Considering parabolic profile for tendons; the height of parabola (Y) from horizontal plane
connecting the edges at various locations shall be Y = 4R * X * (L-X)/L 2
Eccentricity of cables from box bottom at a distance of 0.05 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.05 x span length
L.11 from support 259.32 mm
Eccentricity of cables from box bottom at a distance of 0.10 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.10 x span length
L.16 from support 236.38 mm
Eccentricity of cables from box bottom at a distance of 0.15 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.15 x span length
L.21 from support 216.13 mm
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.029
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
Eccentricity of cables from box bottom at a distance of 0.20 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.20 x span length
L.26 from support 198.59 mm
Eccentricity of cables from box bottom at a distance of 0.25 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.25 x span length
L.31 from support 183.74 mm
Eccentricity of cables from box bottom at a distance of 0.30 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.30 x span length
L.36 from support 171.59 mm
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.030
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
Eccentricity of cables from box bottom at a distance of 0.35 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.35 x span length
L.41 from support 162.15 mm
Eccentricity of cables from box bottom at a distance of 0.40 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.40 x span length
L.46 from support 155.40 mm
Eccentricity of cables from box bottom at a distance of 0.45 x Span length from support
Tendons T1 & T7 at a distance of 0.45 x span length from
L.47 support 169.76 mm
Tendons T2 & T8 at a distance of 0.45 x span length from
L.48 support 163.98 mm
Tendons T3 & T9 at a distance of 0.45 x span length from
L.49 support 158.19 mm
Tendons T4 & T10 at a distance of 0.45 x span length from
L.50 support 152.41 mm
Tendons T5, T6, T11 & T12 at a distance of 0.45 x span length
L.51 from support 151.35 mm
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.031
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
AT MID SPAN
AT SUPPORT
where;
N.01
Coefficient of friction =µ 0.17 per rad
N.02
Wobble coefficient =k 0.0020 per m
N.04
Depth of parabolic cable T1 & T7 (E) 2.138 m
N.05
Depth of parabolic cable T2 & T8 (E) 1.581 m
N.06
Depth of parabolic cable T3 & T9 (E) 1.073 m
N.07
Depth of parabolic cable T4 & T10 (E) 0.724 m
N.08
Depth of parabolic cable T5 & T11 (E) 0.368 m
N.09
Depth of parabolic cable T6& T12 (E) 0.140 m
N.10
Cumulative angle between tangents (α) T1&T7 0.3878 radian
N.11
Cumulative angle between tangents(α) T2 & T8 0.2868 radian
N.12
Cumulative angle between tangents (α) T3 & T9 0.1947 radian
N.13
Cumulative angle between tangents (α) T4 & T10 0.1313 radian
N.14
Cumulative angle between tangents (α) T5 & T11 0.0667 radian
N.15
Cumulative angle between tangents (α) T6 & T12 0.0254 radian
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.033
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
N.16
Loss of prestress in cable T1 & T7 due to friction 14.28 %
N.17
Loss of prestress in cable T2 & T8 due to friction 12.80 %
N.18
Loss of prestress in cable T3 & T9 due to friction 11.42 %
N.19
Loss of prestress in cable T4 & T10 due to friction 10.46 %
N.20
Loss of prestress in cable T5 & T11 due to friction 9.47 %
N.21
Loss of prestress in cable T6 &T12 due to friction 8.84 %
N.22
Average loss due to friction 11.21 %
N.31
Loss of stress in steel due to elastic shortening of concrete=m*FC
N.36
FC1=δ P/A+(δP* E*E/I)-(Md*E/I); where; P=Prestressing force 43029.36 kN
N.37
A= area of section at mid 5115678.71 mm2
N.38
E=Eccentricity of tendon from C.G of section at mid span 1380.86 mm
N.39
I=Moment of inertia at mid section 5.15E+12 mm4
N.40
Md=Moment due to self weight of the structure 29972.92 kN-m
N.41
FC1 13.12 N/mm2
N.51 Relaxation loss of prestressing steels at 1000 hrs for 19 wire low
relaxation strand -BS-4757 (% of initial stress) 2.50 %
N.73
Es= Young's modulus of prestressing cable 195000.00 N/mm2
N.74
Average Humidity ratio as per DBR 70.00 %
N.75
Shrinkage strain for normal (humidity ratio 70%) condition 2.00E-04
N.76
Loss of stress in steel due to shrinkage strain =Ecs* Es 39.00 N/mm2
N.77
Prestress in tendon 1422.93 N/mm2
N.78
Maximum % loss in prestress due to shrinkage 2.74 %
O.16 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 2.93 N/mm2
O.32 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 2.33 N/mm2
P.08 Stress at bottom of box section (C)= δ P/A+(δP* E*Yb/I)-(M*E/I) 0.71 N/mm2
P.16 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 11.49 N/mm2
P.24 Stress at bottom of box section (C)= δ P/A+ (δP* E*Yb/I)-(M*E/I) 8.68 N/mm2
P.32 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 2.12 N/mm2
P.39 M=Maximum moment at 0.10L from support (from Annex-3) 23962.66 kN-m
P.40 Stress at bottom of box section (C)= δ P/A+(δP* E*Yb/I)-(M*E/I) 7.15 N/mm2
P.47 M=Maximum moment at 0.10L from support (from Annex-3) 23962.66 kN-m
P.48 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 4.18 N/mm2
P.55 M=Maximum moment at 0.20L from support (from Annex-3) 42578.49 kN-m
P.56 Stress at bottom of box section (C)= δ P/A+(δP* E*Yb/I)-(M*E/I) 4.72 N/mm2
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.041
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
P.63 M=Maximum moment at 0.20L from support (from Annex-3) 42578.49 kN-m
P.64 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 7.09 N/mm2
P.71 M=Maximum moment at 0.30L from support (from Annex-3) 57065.12 kN-m
P.72 Stress at bottom of box section (C)= δ P/A+(δP* E*Yb/I)-(M*E/I) 3.17 N/mm2
P.79 M=Maximum moment at 0.30L from support (from Annex-3) 57065.12 kN-m
P.80 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 9.29 N/mm2
P.87 M=Maximum moment at 0.40L from support (from Annex-3) 66194.81 kN-m
P.88 Stress at bottom of box section (C)= δ P/A+(δP* E*Yb/I)-(M*E/I) 1.97 N/mm2
P.95 M=Maximum moment at 0.40L from support (from Annex-3) 66194.81 kN-m
P.96 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 10.70 N/mm2
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.043
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
Ultimate moment at mid span = 1.25 *(Moment due to self weight & fixed Imposed loads) +
2*(Moment due to variable Imposed loads) + 1.75 (Moment due to live loads)
Q.05
Q.06 Un-factored moment due to self weight at mid span 29972.92 kN-m
Q.07 Un-factored moment due to fixed imposed loads at mid span 5155.95 kN-m
Q.08 Un-factored moment due to variable imposed loads at mid span 10124.41 kN-m
Q.09 Un-factored moment due to live loads at mid span 18213.22 kN-m
Mult=0.90*db*As*fp
where;
Mult=0.176*b*db2*fck + 0.53*(Bf-b)*(db-t/2)*t*fck
where;
R.04 Compressive stress at centroidal axis due to prestress =fcp 7.09 N/mm2
Vcr=0.037*b*d*√fck +Mcr*V/M
where;
Ultimate Shear Force Check at a distance of Effective depth (2.46m) from Support
AT TRANSFER STAGE
where;
S.09 Md= Moment due to self weight of the section at mid span 31625.99 kN-m
AT SERVICE STAGE
where;
T.02 Length of end block (2/3 rd of total depth of box section) 1740.00 mm
T.08 Half the side of loaded area(half of 19k15 anchorage plate) =Yp0 157.50 mm
T.13 Area of steel required for each cable portion at end block 1392.15 mm2
T.16 Depth in which the bursting force is distributed per cable 600.00 mm
where,
where;
V.09 Elongation for tendons considering the frictional losses T1&T7 277.55 mm
V.10 Elongation for tendons considering the frictional losses T2&T8 281.57 mm
V.11 Elongation for tendons considering the frictional losses T3&T9 285.49 mm
V.12 Elongation for tendons considering the frictional lossess T4&T10 288.34 mm
V.13 Elongation for tendons considering the frictional lossess T5&T11 291.37 mm
V.14 Elongation for tendons considering the frictional lossess T6&T12 285.77 mm
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.053
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
SECTION-II
TRANSVERSE ANALYSIS
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No:: 054
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
A SPAN DETAILS
A.5 Cantilever projection of deck slab from girder at the ends 275.00 mm
B.8 Moment of Inertia about Y axis at mid span (Annex-1) 2.17E+13 mm4
B.10 Centre of gravity of girder from bottom at mid span (Annex-1) 1530.86 mm
C DESIGN STANDARDS
D MATERIAL PROPERTIES
% of initial
D.24 % relaxation loss at 1000 hours 2.50
stress
F.02 Permissible compressive stress during service stage (0.40 fck) 18.00 N/mm2
G LOADINGS
G.03 Cable trough cell (Super imposed dead loads-variable) 0.00 kN/m
Wheel configuration;
H LOAD COMBINATIONS
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No:060
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No:061
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
1.51m
I.13 Centre to Centre distance between two wheel loads along rail 2200.00 mm
I.21 Moment due to nosing force (acts in both directions) 6.17 KN-m/m
I.22 Hogging moment at face of support with nosing force- S2 63.60 KN-m/m
I.23 Sagging moment at mid span with nosing force (STAAD)- S2 126.10 KN-m/m
Derailment loads are considered based on BD-37/01 as reccomended in DBR. These loads are
considered at 1.40m on either side of the center line of track considering the availability of concrete
guard
a) Service stage. 1)Uniform loads of 15KN/m spaced at 1.40m applied within 1.40m on either side
of track center line 2)Single concentrated load of 75KN applied anywhere within 1.40m on either
side of center line of track
b) Ultimate Load case. Four individual concentrated vertical loads of 120KN arranged in the
corners of a rectangle of length 2m and width1.40 and applied anywhere on the deck
c) LIVE LOAD CASE-3 -Moment on Cantilever with derailment load 15KN/m (SLS)
SUPPORT 2.410m SUPPORT
2.410m
I.39 Moment per unit length at face of support (STAAD) S2 35.20 KN-m/m
2.41m
g) LIVE LOAD CASE-7 -Hogging moment (ULS) with derailment point load120KN
2.41m
The max. possible position of point load is 0.40m from edge considering the parapet/kerb
I.57 Parapet load (vertical & Horizontal) as per DBR section 5.16 1.50 KN/m
h) LIVE LOAD CASE-8 -Sagging moment (ULS) with derailment point loads 120KN
1 2
1.05 0.35
2.41m
4820
2410
3135
J.01 Ao= area enclosed by the median wall line 9585775.00 mm2
where;
b)Derailment Loads
c) Wind Loads
SUPPORT 2.41m
SUPPORT
J.07 Torsional Moment due to wheel loads in one lane only 4938.50 KN-M
J.09 Ultimate torsional Moment due to wheel loads in one lane only 9169.12 KN-M
b) Torsional moment due to derailment (ULS) point load
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No:070
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
Sv=spacing of stirrups
6.10
11KN
3155
4200
2.410 4400
K.08 Distance of rail & plinth loads-1 from C/L of deck 2830.00 mm
K.09 Distance of rail & plinth loads-1 from C/L of deck 1320.00 mm
Distance of cable tray,signalling & misc loads from C/L of deck 3155.00 mm
K.10
Max Moment at cantilever S1 support form STAAD Analysis- 63.80 KN-M
K.11
Aannex-5 (SLS) including OHE loading
K.28 OK
OK
OK
OK
OK
K.30 Torsional steel required for the deck slab 662.33 mm2
K.32 Total area of steel at top of slab at mid span 662.33 mm2
K.33 Total area of steel at bottom of slab at mid span 1158.85 mm2
K.34 Min. area of longitudinal steel (0.2% of c/s area) 200.00 mm2
Em (max) 0.001342
OK
CHECK FOR CRACK WIDTH AT MID SPAN
K.86 a' = distance from compression face to the point of crack 200.00 mm
OK
L.04 Max span moment at slab botttom (STAAD analysis) 9.00 KN-M
L.05 Max support moment from STAAD analysis -SLS 104.00 KN/m
L.06 Max span moment at slab botttom (STAAD analysis)-ULS 7.00 KN-m
L.07 Max support moment from STAAD analysis -ULS 156.00 KN-m
fy 500.00 N/mm2
OK
M DESIGN OF WEB
N.19 Total moment due to wind on moving loads and deck 1488.17 KN-m
N.22 Additional load/uplift on each web due to torsional effect of wind 572.37 KN
N.23 Axial load in each bearing due to self weight alone 1470.00 KN
NO UPLIFT AS SELF WEIGHT ITSELF IS HIGHER THAN UPLIFT FORCE DUE TO WIND
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. PB Date.28.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No:082
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
2600
5652KN (ULS)
71o 5652KN (ULS)
LOAD CALCULATIONS
O.08 Reaction per bearing due to self weight of the structure 2753.00 KN
O.45 Maximum permissible stress in steel for the limiting crack width 323.53 N/mm2
O.49 Permissible stress in direct compression for M45 concrete 11.00 N/mm2
O.50 irect stress is less than permissible; only minimum steel reqd
O.52 Actual area of concrete required for permissible direct stress 94996.27 mm2
Asv/Sv =0.4b/0.87fy
O.56 Spacing of 2 legged stirrups rquired for 700mm width diaphragm 202.45 mm
AS PER IRS-CBC-1997-15.9.9
P.05 Diameter of bar required to keep 150mm spacing on each face 11.97 mm
Stress check
SLS stress at transfer Supp 0.1L 0.2L 0.3L 0.4L Mid span 0.6L 0.7L 0.8L 0.9L 1.0L
SLS stress G I Supp 0.1L 0.2L 0.3L 0.4L Mid span 0.6L 0.7L 0.8L 0.9L 1.0L
Percentage of all losses 19.995 18.851 17.711 16.57 15.72 16.396 17.49 18.57 19.61 20.7 21.74
Percentage of Prestress
available considering all
losses=δ 80.01 81.15 82.29 83.43 84.28 83.60 82.51 81.43 80.39 79.30 78.26
Initial prestressing force 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50
Number of strands 216
P=Initial Prestressing foce 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50
A= area of section at support 6.70E+06 6.31E+06 5.86E+06 5.37E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 6.31E+06 6.31E+06
E=Eccentricty of tendon from
C.G of section at support 446.00 879.04 1057.37 1240.15 1349.82 1380.86 1349.82 1240.15 1057.37 879.04 446.00
C.G of section at support from 1408.66 1420.20 1451.45 1500.13 1530.86 1530.86
box bottom=Yb 1530.86 1500.13 1451.45 1420.20 1408.66
C.G of section at support from 1201.34 1189.80 1158.55 1109.87 1079.14 1079.14
box bottom=Yt 1079.14 1109.87 1158.55 1189.80 1201.34
I=Moment of inertia at support 6.11E+12 5.91E+12 5.68E+12 5.35E+12 5.15E+12 5.15E+12 5.15E+12 5.35E+12 5.68E+12 5.91E+12 6.11E+12
DL +SIDL 0.00 18069.9203 31780.3645 41361.606 47040.02685 48931.2284 4.70E+04 4.14E+04 3.18E+04 1.81E+04 0.00E+00
LL only 0.00 5892.744 10798.128 15703.512 19154.784 22038.00 1.92E+04 1.57E+04 1.08E+04 5.89E+03 0.00E+00
M=Moment at support DL + LL 0.00 23962.66 42578.49 57065.12 66194.81 70969.23 6.62E+04 5.71E+04 4.26E+04 2.40E+04 0.00E+00
Top, Mpa 2.12 4.18 7.09 9.29 10.70 11.49 10.70 9.29 7.09 4.18 2.12
Bottom, Mpa 8.68 7.15 4.72 3.17 1.97 0.71 1.97 3.17 4.72 7.15 8.68
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
SLS stress G II a Supp 0.1L 0.2L 0.3L 0.4L Mid span 0.6L 0.7L 0.8L 0.9L 1.0L
Percentage of all losses 22.43 18.851 17.711 16.57 15.72 16.396 17.49 18.57 19.61 20.7 21.74
Percentage of Prestress
available considering all
losses=δ 77.57 81.15 82.29 83.43 84.28 83.60 82.51 81.43 80.39 79.30 78.26
Initial prestressing force 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50
Number of strands 216
P=Initial Prestressing foce 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50
A= area of section at support 6.70E+06 6.31E+06 5.86E+06 5.37E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 6.31E+06 6.31E+06
E=Eccentricty of tendon from
C.G of section at support 446.00 801.47 1057.37 1240.15 1349.82 1386.38 1349.82 1240.15 1057.37 801.47 446.00
C.G of section at support from 1408.66 1420.20 1451.45 1500.13 1530.86 1530.86
box bottom=Yb 1530.86 1500.13 1451.45 1420.20 1408.66
C.G of section at support from 1201.34 1189.80 1158.55 1109.87 1079.14 1079.14
box bottom=Yt 1079.14 1109.87 1158.55 1189.80 1201.34
I=Moment of inertia at support 6.11E+12 5.91E+12 5.68E+12 5.35E+12 5.15E+12 5.15E+12 5.15E+12 5.35E+12 5.68E+12 5.91E+12 6.11E+12
DL +SIDL 0.00 18069.92 31780.36 41361.61 47040.03 48931.23 47040.03 41361.61 31780.36 18069.92 0.00
No LL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthquake loads 0.00 925.54 1645.40 2159.59 2468.11 2570.94 2468.11 2159.59 1645.40 925.54 0.00
M=Moment at support DL + EQ 0.00 18995.46 33425.77 43521.20 49508.13 51502.17 49508.13 43521.20 33425.77 18995.46 0.00
Top, Mpa 2.05 3.72 5.22 6.48 7.21 7.37 7.21 6.48 5.22 3.72 2.05
Bottom, Mpa 8.42 7.69 7.07 6.97 6.92 6.55 6.92 6.97 7.07 7.69 8.42
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
SLS stress G II b Supp 0.1L 0.2L 0.3L 0.4L Mid span 0.6L 0.7L 0.8L 0.9L 1.0L
Percentage of all losses 22.43 18.851 17.711 16.57 15.72 16.396 17.49 18.57 19.61 20.7 21.74
Percentage of Prestress
available considering all
losses=δ 77.57 81.15 82.29 83.43 84.28 83.60 82.51 81.43 80.39 79.30 78.26
Initial prestressing force 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50
Number of strands 216
P=Initial Prestressing foce 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50
A= area of section at support 6.70E+06 6.31E+06 5.86E+06 5.37E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 6.31E+06 6.31E+06
E=Eccentricty of tendon from
C.G of section at support 446.00 801.47 1057.37 1240.15 1349.82 1386.38 1349.82 1240.15 1057.37 801.47 446.00
C.G of section at support from 1408.66 1420.20 1451.45 1500.13 1530.86 1530.86
box bottom=Yb 1530.86 1500.13 1451.45 1420.20 1408.66
C.G of section at support from 1201.34 1189.80 1158.55 1109.87 1079.14 1079.14
box bottom=Yt 1079.14 1109.87 1158.55 1189.80 1201.34
I=Moment of inertia at support 6.11E+12 5.91E+12 5.68E+12 5.35E+12 5.15E+12 5.15E+12 5.15E+12 5.35E+12 5.68E+12 5.91E+12 6.11E+12
DL +SIDL 0.00 18069.92 31780.36 41361.61 47040.03 48931.23 47040.03 41361.61 31780.36 18069.92 0.00
50% of LL only 0.00 2678.52 4908.24 7137.96 8706.72 10017.27 8706.72 7137.96 4908.24 2678.52 0.00
Earthquake loads 0.00 925.54 1645.40 2159.59 2468.11 2570.94 2468.11 2159.59 1645.40 925.54 0.00
M=Moment at support DL +
LL+EQ 0.00 21673.98 38334.01 50659.16 58214.85 61519.44 58214.85 50659.16 38334.01 21673.98 0.00
Top, Mpa 2.05 4.26 6.22 7.96 9.03 9.47 9.03 7.96 6.22 4.26 2.05
Bottom, Mpa 8.42 7.05 5.81 4.97 4.34 3.57 4.34 4.97 5.81 7.05 8.42
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
SLS stress G III Supp 0.1L 0.2L 0.3L 0.4L Mid span 0.6L 0.7L 0.8L 0.9L 1.0L
Percentage of all losses 22.43 18.851 17.711 16.57 15.72 16.396 17.49 18.57 19.61 20.7 21.74
Percentage of Prestress
available considering all
losses=δ 77.57 81.15 82.29 83.43 84.28 83.60 82.51 81.43 80.39 79.30 78.26
Initial prestressing force 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50
Number of strands 216
P=Initial Prestressing foce 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50
A= area of section at support 6.70E+06 6.31E+06 5.86E+06 5.37E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 6.31E+06 6.31E+06
E=Eccentricty of tendon from
C.G of section at support 446.00 801.47 1057.37 1240.15 1349.82 1386.38 1349.82 1240.15 1057.37 801.47 446.00
C.G of section at support from 1408.66 1420.20 1451.45 1500.13 1530.86 1530.86
box bottom=Yb 1530.86 1500.13 1451.45 1420.20 1408.66
C.G of section at support from 1201.34 1189.80 1158.55 1109.87 1079.14 1079.14
box bottom=Yt 1079.14 1109.87 1158.55 1189.80 1201.34
I=Moment of inertia at support 6.11E+12 5.91E+12 5.68E+12 5.35E+12 5.15E+12 5.15E+12 5.15E+12 5.35E+12 5.68E+12 5.91E+12 6.11E+12
DL +SIDL 0.00 18069.92 31780.36 41361.61 47040.03 48931.23 47040.03 41361.61 31780.36 18069.92 0.00
100% LL 0.00 5357.04 9816.48 14275.92 17413.44 20034.55 17413.44 14275.92 9816.48 5357.04 0.00
Temperature 0.00 1831.44 1831.44 1831.44 1831.44 1831.44 1831.44 1831.44 1831.44 1831.44 0.00
M=Moment at support DL + LL 0.00 24186.99 41464.99 54613.78 62802.22 66790.30 62802.22 54613.78 41464.99 24186.99 0.00
Top, Mpa 2.05 4.77 6.86 8.78 9.99 10.57 9.99 8.78 6.86 4.77 2.05
Bottom, Mpa 8.42 6.45 5.01 3.86 2.97 2.01 2.97 3.86 5.01 6.45 8.42
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
Construction combo SLS1 Supp 0.1L 0.2L 0.3L 0.4L Mid span 0.6L 0.7L 0.8L 0.9L 1.0L
Percentage of all losses 11.955 10.81166667 9.67166667 8.53 7.68 8.35 9.45 10.53 11.56 12.66 13.7
Percentage of Prestress
available considering all
losses=δ 88.05 89.19 90.33 91.47 92.32 91.65 90.55 89.47 88.44 87.34 86.30
Initial prestressing force 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50
Number of strands 216
P=Initial Prestressing foce 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50
A= area of section at support 6.70E+06 6.31E+06 5.86E+06 5.37E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 6.31E+06 6.31E+06
E=Eccentricty of tendon from
C.G of section at support 446.00 801.47 1057.37 1240.15 1349.82 1386.38 1349.82 1240.15 1057.37 801.47 446.00
C.G of section at support from 1408.66 1420.20 1451.45 1500.13 1530.86 1530.86
box bottom=Yb 1530.86 1500.13 1451.45 1420.20 1408.66
C.G of section at support from 1201.34 1189.80 1158.55 1109.87 1079.14 1079.14
box bottom=Yt 1079.14 1109.87 1158.55 1189.80 1201.34
I=Moment of inertia at support 6.11E+12 5.91E+12 5.68E+12 5.35E+12 5.15E+12 5.15E+12 5.15E+12 5.35E+12 5.68E+12 5.91E+12 6.11E+12
DL only 0.00 11840.04 20705.01 26825.21 30427.00 31625.99 30427.00 26825.21 20705.01 11840.04 0.00
Construction loads 0.00 7263.98 10231.00 12208.80 14021.70 17152.50 17364.00 14658.40 9937.27 5051.13 0.00
Temperature 0.00 1831.00 1831.00 1831.00 1831.00 1831.00 1831.00 1831.00 1831.00 1831.00 0.00
Wind 0.00 1448.00 1448.00 1448.00 1448.00 1448.00 1448.00 1448.00 1448.00 1448.00 0.00
M=Moment at support DL + LL 0.00 20930.22 32168.81 39871.25 44923.36 48626.99 47597.20 41830.93 31933.83 19159.94 0.00
Top, Mpa 2.33 4.10 4.81 5.48 5.94 6.44 5.94 5.48 4.81 4.10 2.33
Bottom, Mpa 9.55 8.44 8.91 9.84 10.35 9.50 10.35 9.84 8.91 8.44 9.55
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
Construction combo SLS2 Supp 0.1L 0.2L 0.3L 0.4L Mid span 0.6L 0.7L 0.8L 0.9L 1.0L
Percentage of all losses 11.955 10.81166667 9.67166667 8.53 7.68 8.35 9.45 10.53 11.56 12.66 13.7
Percentage of Prestress
available considering all
losses=δ 88.05 89.19 90.33 91.47 92.32 91.65 90.55 89.47 88.44 87.34 86.30
Initial prestressing force 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50
Number of strands 216
P=Initial Prestressing foce 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50
A= area of section at support 6.70E+06 6.31E+06 5.86E+06 5.37E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 6.31E+06 6.31E+06
E=Eccentricty of tendon from
C.G of section at support 446.00 801.47 1057.37 1240.15 1349.82 1386.38 1349.82 1240.15 1057.37 801.47 446.00
C.G of section at support from 1408.66 1420.20 1451.45 1500.13 1530.86 1530.86
box bottom=Yb 1530.86 1500.13 1451.45 1420.20 1408.66
C.G of section at support from 1201.34 1189.80 1158.55 1109.87 1079.14 1079.14
box bottom=Yt 1079.14 1109.87 1158.55 1189.80 1201.34
I=Moment of inertia at support 6.11E+12 5.91E+12 5.68E+12 5.35E+12 5.15E+12 5.15E+12 5.15E+12 5.35E+12 5.68E+12 5.91E+12 6.11E+12
DL only 0.00 11840.04 20705.01 26825.21 30427.00 31625.99 30427.00 26825.21 20705.01 11840.04 0.00
Construction loads 0.00 7263.98 10231.00 12208.80 14021.70 17152.50 17364.00 14658.40 9937.27 5051.13 0.00
50% Earthquake loads 0.00 462.77 822.70 1079.80 1234.05 1285.47 1234.05 1079.80 822.70 462.77 0.00
Wind 0.00 1448.00 1448.00 1448.00 1448.00 1448.00 1448.00 1448.00 1448.00 1448.00 0.00
M=Moment at support DL + LL 0.00 19561.99 31160.52 39120.04 44326.41 48081.47 47000.25 41079.72 30925.53 17791.71 0.00
Top, Mpa 2.33 3.83 4.60 5.32 5.82 6.33 5.82 5.32 4.60 3.83 2.33
Bottom, Mpa 9.55 8.77 9.17 10.05 10.53 9.67 10.53 10.05 9.17 8.77 9.55
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
SLS stress G V Supp 0.1L 0.2L 0.3L 0.4L Mid span 0.6L 0.7L 0.8L 0.9L 1.0L
Percentage of all losses 22.43 18.851 17.711 16.57 15.72 16.396 17.49 18.57 19.61 20.7 21.74
Percentage of Prestress
available considering all
losses=δ 77.57 81.15 82.29 83.43 84.28 83.60 82.51 81.43 80.39 79.30 78.26
Initial prestressing force 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50
Number of strands 216
P=Initial Prestressing foce 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50 43028.50
A= area of section at support 6.70E+06 6.31E+06 5.86E+06 5.37E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 5.12E+06 6.31E+06 6.31E+06
E=Eccentricty of tendon from
C.G of section at support 446.00 801.47 1057.37 1240.15 1349.82 1386.38 1349.82 1240.15 1057.37 801.47 446.00
C.G of section at support from 1408.66 1420.20 1451.45 1500.13 1530.86 1530.86
box bottom=Yb 1530.86 1500.13 1451.45 1420.20 1408.66
C.G of section at support from 1201.34 1189.80 1158.55 1109.87 1079.14 1079.14
box bottom=Yt 1079.14 1109.87 1158.55 1189.80 1201.34
I=Moment of inertia at support 6.11E+12 5.91E+12 5.68E+12 5.35E+12 5.15E+12 5.15E+12 5.15E+12 5.35E+12 5.68E+12 5.91E+12 6.11E+12
DL +SIDL 0.00 18069.92 31780.36 41361.61 47040.03 48931.23 47040.03 41361.61 31780.36 18069.92 0.00
Derailement loads 0.00 6755.04 10692.31 13504.65 15192.05 15754.51 15192.05 13504.65 10692.31 6755.04 0.00
Top, Mpa 2.05 4.63 6.63 8.27 9.23 9.47 9.23 8.27 6.63 4.63 2.05
Bottom, Mpa 8.42 6.62 5.30 4.54 4.05 3.57 4.05 4.54 5.30 6.62 8.42
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No100
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
Vertical
Horizontal dip of Horizontal
dip of parabola Y Distance Vertical Emergency Emergency Length of
parabola Y = 4R * X * from box Distance Angle Angle cable Elongation of
= 4R * X * (L2-X)/L2^ Resulatant center from box (Horizontal)- (Vertical)- (AutoCAD- % loss in cable=Δ=
X (L2-X)/L^2 2 dip (parabolic) bottom 4*Y/L 4*Y/L 3D) friction P*L/A*Es
0L 0.00 0.00 0.00 0.00 2181.00 2200.00 3.15 10.66 44375 14.28 277.57
5L 2565.00 132.79 449.20 468.41 2048.21 1750.80
10L 4730.00 232.10 785.17 818.76 1948.90 1414.83
15L 6895.00 319.74 1081.61 1127.88 1861.26 1118.39
20L 9060.00 395.68 1338.53 1395.79 1785.32 861.47
25L 11225.00 459.95 1555.93 1622.48 1721.05 644.07
30L 13390.00 512.53 1733.79 1807.96 1668.47 466.21
35L 15555.00 553.42 1872.13 1952.22 1627.58 327.87
40L 17720.00 582.63 1970.95 2055.26 1598.37 229.05
45L 19885.00 600.16 2030.24 2117.09 1580.84 169.76
50L 22050.00 606.00 2050.00 2137.69 1575.00 150.00
55L 24215.00 600.16 2030.24 2117.09 1580.84 169.76
60L 26380.00 582.63 1970.95 2055.26 1598.37 229.05
65L 28545.00 553.42 1872.13 1952.22 1627.58 327.87
70L 30710.00 512.53 1733.79 1807.96 1668.47 466.21
75L 32875.00 459.95 1555.93 1622.48 1721.05 644.07
80L 35040.00 395.68 1338.53 1395.79 1785.32 861.47
85L 37205.00 319.74 1081.61 1127.88 1861.26 1118.39
90L 39370.00 232.10 785.17 818.76 1948.90 1414.83
95L 41535.00 132.79 449.20 468.41 2048.21 1750.80
100L 44100.00 0.00 0.00 0.00 2181.00 2200.00
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No101
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
HORIZONTAL & VERTICAL TENDON PROFILES (T2 & T8)
Horizontal Vertical
dip of dip of Horizontal Vertical Emergency Emergency Length of
parabola Y parabola Y Distance Distance Angle Angle cable Elongation of
= 4R * X * = 4R * X * Resulatant from box from box (Horizontal)- (Vertical)- (AutoCAD- % loss in cable=Δ=
X (L2-X)/L^2 (L2-X)/L^2 dip center bottom 4*Y/L 4*Y/L 3D) friction P*L/A*Es
0L 0.00 0.00 0.00 0.00 1975.00 1600.00 3.28 7.54 44251 12.8 281.57
5L 2565.00 138.05 317.73 346.42 1836.95 1282.27
10L 4730.00 241.30 555.36 605.52 1733.70 1044.64
15L 6895.00 332.40 765.04 834.13 1642.60 834.96
20L 9060.00 411.35 946.77 1032.27 1563.65 653.23
25L 11225.00 478.16 1100.53 1199.92 1496.84 499.47
30L 13390.00 532.82 1226.34 1337.09 1442.18 373.66
35L 15555.00 575.34 1324.19 1443.78 1399.66 275.81
40L 17720.00 605.71 1394.09 1519.98 1369.29 205.91
45L 19885.00 623.93 1436.02 1565.71 1351.07 163.98
50L 22050.00 630.00 1450.00 1580.95 1345.00 150.00
55L 24215.00 623.93 1436.02 1565.71 1351.07 163.98
60L 26380.00 605.71 1394.09 1519.98 1369.29 205.91
65L 28545.00 575.34 1324.19 1443.78 1399.66 275.81
70L 30710.00 532.82 1226.34 1337.09 1442.18 373.66
75L 32875.00 478.16 1100.53 1199.92 1496.84 499.47
80L 35040.00 411.35 946.77 1032.27 1563.65 653.23
85L 37205.00 332.40 765.04 834.13 1642.60 834.96
90L 39370.00 241.30 555.36 605.52 1733.70 1044.64
95L 41535.00 138.05 317.73 346.42 1836.95 1282.27
100L 44100.00 0.00 0.00 0.00 1975.00 1600.00
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No 102
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
HORIZONTAL & VERTICAL TENDON PROFILES (T3 & T9)
Horizontal Vertical
dip of dip of Horizontal Vertical Emergency Emergency Length of
parabola Y parabola Y Distance Distance Angle Angle cable Elongation of
= 4R * X * = 4R * X * Resulatant from box from box (Horizontal)- (Vertical)- (AutoCAD- % loss in cable=Δ=
X (L2-X)/L^2 (L2-X)/L^2 dip center bottom 4*Y/L 4*Y/L 3D) friction P*L/A*Es
0L 0.00 0.00 0.00 0.00 1770.00 1000.00 3.41 4.42 44170 11.42 285.50
5L 2565.00 143.52 186.25 235.14 1626.48 813.75
10L 4730.00 250.87 325.56 411.00 1519.13 674.44
15L 6895.00 345.59 448.47 566.18 1424.41 551.53
20L 9060.00 427.68 555.00 700.67 1342.32 445.00
25L 11225.00 497.14 645.14 814.46 1272.86 354.86
30L 13390.00 553.97 718.89 907.57 1216.03 281.11
35L 15555.00 598.17 776.25 979.99 1171.83 223.75
40L 17720.00 629.74 817.22 1031.71 1140.26 182.78
45L 19885.00 648.69 841.81 1062.75 1121.31 158.19
50L 22050.00 655.00 850.00 1073.09 1115.00 150.00
55L 24215.00 648.69 841.81 1062.75 1121.31 158.19
60L 26380.00 629.74 817.22 1031.71 1140.26 182.78
65L 28545.00 598.17 776.25 979.99 1171.83 223.75
70L 30710.00 553.97 718.89 907.57 1216.03 281.11
75L 32875.00 497.14 645.14 814.46 1272.86 354.86
80L 35040.00 427.68 555.00 700.67 1342.32 445.00
85L 37205.00 345.59 448.47 566.18 1424.41 551.53
90L 39370.00 250.87 325.56 411.00 1519.13 674.44
95L 41535.00 143.52 186.25 235.14 1626.48 813.75
100L 44100.00 0.00 0.00 0.00 1770.00 1000.00
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No 103
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
HORIZONTAL & VERTICAL TENDON PROFILES (T4 & T10)
Horizontal Vertical
dip of dip of Horizontal Vertical Emergency Emergency Length of
parabola Y parabola Y Distance Distance Angle Angle cable Elongation of
= 4R * X * = 4R * X * Resulatant from box from box (Horizontal)- (Vertical)- (AutoCAD- % loss in cable=Δ=
X (L2-X)/L^2 (L2-X)/L^2 dip center bottom 4*Y/L 4*Y/L 3D) friction P*L/A*Es
0L 0.00 0.00 0.00 0.00 1564.00 400.00 3.53 1.30 44132 10.46 288.35
5L 2565.00 148.78 54.78 158.55 1415.22 345.22
10L 4730.00 260.06 95.75 277.13 1303.94 304.25
15L 6895.00 358.25 131.90 381.76 1205.75 268.10
20L 9060.00 443.35 163.24 472.44 1120.65 236.76
25L 11225.00 515.35 189.75 549.17 1048.65 210.25
30L 13390.00 574.27 211.44 611.95 989.73 188.56
35L 15555.00 620.09 228.31 660.78 943.91 171.69
40L 17720.00 652.82 240.36 695.66 911.18 159.64
45L 19885.00 672.45 247.59 716.59 891.55 152.41
50L 22050.00 679.00 250.00 723.56 885.00 150.00
55L 24215.00 672.45 247.59 716.59 891.55 152.41
60L 26380.00 652.82 240.36 695.66 911.18 159.64
65L 28545.00 620.09 228.31 660.78 943.91 171.69
70L 30710.00 574.27 211.44 611.95 989.73 188.56
75L 32875.00 515.35 189.75 549.17 1048.65 210.25
80L 35040.00 443.35 163.24 472.44 1120.65 236.76
85L 37205.00 358.25 131.90 381.76 1205.75 268.10
90L 39370.00 260.06 95.75 277.13 1303.94 304.25
95L 41535.00 148.78 54.78 158.55 1415.22 345.22
100L 44100.00 0.00 0.00 0.00 1564.00 400.00
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No 104
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
HORIZONTAL & VERTICAL TENDON PROFILES (T5 & T11)
Horizontal Vertical
dip of dip of Horizontal Vertical Emergency Emergency Length of
parabola Y parabola Y Distance Distance Angle Angle cable Elongation of
= 4R * X * = 4R * X * Resulatant from box from box (Horizontal)- (Vertical)- (AutoCAD- % loss in cable=Δ=
X (L2-X)/L^2 (L2-X)/L^2 dip center bottom 4*Y/L 4*Y/L 3D) friction P*L/A*Es
0L 0.00 0.00 0.00 0.00 995.00 290.00 1.77 0.73 44109 9.47 291.39
5L 2565.00 74.50 30.68 80.57 920.50 259.32
10L 4730.00 130.22 53.62 140.83 864.78 236.38
15L 6895.00 179.39 73.87 194.00 815.61 216.13
20L 9060.00 222.00 91.41 240.08 773.00 198.59
25L 11225.00 258.06 106.26 279.08 736.94 183.74
30L 13390.00 287.56 118.41 310.98 707.44 171.59
35L 15555.00 310.50 127.85 335.79 684.50 162.15
40L 17720.00 326.89 134.60 353.52 668.11 155.40
45L 19885.00 336.72 138.65 364.15 658.28 151.35
50L 22050.00 340.00 140.00 367.70 655.00 150.00
55L 24215.00 336.72 138.65 364.15 658.28 151.35
60L 26380.00 326.89 134.60 353.52 668.11 155.40
65L 28545.00 310.50 127.85 335.79 684.50 162.15
70L 30710.00 287.56 118.41 310.98 707.44 171.59
75L 32875.00 258.06 106.26 279.08 736.94 183.74
80L 35040.00 222.00 91.41 240.08 773.00 198.59
85L 37205.00 179.39 73.87 194.00 815.61 216.13
90L 39370.00 130.22 53.62 140.83 864.78 236.38
95L 41535.00 74.50 30.68 80.57 920.50 259.32
100L 44100.00 0.00 0.00 0.00 995.00 290.00
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No 105
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
HORIZONTAL & VERTICAL TENDON PROFILES (T6 & T12)
Horizontal Vertical
dip of dip of Horizontal Vertical Emergency Emergency Length of
parabola Y parabola Y Distance Distance Angle Angle cable Elongation of
= 4R * X * = 4R * X * Resulatant from box from box (Horizontal)- (Vertical)- (AutoCAD- % loss in cable=Δ=
X (L2-X)/L^2 (L2-X)/L^2 dip center bottom 4*Y/L 4*Y/L 3D) friction P*L/A*Es
0L 0.00 0.00 0.00 0.00 425.00 290.00 0.00 0.73 44102 8.84 293.37
5L 2565.00 0.00 30.68 30.68 425.00 259.32
10L 4730.00 0.00 53.62 53.62 425.00 236.38
15L 6895.00 0.00 73.87 73.87 425.00 216.13
20L 9060.00 0.00 91.41 91.41 425.00 198.59
25L 11225.00 0.00 106.26 106.26 425.00 183.74
30L 13390.00 0.00 118.41 118.41 425.00 171.59
35L 15555.00 0.00 127.85 127.85 425.00 162.15
40L 17720.00 0.00 134.60 134.60 425.00 155.40
45L 19885.00 0.00 138.65 138.65 425.00 151.35
50L 22050.00 0.00 140.00 140.00 425.00 150.00
55L 24215.00 0.00 138.65 138.65 425.00 151.35
60L 26380.00 0.00 134.60 134.60 425.00 155.40
65L 28545.00 0.00 127.85 127.85 425.00 162.15
70L 30710.00 0.00 118.41 118.41 425.00 171.59
75L 32875.00 0.00 106.26 106.26 425.00 183.74
80L 35040.00 0.00 91.41 91.41 425.00 198.59
85L 37205.00 0.00 73.87 73.87 425.00 216.13
90L 39370.00 0.00 53.62 53.62 425.00 236.38
95L 41535.00 0.00 30.68 30.68 425.00 259.32
100L 44100.00 0.00 0.00 0.00 425.00 290.00
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project
Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
Zero Slip Point Calculations and loss calculations for Cable - T1&T7
Number of strands 19
Slip 6 mm
ym 2.137 m
Span 44.1 m
Total,θ Final stress Final force Long term loss (infinity stage)
Total loss at Total loss at
Stresses Percentage Elastic transfer Relaxation of service
Distance(x) (rad) μθ+kx e-(μθ+kx) (N/mm2) (kN) after slip loss shortening stage steel Creep Shrinkage stage
0.00 0.00 0.00 1.00 1423 3785 1272 10.57 2.68 13.25 2.5 2.8 2.74 21.29
1.00 0.01 0.00 1.00 1418 3772 1277 10.23 2.68 12.91 2.5 2.8 2.74 20.95
2.00 0.02 0.01 0.99 1413 3759 1282 9.89 2.68 12.57 2.5 2.8 2.74 20.61
3.00 0.03 0.01 0.99 1408 3746 1287 9.55 2.68 12.23 2.5 2.8 2.74 20.27
4.00 0.04 0.01 0.99 1403 3732 1292 9.21 2.68 11.89 2.5 2.8 2.74 19.93
0.1L 4.33 0.04 0.02 0.98 1402 3728 1293 9.10 2.68 11.78 2.5 2.8 2.74 19.82
5.00 0.04 0.02 0.98 1398 3719 1297 8.87 2.68 11.55 2.5 2.8 2.74 19.59
6.00 0.05 0.02 0.98 1393 3706 1302 8.53 2.68 11.21 2.5 2.8 2.74 19.25
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project
Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
7.00 0.06 0.02 0.98 1389 3694 1306 8.19 2.68 10.87 2.5 2.8 2.74 18.91
8.00 0.07 0.03 0.97 1384 3681 1311 7.85 2.68 10.53 2.5 2.8 2.74 18.57
0.2L 8.66 0.08 0.03 0.97 1381 3672 1314 7.63 2.68 10.31 2.5 2.8 2.74 18.35
9.00 0.08 0.03 0.97 1379 3668 1316 7.51 2.68 10.19 2.5 2.8 2.74 18.23
10.00 0.09 0.03 0.97 1374 3655 1321 7.17 2.68 9.85 2.5 2.8 2.74 17.89
11.00 0.10 0.04 0.96 1369 3642 1326 6.83 2.68 9.51 2.5 2.8 2.74 17.55
12.00 0.11 0.04 0.96 1364 3630 1331 6.49 2.68 9.17 2.5 2.8 2.74 17.21
0.3L 12.99 0.11 0.05 0.96 1360 3617 1335 6.16 2.68 8.84 2.5 2.8 2.74 16.88
14.00 0.12 0.05 0.95 1355 3604 1340 5.814 2.68 8.49 2.5 2.8 2.74 16.53
15.00 0.13 0.05 0.95 1350 3592 1345 5.475 2.68 8.15 2.5 2.8 2.74 16.19
15.55 0.14 0.05 0.95 1348 3585 1348 5.286 2.68 7.97 2.5 2.8 2.74 16.01
16.00 0.14 0.06 0.95 1346 3579 1346 5.438 2.68 8.12 2.5 2.8 2.74 16.16
16.72 0.15 0.06 0.94 1342 3570 1342 5.675 2.68 8.36 2.5 2.8 2.74 16.40
17.00 0.15 0.06 0.94 1341 3567 1341 5.767 2.68 8.45 2.5 2.8 2.74 16.49
0.4L 17.32 0.15 0.06 0.94 1339 3563 1338 5.969 2.68 8.65 2.5 2.8 2.74 16.69
18.00 0.16 0.06 0.94 1336 3554 1336 6.096 2.68 8.78 2.5 2.8 2.74 16.82
19.00 0.17 0.07 0.94 1332 3542 1332 6.424 2.68 9.10 2.5 2.8 2.74 17.14
20.00 0.18 0.07 0.93 1327 3529 1327 6.750 2.68 9.43 2.5 2.8 2.74 17.47
21.00 0.18 0.07 0.93 1322 3517 1322 7.075 2.68 9.76 2.5 2.8 2.74 17.80
0.5L 21.65 0.19 0.08 0.93 1319 3509 1319 7.286 2.68 9.97 2.5 2.8 2.74 18.01
22.00 0.19 0.08 0.93 1318 3505 1318 7.400 2.68 10.08 2.5 2.8 2.74 18.12
23.00 0.20 0.08 0.92 1313 3493 1313 7.723 2.68 10.40 2.5 2.8 2.74 18.44
24.00 0.21 0.08 0.92 1308 3481 1308 8.045 2.68 10.72 2.5 2.8 2.74 18.76
25.00 0.22 0.09 0.92 1304 3468 1304 8.365 2.68 11.05 2.5 2.8 2.74 19.09
0.6L 25.98 0.23 0.09 0.91 1299 3457 1299 8.679 2.68 11.36 2.5 2.8 2.74 19.40
27.00 0.24 0.09 0.91 1295 3444 1295 9.003 2.68 11.68 2.5 2.8 2.74 19.72
28.00 0.25 0.10 0.91 1290 3432 1290 9.321 2.68 12.00 2.5 2.8 2.74 20.04
29.00 0.25 0.10 0.90 1286 3420 1286 9.637 2.68 12.32 2.5 2.8 2.74 20.36
30.00 0.26 0.10 0.90 1281 3408 1281 9.952 2.68 12.63 2.5 2.8 2.74 20.67
0.7L 30.31 0.27 0.11 0.90 1280 3405 1280 10.050 2.68 12.73 2.5 2.8 2.74 20.77
31.00 0.27 0.11 0.90 1277 3396 1277 10.267 2.68 12.95 2.5 2.8 2.74 20.99
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project
Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
32.00 0.28 0.11 0.89 1272 3385 1272 10.580 2.68 13.26 2.5 2.8 2.74 21.30
33.00 0.29 0.12 0.89 1268 3373 1268 10.891 2.68 13.57 2.5 2.8 2.74 21.61
34.00 0.30 0.12 0.89 1264 3361 1264 11.202 2.68 13.88 2.5 2.8 2.74 21.92
0.8L 34.64 0.30 0.12 0.89 1261 3353 1264 11.202 2.68 13.88 2.5 2.8 2.74 21.92
35.00 0.31 0.12 0.88 1259 3349 1259 11.512 2.68 14.19 2.5 2.8 2.74 22.23
36.00 0.32 0.13 0.88 1255 3338 1255 11.821 2.68 14.50 2.5 2.8 2.74 22.54
37.00 0.33 0.13 0.88 1250 3326 1250 12.128 2.68 14.81 2.5 2.8 2.74 22.85
38.00 0.33 0.13 0.88 1246 3314 1246 12.435 2.68 15.11 2.5 2.8 2.74 23.15
0.9L 38.97 0.34 0.14 0.87 1242 3303 1242 12.731 2.68 15.41 2.5 2.8 2.74 23.45
39.00 0.34 0.14 0.87 1242 3303 1242 12.740 2.68 15.42 2.5 2.8 2.74 23.46
40.00 0.35 0.14 0.87 1237 3291 1237 13.045 2.68 15.72 2.5 2.8 2.74 23.76
41.00 0.36 0.14 0.87 1233 3280 1233 13.348 2.68 16.03 2.5 2.8 2.74 24.07
42.00 0.37 0.15 0.86 1229 3268 1229 13.650 2.68 16.33 2.5 2.8 2.74 24.37
43.00 0.38 0.15 0.86 1224 3257 1224 13.952 2.68 16.63 2.5 2.8 2.74 24.67
1.0L 43.30 0.38 0.15 0.86 1223 3254 1223 14.042 2.68 16.72 2.5 2.8 2.74 24.76
44.00 0.39 0.15 0.86 1220 3246 1220 14.252 2.68 16.93 2.5 2.8 2.74 24.97
44.10 0.39 0.15 0.86 1220 3244 1220 14.282 2.68 16.96 2.5 2.8 2.74 25.00
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project
Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
Zero Slip Point Calculations and loss calculations for Cable - T2 & T8
Number of strands 19
Slip 6 mm
ym 1.58 m
Span 44.1 m
Total, θ Final stress Final force Long term loss (infinity stage)
Total loss at Total loss
Stresses Percentage Elastic transfer Relaxation at service
Distance(x) (rad) μθ+kx e-(μθ+kx) (N/mm2) (kN) after slip loss shortening stage of steel Creep Shrinkage stage
0 0.00 0.00 1.0000 1423 3785 1281 9.97 2.68 12.65 2.5 2.8 2.74 20.69
1 0.01 0.00 1.00 1419 3773 1285 9.67 2.68 12.35 2.5 2.8 2.74 20.39
2 0.01 0.01 0.99 1414 3762 1290 9.36 2.68 12.04 2.5 2.8 2.74 20.08
3 0.02 0.01 0.99 1410 3750 1294 9.06 2.68 11.74 2.5 2.8 2.74 19.78
4 0.03 0.01 0.99 1405 3738 1298 8.76 2.68 11.44 2.5 2.8 2.74 19.48
0.1L 4.33 0.03 0.01 0.99 1404 3734 1300 8.66 2.68 11.34 2.5 2.8 2.74 19.38
5 0.03 0.02 0.98 1401 3727 1303 8.46 2.68 11.14 2.5 2.8 2.74 19.18
6 0.04 0.02 0.98 1397 3715 1307 8.16 2.68 10.84 2.5 2.8 2.74 18.88
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project
Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
7 0.05 0.02 0.98 1392 3704 1311 7.85 2.68 10.53 2.5 2.8 2.74 18.57
8 0.05 0.02 0.98 1388 3692 1315 7.55 2.68 10.23 2.5 2.8 2.74 18.27
0.2L 8.66 0.06 0.03 0.97 1385 3685 1318 7.35 2.68 10.03 2.5 2.8 2.74 18.07
9 0.06 0.03 0.97 1384 3681 1320 7.25 2.68 9.93 2.5 2.8 2.74 17.97
10 0.06 0.03 0.97 1379 3669 1324 6.95 2.68 9.63 2.5 2.8 2.74 17.67
11 0.07 0.03 0.97 1375 3658 1328 6.65 2.68 9.33 2.5 2.8 2.74 17.37
12 0.08 0.04 0.96 1371 3647 1333 6.34 2.68 9.02 2.5 2.8 2.74 17.06
0.3L 12.99 0.08 0.04 0.96 1367 3635 1337 6.04 2.68 8.72 2.5 2.8 2.74 16.76
14 0.09 0.04 0.96 1362 3624 1341 5.74 2.68 8.42 2.5 2.8 2.74 16.46
15 0.10 0.05 0.95 1358 3613 1346 5.44 2.68 8.12 2.5 2.8 2.74 16.16
16 0.10 0.05 0.95 1354 3602 1350 5.13 2.68 7.81 2.5 2.8 2.74 15.85
16.495 0.11 0.05 0.95 1352 3596 1352 4.98 2.68 7.66 2.5 2.8 2.74 15.70
17 0.11 0.05 0.95 1350 3590 1350 5.14 2.68 7.82 2.5 2.8 2.74 15.86
0.4L 17.32 0.11 0.05 0.95 1348 3587 1348 5.24 2.68 7.92 2.5 2.8 2.74 15.96
18 0.12 0.06 0.95 1346 3579 1346 5.44 2.68 8.12 2.5 2.8 2.74 16.16
19 0.12 0.06 0.94 1341 3568 1341 5.73 2.68 8.41 2.5 2.8 2.74 16.45
20 0.13 0.06 0.94 1337 3557 1337 6.02 2.68 8.70 2.5 2.8 2.74 16.74
21 0.14 0.07 0.94 1333 3546 1333 6.31 2.68 8.99 2.5 2.8 2.74 17.03
0.5L 21.65 0.14 0.07 0.93 1330 3539 1330 6.50 2.68 9.18 2.5 2.8 2.74 17.22
22 0.14 0.07 0.93 1329 3535 1329 6.60 2.68 9.28 2.5 2.8 2.74 17.32
23 0.15 0.07 0.93 1325 3524 1325 6.89 2.68 9.57 2.5 2.8 2.74 17.61
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project
Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
24 0.16 0.07 0.93 1321 3513 1321 7.18 2.68 9.86 2.5 2.8 2.74 17.90
25 0.16 0.08 0.93 1317 3502 1317 7.47 2.68 10.15 2.5 2.8 2.74 18.19
0.6L 25.98 0.17 0.08 0.92 1313 3492 1313 7.75 2.68 10.43 2.5 2.8 2.74 18.47
27 0.18 0.08 0.92 1309 3481 1309 8.04 2.68 10.72 2.5 2.8 2.74 18.76
28 0.18 0.09 0.92 1304 3470 1304 8.33 2.68 11.01 2.5 2.8 2.74 19.05
29 0.19 0.09 0.91 1300 3459 1300 8.61 2.68 11.29 2.5 2.8 2.74 19.33
30 0.19 0.09 0.91 1296 3448 1296 8.89 2.68 11.57 2.5 2.8 2.74 19.61
0.7L 30.31 0.20 0.09 0.91 1295 3445 1295 8.98 2.68 11.66 2.5 2.8 2.74 19.70
31 0.20 0.10 0.91 1292 3438 1292 9.18 2.68 11.86 2.5 2.8 2.74 19.90
32 0.21 0.10 0.91 1288 3427 1288 9.46 2.68 12.14 2.5 2.8 2.74 20.18
33 0.21 0.10 0.90 1284 3416 1284 9.74 2.68 12.42 2.5 2.8 2.74 20.46
34 0.22 0.11 0.90 1280 3406 1280 10.02 2.68 12.70 2.5 2.8 2.74 20.74
0.8L 34.64 0.23 0.11 0.90 1278 3399 1278 10.20 2.68 12.88 2.5 2.8 2.74 20.92
35 0.23 0.11 0.90 1276 3395 1276 10.30 2.68 12.98 2.5 2.8 2.74 21.02
36 0.23 0.11 0.89 1272 3385 1272 10.58 2.68 13.26 2.5 2.8 2.74 21.30
37 0.24 0.11 0.89 1269 3374 1269 10.85 2.68 13.53 2.5 2.8 2.74 21.57
38 0.25 0.12 0.89 1265 3364 1265 11.13 2.68 13.81 2.5 2.8 2.74 21.85
0.9L 38.97 0.25 0.12 0.89 1261 3354 1261 11.40 2.68 14.08 2.5 2.8 2.74 22.12
39 0.25 0.12 0.89 1261 3353 1261 11.40 2.68 14.08 2.5 2.8 2.74 22.12
40 0.26 0.12 0.88 1257 3343 1257 11.68 2.68 14.36 2.5 2.8 2.74 22.40
41 0.27 0.13 0.88 1253 3333 1253 11.95 2.68 14.63 2.5 2.8 2.74 22.67
42 0.27 0.13 0.88 1249 3322 1249 12.23 2.68 14.91 2.5 2.8 2.74 22.95
1.0L 43.3 0.28 0.13 0.87 1244 3309 1244 12.58 2.68 15.26 2.5 2.8 2.74 23.30
44 0.29 0.14 0.87 1241 3302 1241 12.77 2.68 15.45 2.5 2.8 2.74 23.49
44.1 0.29 0.14 0.87 1241 3301 1241 12.80 2.68 15.48 2.5 2.8 2.74 23.52
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project
Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
Zero Slip Point Calculations and loss calculations for Cable - T3 & T9
Number of strands 19
Slip 6 mm
ym 1.073 m
Span 44.1 m
Total,θ Final stress Final force Long term loss (infinity stage)
Total loss at
Stresses Percentage Elastic transfer Relaxation Total loss at
Distance(x) (rad) μθ+kx e-(μθ+kx) (N/mm2) (kN) after slip loss shortening stage of steel Creep Shrinkage service stage
0 0.00 0.00 1.00 1423 3785 1289 9.40 2.68 12.08 2.5 2.8 2.74 20.12
1 0.00 0.00 1.00 1419 3775 1293 9.13 2.68 11.81 2.5 2.8 2.74 19.85
2 0.01 0.01 0.99 1415 3764 1297 8.86 2.68 11.54 2.5 2.8 2.74 19.58
3 0.01 0.01 0.99 1411 3754 1301 8.59 2.68 11.27 2.5 2.8 2.74 19.31
4 0.02 0.01 0.99 1407 3744 1304 8.32 2.68 11.00 2.5 2.8 2.74 19.04
0.1L 4.33 0.02 0.01 0.99 1406 3740 1306 8.23 2.68 10.91 2.5 2.8 2.74 18.95
5 0.02 0.01 0.99 1403 3733 1308 8.06 2.68 10.74 2.5 2.8 2.74 18.78
6 0.03 0.02 0.98 1400 3723 1312 7.79 2.68 10.47 2.5 2.8 2.74 18.51
Zero Slip Point Calculations and loss calculations for Cable - T4 & T10
Number of strands 19
Slip 6 mm
ym 0.723 m
Span,L 44.1 m
Total, θ Final stress Final force Long term loss (infinity stage)
Total loss
at
Stresses Percentage Elastic transfer Relaxation Total loss at
Distance(x) (rad) μθ+kx e-(μθ+kx) (N/mm2) (kN) after slip loss shortening stage of steel Creep Shrinkage service stage
0 0.00 0.00 1.00 1423 3785 1295 8.97 2.68 11.65 2.5 2.8 2.74 19.69
1 0.00 0.00 1.00 1419 3776 1299 8.72 2.68 11.40 2.5 2.8 2.74 19.44
2 0.01 0.01 1.00 1416 3766 1302 8.48 2.68 11.16 2.5 2.8 2.74 19.20
3 0.01 0.01 0.99 1412 3757 1306 8.23 2.68 10.91 2.5 2.8 2.74 18.95
4 0.01 0.01 0.99 1409 3747 1309 7.99 2.68 10.67 2.5 2.8 2.74 18.71
0.1L 4.33 0.01 0.01 0.99 1408 3744 1310 7.91 2.68 10.59 2.5 2.8 2.74 18.63
5 0.01 0.01 0.99 1405 3738 1313 7.74 2.68 10.42 2.5 2.8 2.74 18.46
6 0.02 0.02 0.99 1402 3729 1316 7.50 2.68 10.18 2.5 2.8 2.74 18.22
Zero Slip Point Calculations and loss calculations for Cable - T5& T11
Number of strands 19
Slip 6 mm
ym 0.367 m
Span,L 44.1 m
Total,θ Final stress Final force Long term loss (infinity stage)
Total loss
at Total loss
Stresses Percentage Elastic transfer Relaxation at service
Distance(x) (rad) μθ+kx e-(μθ+kx) (N/mm2) (kN) after slip loss shortening stage of steel Creep Shrinkage stage
0 0.00 0.00 1.00 1423 3785 1302 8.52 2.68 11.20 2.5 2.8 2.74 19.24
1 0.00 0.00 1.00 1420 3776 1305 8.30 2.68 10.98 2.5 2.8 2.74 19.02
2 0.00 0.00 1.00 1417 3768 1308 8.08 2.68 10.76 2.5 2.8 2.74 18.80
3 0.00 0.01 0.99 1413 3759 1311 7.86 2.68 10.54 2.5 2.8 2.74 18.58
4 0.01 0.01 0.99 1410 3751 1314 7.64 2.68 10.32 2.5 2.8 2.74 18.36
0.1L 4.33 0.01 0.01 0.99 1409 3748 1315 7.56 2.68 10.24 2.5 2.8 2.74 18.28
5 0.01 0.01 0.99 1407 3743 1317 7.41 2.68 10.09 2.5 2.8 2.74 18.13
6 0.01 0.01 0.99 1404 3734 1321 7.19 2.68 9.87 2.5 2.8 2.74 17.91
7 0.01 0.02 0.98 1401 3726 1324 6.97 2.68 9.65 2.5 2.8 2.74 17.69
Zero Slip Point Calculations and loss calculations for Cable - T6 & T12
Number of strands 19
Slip 6 mm
ym 0.14 m
Span,L 44.1 m
Total,θ Final stress Final force Long term loss (infinity stage)
Total loss
at Total loss at
Stresses Percentage Elastic transfer Relaxation service
Distance(x) (rad) μθ+kx e-(μθ+kx) (N/mm2) (kN) after slip loss shortening stage of steel Creep Shrinkage stage
0 0.00 0.00 1.00 1423 3785 1306 8.22 2.68 10.90 2.5 2.8 2.74 18.94
1 0.00 0.00 1.00 1420 3777 1309 8.02 2.68 10.70 2.5 2.8 2.74 18.74
2 0.00 0.00 1.00 1417 3769 1312 7.81 2.68 10.49 2.5 2.8 2.74 18.53
3 0.00 0.01 0.99 1414 3761 1315 7.61 2.68 10.29 2.5 2.8 2.74 18.33
4 0.00 0.01 0.99 1411 3753 1318 7.40 2.68 10.08 2.5 2.8 2.74 18.12
0.1L 4.33 0.00 0.01 0.99 1410 3751 1319 7.33 2.68 10.01 2.5 2.8 2.74 18.05
5 0.00 0.01 0.99 1408 3745 1321 7.19 2.68 9.87 2.5 2.8 2.74 17.91
6 0.00 0.01 0.99 1405 3738 1323 6.99 2.68 9.67 2.5 2.8 2.74 17.71
ANNEX-6
CABLE T1 & T7
A
A.05 Pµ=loss in prestress due to friction per unit length 12.86 N/mm
A.08 Loss in prestress along the total length of cable 203.19 N/mm2
A.10 The drop in prestressing force at stressing end Δp=2 *Pµ*L 400.17 KN
A.12 Pµ=loss in prestress due to friction per unit length 12.86 N/mm
A.13 Average % loss in prestress due to slip for the zero slip length of
cable 5.29 %
B CABLE T2 & T8
B.05 Pµ=loss in prestress due to friction per unit length 11.44 N/mm
B.08 Loss in prestress along the total length of cable 182.13 N/mm2
B.10 The drop in prestressing force at stressing end Δp=2 *Pµ*L 377.34 KN
B.12 Pµ=loss in prestress due to friction per unit length 11.44 N/mm
Average % loss in prestress due to slip for the zero slip length of
B.13 cable 4.98 %
C CABLE T3 & T9
C.05 Pµ=loss in prestress due to friction per unit length 10.16 N/mm
C.08 Loss in prestress along the total length of cable 162.50 N/mm2
C.10 The drop in prestressing force at stressing end Δp=2 *Pµ*L 355.70 KN
C.12 Pµ=loss in prestress due to friction per unit length 10.16 N/mm
C.13 Average % loss in prestress due to slip for the zero slip length of
cable 4.70 %
D.05 Pµ=loss in prestress due to friction per unit length 9.25 N/mm
D.08 Loss in prestress along the total length of cable 148.84 N/mm2
D.10 The drop in prestressing force at stressing end Δp=2 *Pµ*L 339.34 KN
D.12 Pµ=loss in prestress due to friction per unit length 9.25 N/mm
Average % loss in prestress due to slip for the zero slip length of
D.13 cable 4.48 %
Average % loss in prestress due to slip considering force in the
D.14 the entire length of cable 1.86 %
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
D.05 Pµ=loss in prestress due to friction per unit length 8.35 N/mm
D.08 Loss in prestress along the total length of cable 134.75 N/mm2
D.10 The drop in prestressing force at stressing end Δp=2 *Pµ*L 322.39 KN
D.12 Pµ=loss in prestress due to friction per unit length 8.35 N/mm
Average % loss in prestress due to slip for the zero slip length of
D.13 cable 4.26 %
Average % loss in prestress due to slip considering force in the
D.14 the entire length of cable 1.86 %
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
E.05 Pµ=loss in prestress due to friction per unit length 7.78 N/mm
Total % loss in prestress for cable 1 (section "N'-longitudianl
E.06 analysis) 8.84 %
E.08 Loss in prestress along the total length of cable 125.78 N/mm2
E.10 The drop in prestressing force at stressing end Δp=2 *Pµ*L 311.21 KN
E.12 Pµ=loss in prestress due to friction per unit length 7.78 N/mm
Average % loss in prestress due to slip for the zero slip length of
E.13 cable 4.11 %
Average % loss in prestress due to slip considering force in the
E.14 the entire length of cable 1.86 %
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
ANNEX-5
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 24-May-12
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 2.8325 0 0; 2 5.9675 0 0; 6 1.99 2.61 0; 7 6.81 2.61 0; 8 0 2.61 0;
9 8.8 2.61 0;
MEMBER INCIDENCES
5 6 7; 9 1 6; 10 2 7; 11 8 6; 12 7 9; 13 2 1;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
TYPE CONCRETE
G 9.28139e+006
TYPE CONCRETE
TYPE CONCRETE
STRENGTH FCU 27579
STRENGTH FCU 27579
STRENGTH FCU 27579
ISOTROPIC CONCRETE-M45
E 3.25e+007
POISSON 0.15
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
G 9.28139e+006
TYPE CONCRETE
TYPE CONCRETE
STRENGTH FCU 45000
STRENGTH FCU 27579
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
5 11 TO 13 PRIS YD 0.2 ZD 1
9 10 PRIS YD 0.38 ZD 1
CONSTANTS
MATERIAL CONCRETE-M45 ALL
SUPPORTS
BEAM LABELS
Average of total loss of prestress
Distance(x) T1 & T7 T2 & T8 T3 & T9 T4 & T10 T5& T11 T6 & T12 Avg.
0L 0 13.25 12.65 12.08 11.65 11.2 10.9 11.96
0.1L 4.33 11.78 11.34 10.91 10.59 10.24 10.01 10.81
0.2L 8.66 10.31 10.03 9.75 9.53 9.29 9.12 9.67
0.3L 12.99 8.84 8.72 8.59 8.47 8.33 8.23 8.53
0.4L 17.32 8.65 7.92 7.43 7.41 7.38 7.34 7.69
0.5L 21.65 9.97 9.18 8.46 7.96 7.45 7.12 8.36
0.6L 25.98 11.36 10.43 9.58 8.98 8.37 7.98 9.45
0.7L 30.31 12.73 11.66 10.68 9.99 9.29 8.84 10.53
0.8L 34.64 13.88 12.88 11.77 10.99 10.2 9.69 11.57
0.9L 38.97 15.41 14.08 12.84 11.98 11.1 10.53 12.66
1.0L 43.30 16.72 15.26 13.91 12.96 11.99 11.36 13.70
Distance(x) T1 & T7 T2 & T8 T3 & T9 T4 & T10 T5& T11 T6 & T12 Avg.
0L 0 21.29 20.69 20.12 19.69 19.24 18.94 20.00
0.1L 4.33 19.82 19.38 18.95 18.63 18.28 18.05 18.85
0.2L 8.66 18.35 18.07 17.79 17.57 17.33 17.16 17.71
0.3L 12.99 16.88 16.76 16.63 16.51 16.37 16.27 16.57
0.4L 17.32 16.69 15.96 15.47 15.45 15.42 15.38 15.73
0.5L 21.65 18.01 17.22 16.5 16 15.49 15.16 16.40
0.6L 25.98 19.4 18.47 17.62 17.02 16.41 16.02 17.49
0.7L 30.31 20.77 19.7 18.72 18.03 17.33 16.88 18.57
0.8L 34.64 21.92 20.92 19.81 19.03 18.24 17.73 19.61
0.9L 38.97 23.45 22.12 20.88 20.02 19.14 18.57 20.70
1.0L 43.30 24.76 23.3 21.95 21 20.03 19.4 21.74
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.27.06.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.
Doc. No HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016 Reviewed. DVR Rev. B
ULS Factors
G II
Loads Symbol GI GIII
G IIa G IIb GV
Dead Loads DL 1.25 1.25 1.25 1.25
Prestressing PR 1.15/.87 1.15/.87 1.15/.87 1.15/.87
Combinations
GI G IIA G IIB
Moment (kN- Shear Moment (kN- Moment
Point # Shear (kN) m) (kN) m) Shear (kN) (kN-m)
0.1L 6753.02 33786.19 5334.71 25783.37285 5971.63 29233.18
0.2L 5434.03 60147.09 3919.72 45407.44706 4577.64 51745.41
0.3L 4181.76 80941.21 2571.45 59159.62754 3250.37 68452.49
0.4L 1559.87 94138.06 1281.55 67323.25917 1410.28 78712.32
0.5L 0.00 97932.86 0.00 70354.46358 0.00 82133.15
0.6L -811.24 91981.78 -1089.55 67323.25917 -960.83 77849.81
0.7L -577.13 79713.13 -2187.45 59159.62754 -1508.52 67961.26
0.8L -1829.40 62160.57 -3343.72 45407.44706 -2685.79 52550.80
0.9L -3148.39 35942.47 -4566.71 26364.97285 -3929.78 30550.06
Project
Title
Doc. No
Tabulation of Forces
6 Derailment loads
Point # 1 2 3 4.0 5 6.0 7 8 9 10 11.0 12
x (m.) 0 0.866 1.732 2.6 3.464 4.3 5.196 6.062 6.928 7.794 8.7 9.526
Shear (kN) 1299 1247.04 1195.08 1143.1 1091.16 1039.2 987.24 935.28 883.32 831.36 779.4 727.44
Total Moment 1692.84 2795.2753 3852.7133 4865.2 5832.6 6755.0 7632.5 8464.9 9252.4 9994.9 10692.3 11344.8
7 Wind loads
13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 23.0 24.0 25.0 26.0
10.4 11.3 12.1 13.0 13.9 14.7 15.6 16.5 17.3 18.2 19.1 19.9 20.8 21.65
1029.9 1029.9 1029.9 1029.9 1029.9 621.9 621.9 621.9 213.9 213.9 213.9 213.9 213.9 -194.1
11600.3 12492.1 13384.0 14275.9 15167.8 16009.9 16548.5 17087.0 17413.4 17598.7 17783.9 17969.1 18154.4 18115.2
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Hyderabad Metro Rail Project
Corridor-1, Analysis & Design of 45m obligatory span Viaduct
HM-LE-L1SL1E-M0101-DOC-DC-VIA-00-016
1875.7599 1978.5977 2073.2084 2159.592 2237.7487 2307.6784 2369.381 2422.8566 2468.1052 2505.1268 2533.9213 2554.4889 2566.8294 2570.9429
1448
27 28 29 30 31.0 32 33 34 35 36.0 37 38 39 40
22.516 23.382 24.248 25.114 26.0 26.846 27.712 28.578 29.444 30.3 31.176 32.042 32.908 33.774
-110.7614 -221.5228 -332.2842 -443.0456 -553.8 -664.5684 -775.3298 -886.3582 -999.2554 -1114.3 -1231.457 -1350.762 -1472.202 -1595.778
31578.034 31434.155 31194.357 30858.639 30427.0 29899.445 29275.969 28556.535 27740.219 26825.2 25809.655 24691.708 23469.519 22141.237
27 28 29 30 31.0 32 33 34 35 36.0 37 38 39 40
22.516 23.382 24.248 25.114 26.0 26.846 27.712 28.578 29.444 30.3 31.176 32.042 32.908 33.774
-174.7068 -349.4137 -524.1205 -698.8274 -873.5 -1048.241 -1222.948 -1397.922 -1574.764 -1753.7 -1934.857 -2118.107 -2303.493 -2491.014
48855.58 48628.636 48250.396 47720.859 47040.0 46207.898 45224.473 44089.714 42802.695 41361.6 39764.596 38009.817 36095.418 34019.551
27.0 28.0 29.0 30.0 31.0 32.0 33.0 34.0 35.0 36.0 37.0 38.0 39.0 40.0
22.5 23.4 24.2 25.1 26.0 26.8 27.7 28.6 29.4 30.3 31.2 32.0 32.9 33.8
-194.1 -602.1 -602.1 -602.1 -602.1 -602.1 -602.1 -602.1 -602.1 -602.1 -602.1 -602.1 -602.1 -602.1
17947.1 17745.6 17224.1 16702.7 16181.3 15659.9 15138.4 14617.0 14095.6 13574.2 13052.7 12531.3 12009.9 11488.5
2566.8294 2554.4889 2533.9213 2505.1268 2468.1052 2422.8566 2369.381 2307.6784 2237.7487 2159.592 2073.2084 1978.5977 1875.7599 1764.6952
17364 14658.4
27 28 29 30 31.0 32 33 34 35 36.0 37 38 39 40
22.516 23.382 24.248 25.114 26.0 26.846 27.712 28.578 29.444 30.3 31.176 32.042 32.908 33.774
-51.96 -103.92 -155.88 -207.84 -259.8 -311.76 -363.72 -415.68 -467.64 -519.6 -571.56 -623.52 -675.48 -727.44
15732.0 15664.5 15552.0 15394.5 15192.0 14944.6 14652.1 14314.6 13932.1 13504.6 13032.2 12514.7 11952.2 11344.8
27 28 29 30 31.0 32 33 34 35 36.0 37 38 39 40
22.516 23.382 24.248 25.114 26.0 26.846 27.712 28.578 29.444 30.3 31.176 32.042 32.908 33.774
-237.1108 -474.2216 -711.3324 -948.4432 -1185.6 -1422.665 -1659.776 -1897.22 -2136.999 -2379.4 -2624.564 -2872.35 -3122.804 -3375.927
66128.595 65820.588 65307.243 64588.56 63664.5 62535.18 61200.484 59660.401 57913.777 55958.3 53791.803 51411.832 48816.123 46002.365
Designed. JKJ Date.27.06.12
Checked. AP Sheet No.
Reviewed. DVR Rev. B
41.0 42.0 43.0 44.0 45.0 46.0 47.0 48.0 49.0 50.0 51.0
34.6 35.5 36.4 37.2 38.1 39.0 39.8 40.7 41.6 42.4 43.3
-602.1 -602.1 -1010.1 -1010.1 -1418.1 -1418.1 -1418.1 -1418.1 -1418.1 -1826.1 -1826.1
10967.0 10445.6 9650.0 8775.3 7817.3 6589.2 5361.1 4133.0 2905.0 1581.4 0.0
Designed. JKJ Date.27.06.12
Checked. AP Sheet No.
Reviewed. DVR Rev. B
1645.403464 1517.8847 1382.1389 1238.1661 1085.97 925.5394485 756.88559 580.00472 394.89683 201.56192 0
9937.27 5051.13 0
A.5 Cantilever projection of deck slab from girder at the ends 275.00 mm
B.8 Moment of Inertia about Y axis at mid span (Annex-1) 2.16E+13 mm4
B.10 Centre of gravity of girder from bottom at mid span (Annex-1) 1536.38 mm
C DESIGN STANDARDS
D MATERIAL PROPERTIES
F.02 Permissible compressive stress during service stage(0.40 fck ) 18.00 N/mm2
F.04 Permissible tensile stress at the time of prestress transfer 0.00 N/mm2
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.10.05.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.010
Doc. No HM-LE-XXXXXX-M0101-XXX-XX-VIA-00-00X Reviewed. DVR Rev. A
G LOADINGS
G.03 Cable trough cell (Super imposed dead loads-variable) 7.40 kN/m
Wheel configuration;
H LOAD COMBINATIONS
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.10.05.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.013
Doc. No HM-LE-XXXXXX-M0101-XXX-XX-VIA-00-00X Reviewed. DVR Rev. A
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.10.05.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.014
Doc. No HM-LE-XXXXXX-M0101-XXX-XX-VIA-00-00X Reviewed. DVR Rev. A
I LOADS, MOMENTS AND SHEAR CALCULATIONS AT MID SPAN FOR SERVICE STAGE
Loads from self weight of the structure 5% extra considered for 127.17 kN/m
I.01
support thickening and misc. items like future stress blocks etc.)
I.02 Sum of all super imposed dead loads (variable) with factor 1.20 51.84 kN/m
I.03 Sum of all super imposed dead loads (fixed) 22.00 kN/m
I.04 Total Dead Load (self wt+SIDL variable & fixed) 201.01 kN/m
MOVING LOAD ANALYSIS IS DONE USING THE SPREAD SHEET (ANNEX-2) AND RESULTS
ARE COMPARED WITH A SIMPLE BEAM ANALYSIS OF WHEEL LOADS FOR MAXIMUM
BENDING MOMENT CASE (ANNEX-3). (For moving loads; the maximum bending moment in
simple beam analysis is arrived by keeping the C.G of span equidistant from the C.G of loading
and nearest wheel load). The analysis results converted into the units required for further calcs
The stresses and moments due to temperature difference and is calculated based on sec.5.13 of
DBR, Fig-10 of IRC-6-2000, Fig 9 and Table 24 of BD-37/01- Appendix-A
Positive temperature difference values (T1 to T3) for Group-4 structures with wearing coat
thickness of 150mm as per Table-24 of BD-37/01-Appendix-A are as below (rerer Annex-4)
J.03 T1 10.00 0C
J.04 T2 2.50 0C
J.05 T3 2.00 0C
J.09 Modulus of elasticity for Temperature stress calculations (50%) 16250.00 N/mm2
J.16 Distance from C.G of box section to C.G of h2 portion (Annex-4) 895.24 mm
J.20 Distance from C.G of box section to C.G of h3 portion (Annex-4) 1460.81 mm
J.27 Distance from C.G of box section to C.G of h1 portion (Anx-4) 1171.32 mm
J.31 Distance from C.G of box section to C.G of h2 portion (Annex-4) 1015.26 mm
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.10.05.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.017
Doc. No HM-LE-XXXXXX-M0101-XXX-XX-VIA-00-00X Reviewed. DVR Rev. A
J.35 Distance from C.G of box section to C.G of h3 portion (Anx-4) 2348.42 mm
Reverse temperature difference values (T1 to T4) for Group-4 structures with wearing coat
thickness of 150mm as per Table-24 of BD-37/01-Appendix-A are as below (refer Annex-4)
J.41 T1 6.50 0C
J.42 T2 0.40 0C
J.43 T3 1.10 0C
J.44 T4 6.20 0C
J.47 Modulus of elasticity for Temperature stress calculations (50%) 16250.00 N/mm2
J.50 Distance from C.G of box section to C.G of h1 portion (Anx-4) 1008.29 mm
J.54 Distance from C.G of box section to C.G of h2 portion (Anx-4) 792.30 mm
J.58 Distance from C.G of box section to C.G of h3 portion (Anx-4) 1183.86 mm
J.62 Distance from C.G of box section to C.G of h4 portion (Annex-4) 1172.43 mm
J.69 Distance from C.G of box section to C.G of h1 portion (Annex-4) 1134.90 mm
J.73 Distance from C.G of box section to C.G of h2 portion (Anx-4) 913.29 mm
J.77 Distance from C.G of box section to C.G of h3 portion (Anx-4) 1032.71 mm
K.02 Permitted stress at bottom fibre of box section at service stage 0.00 N/mm2
P/A (axial compressive stress) + M1/Z (internal stress due to prestress) + M2/Z ( stresses
due to external moments/forces) = Permissible stress
where;
P = PRESTRESSING FORCE
Considering % loss in prestress and no tensile force at bottom fibre of the box section
L.06 Tendons T5, T6, T11& T12 at support (Refer Annex-1) 290.00 mm
Considering parabolic profile for tendons; the height of parabola (Y) from horizontal plane
connecting the edges at various locations shall be Y = 4R * X * (L-X)/L2
Eccentricity of cables from box bottom at a distance of 0.05 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.05 x span length
L.11 from support 259.32 mm
Eccentricity of cables from box bottom at a distance of 0.10 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.10 x span length
L.16 from support 236.38 mm
Eccentricity of cables from box bottom at a distance of 0.15 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.15 x span length
L.21 from support 216.13 mm
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.10.05.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.023
Doc. No HM-LE-XXXXXX-M0101-XXX-XX-VIA-00-00X Reviewed. DVR Rev. A
Eccentricity of cables from box bottom at a distance of 0.20 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.20 x span length
L.26 from support 198.59 mm
Eccentricity of cables from box bottom at a distance of 0.25 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.25 x span length
L.31 from support 183.74 mm
Eccentricity of cables from box bottom at a distance of 0.30 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.30 x span length
L.36 from support 171.59 mm
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.10.05.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.024
Doc. No HM-LE-XXXXXX-M0101-XXX-XX-VIA-00-00X Reviewed. DVR Rev. A
Eccentricity of cables from box bottom at a distance of 0.35 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.35 x span length
L.41 from support 162.15 mm
Eccentricity of cables from box bottom at a distance of 0.40 x Span length from support
Tendons T5, T6, T11 & T12 at a distance of 0.40 x span length
from support 155.40 mm
Eccentricity of cables from box bottom at a distance of 0.45 x Span length from support
Tendons T1 & T7 at a distance of 0.45 x span length from
L.38 support 169.76 mm
Tendons T2 & T8 at a distance of 0.45 x span length from
L.39 support 163.98 mm
Tendons T3 & T9 at a distance of 0.45 x span length from
L.40 support 158.19 mm
Tendons T4 & T10at a distance of 0.45 x span length from
L.41 support 152.41 mm
Tendons T5, T6, T11 & T12 at a distance of 0.45 x span length
from support 151.35 mm
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.10.05.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.025
Doc. No HM-LE-XXXXXX-M0101-XXX-XX-VIA-00-00X Reviewed. DVR Rev. A
AT MID SPAN
AT SUPPORT
where;
N.01
Coefficient of friction =µ 0.17 per rad
N.02
Wobble coefficient =k 0.0020 per m
Cumulative angle between tangents to cable at supports= α = 2*
Slope of cable = 4* E/L ; where L= horizontal length of paraboala
N.04
Depth of parabolic cable T1 & T7 (E) 2.05 m
N.05
Depth of parabolic cable T2 & T8 (E) 1.45 m
N.06
Depth of parabolic cable T3 & T9 (E) 0.85 m
N.07
Depth of parabolic cable T4 & T10 (E) 0.25 m
N.08
Depth of parabolic cable T5,T6, T11& T12 (E) 0.14 m
N.09
Cumulative angle between tangents (α) T1&T7 0.3719 radian
N.10
Cumulative angle between tangents(α) T2 & T8 0.2630 radian
N.11
Cumulative angle between tangents (α) T3 & T9 0.1542 radian
N.12
Cumulative angle between tangents (α) T4 & T10 0.0454 radian
Cumulative angle between tangents (α) T5,T6, T11& T12 0.0254 radian
N.13
Loss of prestress in cable T1 & T7 due to friction 14.05 %
N.14
Loss of prestress in cable T2 & T8 due to friction 12.45 %
N.15
Loss of prestress in cable T3 & T9 due to friction 10.81 %
N.15
Loss of prestress in cable T4 & T10 due to friction 9.15 %
Loss of prestress in cable T5, T6, T11 &T12 due to friction 8.84 %
N.16
Average loss due to friction 11.06 %
N.32
I=Moment of inertia at mid section 5.13E+12 mm4
N.33
Md=Moment due to self weight of the structure 29804.03 KN-m
N.34
FC1 14.54 N/mm2
N.44 Relaxation loss of prestressing steels at 1000 hrs for 19 wire low
relaxation strand -BS-4757 (% of initial stress) 2.50 %
N.69
Loss of stress in steel due to shrinkage strain =Ecs* Es 39.00 N/mm2
N.70
Prestress in tendon 1422.90 N/mm2
N.71
Maximum % loss in prestress due to shrinkage 2.74 %
O.16 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 2.65 N/mm2
O.17 % Prestress available considering loss due to slip and friction=δ 84.45 %
O.32 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 4.90 N/mm2
P.08 Stress at bottom of box section (C)= δ P/A+(δP* E*Yb/I)-(M*E/I) 0.55 N/mm2
P.24 Stress at bottom of box section (C)= δ P/A+ (δP* E*Yb/I)-(M*E/I) 8.76 N/mm2
P.32 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 2.14 N/mm2
P.39 M=Maximum moment at 0.10L from support (from Annex-3) 23727.67 KN-m
P.40 Stress at bottom of box section (C)= δ P/A+(δP* E*Yb/I)-(M*E/I) 6.23 N/mm2
P.47 M=Maximum moment at 0.10L from support (from Annex-3) 23727.67 KN-m
P.48 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 6.11 N/mm2
P.55 M=Maximum moment at 0.20L from support (from Annex-3) 40988.70 KN-m
P.56 Stress at bottom of box section (C)= δ P/A+(δP* E*Yb/I)-(M*E/I) 5.56 N/mm2
P.63 M=Maximum moment at 0.20L from support (from Annex-3) 40988.70 KN-m
P.64 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 7.72 N/mm2
P.71 M=Maximum moment at 0.30L from support (from Annex-3) 53748.31 KN-m
P.72 Stress at bottom of box section (C)= δ P/A+(δP* E*Yb/I)-(M*E/I) 3.64 N/mm2
P.80 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 9.06 N/mm2
P.87 M=Maximum moment at 0.40L from support (from Annex-3) 62677.25 KN-m
P.88 Stress at bottom of box section (C)= δ P/A+(δP* E*Yb/I)-(M*E/I) 2.11 N/mm2
P.95 M=Maximum moment at 0.40L from support (from Annex-3) 62677.25 KN-m
P.96 Stress at top of box section (C)= δ P/A- (δP* E*Yt/I)+(M*E/I) 10.13 N/mm2
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.10.05.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.038
Doc. No HM-LE-XXXXXX-M0101-XXX-XX-VIA-00-00X Reviewed. DVR Rev. A
Ultimate moment at mid span = 1.25 *(Moment due to self weight & fixed Imposed loads) +
2*(Moment due to variable Imposed loads) + 1.75 (Moment due to live loads)
Q.05
Q.06 Un-factored moment due to self weight at mid span 29804.03 kN-m
Q.07 Un-factored moment due to fixed imposed loads at mid span 5155.95 kN-m
Q.08 Un-factored moment due to variable imposed loads at mid span 10124.41 kN-m
Q.09 Un-factored moment due to live loads at mid span 18213.22 kN-m
Mult=0.90*db*As*fp
where;
Mult=0.176*b*db2*fck + 0.53*(Bf-b)*(db-t/2)*t*fck
where;
Vcr=0.037*b*d*√fck +Mcr*V/M
where;
Ultimate Shear Force Check at a distance of Effective depth (2.46m) from Support
AT TRANSFER STAGE
where;
S.08 Md= Moment due to self weight of the section at mid span 27094.57 KN-M
AT SERVICE STAGE
where;
where;
OK
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.10.05.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.045
Doc. No HM-LE-XXXXXX-M0101-XXX-XX-VIA-00-00X Reviewed. DVR Rev. A
T.02 Length of end block (2/3 rd of total depth of box section) 1740.00 mm
T.08 Half the side of loaded area(half of 19k15 anchorage plate) =Yp0 157.50 mm
T.13 Area of steel required for each cable portion at end block 1392.15 mm2
T.16 Depth in which the bursting force is distributed per cable 600.00 mm
where,
U.06 Emergence angle at end for tendons T5,T6,T11 and T12 0.7279 deg
LARSEN & TOUBRO LIMITED
ECC Division - INFRA IC, IE&T
Project Hyderabad Metro Rail Project Designed. JKJ Date.10.05.12
Title Corridor-1, Analysis & Design of 45m obligatory span Viaduct Checked. AP Sheet No.047
Doc. No HM-LE-XXXXXX-M0101-XXX-XX-VIA-00-00X Reviewed. DVR Rev. A
where,
where;
V.28 Elongation for tendons considering the frictional losses T1&T7 276.98 mm
V.29 Elongation for tendons considering the frictional losses T2&T8 281.95 mm
V.30 Elongation for tendons considering the frictional losses T3&T9 287.08 mm
V.31 Elongation for tendons considering the frictional lossess T4&T10 292.37 mm
Elongation for tendons considering the frictional lossess T5&T11 293.36 mm
Elongation for tendons considering the frictional lossess T6&T12 286.21 mm
SECTION-II