COMPOUND WALL QUANTITY SHEET
S.NO Discription Unit NO's. Length Width Depth
1 Earth work Excavation for
Footings
HWALL CUM 32 1.3 1.3 1.2
HWALL CUM 4 1.8 1.3 1.2
TOTAL QTY CUM
2
Earth work Excavation for CRS:-
CUM 1 125.24 0.6 0.6
TOTAL QTY CUM
3 Refilling with Excavated soil for Footings
Footings earth work total Qty CUM
Deduction
PCC Bed for Footings
HWALL CUM 32 1.3 1.3 0.1
HWALL CUM 4 1.8 1.3 0.1
FOOTING
HWALL CUM 32 1 1 0.3
HWALL CUM 4 1.5 1 0.3
COLUMN
HWALL CUM 38 0.3 0.23 1.2
TOTAL QTY CUM
4 P.C.C. Bed FOR FOOTINGS
HWALL CUM 32 1.3 1.3 0.1
HWALL CUM 4 1.8 1.3 0.1
TOTAL QTY CUM
5 PCC BED FOR CRS WALL
CUM 1 125.24 0.6 0.1
TOTAL QTY CUM
6 P.C.C. Bed below Plinth Beam
CUM 1 117.19 0.38 0.1
TOTAL QTY CUM
7 FOOTING
HWALL CUM 32 1 1 0.3
HWALL CUM 4 1.5 1 0.3
TOTAL QTY CUM
8 COLUMN
HWALL CUM 38 0.3 0.23 5
TOTAL QTY CUM
9 PLINTH BEAM
HWALL CUM 1 117.19 0.23 0.3
TOTAL QTY CUM
10 BEAM
HWALL CUM 1 125.24 0.23 0.3
TOTAL QTY CUM
11 CRS WALL CUM 1 125.24 0.6 1
TOTAL QTY CUM
12 9" Brick work
HWALL CUM 1 117.19 2.4 0.23
TOTAL QTY CUM
13 External Walls Plastering
HWALL SQM 1 125.24 2.4
TOTAL QTY SQM
14 External Walls Painting
HWALL SQM 1 125.24 2.4
TOTAL QTY SQM
15 Centring Work
A BED CONCRETE
HWALL SQM 32 5.2 0.3
HWALL SQM 4 5.6 0.3
TOTAL QTY SQM
B FOOTING MAT
HWALL SQM 32 5.2 0.3
HWALL SQM 4 5.6 0.3
TOTAL QTY SQM
C Columns SQM 38 1.06 5
TOTAL QTY SQM
D Plinth Beams
HWALL SQM 1 117.19 1.06
TOTAL QTY SQM
E Floor Beams
HWALL SQM 1 125.24 1.06
TOTAL QTY SQM
TOTAL QTY
Providing High Yield Strength
Deformed (HYSD) Steel bars (Fe 500
grade as per IS 1786-1985) of 8mm to
40mm diameters, cutting, bending, to
required sizes and shapes placing in
position with cover blocks of approved
size and binding wire of 20SWG,
forming grills for reinforcement work
as per approved designs and
drawings including cost and
conveyance of bars from approved
sources to site of work, including cost
16 and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers,
dowels, wastage etc., and all
operational, incidental, and labour
charges such as cutting, bending,
placing in position tying etc., and sales
& other taxes,on cost of all materials
complete for finished item of work
(APSS No. 126)
TONS
Quantity Remarks
64.90
11.23
76.13
45.0864
45.09
76.13
5.41
0.94
9.60
1.80
3.15
61.53
5.41
0.94
6.34
7.51
7.51
11.72
11.72
9.6
1.8
11.40
13.11
13.11
8.08611
8.09
8.64156
8.64
75.144
75.14
64.68888
64.69
300.576
300.58
300.576
300.58
49.92
6.72
56.64
49.92
6.72
56.64
201.4
201.40
124.2214
124.22
132.7544
132.75
571.66
8
COMPOUND WALL
S.No Description of Work UNIT QUANTITY RATE
Earth work Excavation for
1 CUM 76.128 300
Footings
Earth work Excavation for CUM
2 45.09 300.00
CRS:-
Refilling with Excavated soil
3 CUM 61.53 200.00
for Footings
5 P.C.C. Bed FOR FOOTINGS CUM 6.34 5,500.00
6 P.C.C. Bed below Plinth Beam CUM 11.719 5500
7 P.C.C Below CRS Wall CUM 7.5144 5500
8 FOOTING CUM 11.4 8650
9 COLUMNS CUM 13.11 9,250.00
10 PLINTH BEAM CUM 8.09 8,650.00
11 BEAMS CUM 8.64 9,000.00
12 CRS WALL CUM 75.14 6,500.00
13 9" Brick work CUM 64.69 8,000.00
14 External Walls Plastering SQM 300.58 600.00
15 External Walls Painting SQM 300.58 175.00
16 Centring Work SQM 571.66 600.00
17 Reinforcement tons 8.00 95,000.00
TOTAL
Amount
22838.4
13525.92
12306.08
34892
64454.5
0
41329.2
98610
121267.5
69944.8515
77774.04
488436
517511.04
180345.6
52600.8
342993.48
760000
2898829.41