Compound wall-NORTH

The document provides a quantity sheet for compound wall construction. It includes 17 items with descriptions of work, units, quantities, rates and amounts. The total amount for all items is Rs. 28,98,829.41.

Uploaded by

Sitaram PREDCR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views8 pages

Compound wall-NORTH

The document provides a quantity sheet for compound wall construction. It includes 17 items with descriptions of work, units, quantities, rates and amounts. The total amount for all items is Rs. 28,98,829.41.

Uploaded by

Sitaram PREDCR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

COMPOUND WALL QUANTITY SHEET

S.NO Discription Unit NO's. Length Width Depth

1 Earth work Excavation for


Footings
HWALL CUM 32 1.3 1.3 1.2
HWALL CUM 4 1.8 1.3 1.2
TOTAL QTY CUM

2
Earth work Excavation for CRS:-
CUM 1 125.24 0.6 0.6
TOTAL QTY CUM

3 Refilling with Excavated soil for Footings


Footings earth work total Qty CUM
Deduction
PCC Bed for Footings
HWALL CUM 32 1.3 1.3 0.1
HWALL CUM 4 1.8 1.3 0.1
FOOTING
HWALL CUM 32 1 1 0.3
HWALL CUM 4 1.5 1 0.3
COLUMN
HWALL CUM 38 0.3 0.23 1.2
TOTAL QTY CUM

4 P.C.C. Bed FOR FOOTINGS


HWALL CUM 32 1.3 1.3 0.1
HWALL CUM 4 1.8 1.3 0.1
TOTAL QTY CUM

5 PCC BED FOR CRS WALL


CUM 1 125.24 0.6 0.1
TOTAL QTY CUM

6 P.C.C. Bed below Plinth Beam


CUM 1 117.19 0.38 0.1
TOTAL QTY CUM
7 FOOTING
HWALL CUM 32 1 1 0.3
HWALL CUM 4 1.5 1 0.3
TOTAL QTY CUM
8 COLUMN
HWALL CUM 38 0.3 0.23 5
TOTAL QTY CUM

9 PLINTH BEAM
HWALL CUM 1 117.19 0.23 0.3
TOTAL QTY CUM

10 BEAM
HWALL CUM 1 125.24 0.23 0.3
TOTAL QTY CUM

11 CRS WALL CUM 1 125.24 0.6 1


TOTAL QTY CUM

12 9" Brick work


HWALL CUM 1 117.19 2.4 0.23
TOTAL QTY CUM

13 External Walls Plastering


HWALL SQM 1 125.24 2.4
TOTAL QTY SQM

14 External Walls Painting


HWALL SQM 1 125.24 2.4
TOTAL QTY SQM

15 Centring Work
A BED CONCRETE
HWALL SQM 32 5.2 0.3
HWALL SQM 4 5.6 0.3
TOTAL QTY SQM

B FOOTING MAT
HWALL SQM 32 5.2 0.3
HWALL SQM 4 5.6 0.3
TOTAL QTY SQM

C Columns SQM 38 1.06 5


TOTAL QTY SQM

D Plinth Beams
HWALL SQM 1 117.19 1.06
TOTAL QTY SQM
E Floor Beams
HWALL SQM 1 125.24 1.06
TOTAL QTY SQM
TOTAL QTY

Providing High Yield Strength


Deformed (HYSD) Steel bars (Fe 500
grade as per IS 1786-1985) of 8mm to
40mm diameters, cutting, bending, to
required sizes and shapes placing in
position with cover blocks of approved
size and binding wire of 20SWG,
forming grills for reinforcement work
as per approved designs and
drawings including cost and
conveyance of bars from approved
sources to site of work, including cost
16 and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers,
dowels, wastage etc., and all
operational, incidental, and labour
charges such as cutting, bending,
placing in position tying etc., and sales
& other taxes,on cost of all materials
complete for finished item of work
(APSS No. 126)

TONS
Quantity Remarks

64.90
11.23
76.13

45.0864
45.09

76.13

5.41
0.94

9.60
1.80

3.15
61.53

5.41
0.94
6.34

7.51
7.51

11.72
11.72

9.6
1.8
11.40
13.11
13.11

8.08611
8.09

8.64156
8.64

75.144
75.14

64.68888
64.69

300.576
300.58

300.576
300.58

49.92
6.72
56.64

49.92
6.72
56.64

201.4
201.40
124.2214
124.22

132.7544
132.75
571.66

8
COMPOUND WALL

S.No Description of Work UNIT QUANTITY RATE


Earth work Excavation for
1 CUM 76.128 300
Footings

Earth work Excavation for CUM


2 45.09 300.00
CRS:-

Refilling with Excavated soil


3 CUM 61.53 200.00
for Footings

5 P.C.C. Bed FOR FOOTINGS CUM 6.34 5,500.00

6 P.C.C. Bed below Plinth Beam CUM 11.719 5500

7 P.C.C Below CRS Wall CUM 7.5144 5500

8 FOOTING CUM 11.4 8650

9 COLUMNS CUM 13.11 9,250.00

10 PLINTH BEAM CUM 8.09 8,650.00

11 BEAMS CUM 8.64 9,000.00

12 CRS WALL CUM 75.14 6,500.00

13 9" Brick work CUM 64.69 8,000.00

14 External Walls Plastering SQM 300.58 600.00

15 External Walls Painting SQM 300.58 175.00

16 Centring Work SQM 571.66 600.00

17 Reinforcement tons 8.00 95,000.00

TOTAL
Amount
22838.4

13525.92

12306.08

34892

64454.5
0
41329.2

98610

121267.5

69944.8515

77774.04

488436

517511.04

180345.6

52600.8

342993.48

760000

2898829.41