This document provides the scheme of evaluation for the second internal assessment of the subject Transformers & Generators for semester 3. It outlines 6 questions that will be asked, covering topics like transformer connections, phasor diagrams, efficiency calculations, tap changing, and synchronous generator construction and EMF equations. Marks are allocated for each part, with the total marks for the assessment being 30. Diagrams, explanations, and calculations will be required from the students.

Uploaded by

raghvendraprasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views2 pages

CIE 2-1 - Merged

This document provides the scheme of evaluation for the second internal assessment of the subject Transformers & Generators for semester 3. It outlines 6 questions that will be asked, covering topics like transformer connections, phasor diagrams, efficiency calculations, tap changing, and synchronous generator construction and EMF equations. Marks are allocated for each part, with the total marks for the assessment being 30. Diagrams, explanations, and calculations will be required from the students.

Uploaded by

raghvendraprasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING

SCHEME OF EVALUATION FOR SECOND INTERNAL ASSESSMENT, ODD SEM, 2023-24

SEM : III
SUBJECT NAME/ CODE: Transformers & Generators (BEE304) DATE: 23/01/2024
FACULTY NAME: Dr. Raghvendraprasad Deshpande TOTAL MARKS: 30Marks

Q
Marks
n.
Scheme Allotte
N
d
o
1a Necessity (02 Marks) 2+2=
I. Non-availability of a single large transformer to meet the total load requirement. 04
II. The power demand might have increased over a time necessitating
III. To ensure improved reliability
IV. To reduce the spare capacity.
V. When transportation problems limit installation of large transformers, it is easier to transport smaller
ones to site and work them in parallel.
Conditions (02 Marks)
The voltage ratio must be the same
I. The per unit impedance of each machine on its own base must be the same.
II. The polarity must be the same, so that there is no circulating current between the transformers

b Circuit diagram (1.5 Mark) Phasor diagram (1.5 Mark)

1.5+1.5
+1.5+
1.5
=
Expression for I1 (1.5 Mark) Expression for I1 (1.5 Mark) 06

2a Circuit diagram, winding connection and phasor diagram of Delta/Delta and Star Delta. (Each 2+2=
carry 02 mark) 04

Delta / star : Line voltage = 925.6 V, line current = 69.28 A, output = 114.3 kVA (03Mark) 3+3=
b 06
Delta/ Delta: Line voltage = 550 V, line current = 120 A, output = 114.3 kVA (03Mark)

3 System voltage control is essential for: (i) Adjustment of consumers’ terminal voltage within prescribed
a limits. (ii) Control of real and reactive power flow in the network. (iii) Periodical adjustment (1–10%) to
check off-set load variations. (02Mark) Tasks performed: (i) For varying the secondary voltage. (ii)
For maintaining the secondary voltage constant with a varying primary voltage. (iii) For providing an 2+2=
auxiliary secondary voltage for a special purpose, such as lighting. (iv) For providing a low voltage for 04
starting rotating machines. (v) For providing a neutral point, e.g. for earthing (02Mark)
b Calculation of K and copper losses (02Mark) 2+2+2=
Efficiency at full load UPF = 95.29% (02Mark) 06
Efficiency at 0.8 p.f. =94.18% (02Mark)
2+2=
On - load" tap changing transformer Diagram (02Mark), explanation (02Mark) 04

b 3+3=
I, = 940234A (03Mark) and l;= 8832- 44A (03Mark)
06

Definition diagram and explanation of Pitch factor (02Mark) and distribution factor (02Mark) 2+2=
04
b Salient (03Mark) and non-salient pole synchronous generators (03Mark) 3+3=
06

68 Construction of a synchronous generator, Stator diagram, explanation (02Mark), rotor diagram, 2+2=
explanation , (02Mark) 04

EMF equation of an alternator.


(02Mark) (02Mark) (02Mark)

f=
PN
H: E(rms/phase) = 444 fT Eg = 2.22k, K, fZ 2+2+2=
120 06

Faculty Signature HOD


Professor & Head
Dept. of Electrical &Electrenics Engg.
GsSSIETW, Mysuru, Indla -570016